Performance Monitoring Report FY 2021-22, part 2

FY 2023-24Other documentsPages 101 to 184 of 184

The Performance Monitoring Report FY 2021-22 is part of the federal budget for FY 2023-24. This page reproduces the text of its 184 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.

Go to a page or part

This text was extracted automatically from the PDF's text layer. Tables may lose their column alignment, and a page with no text layer is marked rather than guessed. Check the official PDF before relying on any figure.

Page 101

                                                                   9 Projects met completion during  financial
                                                                             year 2021-22.
                                                                             Upscaling of PTV world.
                                                          PTV  Introduced  High-Definition  format  to
                                                                        Improve its screen resolution.
                                                                    Launched PTV Flix on OTT Platform.
                                                          PTV academy is converted into PTV Drama
                                                                   and Film Academy to promote film industry.
             Total                 11,071,683     11,903,437

     2.  Planned and delivered Key Performance Targets

Outputs             KPI’s Description  Planned      Delivered     Results/ Remarks and
                                       Target        Target      Reasons
Formulate and implement   Timeliness            in      100%         100%       Federal Advertisement policy for print,
policies, laws, rules and   documentation                                                    electronic,  digital and cinema was
regulatory    framework                                                                        finalized in Financial Year 2021-22.
concerning the print and
electronic media and the  Number              of        33             05        Concept   of  33  schemes  were
news agencies           development   project                                  endorsed and recommended by the
                         concepts     to    be                                       National Assembly during FY 2021-22.
                             realized          by                                  However, the ministry in collaboration
                       Development unit.                                             with      Planning     Commission,
                                                                                               rationalized the target to achieve the
                                                                                      best and remained focused on 5 only
                                                                         due to financial constraints.
                     Number of Monitoring        15             05         Regular desk monitoring as well as
                         Reports      to    be                                        physical monitoring of the projects was
                        produced         by                                         carried out where  it was essentially
                       Development unit.                                           required to ascertain actual progress
                                                                         and resolve pending issues.

To   disseminate   and   Timely  coverage   of      100%         100%      An  interactive  session/seminar  with
project Pakistan and  its   events  for  Pakistan's                                         foreign  media  was  organized  by
Government     abroad  image building                                               External Publicity Wing at Marriot Hotel
through.                                                                           Islamabad.
                                                                                    Extensive coverage  of national and
                                                                                                 international  visits  of the President,
                                                                              Prime  Minister as  well as  Foreign
                                                                                             Minister was carried out by the Ministry
                                                                                                 of Information and Broadcasting.
                                                                                      Organization of an interactive seminar
                                                                                           with  Press  Attaché/diplomats  with
                                                                                             foreign embassies based in Islamabad
                                                                                                 to exchange  views and  to  project
                                                                                                      efforts of Pakistan made for Afghan
                                                                          peace process by External Publicity at
                                                                                        the Pakistan Monument, Islamabad.

Page 102

To project, publicize and  Revenue  Recovered       425            270      PBC is facing acute shortage of sales
promote the activities and   by          PBC                                                  staff, presently only 12 sales personnel
policies       of      the   (Advertisement                                            are   working   against   the    total
Government of Pakistan.   Income)                                                  sanctioned strength. Due to obsolete
                                                                                                transmitters, the coverage area has
                                                                         been reduced and  the  clients  are
                                                                                             hesitant to release the business. Non-
                                                                                                   airing  of  programs  due  to  load
                                                                                shedding in the remote areas is also a
                                                                            cause of concern.
                          Pakistan    Television                            100% Target achieved.                                                12,987,000,000   14,771,000,000
                            corporation
                          Timely  coverage   of      100%         100%      The  ministry  issued  4508  press
                           important events and                                        releases,   covered   132    press
                           feeding  back  to  the                                    conferences   and   15    rebuttals/
                          Federal Minister.                                                     clarifications.
                     Number              of        15             15       100% Target achieved.
                         documentaries  to be
                        produced by DFP.
                     Number of Books to be        30             30       100% Target achieved.
                        produced         by
                            Directorate  of  Films
                       and Publications.
                     Number of Journals to        15             15       100% Target achieved.
                       be    produced    by
                            Directorate  of  Films
                       and Publications.
                          Timely   updating   of      100%         100%     100% Target achieved.
                            President's office and
                            Information       &
                          Broadcasting Website
                           regarding    important
                           events. (Percentage of
                          events  covered  on
                              time).
To promote research and  Government officers to        21             21       100% Target achieved.
provide training          be trained
                     Number of Journalists        80             80       100% Target achieved.
                         from Erstwhile FATA /
                   FANA to be trained (1
                      week         course
                        conducted biannually)
Censor   certificate   for  Number   of   censor       150            180      100% Target achieved.
exhibiting a foreign / local   certificate to be issued
film.                                -  Local and  Foreign
                          Films
To  regulate media and  Number of circulation       320            320      100% Target achieved.
nurture news  agencies   audits to be conducted
and news sources.        by  Audit  Bureau  of
                              Circulation.

Page 103

 Information Technology and Telecommunication Division
 PAO: Secretary
  Total Demands: Current 01 and development 01

      1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                                Rs. In ‘000
    Outputs           Office      Original Budget       Actual          Results/Remarks and
                                                   Expenditure            Reasons
Formulate policies,     Main Secretariat,        3,073,360             1,489,553        Pakistan’s first National Cyber security
regulations,         ECAC &                                                               policy was approved by Cabinet in July
legislations for the      Development                                            2021
growth of ICT sector    Wing                                                              Pakistan’s  cloud    first   policy  was
and Regulate e-                                                                  approved by Cabinet in Feb, 2022
commerce in                                                                                      In principle approval was granted by
Electronic Transaction                                                                 Cabinet  for Pakistan’s  first Personal
                                                                               Data protection Bill
                                                                                      Establishment of PKI infrastructure is in
                                                                                   process
Ensure facilitative       Pakistan               3,070,000             851,605          Internationally certified IT companies.
mechanism to          Software Export                                                    IT courses and certification offered to
accelerate the growth   Board                                                              IT Professionals and students,
of IT exports, services                                                                     Standardization of call center on
and products                                                                    ISO18295, ICT internship programme
                                                               PSEB member/registered IT
                                                                              companies (Per Year), Software
                                                                                      technology park, Increase in IT
                                                                                         remittance USD$ millions, IT Parks
                                                                                 Boot Camp, Industry Academia Bridge
                                                                              program
Provide technical       NITB &TIP              2,200,000             1,860,807        Capacity building training of Public
consultative support to                                                                  Sector personnel (Numbers)
public sector e                                                                             Provision of Technical assistance for
enablement projects                                                                      basic IT infrastructure to Federal
to ensure an effective                                                                            Ministries and attached Departments
and transparent e                                                                          Provision of baseline IT applications to
Governance                                                                           Federal ministries and attached
                                                                                  departments
                                                                              Deployment of Agency specific IT
                                                                                               applications
Enable the provision   SCO                   6,881,982             7,284,748      Number of Mobile Subscribers (GMS
of telecom and                                                                         Services Subscribers)
broadband                                                              Number of Telephone Connections
infrastructure to                                                                           subscribers
augment the supply                                                                Backhaul capacity (Number of
side of ICT ecosystem                                                               Channels)
Develop the human      Inter-Islamic            7,714,000
capital to utilize their    Network on
true potential for the     Information
uplift of the sector       Technology
Total                                    15,233,056         11,486,715

Page 104

     2.  Planned and delivered Key Performance Targets

Outputs              KPI’s Description      Planned      Delivered    Results/ Remarks and
                                             Target       Target      Reasons
Formulate policies,          Recruitment of manpower to        29            14      50% Target Achieved
regulations, and legislation   perform function under                                          Establishment of PKI
for the growth of ICT          electronic transactions                                                 infrastructure is in process.
sector (ECAC)             Ordinance (ETO) 2022
                              Registration of security             2             1       50% Target Achieved
                              auditors                                                            Registration of 2nd Security
                                                                                               Auditors is in process.
                         Develop and enforce new           7             7         Target Achieved
                              regulations to meet the
                           requirements of digital
                       economy (Number of
                              regulations)
Provide technical            Capacity building training of        2500          2500      100% Target achieved.
consultative support to       public sector personnel
public sector e             (Numbers)
enablement projects to
ensure an effective and
transparent e Governance
(NITB)
                             Provision of Technical             10            10      100% Target achieved.
                            assistance for basic IT
                                infrastructure to Federal
                               Ministries and attached
                         5Departments (Numbers)
                             Provision of baseline IT             5             5       100% Target achieved.
                              applications to Federal
                               Ministries and attached
                          departments (numbers)
                         Deployment of Agency             5             5       100% Target achieved.
                                specific IT applications
                          (numbers)
Ensure facilitative             Internationally certified IT           15            12      100% Target achieved.
mechanism to accelerate    companies
the growth of IT exports,
services and products
(PSEB)
                              IT courses and certification        3000          1700     50% Target Achieved
                              offered to IT professionals
                        and students
                            Standardization of call center        30            25        Achieved and 5 are in
                        on ISO18295                                                 process
                         ICT internship programme         600           538      100% Target achieved.
                    PSEB member/registered IT       4100          4329      100% Target achieved.
                         companies (Per Year)
                           Software technology park          26            27      100% Target achieved.
                           (Cumulative Number)
                            Increase in IT remittance          2.5 billion      2.615 billion   100% Target achieved.
                    USD$ millions                        dollars            dollars

Page 105

Operation and            Number of Telephone             51,000          51,000     100% Target achieved.
Maintenance of Fixed line    Connections
facilities to Govt
Dept/officials and Civil
people- AJ&K and GB
Provisioning and          Number of Mobile               1,000,000       1,000,000    100% Target achieved.
maintenance of Mobile       Subscribers (GMS Services
Communication facilities     Subscribers
to the people
Provisioning and          Number of subscribers            24,000          24,000     100% Target achieved.
maintenance of internet
and Data services to the
people
Enabling people to receive   Call duration in minutes per       700,000        700,000    100% Target achieved.
and send calls to foreign    month
countries
Maintenance of            Backhaul capacity                62,700          62,700     100% Target achieved.
Transmission network for    (Number of channels)
backhaul connectivity of
SCO network and
interconnection with other
operators

Inter-Provincial Coordination
PAO: Secretary
Total Demands: Current 01 and development 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                      Rs. In ‘000
      Outputs           Office        Original       Actual     Results/ Remarks and Reasons
                                 Budget    Expenditure
 Coordination among      Main Secretariat      436,181         289,467      Constitutional requirement of
 provinces through                                                             establishment of Separate CCI Secretariat
 implementation of uniform                                           was fulfilled within 4 months of the start of
 policies and resolution of                                                        the financial year. Now CCI Secretariat is
 disputes                                                                            functioning separately.

 Efficient veterinary activity Pakistan             18,669          18,648    98% targets achieved.
 (Animal Husbandry)       Veterinary
                         Medical
                          Council
                     (PVMC)
 Promotion of Sports       Pakistan            4,750,286        1,775,452     Targets/achievements are 4.4 times
 activities                 Sports                                               higher than the planned targets.
                        Board

 National Internship        National             54,548          32,592     No target was fixed for the financial year
 Program                   Internship                                     due  to  non-allocation  of  development
                      Programme                                         budget.
                          Section

Page 106

Development of Tourist    Tourist               26,546          25,664     81% targets achieved
Facilities and             Services
Establishment of Tourist   Departme
information Centers        nt

Land Administration       Federal Land         109,506         113,479    A total of 234 cases were filed, out of which
                      Commission                                   99 cases were decided. Thus 42% of the
                                                                                                     filed cases were decided.
          TOTAL                5,395,736     2,255,305

    2.  Planned and delivered Key Performance Target

Outputs          KPI’s Description   Planned Delivered Results/ Remarks and Reasons
                                     Target   Target

Coordination among   Council of Common         4         1      After hectic efforts of M/o IPC along outstanding issue
provinces through      Interests (No. of                                    of establishment of CCI Secretariat has been resolved
implementation of      meetings) (as per                          and the permanent Secretariat of CCI was
uniform policies and   mandate)                                       established on 03.11.2021(Annex-I) which was a
resolution of disputes                                                        constitutional requirement. Before its establishment,
                                                           one meeting on 06.09.2021 was held under M/o IPC.
                                                                   Since 03.11.2021, the newly established CCI
                                                                            Secretariat is responsible to conduct
                                                                    business/meetings of CCI.
Efficient veterinary     Registration of           1700      1473   PVMC has achieved maximum targets against the set
activity (Animal         Veterinary Doctors (No.                           targets during the FY 2021-22.
Husbandry)             of Doctors)
                     Issuance of Good          10        28
                      Standing Certificate
                        Registration of           2700      2055
                       Veterinary Medical
                      Students
                   Renewal of DVM/AH       300       758
                       Evaluation Visits to
                       Veterinary Institutes
                      Evaluation Visits to          6        10
                       Veterinary Institutes
                   (Number of visits)
                       Registration of Veterinary    60        95
                     Medical Faculty

                      Curriculum/Syllabus         1         0
                      Revision
                       M.Phil Registration         50       311
                PhD Registration           25        32
                      Council Executive          5
                   Committee Meetings

Page 107

                       Publishing of Public         6         4
                      Notices and Public
                   Awareness adds in
                       National Newspapers
                       Veterinary Institutions       3         2
                       accredited
                  MSc. Registration         100       83

Promotion of         Promotion and            10        54    38 Training Camps in different  phases were
Sports activities      Development of                                   established. 1171 players (Male, Female Coaches)
                      Sports activities (No.                           attended these camps.
                         of sports event)                             10main international events were participated by the
                                                                         Pakistani athletes.
                                                                     Apart from the National Championships, 06 different
                                                                        sports activities were organized at national level in
                                                                           collaboration with PSB.
                                                         The exposure of national and international events
                                                                          led to the players to show their unprecedented
                                                                performance at 22nd Commonwealth (UK) and 5th
                                                                          Islamic Solidarity Games (Turkiya) by winning 03
                                                                     Gold, 03 Silver and 04 Bronze medals.
National Internship    No. of interns (50,000       0         0    A total of 181,000 number of educated youths were
Program               internships per year                               trained up to 2018. The details of the program at
                          totaling                                      Annex-VI. However, due to non-provision of
                    150,000 interns in                              (development) funds, since 2019 no further activities
                   a span of three years)                        were carried out. In order to revive the program and
                                                                               to provide opportunities to fresh graduates, the work
                                                                               to prepare new PC-I has been initiated. Presently the
                                                                  PC-I is under process for its approval.
Development of        Registration of            169       138    Maximum targets for registration of establishments (travel
tourist facilities &     Tourism                                           agencies, tourist guide, hotels and restaurants) were
establishment of      Establishment                                    achieved. However, due to Covid-19, the registration of
tourist information     (Numbers)                                        establishments was declined.
centers                                                                  Furthermore, the process of amendments in the Pakistan
                                                                          Hotels and Restaurants Act, 1976, Travel Agencies Act,
                                                              1976 and Pakistan Tourist Guides Act, 1976 have been
                                                                                                 initiated. Website of Department of Tourist Services have
                                                              been prepared and launched (www.dts.gov.pk).

Page 108

Interior Division
PAO: Secretary
Total Demands: Current 01 and development 01

      1. Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                     Rs. In ‘000
    Outputs          Office           Original           Actual         Results/Remarks and
                                 Budget         Expenditure           Reasons
  Administrative       Main Division            1,532,435             1,307,181       Budget was effectively used  for
 services                                                                                     operational/Administrative
                                                                                      requirements of MOI which has
                                                                                             contributed   in  making  various
                                                                                                         policies/ rules and other measures
                                                                                                            in order  to achieve    peaceful
                                                                                    environment    in   the   country
                                                                                       through           deradicalization,
                                                                                          countering  terrorism,  extremism
                                                                            and Counter terrorism financing.
                                                                                        Pakistan Arms Rules 2021 and
                                                                                    2022, Establishment of National
                                                                                               action     Plan      Secretariat.
                                                                                       Establishment  of Naional  Crisis
                                                                                            Information  Management   Cell.
                                                                                        Foreigner  National  Security  cell
                                                                            and many other milestones were
                                                                                    achieved
 Peace keeping       Main Division                        -                 825,467        Budget was  granted for one (01)
 missions                                                                             Mission abroad and the same was
                                                                             expended to achieve the target.
  Policing services      Police                 10,421,944            12,253,866        Current and Development Budget
                     Department                                            was  successfully  expended  to
                                                                 498,510,700       improve    the    law-and-order
                                                                                                      situation  in the Federal Capital.
                                                                                       Establishment      of     Ladies
                                                                                    Complaint  units,  Renovation  of
                                                                                             Police   stations  and   effective
                                                                                                   policing resulted  in reduction  in
                                                                                              registered crimes.
 Pre-service and in-    National Police         192,144,000           245,926,826      Budget allocated was effectively
  service training of    Academy                                                                     utilized to impart training to Police
  security personnel                                                157,000,000        Officers, organizing MCMC and
                                                                                    courses   of  ACs   of  Custom
                                                                                Department   were   conducted
                                                                                           during 2021-22.
  Policing               National Police         55,912,000            63,633,430       Issuance   of  Police  Character
 enhancement        Bureau                                                                    Certificate  and   other   import
                                                                                                                 activities.
 Law enforcement      National Public         33,548,000            33,994,461       Processing of complaints against
 monitoring            Safety                                                          Federal   Law    Enforcement
                    Commission                                                   agencies and their redressal.

Page 109

Prison                National               848,343,000           43,548,093       Budget allocated was effectively
administration       Academy for                                                                  utilized to train adequate number
                       prison                                                                    of persons being nominated from
                       Administration                                                                                 jail staff. Rs. 800.00 million was
                                                                                         not utilized due to revision of PC-I
                                                                                                           for the  project  " Constrution  of
                                                                            Model Jail" at H-16, Islamabad.
Public Welfare        Chief                13,792,384,000         1,382,949,075      Budget allocated  was effectively
(ICT)                commissioner                                             expended  on  various   District
                          office                                                               Administration Offices and targets                                                                 3,242,407,276
                                                                            were achieved successfully and
                                                                                        peaceful    environment   was
                                                                                     ensured.  Furthermore, collection
                                                                                                   of revenue by D.C.  Office to the
                                                                                     tune of Rs.566.000 million against
                                                                                         the target of Rs. 415.00 million,
                                                                                                   collection of Rs. 1305.00 million
                                                                                          against the target of Rs.1285.00
                                                                                                      million by Industries and Mineral
                                                                                   Department,    Registration    of
                                                                          373383 vehicles against the target
                                                                                                   of 106050 vehicles by ETO.
Agriculture and        Agriculture and         121,524,000           54,757,384      The  rights of Rawal Dam have
livestock (ICT)         livestock                                                 been auctioned so therefore; fish
                    Department (ICT)                                                  production will increase once the                                                                 96,172,397
                                                                                        Fish Seed hatchery  is completed.
Security of border     Pakistan               15,113,257            15,584,915       Budget was  utilized  in  effective
adjacent to Sindh     Rangers (Sindh)                                                 border management and keeping
(Rangers)                                                        563,000        peace  in the Province of Sindh
                                                                                     through  Internal  Security  duties
                                                                                    assignments.
Coast guards         Pakistan Coast          2,353,330             3,432,777     PCG is deployed over 1000 km of
                   Guards                                                     Coast    line    of   Sindh   and
                                                                                        Baluchistan    and        it    has
                                                                                            successfully controlled Narcotics
                                                                          and Contraband items and taken
                                                                                             action against illegal immigrants.
Security of border      Frontier Corps,         43,124,637            48,868,945     HQFC (North) is deployed in far
adjacent to            Baluchistan                                                            flung areas  of Balochistan and
Baluchistan                                                                  manning   2100   Kms    long
                                                                   1,109,398(Frontier Corps)                                                                                  international     border      with
                                                                                         Afghanistan.         Managed
                                                                                              operational/administrative
                                                                                     requirement of the Force deployed
                                                                           on   international   border  and
                                                                                                   Internal   Security   Duties    in
                                                                                          challenging    areas    of   FC
                                                                                        Balochistan   (Zhob,   Chaman,
                                                                                          Nushki,Sui,   Dera   Bugti/Kohlu
                                                                                    Agency).   Effectively  performed
                                                                                         anti-smuggling duties.
Security of border      Frontier                12,183,301            13,166,921         Effective deployed 142  Platoon
adjacent to KP        Constabulary                                                         with     Pak.Army,      Frontier

Page 110

(Frontier                                                           49,625          Corps,KP(North)(South)         in
Constabulary)                                                                              operational areas. In the line of
                                                                                        duty  08   personnel  embraed
                                                                              martyrdom and 16  got  injurred
                                                                                         during    the   year   2021-22.
                                                                              Deployment of 23 platoons with
                                                              KP   Police.   Deployment    for
                                                                               maintenance of public peace and
                                                                                                security duties during Muharram.
                                                                                Guarding   CPEC     Projects.
                                                                                           Provision  of  security  to MNCs,
                                                                 HPPs and NHA project throughout
                                                                                         the country. Security of Diplomatic
                                                                                         Missions.    Protecting     Juicial
                                                                         Complex and Jail in KP, Sindh and
                                                                                                             Gilgit Baltistan.
Security of border      Frontier Corps,         52,577,767            58,268,121        Frontier Corps, KP has improved
adjacent to KP      KP                                                                the law-and-order situation in KPK
(Frontier Corps.KP)                                                           and merged  Districts  of FATA.
                                                                   3,146,999                                                                               Smuggling  activities have been
                                                                                        considerably reduced. Conduction
                                                                                                   of Police training for newly merged
                                                                                                                 districts. Construction of Shilman
                                                                                     Wall  at  Pak-Afghan  Border  in
                                                                               Khyber  District,  Dir  Uper  and
                                                                                 performance of IS duties.
 Security of border     Gilgit Baltistan           2,504,012             2,408,937        Keeping law and order situation in
  adjacent to Gilgit    Scouts                                                        area of responsibility. Provision of
 Baltistan (Scouts)                                                                             security to Basha Dam and control
                                                                 14,348,166        over smuggling.
Security of border     Pakistan               13,705,390            14,348,166         Effectively  guarded  1300  km
adjacent to Punjab    Rangers Punjab                                                 border along with India including
(Rangers)                                                                  193  x km  Working  Boundary.
                                                                                                    Effectively managed  operational
                                                                                                /administrative  requirements  of
                                                                                         the  force deployed on Working
                                                                                  Boundary,  International  Border,
                                                                                                   Internal  Security  duties and on
                                                            CPEC Projects. 598 x suspects
                                                                                        apprehended/killed   in  Radd-ul-
                                                                                 Fassad.
Civil Defense            Civil Defence            273,751              243,224          Training  was  given  to  14813
training                                                                           persons  against  the  target  of
                                                                          18000 persons. This performance
                                                                      was achieved despite Covid-19.
Investigation          Federal                 5,754,754             5,972,347        FIA has conducted inquires and
Services               Investigation                                                    converted the inquiries into cases
                   Agency                                      522,285        and has  achieved  the  targets.
                                                                                  Moreover, recoveries have also
                                                                          been increased due to increased
                                                                             emphasis   on    Anti   Money
                                                                                    Laundering/Hundi  and  Hawala
                                                                               cases due to FATF targets during
                                                                 FY 2021-22.

Page 111

  Cyber crime          Federal                 863,036              252,030        FIA has  successfully recovered
                          Investigation                                                  Rs.3783.9   million  against  the                                                                  708,769
                    Agency                                                                 target of Rs. 1187.3 million from
                                                                                           offenders   of  Economic  and
                                                                                      Corporate Crime.
  Forensic sciences     National Police           85,133               406,902         Establishment             and
                     Bureau                                                                operationalization   of   National
                                                                                        Forensics Science Agency at H-II,
                                                                                       Islamabad.
  Pre-serving and in-    Federal                  61,965                82,375         FIA  Academy  has   imparted
  service training of      Investigation                                                              training to 1135 persons against
  federal investigation   Agency                                                            the target of 700 persons. Due to
  agents                                                                        heavy  recruitment, the  trainings
                                                                                   conducted  are  more  than  the
                                                                                                        target.
  Immigration and       Immigration &           4,452,894             4,828,604      IMPASS   has   improved     its
  passport services     Passport                                                        passport processing time and is                                                                  682,813
                                                                                               issuing urgent passport  in  four
                                                                                days and ordinary passport in 10
                                                                                days as per assigned target.

  Urban Development   Capital                 3,780,346             3,708,880      CDA has  effectively  utilized the
  and repair,          Development                                                 budget  allotted  for  repair  and
  maintenance and      Authority                                                    maintenance  of  Govt.  buildings
  security of                                                                  and houses as per their assigned
                                                                     2,111,940  government                                                                     mandate.
  Buildings
               Total               184,094,715,000   201,282,764,925

    2.  Planned and delivered Key Performance Targets

     Outputs          KPI’s Description    Planned   Delivered      Results/ Remarks and
                                             Target     Target           Reasons
Peace keeping missions    Missions abroad (number of       1           1        Target achieved.
                            missions)
Policing services         Number of complaints to be      5560        1372      Less Complaints were received
                           received                                                    during the year 2021-22 and due to
                                                                                                  effective policing, the same were
                                                                                      redressed.
                         No. of accused / arrested       13800       28419     100% Target achieved.

                         Percentage decrease in        23.5%    35841(102%)  100% Target achieved.
                             registered crimes
                         No. of vehicles recovered by      400         224       Target partially achieved.
                               anti-car lifting cell
                         No. of police stations to be        7           5       5 units Renovated and (02) units
                          renovated                                                             partially renovated.
                      Number of challans issued      757451      971105    100% Target achieved.
                               to Traffic violators.
                      Number of ladies complaints       2           6      100% Target achieved.
                               units to be established in
                              police stations

Page 112

Pre-service  and   in-     Number of ASPs to be           44          42        Target almost achieved.
service   training   of      trained in national
security personnel           police academy
                      Number of police officers to      250         412     100% Target achieved.
                       be trained in short courses
Policing enhancement       Police clearance certificate      102000       25000      Less people applied.
                         (Numbers)
Law    enforcement       Complaints to be received        70          50       Less complaints received.
monitoring                  against federal law
                         enforcement agencies
                      Number of persons to be         110          96        Target almost achieved.
Prison administration        trained from jail staff
Public welfare           Number of registrations          730         164       Target not achieved due to shifting
                               to be done                                                       of most of the factories to Hattar
                             (factories/shops)                                                  Industrial Estate, Haripur. Mover
                                                                         due to Covid-19 the activities are
                                                                                    reduced.
                      Revenue to be collected by       415         566     100% Target achieved.
                  DC Office (Rs. In Millions)
                      Number of Audit,               140         140     100% Target achieved.
                            Inspections and
                              Inquiries to be
                          undertaken by
                          Cooperative Society
                          Department.
                      Revenue to be collected         1285        1305     100% Target achieved.
                        by Industries and Mineral
                        Development through
                             Registration fee of firms,
                               societies, royalty &
                           excise duty and
                           limestone minerals (Rs in
                               Millions)
                        Taxes to be collected            7.376        13.000    100% Target achieved.
                        by Excise and
                           Taxation department
                            (Rs. in Million)
                      Number of                   36116       37245     100% Target achieved.
                               registration
                             (Birth/Death) in
                         Twelve Union Council
                               of ICT rural area).
                      Number of cases dealt          750         750     100% Target achieved.
                        by district attorney
                            (Legal opinion, Police,
                           Courts)
                      Number of Licenses (food        730         577       Less applications were received.
                               grain/ Sugar) to be
                          Issued / Renewed.
                      Number of Vehicles           106050      373383    100% Target achieved.
                           registered/owners hip                                                                 .
                             transferred by Excise &
                           Taxation

Page 113

 Agriculture and             Fish production               240000       30000      Target has not been achieved due
  livestock (ICT)                                                                                  to the fact that rights of Rawal Dam
                                                                             has been auctioned. The Fish seed
                                                                                      hatchery is under process and civil
                                                                               works to be completed in 2023
                       Number of vaccinations         6500        6250       Target almost achieved.
                               (Livestock) to be given
 Security of border        Number of units (Rangers        34          34      100% Target achieved.
 adjacent to Sindh           Sindh)
 (Rangers)
 Coast Guards           Number of units (Pakistan        13          13      100% Target achieved.
                          Coast Guards)
Security of border         Number of Units               134         128       Target achieved. However,
 adjacent to                   of FC Balochistan                                           transformation plan is under
 Baluchistan (Frontier                                                               process under which revised target
 Corps)                                                                                                         is to be given.
 Civil Defence training      Number of persons to be        18000       14813      Target almost achieved. However,
                               trained in civil defence and                             due to law-and-order situation and
                     Bomb Disposal                                          Covid-19 the training figures is a
                           (Male/Female)                                                                        little less as compared to originl
                                                                                                     target.
 Security of border        Number of units - Frontier        17          17      100% Target achieved.
 adjacent to KP (Frontier     Constabulary KP
 Constabulary)
 Security of border        Number of units - Frontier        119         109     100% Target achieved.
 adjacent to KP (Frontier     corps KP
 Corps, KP)
 Security of border        Number of units Gilgit            4           4      100% Target achieved.
 adjacent to Gilgit             Baltistan Scouts
 Baltistan (Scouts)
 Security of border        Number of units - Pakistan        29          29      100% Target achieved.
 adjacent to Punjab         Rangers Punjab
 (Rangers)
 Fire protection (ICT)       Number of inspections to be      1800        1800     100% Target achieved.
                           undertaken of firefighting
                          equipment
 Investigation services      Number of inquiries to be        13,750       10,081    100% Target achieved.
                          conducted
                       Number of inquiries to be        4943        2483
                            converted into cases
                         Economic and corporate       1,187.368     3,783.919
                            crime recoveries from
                             offenders (Rs in Millions)
 Pre-services and in-       Number of training courses       50          69      100% Target achieved.
 services training of           to be conducted
 federal investigation       Number of persons to be         700         1135
 agents                       trained (FIA)
 Immigration and passport   Time taken to issue a            4           4      100% Target achieved.
 services                   passport urgent (number of
                            days)
                        Time taken to issue a            10          10      100% Target achieved.
                             passport-ordinary (number of
                            days)

Page 114

National Counter Terrorism Authority
PAO: Secretary
Total Demands: Current 01

    1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                             Rs. In ‘000
         Outputs               Office        Original       Actual     Results/Remarks and Reasons
                                       Budget    Expenditure
 Countering of Terrorism, Violent     National             262,908         268,350     10% increase in pay and allowances,
 Extremism and Financing          Counter                                44% increase in hiring ceiling and rise
 Terrorism                         Terrorism                                                      in prices of electricity and POL etc.
                                       Authority
 TOTAL                                                262,908         268,350

    2.  Planned and delivered Key Performance Targets

          Outputs              KPI’s Description    Planned     Delivered  Results/Remarks and
                                                      Target       Target        Reasons
Formulation, Institutionalization, and     No of policies                01            01       100% Target achieved.
implementation of CVE policy 2021
National Risk Assessment on Terrorist       NRA-Document           01            01       100% Target achieved.
financing
Outreach on understanding of TF Risk    Number of sessions           08            08       100% Target achieved.
Capacity enhancement in LEAs/CTDs      Training of LEAs,             07            07       100% Target achieved.
and Robust Implementation of Pakistan    prosecution and
Action to Counter Terrorism (PACT)         judiciary
Project
NACTA Interactive Capacity Building       Interactive sessions           10            15       100% Target achieved.
Session on TF in all Provinces
TF Investigation and Prosecution by       Meetings hosted             10            17       100% Target achieved.
LEAs
Review/formulation of laws/ Policies       Revision of National          02            02       100% Target achieved.
                                          Action Plan,
                                         Formulation of Policy
                                   on countering violent
                                      extremism (CVE
Revised NAP Portal 2021                Launching of web-            01            01       100% Target achieved.
                                               portal for R-NAP 2021
Maintenance of list of individuals on        Addition and deletion          01            01       100% Target achieved.
fourth Schedule                         from the list of            2004-persons       2004-
                                          proscribed persons on                       persons
                                            regular basis
Verification of applicants for Neya        To verify all applicants            (1)                (1)       100% Target achieved.
Pakistan Housing Scheme from           from the available      To verify all        A total
NACTA’s Portal for Proscribed Persons    database of              applicants for      number of
                                         Proscribed Persons      the scheme as       58,978
                                                                  received withing     (100%)
                                                                 given time           applicants
                                                                  frame.           were verified

Page 115

          Outputs              KPI’s Description    Planned     Delivered  Results/Remarks and
                                                      Target       Target        Reasons
                                                                                 from list of
                                                                                    Proscribed
                                                                              Persons
                                                                                              within given
                                                                                     time frame
Monthly Intelligence coordination         No. of conferences      On required     3x ICC held    100% Target achieved.
conference (ICC)                                                        basis
Quarterly Threat Assessment            No. of Quarterly              2             2        100% Target achieved.
                                            threats assessment
                                        issued
Bi-Annual Threat Assessment            No. of Bi-annual              02            01                 1
                                            threats assessment
                                        issued
Annual Report                         No. of Annual reports         01            01      100% Target achieved.
                                        issued
Essay competition to engage youth       No. of competition held        01            01       100% Target achieved.
Awareness sessions on Counter          No. of session               02            02       100% Target achieved.
extremism                             conducted
Social Media campaigns                 No. of campaigns held         02            02       100% Target achieved.
Outreach campaign on peace and        No. of campaigns held         02            02       100% Target achieved.
tolerance through SMS
Radio Programme on CE                No. of Programme        72 programs    72 programs    100% Target achieved.
                                         held
Youth engagement activities             No. of engagement           02            02       100% Target achieved.
                                      conducted
Poster Competition                     No. of competition held        01            01       100% Target achieved.
Slogan writing competitions              No. of competition held        01            01       100% Target achieved.
National Photography contests on CE     No. of contests              01            01       100% Target achieved.
Themes                                arranged
Display of message on CE at Public       No. of messages             06            06       100% Target achieved.
places                                   displayed
Shout out message on CE               No. of messages             12            12       100% Target achieved.
                                        disseminated
Publication of Pakistan Journal of         No. of PJTR                 02            02       100% Target achieved.
Terrorism Research (PJTR) a NACTA’s    Publication
Bi-annual journal (Jan-June) July-Dec)
Policy Review                          Annual Review 2021          01            01       100% Target achieved.
Review of the implementation of
National Action Plan (Annual)
Policy Review                              Bi Annual review 2022         01            01       100% Target achieved.
Review of the implementation of
Revised National Action Plan (Bi-
Annual)
Liaising with international entities for      Number of inputs for              (1)                (1)       100% Target achieved.
facilitating cooperation in areas relating   MoFA on matters       To provide input       Inputs
to terrorism and extremism                 related to RATS-SCO         to MoFA       provided to
                                                              as/when     MoFA for the
                                                                        required          quarterly
                                                                               meetings of
                                                                                      the Group of
                                                                                     Legal

Page 116

          Outputs              KPI’s Description    Planned     Delivered  Results/Remarks and
                                                      Target       Target        Reasons
                                                                                     Experts
                                                                             (GLE) of
                                                                  RATS-SCO,
                                                                         and for all
                                                                                        other related
                                                                                          matters.
Action on FATF on site preparation        Coordination &               20            40       100% Target achieved.
                                          monitoring sessions
NACTA-Objectives for Identification of     Guidelines issued            01            01       100% Target achieved.
associates on Money-Laundering /Terror
Financing
Implementation of support to Pakistan      Training sessions            08            08       100% Target achieved.
Action to Counter Terrorism (PACT)
program

Kashmir Affairs and Gilgit Baltistan Division
PAO: Secretary
Total Demands: Current 03 and development 03

    1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                             Rs. In ‘000
      Output            Office       Original Budget      Actual         Results / Remarks and
                                                    Expenditure           Reasons
 Administration of the    Main Secretariat          625,000             851,082      Observance of the following days:
  ministry and support                                                                         “Right    of   Self-determination    for
  political stability of                                                                    Kashmiri People” (5th January).
 Kashmir and Gilgit                                                                  “Kashmir Solidarity Day” (5th February).
  Baltistan                                                                                                “Military  Siege”   in  Indian   Illegally
                                                                               Occupied Jammu and Kashmir”  (5th
                                                                                          August).
                                                                                Kashmir Black Day” (27th October)
 Refugees’             Refugees                244,000             243,041      7734 families from Indian Occupied
 management services   Management Cell                                          Kashmir (IOK) residing in the different
                                                                                              parts of AJ&K State were targeted for
                                                                                maintenance and support.
 Communication         Planning and             6,505,110            2,000,000      AJK:- Project planning, execution and
  infrastructure            Monitoring Cell                                                  monitoring  is done by Planning and
 improvement services                     AJK (103,200)                       Development     Division,    Finance
  - roads and bridges                            GB:(5,472,181)                            Division  and  AJ&K  Government.
                                                                         Hence information does not pertain to
                                                                                                 Ministry of KA&GB.
                                                                             GB:- Originally funds to the tune of
                                                                                    Rs. 5472.181 million were allocated
                                                                                                            for 05 projects and funds amounting to
                                                                                    Rs. 2428.18 million were surrendered
                                                                           and 3044.000 million were released.
                                                                     Due to inclusion of 04 new projects,
                                                                                           bidding process was not carried out by

Page 117

                                                                                         the Project Directors. Due to seasonal
                                                                                              constraints utilization remained low
Improvement in hydel    Planning and            10,850,000           2,195,000      AJK:- Project planning, execution and
power - AJK & GB       Monitoring Cell                                                  monitoring  is done by Planning and
                                     AJK :(900,000)                       Development     Division,    Finance
                                              GB:-(9,950,000)                           Division  and  AJ&K  Government.
                                                                       Hence information does not pertain to
                                                                                                Ministry of KA&GB.
                                                                            GB:- Funds to the tune of Rs. 9950.00
                                                                                                      million were allocated originally for 05
                                                                                                  projects. However, funds amounting to
                                                                                   Rs. 4655.00 million were surrendered.
                                                                                       Against the revised allocation, funds
                                                                               amounting to Rs. 5295.00 million were
                                                                                          released. Two projects
                                                                                                                                                                     i. “20 MW HPP Hanzil” and ii. “04 MW
                                                             HPP Thack Chillas” were awarded to
                                                                                         the lowest bidders who have mobilized
                                                                          on site. After finalizing the bidding
                                                                                       process, revised PC-Is based on
                                                                                       lowest bid cost in favor of two projects
                                                                                                                                           (i) 26 MW Shagarthang HPP Skardu
                                                                          and (ii) Establishment of Regional
                                                                                      Grids in GB were forwarded to
                                                                                     Planning Commission for approval of
                                                                                         the competent forum. Due to seasonal
                                                                                              constraints and snow on project area,
                                                                                        geotechnical investigation was
                                                                                   delayed for project 30 MW HPP
                                                                                  Ghowari. Hence utilization remained
                                                                                             low.
Provision of food       Main Secretariat          8,000,000
subsidies (wheat, salt
etc.)
Provision of social,      Planning and           103,360,000                        AJK:- Project planning, execution and
infrastructure, and       Monitoring Cell                                                  monitoring  is done by Planning and
other services (lump)                                                           Development     Division,    Finance
in Azad Jammu and                                                                          Division  and  AJ&K  Government.
Kashmir                                                                 Hence information does not pertain to
                                                                                                Ministry of KA&GB.

Provision of social,      Planning and            65,000,000            749,000,        Project   planning,   execution  and
infrastructure, and       Monitoring Cell                                                  monitoring  is done by Planning and
other services (lump)                        AJK: - (600,000)                      Development     Division,    Finance
in Gilgit Baltistan                              GB:(3,997,819)                            Division  and  AJ&K  Government.
                                                                       Hence information does not pertain to
                                                                                                Ministry of KA&GB.

Social services (e.g.     Planning and              4,619,819            21,846       AJK:- Project planning, execution and
health, education,       Monitoring Cell                                                  monitoring  is done by Planning and
population welfare                           AJK: (600,000)                       Development     Division,    Finance
services) - AJK and                            GB:(3,997,819)                            Division  and  AJ&K  Government.
GB                                                                     Hence information does not pertain to
                                                                                                Ministry of KA&GB.

Page 118

                                                                            GB:- Allocation was revised to Rs.
                                                                               2150.264 million from original
                                                                                                  allocation of Rs. 3997.819 million.
                                                                          Funds amounting to Rs. 1847.555
                                                                                                      million were surrendered. Due to
                                                                                       Covid-19, snow fall in Skardu and
                                                                                          closure of Gilgit-Skardu road, work on
                                                                                         the project “Establishment of 250
                                                                        Bedded Hospital, Skardu” was not
                                                                                              carried out as per planned work plan.
                                                                                Revised PC-I of the project
                                                                                       “Establishment of 50 Bedded Cardiac
                                                                                                Hospital, Gilgit” was forwarded to
                                                                                     Planning Commission on 1st April,
                                                                                  2021, however CDWP approved
                                                                                                project on 10th January, 2022 due to
                                                                                 which bidding of Bio Medical
                                                                              Equipment was delayed. 97% of civil
                                                                              work has already been completed on
                                                                                         the project. Govt. of GB has not
                                                                                                     finalized site for “Establishment of
                                                                                    Medical and Nursing College” at Gilgit,
                                                                            hence no work has been initiated. The
                                                                                                factors mentioned above lead to less
                                                                                                             utilization of released funds.
Water, Sanitation and    Planning and              1,206,974                        AJK:- Project planning, execution and
Sewerage               Monitoring Cell                                                  monitoring  is done by Planning and
infrastructure                                  AJK:-(706,974)                       Development     Division,    Finance
development in AJK                       GB: - (500,000)                            Division  and  AJ&K  Government.
and GB                                                                  Hence information does not pertain to
                                                                                                Ministry of KA&GB.
                                                                            GB:- Rs. 500.00 million were originally
                                                                                                allocated, however Rs. 250.00 million
                                                                            were released and Rs. 250.00 million
                                                                            were surrendered. Bidding for the
                                                                                                project “Sewerage and Sanitation
                                                                          System for Gilgit City” was carried out
                                                                          and revised PC-I was forwarded to the
                                                                                     Planning Commission on the lowest
                                                                                             bid cost on 26th October, 2022. PC-I is
                                                                                                                                               still awaiting approval of the CDWP.
                                                                              Less utilization is due to long bidding
                                                                                  process and grievances submitted by
                                                                                         the aggrieved bidders.

      Total                          200,410,903       1,115,969

Page 119

     2.  Planned and delivered Key performance targets

Outputs                    KPI’s Description        Planned   Delivered   Results/ Remarks
                                                    Target     Target     and Reasons
Administration of the ministry and  Number of departments             4           4      100% Target
support political stability of Gilgit   administered under GB Council                                achieved.
Baltistan
Refugees’ management services   Maintenance of refugees           7405        7734      7734   families   from
                               coming from IOK (number of                                     Indian      Occupied
                                        families)                                                 Kashmir (IOK) residing
                                                                                                                      in the different parts of
                                                                         AJ&K   State   were
                                                                                                   targeted              for
                                                                                        maintenance     and
                                                                                                support
Communication infrastructure      Number of roads and bridges         2                    AJK:-          Project
improvement services - roads       projects to be completed in AJK                                  planning,    execution
and bridges                                                                         and monitoring is done
                                                                                       by    Planning   and
                                                                                     Development Division,
                                                                                          Finance  Division and
                                                                         AJ&K    Government.
                                                                               Hence     information
                                                                                    does  not  pertain  to
                                                                                                          Ministry of KA&GB.

                            Number of roads and bridges         2                 One  project  namely
                                      projects to be completed in GB                                 “Up-gradation of Road
                                                                                           from  RCC   Bridge
                                                                                 Konodas   to   Naltar
                                                                                                          Airforce   Base   Via
                                                                                     Nomal” was  planned
                                                                                                                     for        completion,
                                                                                     however desired funds
                                                                                    were not released. Rs.
                                                                                         700.00   million  was
                                                                                                   required   over   and
                                                                                    above allocated funds
                                                                                                  but cut was imposed
                                                                                  on original allocation in
                                                                                                           fourth          quarter,
                                                                                                          therefore, project was
                                                                                                  not completed during
                                                                                                   the year.
Improvement in hydel power - AJK  Number of Hydel projects to be       1                    AJK:-          Project
& GB                           completed in AJK                                               planning,    execution
                                                                                  and monitoring is done
                                                                                       by    Planning   and
                                                                                     Development Division,
                                                                                          Finance  Division and
                                                                         AJ&K    Government.
                                                                               Hence     information

Page 120

                                                                                    does  not  pertain  to
                                                                                                          Ministry of KA&GB

                            Number of Hydel projects to be       6                    06    Projects   were
                                completed in GB                                           planned to be initiated
                                                                                                  during  the  year and
                                                                                                        targets  achieved. No
                                                                                                        projects were planned
                                                                                                                      for completion during
                                                                                                   the year
                               Development of regional grid         1                        Project   initiated  and
                                       station (number)                                                bidding  process  has
                                                                                  been finalized
Provision of food subsidies          Maintain subsidy on scale of       150,000
(wheat)                         wheat for Gilgit Baltistan (in
                                    metric tons)
Water, sanitation and sewerage    Number of water supply and          1                    AJK:-          Project
infrastructure development in       sewerage schemes to be                                        planning,    execution
AJK-GB                         executed in AJK                                       and monitoring is done
                                                                                       by    Planning   and
                                                                                     Development Division,
                                                                                          Finance  Division and
                                                                         AJ&K    Government.
                                                                               Hence     information
                                                                                    does  not  pertain  to
                                                                                                          Ministry of KA&GB.

                            Number of water supply and          3           1        Only one project was
                              sewerage schemes to be                                       included in PSDP and
                                executed in GB                                                 bidding was finalized
Social services (e.g. health,       Number of hospitals to be            6           03       03    projects   were
education, population welfare       constructed in GB                                              included in PSDP and
services) - AJK and GB                                                                02   were   ongoing.
                                                                                           Consultancy for 3rd has
                                                                                  been hired
                            Number of technical education        1                        Project     is    under
                                           institute to be constructed in                                   implementation and is
                       GB                                                       planned      to    be
                                                                                         completed  by  June,
                                                                                  2023 as per approved
                                                                                                    PC-I.

Page 121

Law and Justice Division
PAO: Secretary
Total Demands: Current 02 and development 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                      Rs. In ‘000
        Output                 Office           Original         Actual      Results / Remarks and
                                         Budget      Expenditure        Reasons
Advocacy and representation     Attorney General           866,063          868,333
of government in law suits           for Pakistan
Legal  advisory  to  government  Main Ministry             1,481,487          609,286      30 newly established
entities admin support services                                                                     Accountability Courts
and vetting of draft of law before
presentation to parliament.

Promotion of Alternate dispute   Income tax               444,491           640.314
resolution system in income tax   Appellate Tribunal
conflicts
Provision    of    justice    to    Main Ministry              927,015          1,084,155
appellants regarding banking,
foreign    exchange    and
insurance matters
Promotion of                   Main Ministry              175,070          236,210
Alternate   dispute   resolution
system  in Customs, Excise &
Sales Tax Conflicts
Provision of justice to appellants   Main Ministry             1,627,874          2,279,352
on        specified       areas
(Accountability,  service maters
of  federal  govt.  employees,
Environment          protection,
Narcotics control)

Infrastructure development and   Development Wing        6,027,351          2,360,357      Planning Commission has
legislative,                 judicial,                                                                  revised allocation to Rs.
administrative reforms services                                                           2360.357 million has been
for judiciary                                                                                                       utilized and Rs. 385.912
                                                                                                                million surrendered and Rs.
                                                                                          0.319 million has been lapsed
                  Total                        11,549,351      8,078,007

     2.  Planned and delivered Key performance targets

Outputs            KPI’s Description       Planned     Delivered     Results/ Remarks
                                            Target       Target      and Reasons
Advocacy and            Attorney General / Deputy      50            50           100% Target achieved.
representation of          Attorney General Offices
government in law suits   (numbers)

Page 122

                          Assistant Attorney General     97            97           100% Target achieved
                           Offices (Numbers)
                  New cases file for hearing       34,500         38,820        100% Target achieved
                       (numbers)
Promotion of           Income Tax                 20            20           100% Target achieved.
Alternate dispute          Appellate Tribunals
resolution system        (numbers)
in income tax          New cases file for             22,000         38,146        100% Target achieved.
conflicts                  hearing (numbers)
                      Pendency of registered        8,658          43,026
                        cases (numbers)
Provision of               Banking, Foreign            43            43           100% Target achieved.
justice to               Exchange and
appellants                Insurance Courts
regarding                (number)
banking, foreign        New cases file for             24,996         27,698        100% Target achieved.
exchange and             hearing (numbers)
insurance matters
                      Pendency of registered        28,903         24,866
                        cases (numbers)

Promotion of             Custom, Excise and          9             9            100% Target achieved.
Alternate dispute          Sales Tax Appellate
resolution system          Tribunals (numbers)
in Customs, Excise      New cases file for             3,494          14,300        100% Target achieved.
& Sales tax               hearing (numbers)
conflicts
                       Pendency of Registered       3,602          8,357         100% Target achieved.
                        cases

Provision of justice          Accountability, Services       103           103          100% Target achieved.
to appellants on          and Environment
specified areas             Protection Courts
(Accountability,           (number)
service maters of       New cases file for             11,639         12,119        100% Target achieved.
federal govt.               hearing (numbers)
employees,
Environment
protection,              Pendency of registered        12,368         19,318        100% Target achieved.
Narcotics control)         cases (numbers)

Infrastructure          Number of Physical           15            9              5 Schemes are still ongoing
development and          infrastructure schemes                                     1 Scheme is dropped from PSDP
legislative, judicial,      Number of Capacity Building    6             2              3 Schemes are still ongoing
administrative          Schemes                                                1 Scheme is dropped from PSDP
reforms services                    Number of Automation         2             1              1 Schemes are still ongoing
for judiciary                    Schemes
                     Number of Feasibility/         1             0             The project time period is
                        Design Schemes                                            extended due to non-qualification
                                                                                                              in first tender

Page 123

Supreme Court of Pakistan:
PAO: Registrar
 Total Demands: Current 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                                                       In Rs. 000
Output                    Office    Original        Actual         Results / Remarks and Reasons
                               Budget        Expenditure
Provision    of    justice    to  Supreme            2,810,000          2,354,543   Recruitment, promotion process was to be
appellants on  constitutional   Court of                                          conducted in F.Y 2021-22 which could not
matters, human rights issues,   Pakistan                                             accomplish.
sue moto actions, and against                                                       Operation cost was controlled to observe
the decision of High Courts,                                                          the  austerity  measures  to  avoid  the
Federal    Sharia     court,                                                    unnecessary burden on public exchequer.
Provincial/Federal    Service                                            Due    to    better   management   and
tribunals, and fulfilling of any                                                    observance  of  austerity measures  the
judicial  advice/interpretation                                                         operation cost was minimized.
requested by the government.                                         Some  vehicles were  to be purchased
                                                                             depending  upon  the  appointment  of
                                                                              Honorable Judges.
               Total                   2,810,000       2,354,543

     2.  Planned and delivered Key performance targets

       Outputs              KPI’s      Planned     Delivered           Results/ Remarks
                          Description     Target       Target            and Reasons
Provision    of    justice    to  Cases    to   be  32593      19574             Cases filed in the Supreme Court of
appellants  on  constitutional   decided within the                                    Pakistan are decided  in accordance
matters, human rights issues,  FY                                                        with the prescribed  judicial process
sue moto actions, and against                                                     under  the  constitution  of  Islamic
the decision of High Courts,                                                        Republic of Pakistan by the constituted                           Pendency of        52000      51830
Federal     Sharia      court,                                                   benches of the hon‘ble judges. So far,                               Registered cases
Provincial/Federal     Service                                                 no   reasons    for   variance   are                            (Numbers)
tribunals, and  fulfilling of any                                                               administratively possible
judicial   advice/interpretation
requested by the government.
                               Disposal of         25000      19386
                               Registered cases
                            (Numbers)

Page 124

Islamabad High Court
PAO: Registrar
Total Demands: Current 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                                                       In Rs. 000
Output                         Office      Original        Actual        Results / Remarks and
                                    Budget        Expenditure  Reasons
Provision of justice to aggrieved    Registrar Office       1,086,000         773,624      Goals achieved by disposal of
persons      in     constitutional                                                      cases as per targets proposed for
jurisdiction  besides  exercising                                                            the year 2021-22
the   jurisdiction  as  appellate
revision   forum   against   the
decision of subordinate Courts
and original Jurisdiction etc.
Provision of justice to aggrieved        District &          645,000          627,814      Goals achieved by disposal of
person  under   civil  procedure    Session Judge                                      cases as per targets proposed for
code,  criminal procedure code    (East & West)                                           the year 2021-22
Family Laws & Rent Laws etc
                  Total                      1,731,000      1,401,439

     2.  Planned and delivered Key performance targets

         Outputs                  KPI’s       Planned    Delivered       Results/ Remarks
                                 Description      Target      Target         and Reasons
Provision of justice to aggrieved      New cases filed for       9,000          9,855        100% Target achieved.
persons in constitutional jurisdiction      hearing
besides exercising the jurisdiction as
appellate revision forum against the
decision of subordinate Courts and     Pendency of cases       17,400         17,372        100% Target achieved.
original Jurisdiction etc.
                                      Disposal of Cases        8,500          8,982        100% Target achieved.

Provision of justice to aggrieved      New cases filed for       74,917         83,374        100% Target achieved.
person under civil procedure code,      hearing
criminal procedure code Family Laws
& Rent Laws etc.                    Pendency of cases       33,214         51,802        100% Target achieved.

                                        Disposal of Cases      74,944         83,828        100% Target achieved.

Page 125

Federal Shariat Court
PAO: Registrar
Total Demands: Current 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                                                      In Rs. 000

 Output                         Office     Original      Actual       Results / Remarks and
                                     Budget      Expenditure  Reasons
  Administration of Justice to the       Registrar              494,000         499,208   Acheived
  citizens through matters shown in    Office
  original jurisdiction and disposal of
  criminal appeals filed under
 Hudood Ordinance
 Total                                       494,000      499,208

     2.  Planned and delivered Key performance targets

                                     KPI’s       Planned     Target     Results / Remarks and           Outputs
                                  Description     Target    Achieved        Reasons

 Examined   and   decided    different  New cases filed        101                      Target  achieved  more  than
 Prevision of law in context of Shariat   for hearing (Nos.)                        70%
  petition  under   original   constitution                                                   Increased numbers of Cases
  Jurisdiction of Federal Shariat Court as                                              were  anticipated  during  the
                                         Previous              173 per Injections of the Holy Qur’an Sunnah                                                   year  due   to   land  mark
                                    Pendency and the sharia’.                                                                      judgments  on  Family  Laws,
                                             Total Cases           274      211                                                                                             Riba, transgender  issue and
                                                                                                other    issues    of    public
                                                                                            importance.
                                                                                                  Total numbers of Cases fixed
                                                                                                                for hearing are 274 out of which
                                                                              211 cases attained finality.

 Decided  whole  the  criminal  appeals   Accumulated           63                    63 Cases are in progress which
 received under appellate Jurisdiction of  pendency of                                        requires  due  diligence  and
 Federal  Shariat  Court  and  provided   registered cases                                  proper addressal /redressal of
 speedy  justice  to  the  litigants  and   (Nos.)                                                  legal issues while adhering to
  prisoners.                                                                                   the  principal  Audi  Alterem
 The land marks Judgments  / decisions                                             partem for the dispensation of
 delivered by  this court particularly the                                                         natural justice.
 judgment on Riba petition, child marriage
 (suo-moto), violence against woman and
 the family laws have benefited the public
  at large

Page 126

National Accountability Bureau
PAO: Chairman
Total Demands: Current 01

    1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                                                      In Rs. 000
           Output               Office      Original        Actual     Results / Remarks and
                                       Budget     Expenditure        Reasons
 Eradication   of   corruption   through  NAB        1,685,038          1,217,613        Actual  expenditure   for  the
  inquiries,  investigation,  prosecutions,                                                             financial year 2021-22.
 awareness and preventions
 Administration  and  support  function  NAB        3,451,962          3,630,781        Variance is due to provision of
  including finance and training                                                            funds for increase in “House
                                                                                 Rent Ceiling” and grant of “Ad
                                                                                hoc Relief Allowance -2021” by
                                                                                        Federal Govt.
 Total                                     5,137,000      4,848,394

    2.  Planned and delivered Key performance targets

 Outputs            KPI’s Description         Planned  Delivered  Results/ Remarks
                                              Target    Target    and Reasons
 Eradication           of   Investigations (on the  inquiries     1130        439       National   Accountability  Bureau
 corruption     through  where established that corruption                          has achieved most of the targets
 inquiries, investigation,   has                                                             set  out  for  the  year  2021-22.
 prosecutions,          been taken place                                        However,    variance   between
 awareness       and   Inquiries (on complaints received     1460       1346       targets planned and achieved  is
 preventions             from general public, Government                         due to unavoidable
                        departments and agencies or at                            reasons as the white-collar crime’
                    own accord)                                             cases  (inquiries  /  investigations)
                                                                                     are complex in nature and require
                                                                                                  collection   of   evidence   from
                                                                                               multiple departments. Therefore, it
                                                                                      takes   considerable   time    to
                                                                                     complete.
                                                                                Lengthy   litigation   in   different
                                                                                   Courts  of Law  is also a major
                                                                             cause  of slow progress.  It also
                                                                                      takes time to get response from the
                                                                                              foreign countries due  to  certain
                                                                                                        limitations,   of   Mutual   Legal
                                                                                    Assistance (MLA) etc. which
                                                                                            resulted  delay  in  completion  of
                                                                                     cases.
                         Prosecutions   (on   successful     396        238      Concrete efforts have been made
                         completion    of    investigation,                                  to achieve the maximum  target
                          references against the accused                            planned for the year 2021-22. The
                         are filed in court)                                            decreasing trend is, however,
                                                                         due to the National Accountability

Page 127

                                                                       (Amendment Ordinance 2021) and
                                                                                         National            Accountability
                                                                    Amendment Act, 2022)
                                                                                     Furthermore, 4183 cases / appeals
                                                                                                                                                   / petitions have been processed in
                                                                                         various   courts   by   National
                                                                                             Accountability Bureau across the
                                                                                       country  parallel  to the achieved
                                                                                                  targets.

                                                                                  Covid-19  has  also  contributed
                                                                                  towards   the   slow  pace   of
                                                                                     Prosecution in Courts.
                       Annual  Reports  (number   of      1          1         Efforts  have  been  made   to
                            reports)                                                     organize      and     manage
                       Number of Conference/Seminars        147        118      Conferences  and  Seminars  as
                         Supplements to be published           09         10        strategic measures for Awareness
                        (Number of publications)                                  and  Prevention  campaigns  for
                                                                                            eradication of
                                                                                            corruption and corrupt practices.
                                                                             However,  due   to   preventive
                                                                          measures    of   Covid-19   the
                                                                               Conferences and Seminars could
                                                                                        not be organized up to the planned
                                                                              numbers.

Federal Ombudsman Secretariat for Protection Against Harassment
PAO: Federal Ombudsman
Total Demands: Current 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                                                      In Rs. 000
       Outputs                Office          Original      Actual     Reasons for Results/Remarks
                                       Budget    Expenditure         and Reasons
  Investigation, redressal and   Federal Ombudsman        74,690         73,445       Assets creation for strengthening of
 review of cases in                                                                                 offices (Renovated & converted them
  public/private Sector                                                                                into state of the Art 04 new Offices),
 organizations                                                                    Improved monitoring systems through
                                                                      CCTV, Online monitoring of Regional
                                                                                                   Offices, Easy & inexpensive access to
 Enforcement of Women’s     Federal Ombudsman        2,310           2,271        Justice and ensure speedy & better
 Property Rights Act, 2020     Secretariat for                                                 delivery of Justice within 60 days, Online
                                Protection against                                       Complaint System, Judgements monthly
                           Harassment of Women                                         reports, Annual Reports
                                   at Workplace                                     Case list, UN Report, Outreach
                        (FOSPAH)                                             programs, Awareness campaigns,
                                                                                               Trainings, Publications, Seminars,
                                                                                             Social Media (Instagram, Facebook,
                                                                                                      Twitter, Website), Print & Electronic
                                                                                    Media, Automated systems, State of the
                                                                                                   Art Court room (Facilitating the

Page 128

                                                                                     complainants & visitors), Achieving
                                                                                      Targets within timeline.
                    Total                     77,000       75,717

     2.  Planned and delivered Key performance targets
 Outputs                KPI’s Description           Planned    Delivered   Results/ Remarks
                                                    Target      Target     and Reasons
  Investigation  redressal and  Number of harassment cases           550          580     100% Target achieved.
 review     of    cases     in   registered (male/female)
  public/private          sector
 organization’s                  Total number of disposed-off cases       550          497     100% Target achieved.

                             Percentage of decided cases         90%        97%     100% Target achieved.
                             implement

                            Average days taken to resolve a          60           60      100% Target achieved.
                                  single case

                         Number of awareness/training           120          160     100% Target achieved.
                             seminars conducted

                         Number of publications/newsletters       15           18      100% Target achieved.
                               published

 Enforcement of women’s      Average days taken to resolve a          60           60      100% Target achieved.
 property Rights Act,2020        single case

Election Commission of Pakistan
PAO: Secretary
Total Demands: Current 02 and development 01
    1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                                     Rs. In 000’
            Output                     Office          Original       Actual     Results / Remarks
                                               Budget    Expenditure    and Reasons
 Advisory/  Administrative  support  to      Directorate General         2,819,845     3,136,028
 the subordinate offices of ECP e.g.,        (IT, MIS,
  Provincial  Election  Commissioners      Development,

Page 129

and field offices regarding elections in      Research) &
line with the prevailing policies and      Additional Director
procedures.                            General Public
                                          Relations

Conduct of National and Provincial        Director   General          1,007,155     1,000,155
Assemblies and Senate Elections.         Election &  Local
                                   Government
                      Total                           3,827,000     4,136,183

   2.  Planned and delivered Key performance targets

    Outputs            KPI’s Description       Planned    Delivered        Results/ Remarks
                                               Target      Target         and Reasons
Amendment         Recommendation sent to the federal                 Achieved
proposed in election   government for addition of provision in
laws to make          Section 122 of the Elections Act, 2017
electoral process       regarding senate Elections.
more transparent
Strengthening of       Establishment of project Management               Achieved
information             Unit in order to consider the use of
Technology            technologies  in  electoral processes
support system          after   careful   consideration  and
                     expansion  of additional  footprint  of
                  ECP.
                     Upgradation of Results Transmission
                       (Section 13 of the Elections Act, 2017:
                      Establishment of results management
                      system.  (1) The commission  shall
                        establish  a   transparent   results
                  management system for expeditious
                        counting,   tabulation,   compilation,
                       transmission,   dissemination   and
                        publication of results.
                      Implementation of Online Recruitment
                    system and optical mark recognition
                  (OMR) Technology  for merit-based
                        recruitment.
                      Establishment of Video conferencing
                    system for improving communication
                        with field offices.
                      Extending       fiber     optic-based
                      telecommunication  services  to   all
                         provincial headquarter and regional
                         election commissioner’s offices.
                   Launch      of     Website     with
                     improved/enhanced features
                     Upgradation       of      complaint
                  Management   Unite   (PMU)    for
                   managing emerging technologies

Page 130

                        Introduction of click mobile application
                           for facilitation of general public

To promote            Celebration of National Voters                     Achieved
awareness in        Day across Pakistan (7th
general public        December 2021)
regarding            Frequency of public awareness
importance of        campaign (Time on electronic
vote                media/number of advertisements
                           in print media)
Conduct of bye-        Elections to 02 seats of Senate,                   Achieved
election in           03 seats of National Assembly
accordance with      and 03 seats of Provincial
law                 Assembly were conducted.
Conduct of Local      Conducted      following      Local              Achieved
Government         Government Elections for:
Elections            Cantonment  Boards   across   the
                      Pakistan
                   35 districts in Khyber Pakhtunkhwa
                   14 districts (1st Phase) in Sindh
                   32 districts of Baluchistan for general
                      seats (expect Quetta and Lasbela)

Error free               Periodical Revision of Electoral                       Achieved
Electoral Rolls          Rolls 2021-22. CERS Software
                    improvement
                        Registration Software
                    improvement

Page 131

                     Male voters     = 67.1
                            million
                    Female voters   = 56.662
                            million
                         Total           = 123.691
                            million
                    Development of module for:
                          Verification of lists containing
                       voters
                    Form-13 (Eligibility of voter,
                    Form-14 (Application by person
                           in service of Pakistan) Form-15
                         (inclusion of Name, Form-16
                       (Objection on inclusion of Name)
                    Assignment of CBCs to
                        unverified voters
                    Decreased voters’ entry
                         Reverification of deceased voters
                      Voters above 99 Years
Capacity Building      Training  of 1684  District Returning                 Achieved
of Election              Officers (DROs), Returning Officers
officials for           (ROs)  and   Assistant   Returning
effective                Officers (AROs)
discharge of           Training   of  ECP    officers    for
electoral                Delimitation     Committees    &
responsibilities in       Delimitation Authority (GE)
connection with        Training of 875 election officials for
General               Result Management System (RMS)
Elections and          Training of 397,892 election officials
local government        for bye-elections, Local Government
elections.               Elections,   Cantonment   Boards,
                    Khyber    Pakhtunkhwa,    Punjab,
                       Baluchistan, ICT, Sindh, Pre-Service
                         Training, In Service Training etc.
                                                                   Achieved
Conduct of National    Stakeholders’ consultation          100%       Yes, it is ongoing process
and Provincial
Assemblies and
Senate Elections.      Scrutiny of statements of assets      100%     100%
                & liabilities of MPs
                   Watch on campaign
                      expenditure
                       Monitoring during elections / bye-     100%     100%
                        elections
                         Pre-poll activities
                        Training activities
                          Poll day activities
                     Post poll activities
                      Target for voter turnout for          Up to 70%   Target will be
                      nest general elections                            analyzed after
                                                            G.E 2023

Page 132

Council of Islamic Ideology
PAO: Chairman
Total Demands: Current 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                                      In Rs. 000’
     Output          Office       Original       Actual       Results / Remarks and Reasons
                              Budget    Expenditure
 Research, review,     Council of              140,000         139,663  Research Studies/Publications
 recommendation to    Islamic                                         Research Studies were conducted on, Forced
  legislative authority    Ideology,                                           Conversion,  Child  Marriage  Restraint  Act,
 regarding              Secretariat                                       Transgender Persons Rights-Violent Incidents
  Islamization of law                                                       Related to Blasphemy, Balanced Population
 and standard                                                                Planning, Vitamin D Extracted from the Wool of
  religious practices                                                               Alive Sheep. (Sharia Point of View), Halal Food
                                                                                        Certification in Pakistan, Reduction of Scope of
                                                                   Death Penalty Prescribed in Laws, Protection
                                                                                      of Plants and Wildlife, Islamic Injunctions and
                                                                         Teachings, Specification of Separate Place for
                                                    Women to Offer Prayers in Major Mosques of
                                                                              the  Country,  Sialkot  Tragedy:  Causes  and
                                                                                       Solutions (Special  Edition  of Council's  Bulletin)-
                                                                                 Islamic Law  of  Inheritance (Monograph).  -
                                                                              National Cohesion and  Better Coordination
                                                         Among Diverse Masalik (School of Thoughts)
                                                         Laws Reviews:
                                                                          Several Laws were reviewed such as, Criminal
                                                           Law (Amendment) Bill 2020, Section (298-A),
                                                                      Guardian and Wards (Amendment) Bill 2021,
                                                                              National Commission for Minorities Rights Act
                                                                        2020,  Protection  Against  Harassment  of
                                                                         Students in Educational Institutions Act 2020,
                                                                                    Alternative Dispute Resolution  Bill KP (Draft
                                                                                                               Bill),   Child   Protection   Act   2018,  The
                                                                                  Constitution (Amendment) Bill, 2021 (Insertion
                                                                                      of Article 24-A Regarding Inheritance Rights of
                                                          Women,  Depriving Women  of  Inheritance
                                                                   Through Various Pretexts Women Property
                                                                            Rights  Act,  2020,  Prohibition  of  Forced
                                                                       Conversion  Bill 2020, Transgender Persons
                                                                                Protection of Rights Act, 2018, Shariat Petition
                                                                 on Death Penalty (Gulwali v. Secretary Law),
                                                                           Sections 268, 374 of the Criminal Code, The
                                                                           Issue of Meeting with the Children of Separated
                                                                     Spouses. Issue of Amendment  in the Oath
                                                                              Declaration   for  Non-Muslim  Members  of
                                                                              Parliament, Criminal Law (Amendment)  Bill
                                                                        2021. (Issue of Castration), Salient Points of
                                                                              the Judgment of the Supreme Court Regarding
                                                            Rape Cases, Islamabad Capital Territory Waqf

Page 133

                                                                              Property Act 2020, The Judgment of Federal
                                                                             Sharia Court Regarding Khula.

        Total                       140,000      139,663

       2.  Planned and delivered Key performance targets

            Outputs               KPI’s Description     Planned   Delivered       Results/
                                                          Target     Target      Remarks
                                                                     and Reasons
   Research, review, recommendation to  New laws for review.              20          21         100% Target
    legislative     authority     regarding                                                                    achieved.
    Islamization  of  law  and  standard
    religious practices.
                                      No. of Research Studies/          15          18         100% Target
                                              publications.                                                     achieved.

                                     Conduct of                                       100% Target
                                              National/International                                             achieved.
                                        Conference/ Seminars/            12         12
                                    Workshops

 Federal Judicial Academy
 PAO: Director General
  Total Demands: Current 01

       1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                                        In Rs. 000’
          Output              Office        Original       Actual         Results / Remarks and
                                      Budget    Expenditure           Reasons
   Capacity Building of Judiciary    Federal Judicial      210,000         209,844
                            Academy
   Total                                   210,000      209,844

       2.  Planned and delivered Key performance targets

          Outputs                  KPI’s       Planned   Delivered       Results/ Remarks
                                  Description      Target      Target         and Reasons
Capacity Building of Judiciary          Number of              80           24      The FJA could not meet the target of
                                              trainings to be                                         eighty (80) activities due to Covid-19
                                      conducted                                   and shortage of faculty members.
                                    Number of persons to      3000         654
                                      be trained

Page 134

 Federal Tax Ombudsman Secretariat
 PAO: Federal Tax Ombudsman
 Total Demands: Current 01

       1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                                        In Rs. 000’
Output                       Office        Original     Actual      Results / Remarks and Reasons
                                    Budget      Expenditure
Diagnosis, investigation, redressal and   Federal Tax      279,000        292,995      All the planned targets of Key Performance
rectification  of  injustices done  to a  Ombudsman                                      Indicators have  not  only achieved  but
taxpayer through maladministration by                                             achievement in some targets were more
functionaries administrating tax laws.                                                 than 100 percent. FTO Secretariat, through
                                                                                                                         its functions and performance has paved
                                                                                       the  base   for  enhancing  government
                                                                              revenue through  facilitating  tax  payers,
                                                                                      focusing on systemic issues of taxation and
                                                                                             building confidence of tax payers on the tax
                                                                                                collection departments. In addition to the
                                                                                above, FTO’s recommendations have also
                                                                                          resulted  in collection of significant govt.
                                                                                  revenue, to the tune of billions of rupees,
                                                                            by FBR.     It can be expected that FTO’s
                                                                             endeavors will play a key role in boosting
                                                                                       the   taxpayers’   confidence    in   tax
                                                                                      dispensation of the country resulting into
                                                                                broadening the tax base and the collection
                                                                                                of duties/taxes.
Total                                      279,000     292,995

       2.  Planned and delivered Key performance targets

                                            Planned    Delivered     Results / Remarks and
         Outputs            KPI’s Description                                                 Target      Target           Reasons
 Diagnosis,          investigation,   Total cases received         3300         3371      100% Target achieved.
 redressal  and   rectification  of
                                     Total cases disposed.        2900         2867        Target almost achieved.  injustices done  to a  taxpayer
 through   maladministration  by   Percentage of cases                                              88%        85%        Target almost achieved.
 functionaries  administrating  tax   disposed Off
 laws                           No. of decided cases                            100% Target achieved.                                                       2465         2539
                                 implemented.
                                Percentage of decided                           100% Target achieved.
                                              85%        88.15%
                                cases implemented
                                                                           To  facilitate  the  taxpayers  for
                            Number of geographical                                                                                                   provision of cost-free justice, four
                                      locations where service        8            12
                                                                        new regional offices have been
                                                will be provided
                                                                                                   established.
                            Number of major Studies
                                                         1            2       100% Target achieved
                                   regarding public

Page 135

                                     grievance pertaining to
                                         taxation

                                  Average days taken to                                                                      100% Target achieved.
                                    dispose a case (Working       45           41.06
                                    days)

   Wafaqi Mohtasib Secretariat
   PAO: Secretary
    Total Demands: Current 01

         1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                                                          In Rs. 000’
 Output                       Office      Original      Actual        Results / Remarks and Reasons
                                    Budget      Expenditure
 Diagnosis, investigation,       Wafaqi Mohtasib          837,000         835,184   Other   initiatives  such  as  holding   khuli
 redressal and rectification of     Secretariat                                                katcheries,   Onsite   Inspections,   Informal
 injustice done to a citizen                                                                    resolution of Disputes on basis of enabling
 through mal- administration                                                                           article in the Presidents’ Order No. 1 of 1983;
                                                                          and Outreach Complaint Resolution (OCR)is
                                                                                          also being carried out to provide administrative
                                                                                                      justice to the citizens at their doorstep from
                                                                                                 within the existing budget.
 Total                                      837,000       835,184

         2.  Planned and delivered Key performance targets

Outputs                        KPIs Description    Original   Delivered   Reasons for Variance
                                                    Target    Target
 Diagnosis, investigation, redressal           Disposal of                                        Large scale increase in receipt of
 and rectification of injustice done to a        complaints per            90          188        complaints.
 citizen through mal-administration             investigation                              109% more disposal than original
                                                     officer per month                                         target

                                         Percentage of                                       Increased    workload     without
                                        cases disposed        100%       81%        proportionate  increase  in human
                                                        off in time (60                                  and financial resources.
                                           days)                                                Besides,  more  complex  cases
                                                                                                          requiring thorough and time taking
                                                                                                           investigations    resulted   more
                                                                                                hearings and little slid the timelines.
                                         Percentage of         90%       82%       Increased    workload     in    the
                                         decided cases                                       implementation wings due to 109%
                                        implemented                                  more  disposal  of complaints per
                                                                                                           Investigation Officer per month and
                                                                                        non-commensuration resources

Page 136

                                Number of                5            6       No statutory requirement
                                    Research /                                          Previous   Study   reports   being
                                          analysis / study                                        followed up for Implementation.
                                             reports.
                                      Linkage of                       All          181       Only  181  the  Federal  agencies
                                       Federal Agencies                     (100%)      which  are   involved   in   public
                                                 in CMIS for                                           dealings   have   already   been
                                          Integrated                                                integrated. Further agencies will be
                                      Complaint                                          considered  for  integration  upon
                                        Resolution (ICR)                                  development   of  agency’s  own
                                 mechanism                                     mechanism.
                                            Interface (No.of
                                       Federal

                                     Linkage of Federal          10       5             Only 5 agencies have their internal
                                    Agencies in CMIS for                (100%)         system      for     system-system
                                         Integrated Complaint                                      integration with WMS.
                                       Resolution (ICR)
                                   System- System                                The   other   agencies    will  be
                                           Integration (No.of                                     considered    for   system-system
                                      Federal Agencies)                                         integration after the development of
                                                                                                                 their  internal  system  at  agency
                                                                                                                  level.
                                      Online Hearing using      20%    25%          More usage of integrated computer
                                    Skype, WhatsApp (%                                 technology  (ICT) by  investigation
                                            of total disposal                                                officers.

Maritimes Affair Division:
PAO: Secretary
Total Demands: Current 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                                                      In Rs. 000’
Output            Office      Original         Actual          Results / Remarks and Reasons
                          Budget         Expenditure
Policy,           Main Ministry                419,000            305,885   During  the  year 2021-22  fish &  Fisheries
coordination                                                                   products were exported US $ 431 million and
and                                                                           increased 3.85% as compared  to the year
administration                                                                2020-21.
                                                                    17 processing plants registered  in the said
                                                                                      period.
                                                                Number  of  training programme have been
                                                                          conducted by Marine Fisheries Department for
                                                                             fishermen and  food  business  operator on
                                                      HACCP  based  food  safety  management
                                                                             system.

Page 137

Modernization    Gwadar Port                4,754,911           2,838,743   Acquisition of Marine Services Vessels for
of Ports            Authority                                           Gwadar Port.
facilities                                                                       Up-gradation of Berthing Facilities for Coats at
                                                                      Gwadar.
                                                                                       Rehabilitation of leading Light Tower, Gwadar
                                                                                          Port.

Surveys,           Directorate                  262,000            303,174  3148 surveys /inspection of  all vessels and
inspections &     General Ports &                                                         craft and dangerous goods cargos, 2610 NOC
safety             Shipping, Karachi                                                       for outward  Port clearance  to  all  vessels,
management                                                              512.38 million revenue receipt in respect of
                                                         MMD, 138 number of cadets register in PMA,
                                                                    5520 number of sign -on seamen engaged on
                                                                                       ships, 3907 number  of  sign  -off seamen
                                                                    engaged on ships.
Fisheries         Marine Fisheries             216,000            216,514                   -do-
management     Development
and navigation
facilities

Total                               5,651,911        3,664,316

     2.  Planned and delivered Key performance targets

     Outputs             KPI’s Description      Planned    Delivered       Results/ Remarks
                                                 Target      Target         and Reasons
Surveys, inspections &      Surveys / Inspections of all           2920          3,148      100% Target achieved.
safety management         vessels and Crafts and
                         dangerous goods Cargos
                       (Number of inspection)

                  NOC for Outward Port               3820          3,610      95% Target Achieved.
                         Clearance to all vessels                                        However, remaining 5% target
                       (Number of No. objection                                           could not be achieved due to
                                 certificates)                                                            less arrival of Ships.
                       Revenue Receipts Rs. in             407          512.38      100% Target achieved.
                                Million (Mercantile Marine
                          Department)
                          Marine Academy Cadets             155          138      89%    Target    Achieved.
                               registration (Number of                                        However,   remaining  11%
                          Cadets)                                                                  target could not be achieved
                                                                                due to less arrival of cadets.
                     Seamen engaged  on  ships        6600         5520      84%    Target    Achieved.
                       (Number of Sign-on)                                           However,   remaining  16%
                                                                                                         target could not be achieved
                                                                                 due to introduction of online
                                                                                         process the charging of Ship
                                                                                                                Article fee, NOC fee has been
                                                                                               discontinued by GSO.

Page 138

                     Seamen engaged on ships           6285         3907      62%    Target    Achieved.
                       (Number of Sign-off)                                           However,   remaining  38%
                                                                                                         target could not be achieved
                                                                                 due to introduction of online
                                                                                         process the charging of Ship
                                                                                                                Article fee, NOC fee has been
                                                                                                  discontinued.
                            Port clearance inward               330          128      38%    Target    Achieved.
                       (Number of Ships)                                            However,   remaining  62%
                                                                                                         target could not be achieved
                                                                                due to less arrival of ships.

                            Port clearance outward              244          127      52%    Target    Achieved.
                       (Number of Ships)                                            However,   remaining  48%
                                                                                                         target could not be achieved
                                                                                due to less arrival of ships.
                       Revenue Receipts Rs. in              25          12.59 M     50%    Target    Achieved.
                                Million (Government Shipping                                   However, 50% target could not
                              Office Karachi                                              be achieved due to following
                                                                                             reasons:
                                                                                                           1. Discontinuation of policy for
                                                                                          medical fitness certificate.
                                                                                                           2. Due  to online system,
                                                                                                      Collection  of  Cancelation
                                                                                                 fee  in respect  of NOC  /
                                                                                                                 Article  has   also  been
                                                                                                   discontinued.
                       Revenue Receipts Rs. in Million         7.5             7.6       100% Target achieved
                            (Pakistan Marine Academy)

Fisheries management      Reshipment inspection             34,000         30,321      89%    Target    Achieved.
and navigation facilities       of exporters (Number of                                       However, 11% target could not
                             inspections                                               be achieved due to increase of
                                                                                                 cost  of  doing  business  for
                                                                                             progressing   of   Fish  and
                                                                                                           fisheries products for export.
                             Quality Certificates for Export         34,000         30,321      89%    Target    Achieved.
                       (Number of Certificates)                                       However, 11% target could not
                                                                                 be achieved due to increase of
                                                                                                 cost  of  doing  business  for
                                                                                             progressing   of   Fish  and
                                                                                                           fisheries products for export.
                          Processing Plants registered          155           17       10% Target Achieved.
                       (Number of registrations)                                       However, 90% target could not
                                                                                 be achieved due to Due to
                                                                                    complex documentation
                                                                                            requirement by MFD
                                                                                Management.
                       Revenue Receipts in Million           47.00      45.17 (million)   100% Target achieved.
                           (Marine Fisheries Department)

Page 139

Narcotics Control Division, Islamabad
PAO: Secretary
Total Demands: Current 01 and development 01

    1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                                                      In Rs. 000’
 Output                Office       Original         Actual          Results / Remarks and Reasons
                              Budget         Expenditure
 Drug supply           Anti-Narcotics force           3,796,008           3,748,583
 reduction - drug        office
 seizures services
 Policy                 Policy II wing                  155,741            161,379
  formulation/revision
 and overall
 implementation
 services

 Drugs demand        Anti-Narcotics force             71,644             17,267
 reduction services     office)
 (treatment,
  rehabilitation and
 educational
 services to the
 drugs addicts)
 Decrease area        Coordination-II
 under poppy         wing
  cultivation, provide
  alternative earning
 sources to poppy
  cultivators and
 development of
 poppy growing
 areas
  Total                                       4,023,393               3,927,229

    2.  Planned and delivered Key performance targets

      Outputs        KPI’s Description     Planned      Delivered          Results/ Remarks
                                            Target        Target            and Reasons
 Drug supply reduction -   Raids / operations for          1420           1368
 drug seizures services    drug seizure (no of raids)

                        Drug and precursor          85.00 (MT)       94.967 (MT)    100% Target achieved.
                           seizures

Page 140

                   No of cases to be             800            1270      100% Target achieved.
                           registered

                         Freezing of assets of           ___         2742.389 (M)
                        drugs smugglers
                            including money
                          laundering (Rs in million)
                            Conviction/              85%          89%      100% Target achieved.
                        punishment rate
                           (percentage)

                      Drug intelligence              100            282       Due to effective collaboration, operation
                         provided to other                                                co-operation enhanced.
                           countries including joint
                          operations (Number of
                             intelligence information’s
                                            / operations)
                   No of staff to be trained         220            655       100% Target achieved.
                               in ANF Academy

                   No of staff of other             110            175       100% Target achieved.
                        agencies to be trained in
                  ANF Academy

Policy                Number of Bilateral and          1                   MoU  with  Mauritius and  Bahrain  is
formulation/revision and   Multilateral Agreements                                     under process and at  final stage  for
overall implementation     with foreign countries                                            approval.
services                  against drug trafficking                                      Revised  MoU  with   Australia  was
                                                                                                  informally   agreed   between  ANF
                                                                                       Pakistan and AFP Australia in July 2017
                                                                           and pending due to finalization through
                                                                                             diplomatic channels.
Drugs demand         Number of patients to be       1000           1604      100% Target achieved.
reduction services         treated in Model
(treatment,                Addiction Treatment
rehabilitation and
educational services to
the drugs addicts)       Awareness Campaign          550            720       100% Target achieved.
                       Conference / Seminars
                        conducted

Page 141

National Food Security and Research Division, Islamabad
PAO: Secretary
Total Demands: Current 01 and development 01

    1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                                                      In Rs. 000’

                                               Original        Actual        Result / Remarks and
        Output                Office                                       Budget     Expenditure         Reasons

 Import/Export regulation of      Animal Quarantine                                                                       i) Pakistan agriculture secured
 Animals and Allied Services     Department,                                                 against locust and more than
                                  National Veterinary      1,397,545          498,294        1.3 million hectares were
                                Laboratory                                                    treated and 56 million hectares
                                                                                were surveyed
 Research and Development     Pakistan                                                                                              ii) The Food Security policy is
  in Agri. including technology     Agricultural                                                    strategized resultantly 90%
  transfer, surveillance          Research Council,                                                      8,280,094        5,700,159        food requirement met through
 programs and coordination      Pakistan Central                                         domestic production.
 among provinces              Cotton Committee                                                                                iii) Record production of Rice,
                                                                                        Maize, Potato, Onion, Mung
 Import/Export regulation of      Department of                                                                              and Sugarcane in Pakistan.
  Plants, pesticides registration    Plant Protection                                                                                                                            iv) Record export of Mango,
 and allied services                                    1,575,000          697,677                                                                                       Rice and vegetables were
                                                                                        recorded despite COVID
                                                                                         through facilitation to the Provision of certified seeds      Federal Seed
                                                                                     growers and exporters. and ensuring plant breeders      Certification &
                                                                                                        v) In order to ensure food  rights                            Registration
                                                                                                     security of the country import of                               Department, Plant        818,659          549,353
                                                                                              2.2 million tons of wheat was                              Breeders Rights
                                                                                       arranged through TCP.                                  Registry
                                                                                                                            vi) National Strategy on
                                                                                           Aquatic Animal Health is Water Management            Federal Water
                                                                                        devised to enhance production coordination among provinces  Management Cell       4,110,000        3,535,560                                                                              and export.
                                                                                                                                        vii) Subsidy of 7.00 billion was
 Public Policy Management     Main Ministry,                                              kept for PASSCO to procure
 and Secretariat services         Agriculture Policy                                      wheat and to reduce prices.
                                         Institute, National                                              Additional funds allocated
                                       Fertilizers                                              under PM Package for Rabi                                                     756,280          416,370
                             Development Cell,                                        Crops. in wake of COVID-19,
                                   Agriculture                                                            for fruitful results in production
                                    Minister’s Office                               & Export.
                          Rome, SUPARCO
 Development of Oilseed,        Pakistan Oilseed
 Livestock and Fisheries         Department,
 sectors                         Livestock & Dairy
                             Development Board     1,197,702        1,771,160
                              (LDDB), Fisheries
                             Development Board
                             (FDB)

Page 142

Provision of subsidies to        Finance Division
reduce food prices                                    7,000,000       15,169,451

Total                                                   25,135,280       28,338,027

   2.  Planned and delivered Key performance targets

                                                           Original      Target
      Output               KPI’s Description                                  Result / Remarks and Reasons
                                                        Target     Achieved
Import/Export          Non-Tax revenue receipts by     160.000       160.352    100% Target achieved.
regulation of Animals    Animal Quarantine Department
and Allied Services      (Rs. In Million)

                   Number of health certificates     45000        40463    90% targets achieved. Slight variance
                       issued by Animal Quarantine                                            is due to ban on export on poultry and
                      Department for import/ export                                               its products.
                    Samples analyzed by National    18150        18239     100% Target achieved.
                         Veterinary Laboratory for
                        various animal/ poultry diseases
Research and         Germplasm acquisition,         28000        28106        All targets achieved. Further, PARC
Development in           distribution and evaluation                                  major research initiatives are:
Agriculture including     (Nos.)                                                         Virus free nucleus potato seed
technology transfer,     Annual Farmer Filed Days       160          164         production
surveillance programs   (Nos.)                                                     through aeroponics.
and coordination         Beneficiaries in crops and value   25000        27804      Vaccine development for animal
among provinces        addition technologies (Nos.)                                    viruses /
                                                                                 diseases
                        Production of Bio Fertilizers      22000        22055                                                                                 Genetic improvement of indigenous
                       (Bags)                                                                                              livestock breeds using genomics tools
                        Technical Studies, sample       400          430         Indigenized precision design and
                     based (Nos.)                                CNC
                      Radio Talks / TV Programs       200          207        manufacturing machines
                         (Nos.)                                                  development and tools like 3D
                        Advisory Service Beneficiaries    25000        29819      Scanners, 3D Printers
                         (Nos.)                                                                etc.
                                                                              High yield / climate resilient variety
                                                                             development through genomic
                                                                                   technique
                                                                     Speed Breeding Technologies for
                                                                                                   varietal
                                                                                development.
                                                                                Ginger tissue culture for seed
                                                                                     production
Import/Export             Certificates / Import Permits /     310000       166771    54% targets achieved; result is based
regulation of Plants,     Release Orders                                       on the applications received during
pesticides registration   Phytosanitary Certificates                                     the financial year.
and allied services      Import permits issued
                      Release orders issued (Nos)
                        Registration/Renewal of         3350         3345      100% Target achieved.
                         Pesticides (Nos.)

Page 143

                         Registration of formulation &     20           18       90% Targets achieved
                             Refilling / Repacking Plants
                         (No.)
                         Pesticides sample analysis       240          513       214% targets achieved; result is
                         (Nos.)                                                based on the application received
                                                                                      during the financial year.
                      Survey of Locust Area          2572000      908905    35% locust area covered for survey,
                     Coverage (Hectors)                                       however, Desert Locust Situation
                                                                                   contained due to unfavorable weather
                                                                                          condition for locust egg hatching.
                       Locust spot identification / visits   13000        4517       Targets achieved, as per requests
                                                                                    received from provinces.
Provision of certified     Distinctness, Uniformity and      375          216         Distinctness, Uniformity and Stability
seeds and ensuring       Stability (DUS) Trials for                                (DUS) Trials are carried out on the
plant breeders rights     Registration of Crops (Nos.)                                   basis of No. of applications submitted
                                                                            by various research institutes and
                                                                                             private Seed Companies every year.
                         Registration of various crop      120          112      93% targets achieved.
                           varieties (Nos.)
                   Seed certification of different     700000       804124    115% targets achieved, during 2021-
                       crop varieties Metric Ton (MT)                           22 due to bumper crop of wheat
                                                                        63700 Metric Ton (MT) certified seed
                                                                          has been produced the first-time
                                                                                               history of Pakistan.
                         Registration and regulation of     55           119       The targets achieved; it depends
                     seed companies (Nos.)                                 upon number of cases submitted by
                                                                          seed companies.
                      Domestic Trainings of farmers    12000        6040       Targets achieved, as per applications
                         (Nos.)                                                       received and Capacity building
                                                                             enhanced.
                    Revenue generation through     550          520      95% target achieved, due to Capacity
                        deposit of Challans under Seed                                  building enhancement.
                        Act enforcement
                   Number of Application for Plant   30           71        237% target achieved.
                        Breeder's Rights (No) and Grant                           Overwhelming response received for
                           of PBR Certificate (No)                                         Plant Breeder’s Rights (PBR)
                                                                                        received. PBR protection is new
                                                                         avenue in Pakistan, it started in Feb.
                                                                                2021. The cases require 2-3 years for
                                                                                             getting mature for award of the PBR
                                                                                                         certificate. The breeding institutes are
                                                                                                       in process of getting familiar with the
                                                                                            application process
Water management     Water Courses Improvement     12829        5564     43% targets achieved. As compare to
coordination among                                                             performance vs released budget, it is
provinces                                                                up to the mark.
                       Subsidized Laser Land levelers   3091         3158      102% targets achieved.
                        Construction of Dug Wells, farm   8806         4658     53% targets achieved, the result is up
                      pounds, water ponds and                                          to mark, despite limited budget.
                             installation of Solar pump
                       system.
                            Installation of Tube Wells        60           82        136 % targets achieved

Page 144

                            Solarization of Tube Wells and    1076         450      42% targets achieved. The initiative is
                    Dug Wells                                                towards solarization to improvise new
                                                                                    technology and to reduce production
                                                                                                 cost.
                           Price analysis for major crops     4            4           Price analysis of 04 major crops,  Public Policy
                           (Nos.)                                                   which helped to devise strategies / Management and
                                                                                                policy making.  Secretariat services
  Development of        Farmers gatherings and         288          347       120 % targets achieved.
  Oilseed, Livestock      Demonstration Plots for Oilseed
  and Fisheries sectors    Crop.
                         Establishment Model Cage       2            2         The targets achieved. The civil work
                        farms and Shrimp Hatcheries                                           is progress

                           Training and Capacity Building    900          406        Targets achieved, as per applications
                               for Farmer’s regarding cage                                    received. The exercise is an ongoing
                            culture Development and                                   process to empower farmers and to
                        shrimp farming culture                                           contribute in Federal reserves
                                                                                    through Export.

                          Fish Hatcheries establishment    6              5.5          Targets: completion of 50% work
                      and its renovation (trout forming                               during financial year.
                               in Northern Areas)

                           Training of Famer (trout forming   25 AJK       84 AJK      Overall, 99% targets achieved.
                               in Northern Areas)             150 GB       170 GB
                                                  175 KP       42 KP

National Health Services, Regulations and Coordination, Islamabad
PAO: Secretary
Total Demands: Current 02 and development 01

     1.  Budget and expenditure  Analysis by Outputs for the period July-21 to June-22

                                                                                                                      In Rs. 000’
    Output             Office           Original        Actual         Results / Remarks and
                                  Budget     Expenditure           Reasons
Improvement in       PIMS, Polyclinic,           38,411,984       11,828,254    To improve the performance of
Tertiary healthcare    NIRM, FMDC, FGH,                                           healthcare facilities in ICT: -
services              Cancer, TB Center                                                                          i). A project for extension of Poly Clinic
                                                                                       Hospital for 200 Beds at G-11/3
                                                                                                          initiated.
                                                                                                                                                      ii). A project for 200 beds emergency
                                                                                                      in PIMS initiated
                                                                                                                                                           iii). NIRM, FMDC, FGH and TB center
                                                                                  are providing quality health care
                                                                                          services.

Page 145

Health Insurance      Health Insurance           5,600,000         3,436,000     135,659 families were treated through
Program            Program                                                Sehat Sahulat Card.

Medical services to    Central    Health           731,071          568,436            i). Up-gradation of points of entries of
Federal employees    Establishment                                               Pakistan and Establishment of
and quarantine of     (CHE)                                                        Laboratories network in Director office,
infectious diseases                                                                                             civil surgeon offices and points of
at ports and borders                                                                       entries across the country for work
                                                                                         visa health requirement of all
                                                                                           countries.
                                                                                                                                                      ii). Testing of non-gazette/gazette
                                                                                                  officers and medical fitness of
                                                                        Government employees.
Policy formulation &   Main Ministry              1,796,220         850,899            i). 1638 inspection of health care
implementation,                                                                    establishment by IHRA
management of                                                                                                                           ii). 703 complains received & resolve
authorities and EPI                                                           by IHRA
including national                                                                                                                             iii). 6,107,046 children under the age
and international                                                                             of 0-11 months were vaccinated
coordination                                                                                                      iv). 5,032,989 pregnant women
                                                                                   vaccinated
Homeopathy and     Homeopathy and             4,524            3,392              i). Registration and Renewal of the
Tibb regulatory        Tibb                                                Homeopathy medical practitioners
services                                                                                                                                        ii). Promotion of Unani system of
                                                                               medicine
Population studies     National Institute of          60,934           54,558      An amount of Rs. 3.125 million was
                                                                          saved due to the non-recruitment of a
                      Population studies                                          vacant post in the relevant head as
                                                                                            well as operating expenses.
Preventive             National Institute of         1,804,866        1,085,442     Making Pak-VAC vaccine in
healthcare services    Health                                                            collaboration with Pakistan and China

Control of Malaria      Directorate of               41,170           41,611       Routine campaigns for Malaria and
                      Malaria Control                                      Dengue Control.
                   Program

Capacity Building of   Heath Service              106,058           6,058         Delivering quality education on health
public health        Academy
professionals

Network for            National Health              54,218           41,751       Three days basic life support training
healthcare in        Emergency                                                conduct for 60 persons
disasters            Preparedness and
and                  Network, Islamabad
emergencies

Research on           National    Research       44,962           41,173       During the year 3448 patients
Fertility                   Institute   for   Fertility                                      attended the NRIFC and 2272 patients
                   Care                                                          got family planning services/ treatment

Health related        AFIC, Al Shifa Eye          528,675          528,675      AFIC and Al-shifa eye hospital
services in the         Hospital                                                        providing free cost treatment to the
Federal Capital                                                                   Federal Government employees.

Page 146

- Health Grants

Health related           District Family              514,289          611,785            i). 979,757 people were given first
services in the         Health Office                                           dose of Covid-19 vaccination
Federal Capital      (DFHO)                                                                                                 ii). 871,935 people were given second
- DFHO                                                                  dose of Covid-19 vaccination
                                                                                                                                                           iii). 232,404 people were given booster
                                                                         dose of Covid-19 vaccination
                                                                                                                       iv). 303,946 patients were provided
                                                                                    healthcare in RHCs/BHUs in rural area
                                                                                               of Islamabad
Health related         Regional Training            35,075           33,575       RTI is providing healt/population
services in the           Institute (RTI)                                                    related education (certificates/
Federal Capital-                                                                   diplomas)
Regional Training
Institute (RTI)

Drugs surveillance,    Drug Regulatory             62,460           31,289
laws and               Authority
regulations

Total                                 49,796,506    19,162,898

     2.  Planned and delivered Key performance targets

     Outputs        KPI’s Description   Planned     Delivered          Results/ Remarks
                                         Target       Target           and Reasons
Tertiary healthcare       Number of Beds -          715           718      100% Target achieved
services              PIMS
                     Bed Occupancy Rate -     77%         79%      100% Target achieved.
                    PIMS
                     Number of Beds            550           550        1,352,214 patients were treated
                         Poly Clinic
                     Bed Occupancy Rate -     100%        100%      100% Target achieved.
                         Poly Clinic
                     Number of Beds -          160           139
                   NIRM
                     Bed Occupancy Rate -     75%         87%      100% Target achieved.
                   NIRM

                     Number of Beds -          200           200      100% Target achieved.
                 FGH
                     Bed Occupancy Rate -     90%         90%      100% Target achieved.
                 FGH
                         Diagnosis &              1,150,000        112,000
                        Treatment of TB
                           Patients
                      Enhancement of           100
                  MBBS seats &
                              starting of BDS by
                         Federal Medical
                      and Dental College

Page 147

Policy   formulation  &   Monitor, Regulate and       550           550      100% Target achieved.
Implementation,           enforce    prescribed
management          of   standards  to  ensure
authorities   and   EPI   quality        organs
including  national  and   Transplant procedures
international             by   the   recognized
coordination              Medical    Institutions
                      and Hospitals in ICT
Homeopathy and Tibb     Registered               13239         11280      Due to non-applied for registration
regulatory services       homeopathic                                       and renewal of the homeopathy
                             practitioners
                       (number of
                              practitioners)
                         Registered Tibb           2250          2300      Due to promotion of Unani system of
                             practitioners                                            medicine
                       (number of
                              practitioners)
                        Enrolments in             10446          8109      Due to lack of admission in the
                      homeopathy                                                 registered homeopathic medical
                       (number of                                                    colleges, the number of enrolments
                           students)                                           were reduced during the FY 21-22
                        Enrolments in Tibb         2250          2350      Due to promotion of Unani system of
                       (number of                                             medicine
                           students)
Preventive                Production of             916,100         353,805
healthcare                vaccines (number)
services                  Production of ORS/       3,000,000        10,000
                        Nimkol (number)
                       Pak-Vac (Covid-19       19,969,240      19,969,240     Making Pak-VAC vaccine in
                          Vaccine)- NIH                                                 collaboration with Pakistan and China
                       Conduct   of   drug        7450           15,350       Target Achieved
                             tests  (number   of
                              tests)
                        Treatment of             250000         195,660       Target Achieved
                             allergy patients
                       (number of
                             patients)
Research on             Treatments in             16000         15550       Target Achieved
Fertility                  Family Welfare
                        Centres (Number
                             of patients)
                       Conduct of                 5             5          Target Achieved
                         research on fertility
                       (number of
                            studies)
Health related            Miscellaneous             600                         Target Achieved
services in the             Trainings by RTI
Federal
Capital-
Regional
Training
Institute (RTI)
Drugs                     Inspections of             1100          1050        Target Achieved

Page 148

surveillance,           Pharma Industry
laws and                  (No.of
regulations                Inspections)
                        Clearance                30,500          29,800       Target Achieved
                               certificates of
                               finish imported
                      goods (number of
                               certificates)
                        Clearance                 5,120           5,100        Target Achieved
                               certificate of
                          exportable goods
                       (number of
                               certificates)

                         Approval of new            20            22         Target Achieved
                           licenses of
                         pharmaceutical
                       companies
                       (number of drug
                            licenses)
                             Certificates to              150           110         Target Achieved
                         pharmaceuticals
                      on Goods-
                          Manufacturing-
                         products standard
                       (number of
                               certificates)
                           Registration of            4700
                       Drugs
                      Sample Disposed          2000          2000        Target Achieved
                                 off
                              Clinical Trails              44            40         Target Achieved
                       Processed

Overseas Pakistanis and Humans Resources Development, Islamabad
PAO: Secretary
Total Demands: Current 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                                      In Rs. 000’
Output                Office       Original     Actual        Results / Remarks and Reasons
                              Budget      Expenditure
Promotion of           Policy Planning Unit   776,600        846,687          During the period under review, the CWAs
overseas           and Community                                                   facilitated  Overseas  Pakistanis  in  befitting
employment and      Welfare Attaches                                  manner  and  resolved 96%  complaints  of
welfare of overseas                                                     Overseas   Pakistanis.   Consequently,   the
Pakistanis                                                                     increase in remittance has also been observed
                                                                                during said period.

Page 149

Resolution of          National Industrial     166,000        156,242         7661 cases were disposed against 5334 fresh
Industrial Disputes     Relation                                            cases reducing the pendency.
                   Commission
Overseas           Bureau of            106,078        123,119       BE&OE has sent 576,668 persons abroad for
employment          Emigration and                                     employment during this period  is above the
promotion and       Overseas                                                     target  i.e 460,000/-. Resultantly, remittances
regulation of         Employment                                       have also been increased.
overseas
employment
promoters
Monitoring and       Bureau of              188,922     215,285           Monitoring and control of immigration in shape
control of             Emigration and                                                of computerization of the data of emigrants i.e
immigration and      Overseas                                           576,668 has been done which is above the
overseas           Employment                                                 target i.e 460,000.
employment
Administrative        Main Secretariat         345,400     339,219         The Ministry had provided full administrative
support to policy                                                               support to its departments in formulation and
making and                                                                  implementation of policy.
implementation
Worker’s education    Directorate of            43,000      51,267           Despite  Covid-19  slowdown   of   training
services             Workers Education                                                activities  were  continued  by DWE  and
                 (DWE)                                                achieved 64% of their target.

    Total                           1,626,000     1,731,821

     2.  Planned and delivered Key performance targets

Outputs           KPI’s Description        Planned        Delivered   Results/ Remarks
                                            Target          Target     and Reasons
Promotion of          Number of Community               24             24      100%  Target  achieved.  The
overseas employment    Welfare Attaches around                                    number  of CWA Wings were
and welfare of            the world                                                         increased by 05 posts at Riyadh,
overseas Pakistanis                                                                    Jeddah,  Doha,  Tokyo  and
                                                                                                       Pretoria.
                                                                           The   creation   of   additional
                                                                                                     stations  resulted  in  resolving
                                                                                               Pakistanis        community’s
                                                                                    problems   &     significance
                                                                                               increasing remittances.
                   Number of complaints of              35,000          34,849     Target achieved
                       emigrants registered by
                    Community Welfare
                       Attaches
                      Percentage of complaints of         71%         96%      Community         complaints
                       emigrants resolved by                                                   resolution is above the target
                    Community Welfare Attaches
 Resolution of        Number of labor disputes              15,550          7661       Total cases 12964 (7630
 Industrial Disputes      resolved                                                        Brought Forward + 5334 Fresh)
                                                                         Were less than the target, out of
                                                                                     which 7661 were disposed
                                                                                          reducing the pendency further.

Page 150

Overseas            Number of employees hired by        460,000         576,668    100% Target achieved.
employment             foreign countries
promotion       and
regulation of overseas
employment
promoters
Monitoring and control   Computerization of data of           460000         576,668    100% Target achieved.
of immigration and      outgoing emigrants
overseas employment
Worker’s education      Training and facilitation of             3913           2508     Due   to   Covid-19,   training
services               Trade Unions, Workers and                                                    activities were  affected  badly.
                     Employers at DWE                                             However, 64%  of  targets are
                                                                                           achieved.

Parliamentary Affairs, Islamabad
PAO: Secretary
Total Demands: Current 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                                                      In Rs. 000’
Output                  Office          Original Budget   Actual         Results / Remarks and
                                                     Expenditure   Reasons
Liaison between        National Assembly, Senate &   198,295                     191,205        Processed and got enacted 68 Bills
legislature and        Committee Branch                                                                including “the enforcement of Women’s
executive                                                                                           Property Rights (Amendment) Act 2020,
                                                                                                      the Mutual Legal Assistance (Criminal
                                                                                                       Matters) Amendment Act 2021, the
Redressal of public                                  73,342                      70,719                                                                                                        National Accountability (Amendment) Act
grievances            Grievance Wing                                                                                               2021, the protection of Journalists and
                                                                                       Media Professional Act,2020, the Muslim
                                                                                                Family law (Amendment) Act 2021, the
                                                                                                Anti-Rape (Investigation & Trial) Act 2021,
                                                                                                      the State Bank of Pakistan (Amendment)
                                                                                                              Act, 2022 and the Elections (Amendment)
                                                                                                              Act, 2022”.
Administrative        Budget & Accounts            210,363                     173,961          Facilitation provided to 36-Parliamentary
support services                                                                                          Secretaries.

                Total                     482,000         435,887

     2.  Planned and delivered Key performance targets

Outputs        KPI’s Description     Planned     Delivered    Results/ Remarks
                                     Target       Target      and Reasons
Liaison             Support to holding         130           150         100% Target achieved.
between             National Assembly
legislature          Sessions (Days)
and                Support to holding Senate   110           114         100% Target achieved.
executive           Sessions (Days)

Page 151

Redressal  of       Grievances redressed out   As per          21,270       100% Target achieved.
Public                 of total complaints.          complaints                     20,880 numbers of complaints
grievances         (Numbers)                  received                         resolved/disposed of.
Administrative          Total number of              40             36               Target Achieved
support services       Parliamentary Secretaries to
                   be appointed.

Planning Development and Special Initiatives Division, Islamabad
PAO: Secretary
                           Total Demands: Current 01 and development 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                                      In Rs. 000’
     Output           Office          Original         Actual       Results / Remarks and Reasons
                                 Budget      Expenditure
Development and       Plan             2,738,724            1,583,411         Projects monitored and review conduted
implementation of       Coordination
national level            Section
sustainable policy
plans and, appraisal
of development
projects (PC-I's) and
their monitoring
Capacity building and   Governance      6,242,708           584,192         Research conducted
research &              Section
development
regarding economic
and development
activities
Provision            for   Public            98,797,022           4,939,880      Lump provision managed
development           Investment
initiatives            Programme
Collection and          Pakistan Bureau   2,956,729            6,950,741         Statistical Survey Conducted and Published
compilation of socio-     of Statistics
economic statistical
data through primary
and secondary
sources including
census
Public Private        PPP Authority          128,375           127,732
Partnership
Development
Services
Provision of                                   1,000,000       1,881,122
Emergency Funds for
National Disaster Risk
Management
Coordination and     CPEC Authority           0
Implementation of

Page 152

China Pakistan
Economic Corridor
(CPEC) in
collaboration with
the concerned line
ministries
Total                              111,863,558    16,067,081

     2.  Planned and delivered Key performance targets

Outputs            KPI’s Description     Planned    Delivered   Results/ Remarks
                                         Target    Achieved   and Reasons
Development and      Number of PSDP             4            4       100% Target achieved.
implementation of        reviews
national level
sustainable policy      Number of                  320          263       Remarkable Performance
plans and, appraisal of   Project
development projects    Monitored
(PC-I's) and their
monitoring                Financial,           CDWP 100   CDWP 251     Target achieved as per planned target.
                       economic, technical     DDWP 700   DDWP 444
                     and environmental
                         appraisal of
                      development project
                        proposals (number
                            of projects)

                         Evaluation of                40           32       Due to inadequate HR/Strength of Staff
                      development
                          projects (number of
                          evaluations)

                    Cash and work plan          1000          716        Sponsoring ministries not responded.
                      methodology (number of
                           projects)
                   Number of PC-4s            200           0         Evaluation Module not operational in PMES
                        published online
Capacity building and   Number of Master/           300           96       PIDE  believes   in   quality  research-based
research &                M.Phil. courses offered,                                   education at post graduate and doctoral level
development            Pakistan Institute of                                  and hence follows stringent admission/interview
regarding economic     Development Economics                                            criteria and selects only such candidates who
and development       Number of students          1000          614       have  potential  to  contribute  towards PIDE
activities                 enrolled at the Pakistan                                Research agenda. Programmes are offered as
                              Institute of Development                                   per HEC requirements and according to the
                     Economics                                            response of the applicants against admission
                                                                                   advertisement. Deviation in the intake target vs
                                                                            achievement is due to managements policy to
                                                                                   take only the brightest applicants in MS/PH.D
                                                                     Programmmes.
                    Number of research           40                    PIDE has outperformed its research targets
                          studies conducted,                                  due to current management's resolve to

Page 153

                        Pakistan Institute of                                          restore PIDE's status as premier Research
                      Development Economics                                          Institute
                    Number of Ph.D.             80
                         students qualified,
                        Pakistan Institute of
                      Development Economics
                    Number of trainings,          38
                      workshops and seminars
                       conducted
                    Number of trainings           32           47       PPMI received demand for 15 customized
                       conducted by Pakistan                                   courses & conducted 15 courses in addition to
                        Planning and                                             calendar course hence increase in the number
                    Management Institute                                           of participants and courses
                    Number of participants at      1225         2308
                        Pakistan Planning and
                    Management Institute
                    Number of youth fellows
                           recruited
Collection and         Quantum Index of large-       12           12      100% Target achieved.
compilation of socio-     scale manufacturing
economic statistical      organizations (published
data through primary     within 45 days) (# of
and secondary           Index)
sources including        National Health Accounts    Analysis of       Yes      100% Target achieved.
census                  (published number of        date and
                           reports)                        finalization
                                                             of NHA
                                                   Report
                                                2019-20
                       Completion of Annual          1            1       100% Target achieved.
                      Gross Value Added,
                      Gross Fixed Capital
                       Formation by Industries
                            at Constant and current
                          prices (once in a year)
                       Completion of                1            1       100% Target achieved.
                        expenditure of GDP at
                          current and constant
                          prices (once in a year)
                       Completion of per capita        1            1       100% Target achieved.
                      income (once a year)
                      Computation of Sensitive       52           52      100% Target achieved.
                          Price Index (SPI) -
                          reports on weekly basis
                      Computation of              12           12      100% Target achieved.
                    Consumer Price Index
                         (CPI) and Whole Sale
                          Price Index (WPI) -
                          reports on monthly basis
                          (# of reports)
                     Advance release of           12           12      100% Target achieved.
                        Foreign Trade. reports

Page 154

on monthly basis (# of
reports)

Merchandized Trade          415          415      100% Target achieved.
Statistics (country by
commodities and
commodities by country)-
(# of reports)
Trade Statistics              12           12      100% Target achieved.
(published days after
month end)
Number of reports to be        1            1       100% Target achieved.
published on
demographic profile and
demographic survey
Collection, compilation &       3            1         Usually AJ&K LFS Report is prepared on
analysis of Labor Force                         (District Level    request of AJK P&D Department. In the month
Survey - number of                      Labour Force    of October, LFS received this request. So,
reports                                Survey 2020-   work on this report is in progress.
                                    21 has been
                                         released and
                                        work of
                                           compilation of
                                           other reports is
                                                    in progress)
Annual Labor force           Provincial     not conducted    Provincial Level Labour Force Survey was not
survey (LFS) (Published     level Labor                   conducted this year. This year District Level
months after year end)        Force                  LFS was conducted. District Level Labour
                           Survey                     Force Survey 2020-21 has been released
Publication of Pakistan         1            1       100% Target achieved.
Statistical Year Book and
Pocket Book
(# of Books)
Publication of Monthly         12           12      100% Target achieved.
Bulletin of Statistics and
Monthly Newsletter (# of
bulletins/ newsletters)
6th housing and                Total       163 reports   100% Target achieved.
population census          Census      are prepared.
(Number of Publications     Reports =     39 Census
i.e. National, Provincial        163       Reports out of
and District Reports)          National    163 have been
                        Census      printed so far
                          Report = 1      whereas
                               Provincial         printing
                        Census       process of
                          Reports = 4     remaining
                                    District     reports-2017 is
                        Census        in progress
                          Reports =     whereas the
                          142         Census
                           Regional      data/reports-
                        Census     2017 of all the

Page 155

                                                 Reports = 3    districts of four
                                                Agencies =      provinces
                                                7         have been
                                                          Frontier      uploaded on
                                              Regions = 6     the official
                                                                  website of
                                                           PBS.
                       Updating of Rural Area     2,264 Rural    3885 Rural     Total Blocks of rural area increased from
                      bocks and retrieval of       Blocks will       Blocks      113,384 to 116,765. Due to which target is
                        data of total 113.384       be updated      updated       revised. Total 115,005 Blocks have been
                        Blocks through GPS                                    completed and 1760 blocks yet to be
                       Devices for Glitzed                                     completed due to security reasons of sensitive
                     maps: Field Activities                                       areas.
                      Data Entry of QCR forms      2,264       3885 Rural
                            of Total 113384 Blocks      Blocks will       Blocks
                                               be         completed
                                                completed
                  Geo referencing and         30,749      44324 Rural     1. Rural blocks increased from 113384 to
                            Digitization Mauzas /          Blocks         Blocks      116765. Total blocks digitized are 114,365 and
                     113384 Blocks Maps        maps           digitized      remaining 2400 are yet to be digitized.
                                                                                              2. The remaining 2400 Blocks are not digitized
                                                                      due to following reasons:
                                                                                                                                                             i. Area under Army control
                                                                                                                                                                   ii. Line of Control
                                                                                                                                                                       iii. Border Area
                                                                                                                     iv. Security reasons
                                                                                                     v. Blocks under water/Dam

                      Scanning of Massavies       12377        No
                                                                                 Target not achieved due to non-approval of
                            of Mauzas / Dehs /         Mauzas
                                                                                     revised PC-1
                           Villages 49507 Mausavis
                    Number of reports to be        1          *1 (Partial)      *Draft Report is ready and will be released
                        published on                                                    shortly after approval. Slight delay occurred
                         contraceptive                                       due to verification of CYP methods by the M/o
                       performance                                                National Health Services, Regulation &
                                                                                   Coordination (M/o NHSR&C).

China Pakistan Economic Corridor Authority, Islamabad
PAO: Chief Executive Officers
Total Demands: Current 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                                                      In Rs. 000’
Output                                 Office    Original Budget    Actual        Results / Remarks
                                                               Expenditure  and Reasons
Coordination and Implementation of China     CPEC              313,000             615
Pakistan Economic Corridor (CPEC) in
collaboration with the concerned line
ministries
Total                                              313,000          615

Page 156

     2.  Planned and delivered Key performance targets

Outputs               KPI’s Description       Planned Target     Delivered          Results/ Remarks
                                                            Achieved        and Reasons
Coordination and             Holding of at least one       100%
Implementation of China      meeting of the Joint
Pakistan Economic           Coordination Committee
Corridor (CPEC) in
collaboration with the
concerned line ministries
                            Holding of meeting of all the    100%
                         11 Joint Working Group
                           under CPEC.
                             Resolution of issues of claim   50%
                    CPEC companies

Poverty Alleviation & Social Safety Division
PAO: Secretary
Total Demands: Current 01 and development 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                                      In Rs. 000’
Output          Office     Original        Actual       Results / Remarks and Reasons
                       Budget        Expenditure
Mainstreaming the   Poverty      2,753,910          4,046,027       Ehsaas Tahfuz Programme
Poverty Alleviation   Division                                     Ehsaas Delivery Unit:
and        Social                                       PPAF
Protection                                         NPGP
Services/Nets                                                         Poverty Alleviation & Social (Main Sectt)
     Total                    2,753,910      4,046,027

     2.  Planned and delivered Key performance targets

 Outputs                    KPI’s Description       Planned      Delivered      Results/ Remarks
                                                    Target        Target       and Reasons
  Mainstreaming the Poverty        Number of Assets to be        50,000           24,968          Due  to  unavailability  of  additional
  Alleviation and Social Protection     transferred to poor household                                      budget    allocation/Rupee   Cover
  Services                      Number of Livelihood          122,888          22,349              (against USD  released by Foreign
                                         beneficiaries to be trained                                       Donor IFAD and against the planned
                              Number of Loans disbursed     91,829           79,701            annual target of Rs. 5 billion (USD 34
                                          to poor Households                                                          million spending), required funds were
                                                                                                            not released to Partner Organizations
                                                                                                             against  the  implementation  plans
                                                                                                approved  by NPGP PMU,  which
                                                                                                                 resulted in the under achievement of
                                                                                                            the planned targets

Page 157

Benazir Income Support Programme, Islamabad
PAO: Secretary
Total Demands: Current 01

    1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                                      In Rs. 000’
 Output             Office      Original         Actual           Results / Remarks and
                           Budget         Expenditure     Reasons
 Unconditional cash    DG (CT)         205,779,740         168,246,000       Provision of regular income support to
  transfer                                                                         7.76    million    poorest    of   poor
                                                                                              beneficiaries, through disbursement of
                                                                                         regular quarterly tranches @ Rs. 7000/-
                                                                                  per quarter/ beneficiary
  Relief Package      DG (CT)             0                8,740,000         Relief Package (ECT Phase-II COVID-
 (Emergency Cash                                                                       19).
 Transfer                                                            To mitigate the effect of  3rd wave of
                                                                                   Covid-19, one-time cash assistance of
                                                                               Rs. 12000 was provided  to 728,000
                                                                                                 families.
 CCT / Waseela-e-    DG (CCT)         18,566,050           20,482,712       Target was  achieved,  payment was
 taleem programme                                                 made to actual eligible students based
                                                                       on admission, attendance compliance,
                                                                       and graduation Bonus.
 National Socio-      DG (NSER)        4,630,800            2,158,000
 Economic Registry
 (NSER)

 Complementary     DG (CI)           1,257,550              0
  Initiatives &
 Graduation
 Undergraduate      DG (CI)           6,631,100            7,347,000      A total number of 76,854 poor students
 Scholarship                                                              were provided University fee and stipend
                                                                                               to  pursue  undergraduate  studies  in
                                                                                           public sector universities.
 Nashonuma (Health   DG (NSER)        2,760,000            4,870,000       Rapid   increase    in   number    of
 & Nutrition)                                                                              beneficiaries in response of Establishing
                                                           New Nashonuma Facilitation Centres.
 ERE/Administration   DG (OM)          10,374,760           6,531,000
 and other program    DG (Tech)
 expenditure        DG (CT)
 Fuel Subsidy       DG (CT)             0               16,752,000       Fuel Subsidy to give relief to 8.38 million
 Scheme                                                                     households to offset the impact of hike in
                                                                                                  fuel  prices. As per  the  directions  of
                                                                                          federal  government,  to  protect  and
                                                                        compensate the poor from impact of high
                                                                                               petrol prices, fuel subsidy was given @
                                                                               Rs. 2000/- per family  to 8.38  million
                                                                                      vulnerable households.
 Total                           250,000,000      235,126,712

Page 158

     2.  Planned and delivered Key performance targets

Outputs        KPI’s Description     Planned     Delivered   Results/ Remarks and Reasons
                                     Target       Target
Unconditional      Number of Beneficiaries of   10,000         7,726         8 million beneficiaries and 97% of planned
Cash Transfer       unconditional cash                                               target was achieved.
                      transfer (in Thousands)
Relief Package    Number of Beneficiaries     4,000           3,200          Target is 80% achieved
(Emergency           (in Thousands)
Cash Transfers)
CCT / Waseela-    Number of Children of       2,643           5,183        100% Target achieved.
e- Taleem         Waseela-e-Taleem
Programme       Programme (in
                  Thousands)
National Socio-    Number of Coverage of     32,500         35,019         Target is achieved. The original target was on
Economic         House Holds across the                                      the  basis  of Census-2017.   Actual  data
Registry (NSER)    country (in Thousands)                                            collection  increased  as  per  population
                                                                          surveyed as of 30.06.2022.
Undergraduate    Number of Students        50,000         76,854        The target over-achieved.
Scholarship

Pakistan Bait ul Mal:
PAO: Managing Director
Total Demands: Current 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                                      In Rs. 000’
Output                        Office         Original        Actual         Results / Remarks and
                                      Budget        Expenditure   Reasons
Provide  financial  assistance  to  the  Managing         6,505, 000         6,504,991          Widows, orphans, invalid and infirm
poorest of the poor                      Director being                                                       irrespective  of  their  gender,  sex,
                         PAO of Pakistan                                                  caste, creed and  religion through
                                                                                                         poorest   of   the   poor   focused                                         Bait ul Mal
                                                                                        Programmes/Schemes            like
                                                                                                                      Individual Financial Assistance  for
                                                                                                     medical   treatment   of   poor  &
                                                                                                       deserving     patients,     financial
                                                                                                         assistance   to   brilliant/deserving
                                                                                                               students,     general      financial
                                                                                                         assistance to disable persons and
                                                                                                              other  needy   persons.  Orphan
                                                                                                                  children  are  being  provided  free
                                                                                                                food, nutrition, boarding and lodging
                                                                                              as well as free high quality education
                                                                                                                               in well reputed educational institutes
                                                                                                       through  Pakistan  Sweet  Homes,
                                                                                                             Provision of home like environment
                                                                                                                       to senior citizens through Pakistan
                                                                                               Old Home, elimination of child labour
                                                                                                       through Schools for Rehabilitation of

Page 159

                                                                                                              Child  Labour  (SRCL),  Vocational
                                                                                                              Dastkari Schools for providing free
                                                                                                                              training/different  skills  i.e.  cutting,
                                                                                                        sewing,  drafting,  knitting, hand &
                                                                                                  machinery embroidery (WECs) and
                                                                     PBM Shelter Homes & PBM Roti Sab
                                                                                               ke Leay are established for mainly
                                                                                                         focus on quality services delivery to
                                                                                                            the shelter-less persons by taking
                                                                                                       care  of multiple aspects including
                                                                                                              health   care,   safe/secure   living
                                                                                                    environment   food    etc.    in   a
                                                                                                           respectable manner and distribution
                                                                                                                        of foods among needy and deserving
                                                                                                   persons throughout the country.
Total                                       6,505,000       6,504,991

      2.  Planned and delivered Key performance targets

        Outputs                  Indicators          Original    Delivered   Results/remarks and
                                                     Target      Target         reasons
The mandate of Pakistan Bait ul     Overall Targets of Pakistan
Mal is to Provide financial           Bait ul Mal for FY 2021-2022     4,050,344      6,088,899
assistance to the poorest of the
poor i.e. widows, orphans, invalid                            Number of beneficiaries of          6,860          5,769      Pakistan Bait-ul-Mal is theand infirm irrespective of their                                       Individual Financial                                           premier social safety netgender, sex, caste, creed and                                  Assistance Education                                           organization of Federalreligion through poorest of the
                            Number of beneficiaries of        3,843,000      5,992,720    Government to providepoor focused
                                  Shelter Homes and Roti Sab                                      social services and reliefProgrammes/Schemes like
                              ke Leay (RSKL)                                                          activities to the poorest ofIndividual Financial Assistance for
                            Number of beneficiaries of         30,772        25,618      the poor segment of themedical treatment of poor &
                        Women Empower Centres                                        society through its differentdeserving patients, financial
                            (WECs)                                             Programmes / Schemes.assistance to brilliant/deserving
                                                                                            For the Financial Yearstudents, general financial        Number of beneficiaries of         49,000        13,720
                                                                                       2021-22 initial Target wasassistance to disable persons and   Individual Financial
                                                                                                              to provide relief to 4 millionother needy persons. Orphan       Assistance Medical
                                                                                                             beneficiaries, however thechildren are being provided free    Number of beneficiaries of          5,100          4,335
                                                                                                     organization not onlyfood, nutrition, boarding and        Pakistan Sweet Homes (PSH)
                                                                                            achieved this target butlodging as well as free high       Number of beneficiaries of          50           33
                                                                                                  provide relief to 6 millionquality education in well reputed    Pakistan Old Home
                                                                                            poor and deservingeducational institutes through      Number of beneficiaries of         58,800        11,090                                                                                                           beneficiaries which isPakistan Sweet Homes, Provision   Individual Financial                                                                        150% of the original target.of home like environment to         Assistance general & SFP
senior citizens through Pakistan    Number of beneficiaries of         37,162        19,080
Old Home, elimination of child      Schools for Rehabilitation of
labour through Schools for          Child Labour (SRCLs)

Page 160

Rehabilitation of Child Labour      Number of beneficiaries           19,600        16,234
(SRCL), Vocational Dastkari          (Institutional Rehabilitation
Schools for providing free          through Registered NGOs
training/different skills i.e. cutting,
sewing, drafting, knitting, hand &
machinery embroidery (WECs)
and PBM Shelter Homes & PBM
Roti Sab ke Leay are established
for mainly focus on quality
services delivery to the shelter-
less persons by taking care of
multiple aspects including health
care, safe/secure living
environment food etc. in a
respectable manner and
distribution of foods among needy
and deserving persons
throughout the country.

 Privatisation Division:
 PAO: Secretary
 Total Demands: Current 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                                       In Rs. 000’
Output               Office       Original        Actual           Results / Remarks and
                             Budget        Expenditure     Reasons
 Policy formulation for       Privatisation        215,000            214,355
 the privatisation of        Commission
 State-Owned
 Enterprises (SOE'S) and
 the process of
 monitoring & evaluation
Total                              215,000         214,355

     2.  Planned and delivered Key performance targets

Outputs            KPI’s         Planned   Delivered  Results/ Remarks
                     Description    Target     Target    and Reasons
 Policy  formulation   for  Number of            07          02      The bidding process for Services International Hotel,
 the    privatization    of   Entities to be                              Lahore and Heavy  Electrical Complex have been
 State-Owned               privatized                                   completed during FY 2021-22. Concluding formalities are
 Enterprises    (SOE'S)   (subject to                                 underway for closure of said transactions.
and  the  process   of   National /
 monitoring & evaluation    International
                           Financial
                              situation and
                          Govt. policy /
                           approval)

Page 161

Percentage                  28%      For Revival of Pakistan Steel Mills, 04 Chinese potential
of entities                                         investors  have  been  pre-qualified.  Buyer-side  due
privatized                                         diligence is underway. Further, certain dependencies are
within                                                lying pending resolution with MoIP and Petroleum Division
stipulated                                               in order to complete the approval process of Scheme of
time.                                       Arrangements by the SECP. The process is now targeted
                                                          for completion by end of FY 2022-23.
                                             For   privatisation   of  House   Building   Finance
                                             Corporation, Expression  of  Investors have been  re-
                                                      invited in October 2022, due to luke-warm response.
                                             For  privatisation of First Women Bank Limited, the
                                             process is currently at halt, as 2018 Audited Report is
                                               pending, due to request of the Bank to Ministry of Finance
                                                      to provide Letter of Comfort, as the minimum capital
                                              requirement of Rs.3.0  billion has been breached. The
                                              marketing process  will be  initiated  after  provision  of
                                            pending Audited Accounts up to 2021.
                                             For privatisation of 02 RLNG Power Plants the process is
                                                 also dependent upon  (i) Amendment in Implementation
                                         Agreement by PPIB, (ii) Amendment in GSA by SNGPL,
                                                                                    (iii) Receivables of approx. Rs. 200 billion to be brought
                                      down to Industry Norm by CPPA-G / Finance Division, and
                                                                 (iv) Rescheduling  of PDFL Loan by PDFL, Finance
                                                      Division. CCoP  in June, 2022 decided and approved
                                                     constitution of a Sub-Committee under the chairmanship
                                                      of  Minister  for Power  for  early  resolution  of  major
                                                  bottlenecks/ issues with respect to debt recapitalization of
                                   NPPMCL. Various meetings of the said Committee were
                                                    held; however, sectoral and transactional issues could not
                                        be resolved.  Further, PC Board  in September, 2022
                                             decided  re-engagement   of  Financial  Advisor   i.e.,
                                            Consortium led by M/s Credit Suisse  for the optimal
                                                  transaction structure of NPPMCL. CCoP in September,
                                        2022 approved the recommendations. The process for re-
                                        engagement of FA is at advance stage.
Sale of GOP          17           0       Out  of 27, auction process  of 10  properties owned/
Land                                               controlled  by  the  Federal  Government  have  been
                                            completed generating proceeds of approx. Rs. 933 million.
                                             For remaining 17 properties, PC had hired a new
                                                  Financial  Advisor, who had completed  sell-side due
                                                     diligence, wherein issues relating to the properties have
                                        been  identified. PC Board  in September, 2022 while
                                                considering   non-marketability    of   the   properties
                                       recommended delisting of 16 properties, which  will be
                                              taken-up with the CCoP for consideration.

Page 162

                                                            The remaining 01 Republic Motors Plot at Mall Road
                                                                  Lahore is also pending resolution of all the encumbrances
                                                                  by MOIP to enable PC to sell the property in the light of
                                                                                 prevailing Civil Court’s order dated January 16, 2019.
                                                                               Further, on the request of Commerce Division, 01 property
                                                                          (from 16 properties), owned by Trading Corporation of
                                                                        Pakistan in Multan have been delisted by the CCOP.

Railways Division:
PAO: Secretary
Total Demands: Current 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                                      In Rs. 000’
Output                   Office         Original        Actual           Results / Remarks and
                                  Budget        Expenditure     Reasons
Railways Policies              Secretary             300,000            226,066        Railways policies implemented
Formulation and
Implementation
Railways Services              Chief Executive      42,000,000          47,064,317       Railways services improved
                                 Office (CEO)
Pak railways infrastructure      Additional           14,454,020           4,510,643        Track developed
& equipment development     General
services - Track*             Manager
                                  Infrastructure
Pak railways infrastructure      Additional            612,728             41,954         Other Infrastructure Developed
& equipment development     General
services - Other             Manager
Infrastructure                    Infrastructure
Pak railways infrastructure &    Additional             1,473,414           797,686         Signaling System improved
equipment development       General
services - Signaling          Manager
                                  Infrastructure

Pak railways infrastructure      Additional            11,686,590          8,075,667         Rolling Stock Developed
& equipment development     General
services - Rolling Stock       Manager
                                  Infrastructure
Pak railways infrastructure &    Additional              516,000           493,352         Target achieved
equipment development       General
services - Regional           Manager
Development

Business                        Additional              602,024           220,096         Target achieved
Development                 General
                          Manager

Governance                     Director                680,814           156,994         Target achieved
                            General
                                  Ministry of

Page 163

                             Railway

Total                                   72,325,590       61,586,775

     2.  Planned and delivered Key performance targets

Outputs      KPI’s Description         Planned     Delivered    Results/ Remarks
                                        Target       Target      and Reasons
Railways          Policies Formulation and
Policies          Implementation (%)
                                                                                               Finalization  of some  policies  is under
Formulation                                       50            40
                                                                                process
and
Implementation
Railways         Freight traffic to be handled
Services            (Billion Tonnes                                                          7.8            8.070      Achieved more than Original Target
                  Kilometers)

               Passenger traffic to be
                handled (Billion Passenger
                                                      22.2          23.110      Achieved more than Original Target
                  Kilometers)

                  Freight Revenue                                                  Target   Achieved  more   than   the
                   (Rs. in Billion)                      22           23.700      Estimated.

               Passenger Revenue (Rs.                                          Target   Achieved  more   than   the
                     in Billion)                          26           26.430      Estimated.

                   Total Revenue Receipt                                            Target   Achieved  more   than   the
                  (Rs. in Billion)                                                      Estimated.
                                                58           60.256

Pak   railways  New track (Kms)                                               Only 0.6 Kms new track laid. Target could
infrastructure &                                                                       not be achieved as no PC-1 of PSDP
equipment                                                                               Project  was  approved   in  2020-21.
development                                                                    Moreover,  the new  track  lying works                                                11              0.6
services         -                                                                 which  were  going  on  under PSDP
Track*                                                                                    projects   like  TR-II  (KPR-LON)  were
                                                                                   closed as the same scope was envisaged
                                                                                                to be carried out under ML-1/CPEC
                   Rehabilitation of track                                             Target could not be achieved as no PC-1
               (Kms)                                                                     of the PSDP project was approved  in
                                                                                 2020-21.      Moreover,   the    track
                                                                                                  rehabilitation works which were going on
                                                180           40.063                                                                              under PSDP Projects  like TR-II (KPR-
                                                                   LON) were closed as the same scope was
                                                                               envisaged to be carried out under ML-
                                                                        1/CPEC.
                   Rehabilitation of structures                                   These bridges were rehabilitated by the
                   (bridges, culverts) (Nos)              80            55        department from our own resources. No
                                                           PSDP works  are  involved  except 02

Page 164

                                                                                     bridges which were rehabilitated under
                                                           PSDP project of RFD
                 Up-gradation of Mail Line-1 (ML-
                   1) under CPEC (K.Ms)
Pak   railways   Rehabilitation  of  existing                                   These Stations were rehabilitated by the
infrastructure &   stations (Nos)                                                  department from our own resources. No
equipment     New Station                                       PSDP works are involved
development     (Numbers)                         23             5
services         -
Other
Infrastructure
Pak   railways    Upgradation of signaling
infrastructure &   system (Kms)                      46            46      100% Target achieved.
equipment
development     Upgradation  of  signaling
services         -   system (No.of stations)
Signaling                                                                      Achieved  for more  than  the  Original                                                 1             4
                                                                                  Target

Pak   railways   Procurement    of   new                                  PC-1   for  25  Nos  new   shunting
infrastructure &   locomotives (Nos)                   10                     -         Locomotives  in  not approved by  the
equipment                                                                    competent forum.
development      Rehabilitation  of  existing                                  PC-1 for Re-Commissioning of 05 DPU-
services         -   locomotives                                               30 De Locomotives is not approved by the
Rolling Stock                                                                 competent forum.    * Locomotive could
                                                                                      not be turned out as per target under
                                                20            10
                                                                                          special repair of 100 Locomotives project
                                                                        due to non provision of FEC by Finance
                                                                                           Division which resulted in non finalization
                                                                                                of procurement for these Locomotives.
                Procurement    of   new                                      Design approval and inspection at sight
               coaches (Nos)                                                  delayed a bit due to COVID restrictions in
                                                46            46        China. 46 Coaches reached Pakistan and
                                                                              under extensive trial before utilization on
                                                                                 system.
                Procurement    of   new                                      Design approval and inspection at sight
              wagons and power vans                                       delayed a bit due to COVID restrictions in
                 (Nos)                                                             China. 70  High Capacity Wagons have
                                                                        been inspected in China and waiting for
                                                200            NIL                                                                               shipment at China Port. Remaining 130
                                                                 Wagons will reach in Pakistan in the Last
                                                                    week of January,2023 which  is well in
                                                                                schedule time.
                 Upgradation              of                                       Quetta and Central Diesel Locomotive
                maintenance        facilities                                     Workshop,  Rawalpindi were  equipped
                                                 1             1                 (Nos)                                                                  with overhead Electric Cranes under up
                                                                                      gradation of Maintenance Facilities.
Business         Establishment of new dry                                  Aza Khel Dry Port shifted from Peshawar
                                                 1             1Development     ports (NoS)                                                                to Aza Khel in March 2021
Governance      Training and Development                                                    Achieved
                                                40            40
                (NoS)
                  Monitoring and Evaluation                                                    Achieved                                                 1             1
                system (NoS)

Page 165

                 Monitoring and evaluation                                             Total 38 M&E Reports were generated
                  reports                            45            38            for PSDP funded projects in Financial
                                                                                       Year 2021-22

Religious Affairs and Inter-faith Harmony:
PAO: Secretary
Total Demands: Current 01

    1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                                      In Rs.000’
     Output           Office          Original         Actual         Results / Remarks and
                                 Budget       Expenditure           Reasons
  Facilitation and         Hajj Wing               664,400            2,975,495         1. Arranged Hajj on subsidized
 arrangement                                                                             rates under Gov Schemes for
 services for Hujjaj                                                               34,000 Hujjaj.
                                                                                                  2. Made Hajj arrangement for
                                                                                83,000 Hajj in short span of time.
                                                                                                  3. Route to Makkah
                                                                                          operationalized and about 50%
                                                                                                  Hujjaj were moved to KSA through
                                                                       scehems
                                                                                                  4. Training Programmes were
                                                                                 arranged for all successful Hujjaj
                                                                                     throughout the country
 Financial assistance    Interfaith Harmony       102,000            102,000          1. All applications for grant of
  in shape of cash      Wing                                                          Scholarship were accommodated.
  transfers, small                                                                                2. 28 Development Schemes were
 development                                                                  approved and executed
 schemes,                                                                                      3. 3,101 cases of cash transfers to
 scholarships for                                                                             minorities community were
  minorities                                                                            received and accommodated.
  Facilitation and      Dawah and Ziarat         1,000               0         No request were received from any
 management of      Wing                                                    Muslim Country or Islamic
 Muslim pilgrimages                                                                   Organization for grant of funds
 beyond Pakistan
 except Hajj, and
 coordination with
 Muslim countries
 and organisations
 on Islamic matters
 Moon sighting        Research and             3,600               4,976        4 Meetings of Central Ruet e Hilal
 services             Reference Wing                                            committee and monthly Zonal Ruet
                                                                          e Hilal Meetings were conducted
                                                                                           successfully
 Celebration of           Interfaith Harmony       160,000            139,909        Arrangements of Minorities
  religious festivals of   Wing                                                               Festivals at Federal Government
  minorities                                                                                       level like Chirstmas, Easter, Holi,
                                                                                                 Diwali, Eid e Rizwan etc were
                                                                                conducted successfully.

Page 166

Policy making and    Main Ministry            300,000            279,628          1. Formulation of Hajj Policy-2022
administration                                                                                 2. Hajj and Umrah Act
                                                                                                3. Iran/Iraq Zaireen Policy
Total                                1,231,000        3,502,008

   2.  Planned and delivered Key performance targets

Outputs            KPI’s Description    Planned    Delivered   Results/ Remarks
                                        Target     Target     and Reasons
Facilitation and           Training for Hujjaj on       20%       100%     100% Target achieved by arranging
arrangement services     Manasik-e-Hajj (as                                            training programmes for successful
for Hujjaj            %age of total Hajj                                          Pilgrims all around the country.
                         quota)

                    Number of                                    Due to Covid-19, these arrangements
                            airports to be                5            1        could only be executed at Islamabad
                         included under                                               Airport by KSA. However, efforts are
                        road to makkah                                    underway to extend Route to Makkah
                                                                                            at remaining 4 stations.
                        No. of Hujjaj               40,000       83132    100% Target achieved. Hajj Quota of
                                                                           83,132 was allowed by KSA for Govt
                                                                     and Private Hajj Scheme.
                       No. of Master               433          433     100% Target achieved. 433 master
                          Trainer                                                        trainers were appointed to train the
                      Male/Female                                                  Hujjaj with basic Hajj concepts and
                                                                                                        rituals.
                  CDS / Books of            200,000         0       Due to late announcement of Hajj by
                       Manasik e Hajj                                  KSA, CDs and books could not be
                                                                                arranged.
                   %age compliance with      100%       100%      Targets Achieved. All complaints were
                  SPA                                                 disposed of.
                   %age of complaints and     100%       100%     100% Target Achieved
                            inquiry resolution
Financial assistance in   Number of                 3300         3101      Target achieved as per the requests
shape of cash             beneficiaries-                                                     for cash transfers received.
transfers, small          cash transfers
development schemes,
scholarships for        Number of                 2900         3636         All applications grant of scholarship
minorities                  beneficiaries-                                      were accommodated.
                         scholarships

                    Number of beneficiaries       35           28        Target achieved as approved by the
                                    - small development                                 Board
                     schemes

Moon sighting services   No. of Ruet e Hilal            4            4        Target achieved. 04 Meetings of
                      Committee Meetings                                      Central Ruet e Hilal Committee were
                                                                                      successfully arranged

Page 167

                    %age of Harmony in Eid                        100% Target achieved.
                       and Ramzan
                       announcement           100%       100%

 Celebration of religious   Number of participants        4,500        4000      Target Achieved. Major events of
  festivals of minorities       in relligious festivals                                         minorities festivals were arranged in
                                                                            Islamabad where there are less
                                                                      numbers of Hindu minority have
                                                                                        resulted in slight a smaller number of
                                                                                            participants
 Policy making and      Number of competitions        9            9      100% Target achieved. 09 categories
 Administration           arranged seerat                                               of literature were selected/ awarded for
                                literature                                                 National Seerat/ Rehmat Tul Lil
                                                                            Alimeen
                          Seerat conference to be    12 Rabi-Ul-    12 Rabi-Ul-   100% Target achieved. National
                           held on                    Awal         Awal       Seerat/ Rehmat Tul Lil Alimeen
                          (Date of holding                                       conference was held at Islamabd on
                          conference)                                                   12th Rabi-ul-Awal
                        Conference to be             4            4      100% Target achieved.
                           held on (Date of holding
                          conference)
                     Number of conferences
                       on sectarian harmony
                            Publications of              1000         1000     100% Target achieved. 1,000 Maqalat
                          Maqalat-e-Seerat                                   were printed and distributed
                       (Number of copies
                             printed and distributed)

Science and Technology Division:
PAO: Secretary
Total Demands: Current 02 and development 01

    1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                                      In Rs. 000’
 Output                 Office              Original      Actual       Results / Remarks and
                                      Budget      Expenditure  Reasons
 Promotion of Standards      D.G, Pakistan National         592,485        346,259     (1) Testing, Calibration and
 and Quality Assurance.        Accreditation Council                                         Inspection of Laboratories,
                           (PNAC), D.G, National                                        Halal Certification of Bodies,
                               Physical Standard                                             Proficiency Testing and
                              Laboratory (NPSL) &                                      Product certification. (2)
                            D.G, Pakistan Halal                                         Testing & Calibration Services
                                 Authority (PHA)                                           Provided to vendors, Standards
                                                                                             Fabricated/ Calibrated and
                                                                                   Reference Materials
                                                                                    Developed.

Page 168

Promotion of Alternate       Chairman, Pakistan            733,670        617,009    Emerging water related issues,
Energy and Water Quality.    Council of Research in                                              Pilot   Sites    for   innovative
                          Water Resources                                          research  and  demonstration
                      (PCRWR) & D.G,                                                     activities to end users, Training
                             Pakistan Council of                                               of               Farmers/end
                         Renewable Energy &                                     users/community  on   efficient
                            Technologies                                             water conservation techniques
                         (PCRET).                                           and    rainwater    harvesting,
                                                                                                   Desertification   Control   and
                                                                                           rainwater harvesting  activities,
                                                                                              Quality Monitoring of Drinking
                                                                                     Water,          Groundwater
                                                                                                  investigation    services    (2)
                                                                                             Projects    with    international
                                                                                                    financial/technical
                                                                                           cooperation/organizations
                                                                                                related  to renewable  energy,
                                                                                            Training programs to installers
                                                                                            /users  of  renewable  energy
                                                                                                  applications.

Promotion of Higher           Rector, National             4,215,542       4,360,830    Paper to be published, Industrial
Education in the field of        University of Science &                                       linkage  established,  No.   of
Science and Technology     Technology (NUST)                                          Patent/ Copy rights/trademarks
                         and Rector,                                                              filed and Research Articles to be
                   COMSATS University                                     presented in conferences.
                           Islamabad (CUI).
Formulation/Implementation   Ministry of Science &         5,087,442        941,651    Prepared    S&T      Policy,
of Policy Frame Work and    Technology (Main                                           Studies/Technical     Reports,
Provision of Admin             Secretariat) &                                          Technology Foresight Studies,
Supports.                  Chairman, Pakistan                                         published quarterly journal on
                             Council for Science &                                    Science  &  Technology  and
                           Technology (PCST)                                          quarter newsletter on STI Voice,
                                                                                 conducted need assessment of
                                                                 S&T  Human  Resources   for
                                                                                                   driving innovation and achieving
                                                                                                  vision  2025.  Incentive  grant
                                                                                       given to 727 SME’s.
Research and Development   Chairman, Pakistan          6,404,611       5,835,965     (1) Testing of Building Material
for Socio Economic           Council of Scientific &                                           (Quality  Control  and  Quality
Development                   Industrial Research                                        Assurance), Destructive Testing
                            (PCSIR), D.G, National                                     Contract    Research    and
                                   Institute of Electronics                                    Consultancy    Services.    (2)
                                (NIE), Chairman,                                        Undertake   mission   oriented
                             Council for Works &                                               multi-disciplinary  research   in
                          Housing Research                                         Pakistan    Maritime   Zones,
                      (CWHR) & D.G,                                        Procurement   of   Specialized
                              National Institute of                                         instruments  and  equipment,
                         Oceanography (NIO)                                            transfer of marine technology.
                                                                                                      (3)   Client   to  be   served,
                                                                                 Processes         Developed,
                                                                                 Processes Leased Out, Patent
                                                                                                      Filed,    Patents    Obtained,
                                                                                     Students Supervised, Analytical

Page 169

                                                                               Equipment      Development,
                                                                                         Established Technical Training
                                                                                   Centre for Precision Mechanic
                                                                           and   Instrument  Technology
                                                                        Gawadr   and   PCSIR     is
                                                                                          aggressively    focusing   on
                                                                                                       Industrial   Linkage   through
                                                                             Focus Group Meeting/Visits to
                                                                                           various   Chambers,   Sector
                                                                                                Specific   Trade   Association
                                                                                      Industries/SEMEs.
Popularization of Science.    Chairman, Pakistan          1,177,65         967,442     Financial  Support   to  R&D
                           Science Foundation                                           Organizations/Universities/
                             (PSF).                                                     Schools, Financial Support  to
                                                            R&D Organization  for holding
                                                                                 Conferences on S&T, Monetary
                                                                                             Benefits   to  Students  under
                                                                                  Science    Talent    Farming
                                                                          Scheme,   Supply   of  S&T
                                                                             documents   to  Researchers/
                                                                                         Students, Technology Roundup
                                                                                                    of    issues    brought    out
                                                                                                       electronically,          Provide
                                                                                            Information                    to
                                                                                        professionals/Researchers    in
                                                                                          the  area  of  ICT/  Research
                                                                                            Tools, Abstracting Service in 10
                                                                             main  subjects,  Collection  of
                                                                               specimens  Identified  Curated,
                                                                                  Catalogued and Preserved  in
                                                                                           Laboratory, Visit in the different
                                                                                   areas     of  the  Country  for
                                                                                                    collection  of  Natural  History
                                                                                   specimens, Patent published in
                                                                                           National International Journals
                                                                           and     Development    &
                                                                                maintenance    of   dioramas/
                                                                                              display for public education.
Liaison with International     Main Secretariat and           330,600        294,986     Contribution on behalf of Govt.
Organizations for the           Joint Scientific Advisor                                           of   Pakistan   provided    to
Development of Science       IL                                                                International Organizations.
and Technology

Total                                           18,542,000    13,364,146

Page 170

   2.  Planned and delivered Key performance targets

    Outputs               KPI’s Description           Planned   Delivered      Results/
                                                       Target      Target      Remarks
                                                                   and Reasons
Promotion of          No. of Testing and Calibration Laboratories    180          228        100% Target
Standards and          Accredited by PNAC                                                        achieved.
Quality Assurance.
Office Responsible,    No. of Inspection Bodies Accredited by        13           14         100% Target
PNAC, D.G, NPSL &   PNAC                                                                     achieved.
D.G, PHA             No. of Medical Lab. Accreditation by PNAC     9            26         100% Target
                                                                                                  achieved.
                     No. of Halal Certification Bodies by PNAC      7            8          100% Target
                                                                                                  achieved.
                           Certification Bodies (PNAC)                 9            10         100% Target
                                                                                                  achieved.
                         Proficiency Testing (PNAC)                 5            4          100% Target
                                                                                                  achieved.
                      Product Certification (PNAC)                3            1          100% Target
                                                                                                  achieved.
                           Certification of Persons (PNAC)              3            1          100% Target
                                                                                                  achieved.
                       Trainings/Courses (PNAC)                  12           16         100% Target
                                                                                                  achieved.
                     No. of Testing & Calibration Services         3200         2991       100% Target
                      Provided by NPSL                                                          achieved.
                        Physical Working Standards                40           44         100% Target
                        Fabricated/Calibrated and Reference                                         achieved.
                        Materials Developed (NPSL)
                     No. of Training/Workshop Organized by       10           10         100% Target
                 NPSL                                                                      achieved.
                        On-site Calibrations by NPSL               220          230        100% Target
                                                                                                  achieved.
                     No. of Public/Private Sectors Clients Served    400          380        100% Target
                    (NPSL)                                                                    achieved.
                 PT Program Organized by NPSL             5            6          100% Target
                                                                                                  achieved.
                          Participation In International ILC/PT          2            5          100% Target
                    Programs (NPSL).                                                          achieved.
                     Paper Published (International), NPSL        5                    -                    -
                     Paper Published (National), NPSL            5            2          100% Target
                                                                                                  achieved.
                       Technical Reports (NPSL)                  6            1          100% Target
                                                                                                  achieved.
                       Consultancies Provided by NPSL            5            2          100% Target
                                                                                                  achieved.
                 MoUs Signed by NPSL                    4            11         100% Target
                                                                                                  achieved.
                      Students Supervised (NPSL)                5            13         100% Target
                                                                                                  achieved.
                     No. Need based Projects (NPSL).            8            1          100% Target
                                                                                                  achieved.

Page 171

Promotion of          No. of R&D Projects on emerging water       5            6          100% Target
Alternate Energy and    related issues (PCRWR).                                                    achieved.
Water Quality. Office    Operation of Research Farms (1286 acres)    7            5          100% Target
Responsible:         and Pilot Sites for innovative research and                                    achieved.
Chairman (PCRWR)    demonstration activities to end users (Nos.),
& D.G (PCRET)     PCRWR
                        Training of Farmers/end users/community on   400          45          Lack of allocation
                             efficient water conservation techniques and                                   of funds for
                        rainwater harvesting (persons), PCRWR                                   research purposes
                          Desertification Control and rainwater          50           81         100% Target
                        harvesting activities Plantation (acres),                                       achieved.
               PCRWR
                       Capacity Building of Staff of Water Supply     300          250        100% Target
                     Agencies and professionals (Persons)                                        achieved.
                PCRWR.
                        Monitoring of Bottled Water throughout the     4            4          100% Target
                       country (no. of Quarters per year), PCRWR.                                  achieved.
                        National Water Quality Monitoring throughout   13000        12500        Target Achieved
                              field laborites (No. of Samples): Drinking
                     Water Testing, PCRWR
                     Annual Report, Newsletter, Brief Handouts,    14           13           Target Achieved
                     Research Reports, Paper and Publications
                            for end users, professionals and policy
                   makes (No.), PCRWR.
                     Groundwater Investigation Services (Nos.),    30           28           Target Achieved
               PCRWR
                        Fabrication and distribution of indigenous      10000        7000        Lack of demand of
                        technologies like microbiological testing kits,                                   tablets
                         testing-meters, etc (Micro testing kists Nos.)
                PCRWR.
                        Fabrication and distribution of indigenous      10000         11,895      100% Target
                        technologies like microbiological testing kits,                                  achieved.
                         testing-meters, etc (Mehfooz Pani Tablets -
                MPT Nos.) PCRWR.
                   Number of projects with international          3            3          100% Target
                          financial/technical cooperation/organizations                                  achieved.
                         related to renewable energ (PCRET)
                        Training programs to installers/users of        4            3             Target Achieved
                     renewable energy applications (PCRET)
                     Arrangement of renewable energy            2            2          100% Target
                      seminars/conferences (PCRET)                                              achieved.
                PHD research projects carried out at PCRET   1            0          No  PhD   student
                         lab (PCRET)                                                            from     academia
                                                                                                 contacted  PCRET
                                                                                                     during 2021-22  for
                                                                                           accomplishment  of
                                                                                                research     project.
                                                                                         However,   9  BS
                                                                                               Students completed
                                                                                                                        their     Research
                                                                                                          Project  in PCRET
                                                                                                Lab.

Page 172

               MS research projects carried out at PCRET    4            4          100% Target
                         lab                                                                        achieved.
                 PV Panel testing services to Public/Private     5            0          No     companies
                       Sector (PCRET)                                                      approached PCRET
                                                                                                                         for  getting  testing
                                                                                                       service for their PV
                                                                                                      panels.
                       Provide Consultancy/technical services to      6            2             Target Achieved
                         Public/Private sector organizations in the field
                          of renewable energy technologies (PCRET)
                      Impact factor Journals publications in the      2            2          100% Target
                              field of Advance PV Technologies (PCRET)                                   achieved.
                         Collaboration/signing of MoUs with           4            4          100% Target
                          National/International                                                       achieved.
                       Universities/Organizations/Companies
                   (PCRET)
                       Patents filed in the field of renewable energy   1            0          PCRET worked on
                        technologies (PCRET)                                          new prototypes,
                                                                                       however they did
                                                                                                     not mature and
                                                                                                         therefore could not
                                                                                                                                                   file patent.
                       Prototype development of renewable energy   4            4          100% Target
                       products (PCRET)                                                          achieved.
                         Accreditation of Testing Lab with ISO-17025    1            0          PCRET is
                       standard (PCRET).                                                              establishing new
                                                                                                    Testing Lab under
                                                                                                     the Pak-Kocia
                                                                                                               Project, which will
                                                                                    be accredited.
                                                                                                           Existing Testing
                                                                                                                        Facility at H-9 can
                                                                                                      only conduct 6 tests
                                                                                                      instead of total 19
                                                                                                               tests as per IEC-
                                                                                            61215, therefore
                                                                                                           accreditation of this
                                                                                                                                       facility is not
                                                                                                                 feasible.
Promotion of Higher    Paper to be published by NUST              1700         1724       100% Target
Education in the field                                                                               achieved.
of Science and
Technology Office
Responsible: Rector     Industrial linkage established by NUST        850          825        100% Target
NUST and Rector                                                                                  achieved.
CIIT
                     No. of Patent/Copy rights /trademarks filed by   350          118         The major reason of
                NUST                                                                       not achieving this
                                                                                                              target was the
                                                                                      pandemic (COVID-
                                                                                                            19).

Page 173

                     No. of Research Articles to be presented in    450          240         The reason for
                      conferences by NUST                                                               disparity is that the
                                                                                                      presentation of
                                                                                                                      articles in
                                                                                              conferences was
                                                                                                         affected due to the
                                                                                      COVID-19.
Formulation/Impleme   No. of S&T Policy Studies/ Technical Reports   5            5          100% Target
ntation of Policy       (PCST)                                                                    achieved.
Frame Work and
                     Technology Foresight Studies (No.), PCST     1            2          100% Target
Provision of Admin                                                                                                  achieved.
Supports. Office
Responsible: Main      Executive Committee of NCST meetings       1                    -            The case has been
Secretariat &         (PCST)                                                               processed in PCST
Chairman, PCST                                                                       and submitted to
                                                                                          concerned quarters.
                        Quarterly Journal "Science Technology"       4                    -           Due to vacant post
                     (PCST).                                                                             of Chairman and
                                                                                                                 non-availability of
                                                                                                         relevant technical
                                                                                manpower in PCST.
                 PCST Quarterly Newsletter "STI Voice"        4                    -           Due to vacant post
                    (PCST)                                                                              of Chairman and
                                                                                                                 non-availability of
                                                                                                         relevant technical
                                                                                manpower in PCST.
                    Books (Directories etc.), PCST.              1                    -           Due to vacant post
                                                                                                                of Chairman and
                                                                                                                 non-availability of
                                                                                                         relevant technical
                                                                                manpower in PCST.
Research and          Testing of Building Materials (Quality Control   60           139        100% Target
Development for       and Quality Assurance), CWHR.                                             achieved.
Socio Economic        Non-Destructive Testing Contract Research    8            4          100% Target
Development Office    and Consultancy Services, CWHR.                                           achieved.
Responsible:              Skill Development and Training to            3            0               Financial constraint
Chairman, PCSIR,      Organizations (CWHR).
D.G, NIE, Chairman,    Dissemination of R&D Products (CWHR).      5            2         R&D financial
CWHR & D.G, NIO                                                                                           constraint.
                      Other Activities Related to joint Collaboration   6            200          200 Sale letters
                   (CWHR).                                                                   sent to Builders &
                                                                                                Developers.
                             Civil Engineering Conference, Exhibitions,     3            2          100% Target
                    Symposia etc. (CWHR).                                                     achieved.
                   To coordinate and maintain liaison with        5            5          100% Target
                          international organization and institute for                                     achieved.
                       arranging training or expert services (No.)
                       (NIO)
                   To undertake mission oriented multi-          20           20         100% Target
                           disciplinary research in Pakistan maritime                                     achieved.
                     zones (NIO).
                     Procurement of Specialized instruments and   6            6          100% Target
                      equipment, transfer of marine technology,                                    achieved.

Page 174

                    and development of cooperative research
                     program by NIO.
                     No. Clients to be served by PCSIR           14500        16089       100% Target
                                                                                                  achieved.
                     No. Processes Developed (PCSIR).          195          231        100% Target
                                                                                                  achieved.
                     No. Processes Leased Ount (PCSIR)         75           80         100% Target
                                                                                                  achieved.
                     No. of Services Provided by PCSIR.          38500        47490       100% Target
                                                                                                  achieved.
                     No. Patent Filed (PCSIR).                  55           20            Target Achieved
                     No. Patents Obtained (PCSIR).              30           3               After filing the
                                                                                                         patents, it takes
                                                                                          around 02-04 years
                                                                                                                         for Patent grant.
                     No. Students Supervised (PCSIR).           950          988        100% Target
                                                                                                  achieved.
                     No. Consultancies Provided (PCSIR)         425          667        100% Target
                                                                                                  achieved.
                     No. Technical/Feasibility Reports (PCSIR).     175          275        100% Target
                                                                                                  achieved.
                     No. of Paper Published (International)         190          122           Target Achieved
                    PCSIR.
                     No. of Paper Published (National) PCSIR.      85           34          Due to COVID-19
                                                                                         Pandemic.
                     No. Analytical Equipment Development        173          223        100% Target
                      (PCSIR).                                                                   achieved.
                        Exhibitions/Conferences/ Seminars           95           93            Target Achieved
                     Organized by PCSIR.
                      Trainings/Workshops Organized by PCSIR     155          146           Target Achieved

                     No. MoUs Signed by PCSIR                50           31          Due to COVID-19
                                                                                         Pandemic.
                          Interaction with Industries (visits), PCSIR.      1200         1926         Target Achieved

                     Research & Development of Electronic        10           6             Target Achieved
                      Products (NIE).
                     Design & Development of Energy            6000         8624       100% Target
                       Conservative Products, Energy Management                                 achieved.
                 & Audit by NIE.
                     No. of Testing Calibration of Electronics       100          90            Target Achieved
                     Equipment (NIE).
                     No. of fabrication of printed circuits board of    1300         889         Due to COVID-19
                           different layer jobs (NIE)                                                Pandemic.
                   To Impart Advance Training in IT &           600          350         Due to COVID-19
                         Electronics (NIE)                                                      Pandemic.
                       Provide Internship to University Students by    300          250           Target Achieved
                    NIE

Popularization of      No of research and development             60           61         100% Target
Science. Office         organizations to be provided with support                                     achieved.
Responsible:          (PSF)
Chairman, PSF.         Financial Support to Societies/ Journals/       10           4           Due to paucity of
                      Schools by PSF                                                               funds.

Page 175

No. of Research Initiatives to by undertaken    35           51         100% Target
by PSF                                                                    achieved.
Financial Support to Conferences/            55           29          Due to paucity of
Workshops/ Symposium by PSF                                               funds.
Financial Support to Organize Project         4            2           Due to paucity of
Formulation Workshops by PSF                                                funds.
Financial Support to Scientific Societies of     18           15          Due to paucity of
Pakistan by PSF                                                               funds.
Literature Search & Supply of S&T           95000        86230        Target Achieved
Documents (PASTIC)
No. of Users served by PASTIC for           7900         7420          Target Achieved
Documents Supply Services.
No. of Events (Seminars, Symposia,          13           12            Target Achieved
Exhibitions) organized by PASTIC.
Technology Roundup No. of issues brought    6            6          100% Target
out electronically (PASTIC).                                                 achieved.
Pakistan Journal of Computer & Information    2            0            Suspended for
Systems (PASTIC)                                                                putting more focus
                                                                on secondary
                                                                             resources.
No. of Library and Information Professionals/   2500         3147       100% Target
Researchers trained in the area of ICT/                                       achieved.
Research Tools by PASTIC
Abstracting Service (Pakistan Science        16000        14500        Target Achieved
Abstracts, PSA in 10 main subjects) PASTIC.
No. of clients served by Library (PASTIC).     15000        13670        Target Achieved

No. of Printing Jobs complected by PASTC.    192          75          The number of jobs
                                                         may vary as per
                                                                           request received
                                                                        from clients.
No. of Organizations served regarding        17           16            Target Achieved
printing services by PASTIC
Technology databases, PASTIC.             16           16         100% Target
                                                                           achieved.
No. of specimens Identified Curated,          29500        73058       The figures also
Catalogued and Preserved in PMNH                                         contained number
Laboratory.                                                                          of collected
                                                                   specimens along
                                                                                 with specimen
                                                                           Curated,
                                                                      Catalogued and
                                                                       Preserved in PMNH
                                                                              Laboratory. These
                                                                   specimens have
                                                                been collected in
                                                                             the result of
                                                                            extensive field
                                                                     works in the
                                                                                         different regions of
                                                                             the country.

Page 176

No. of Collaboration /MoUS signed with       11           2             Previous and
National and International Organizations by                                   present conditions
PMNH.                                                                              of the country for
                                                                                  foreign
                                                                                 collaborators to
                                                           come and work
                                                                              here, lengthy
                                                                        process to sign an
                                                                       agreement. While
                                                          many National and
                                                                                    International level
                                                       MoUs are in
                                                                         progress for
                                                                                   collaborative
                                                                          research work.
                                                                           Signing of any MoU
                                                                                                   is a regular activity
                                                                             but it is depending
                                                                upon various
                                                                                  conditions.
No. of visit in the different area of the Country   20           18            Target Achieved
for the collection of Natural History
specimens by PMNH.
No. of Research Articles/ Books/             18           51           Research
Monographs/ Paten is published in National                                    Collaboration
and International Journals by PMNH.                                      developed on
                                                                              National and
                                                                                    International Level
                                                                    by the researchers
                                                                                      of PMNH.
                                                                     Researchers of
                                                 PMNH also
                                                                          supervised students
                                                                                      of M.Phil and Ph.D.
                                                                These
                                                                                 collaborations result
                                                                                            in research
                                                                                    publications.
Workshop/symposia training on taxidermy     13           20         100% Target
medical plants/gemstone/are mineral                                         achieved.
identifications by PMNH
Development/ maintenance of               31           8           As per plan 31
dioramas/display for public education by                                        displays to be
PMNH.                                                                   renovate and
                                                                                 established. But
                                                                due to unavailability
                                                                                      of funds,
                                                                                renovation, up-
                                                                             gradation and
                                                                           establishment of
                                                                                     existing and new
                                                                               displays remaining
                                                                           pending.

Page 177

                       No. of Schools/ Colleges/ Universities and     150000       286587      Due to the
                       General Public Visited in PMNH.                                              renovation and
                                                                                                         creations of new
                                                                 PMNH display and
                                                                                                                      publicity through
                                                                                       media numbers of
                                                                                                                          visitors are
                                                                                                            increasing.

                         Impart of Education through lectures, public    35           80         100% Target
                          display (PMNH).                                                            achieved.

States & Frontier Region Division
PAO: Secretary
Total Demands: Current 01

     1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22
                                                                                                                      In Rs. 000’
     Output             Office         Original Budget       Actual      Results/ Remarks and
                                                       Expenditure        Reasons
  Administrative and   Main Secretariat               158,740             153,157       For  administration   /  Policy
  Policy formulation                                                                              formulation     of    Afghan
  services                                                                              Refugees,
                                                                                           Ex-Rulers & Federal Levies
  Maintenance of       Chief Commissionerate         590,000                 568,163   For  maintenance   of  54
  Afghan Refugees’     for Afghan Refugees                                                Refugees’    Camps      in
  Camps                                                                                    provinces of Pakistan
 Allowance for        Main Secretariat                20,460                   20,460    Paid  to  Ex-Rulers  of  06
 Ex-Rulers of merged /                                                                        States
 acceded States
 Management of     Home & Tribal Affairs           2,520,530            2,604,351       For  maintenance  of  6,559
 Federal Levies &      Department Balochistan                                              sanctioned posts of Federal
 Khassadars                                                                               Levies Balochistan
 Total                                        3,289,730     3,346,132

     2.  Planned and delivered Key performance targets

 Output      KPI’s Description           Planned      Delivered Target   Results/ Remarks and
                                         Target                      Reasons
  Maintenance   Provision of basis health facilities     18,400          18,400            100% Target achieved.
   of Afghan      (No. of patients per month)
  Refugees’      Provision of basic education         98,712          98,712            100% Target achieved.
  camps            facilities
                  (No. of students enrolled)
                  Provision of water and sanitation     1,440           1,440             100% Target achieved.
                        facilities
                  (No. of hand pumps)
                  Provision of water and sanitation     66             66               100% Target achieved.
                        facilities
                  (No. of tube wells)

Page 178

                   Total population of registered        1,435,445        1,282,963 POR        1,435,445  is  the  figure  of
                Afghan refugees in Pakistan                            (Proof of Registration)   previous year but now the
                    (in numbers)                                     136,490                 actual figure is 2,219,453
                                               UMRF
                                                                          (Un-registered
                                                       Member of Registered
                                                                           Families)
                                                                 800,000
                                                ACC
                                                                   (Afghan Citizen Card)
                No. of Afghan refugees to be        45,000          5,070             11% Target achieved
                   repatriated
                   Total Number of Afghan refugees    3                 2.7              90% Target achieved
                    (in million) Estimated
              Number of registered afghan         1.435            1.42             99% Target achieved
                 refugees
                    (in million)
              Number of un-registered afghan     1                 0.5              50% Target achieved
                 refugees Estimated
                    (in million)
                No. of basic health units for Afghan   44             44               100% Target achieved.
                 refugees Commissionerate of
                Afghan Refugees (CAR)

Water Resources Division:
PAO: Secretary
Total Demands: Current 03 and development 01

    1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                                      In Rs. 000’
      Output             Office       Original Budget     Actual        Results / Remarks and
                                                    Expenditure          Reasons
 Admin support /        M/o Water                  320,000         316,259
 Policy development     Resources
 and approval /
 technical support
 Climate resilient      WAPDA and              43,313,108        30,925,119
 Water infrastructure     Provincial Irrigation
 development           departments for
                            federally funded
                           projects
 Sustainable water      IRSA and WAPDA       59,908,635        73,304,196
 resource                   for the purposes of
 management,          water  management
 monitoring & flood      and CEA/CFFC  for
  mitigation services       coordination of
                            flood irrigation
                          services

Page 179

Research &         WAPDA,                    453,949         327,949
development /        CEA/CFFC, IRSA
capacity building

               Total                   104,083,312    104,873,523

   2.  Planned and delivered Key performance targets

Outputs          KPI’s Description     Planned Target       Delivered         Results/ Remarks
                                                      Achieved       and Reasons
Admin support / Policy
                          Finalization/Approval ofdevelopment     and
                         National Water Policyapproval   /  technical
support
Climate resilient Water   Number of Medium              1                WAPDA      through   The    Project   was
infrastructure          Dams to be started          Naulong Dam                  Consultants carried out    originally  financed  by
development                                            (0.20 MAF)                    updation of Studies as   Government ofI Pakistan
                    Number of Large                                                well as new  Studies   under PSDP.  / CDWP in
                   Dams to be Started                                  recommended     by   January 2016 directed
                                                                                    Asian   Development    to explore funding  for
                                                                       Bank   (ADB)     for   the   Project   outside
                                                                                     securing  financing for   PSD.      WAPDA
                                                                                           the  Project.  Besides,   approached    various
                                                      MoWR  pursued ADB   International  Financial
                                                                                                           for approval of loan for    Institutions.
                                                                                       the   Project.   ADB's   Only ADS shown interest
                                                                         Loan    Fact  Finding    for financing the Project
                           Total water                  15.89 MAF                    Mission          visited
                         storage capacity                                            Pakistan     in   May
                      (MAF)
                                                                            2022 in connection with
                    Number of Feasibility                                                                                           Project    Readiness
                         Studies (FS) to be                                                                                    Financing    for   the
                       completed including                                                                                           Project   for  US$ 5
                           formulation of Detailed                                                                                                       Million    by    ADB.
                         Engineering Design                                                        WAPDA  initiated  the
                      (DED) and PC-I for                                                                          Advance       Actions
                        Large Dams                                                                               proposed by ADB for
                    Number of feasibility         Shyok                         securing PRF Loan for  Non clearance
                         Studies (FS) to be            Multipurpose                   the Project                to   enter  the
                       completed including       Dam (FS) (5.5                            Dam  area  for
                           formulation of Detailed      MAF)                        Rs. 864  million have    field    studies
                         Engineering Design                                   been incurred on the   /surveys by the
                      (DED) and PC-I for                                             Project   upto   June   H/Q  07   Div
                    Medium Dams                                            2022.       Presently,   Miranshah.
                                                   Murunj Dam (FS & DED)                                                                                     Modified 2nd Revised                                                         (0.60 MAF)
                                                                              PC-I  of  the  Project   No, dam  axis
                                                                          amounting   to   Rs.    sites have been
                                                                                39,944 million (based    investigating
                                                                         on   ADB    &I GoP   due   to  weak
                                                  Sindh Barrage (FS)             funding)  has  been   geological
                                                         (1.80 MAF)                  approved by   '           conditions.
                                                       ECNEC in its meeting   Extensive
                                                                                  held on 07.10.2022      increase      in

Page 180

                                                Kurram Tangi                                              geological
                                     Dam - Stage II           ADB on 25.10.2022    investigation
                                              (FS& DED)                  has   also  approved    (I.e.      Drilling
                                                         (0.90 MAF)                     Project    Readiness   extended  from
                                                                                    Financing (PRF)   for   1,150m       to
                                                              US$ 5  Million. Loan   2,700m)
                                                                          Agreement   between                                                       Hingol Dam (DED) (0.816
                                                           ADB and GoP will be                                           MAF)
                                                                                  signed shortly.
                                                Bhimber Dam (FS & DED)
                                                                              Procurement        of                                                       (0.029 MAF)
                                                                                            detailed   engineering
                                                                              Design    consultants                                                          Chiniot Dam (DED) (0.85
                                                                         and  consultants   for                                           MAF)
                                                                                         stakeholders’
                                                                         engagement     and
                                                                                              social     mobilization
                                                                               under ADB’s PRF  is
                                                                               under   Process   by
                                                             WAPDA.       Project
                                                                    commencement      is
                                                                                 schedule             for
                                                                               August,2024

                                                                                 Updation of Feasibility
                                                                                             started and completed
                                                                                 about 70%. The hiring
                                                                                                 of consultants for DED
                                                                                                               is under process and
                                                                                       the    evaluation    of
                                                                                            technical proposals is
                                                                               underway.  Feasibility
                                                                                    study  completed  by
                                                       WAPDA     in-house
                                                                                   resources   in   June
                                                                                 2020.
                          Finalization/Approval of
                         National Water Policy

Sustainable     water    Hydrology &           O&M continued          O&M continued
resource                Research: Hydro
management,             meteorological
monitoring  &   flood     Station (HYCOS)
mitigation services       under O&M

                        Flood Telemetry         O&M continued          O&M continued
                           Stations under O&M

                      Weather             O&M continued          O&M continued
                         Observations
                       under O&M

Page 181

Expansion of Flood         9                        The project has been    completed
Forecasting Stations                                            recently completed at
under Flood                                              30.06.2022 and
Management                                                     currently in Defect
Component of                                                           Liability Period (DLP)
2nd Rehabilitation of
Warsak Project

Installation of                PC-I will be processed and    The installation of     completed
automatic stream             approved. Proposal to be     04 NoS. flows
gauging stations to            included in Flood Protection    measuring stations
be completed by              Sector Project-III                                                             at the upstream of
Neelum Jehlum                                      NJHPC on riverHydro- Power Project
                                            Neelum atfunded
                                                       Islampura, Taubat,
                                                     Kel and Sharda has
                                              been completed on
                                                   30.11.2020
Expansion of Flood           PC-I will be processed       Under the         No Variance
Telemetric Station under     and approved.                 instructions of FFC
TIKA                                          and MoWR,
                                                     hydrology and
                                                Research
                                                         Directorate WAPDA
                                                   Submitted Proposal
                                                             to Turkish Gov for
                                                                Installation of 18
                                                 No. Flood
                                                      Telemetric Stations
                                                                  in Pakistan for its
                                                      funding approval
                                                   from TIKA
Automation of 20          34 Stations and 12        The project has       Completed
No. Existing Manual         weather stations          been completed on
Gauging Stations                                     31.08.2021
under WCAP

Installation of new            Proposal to be included       Proposal has been    NoVariance
Automatic Hydromet            in Flood Protection           considered to be
and Gauges Stations         Sector Project-III              included in Flood
in Balochistan funded                                                         Projection Sector
by Foreign donors/PID
                                                                 Project-III

Development of              PC-I has been
Telemetry Network in         prepared.
Upper Indus Basin
Funder by WB under
Dasu HP

Up gradation of Existing      34 Stations and 12 weather   The project has     No variance
FFT and Manual               stations                  been completed on
Climate Stations funded                                31.08.2021
by World Bank under
WCAP Project.

Page 182

 Number of           Number of research          5 (20%)
 research                 studies
  studies                     initiated/carried out
  initiated/carried          (along with
  out (along with           work completed in
 work completed         %age)
  in %age)

                                Installation of new              Installation of AWS
                       Weather Stations         & ARL's
                         under Pakistan Glacier
                           Monitoring Network
                             Project (KfW funded)

                      Mass balance              3
                           study/survey
                          (Passu, Yashkuk
                          Barpu, Hispar
                             Glaciers)
                        (Number)

                        Snout Survey (Kuki          1
                            Jerab, Dook Pal, Hunza,
                           Astore and Gilgit
                             Glaciers)
                        (Number)

National Assembly:
PAO: Secretary
Total Demands: Current 02

    1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                         In Rs. 000’
 Output             Office              Original Budget    Actual            Results / Remarks
                                                       Expenditure      and Reasons
 Overall effectiveness
  of the National                                                                       Funds were surrendered
                      Main secretariat              2,600,307              2,510,246
 Assembly                                                                                                   to the Government

  Committee
 effectiveness / Public
                                                                                   Funds were surrendered
 Accounts Committees   Main Secretariat              2,980,693              2,692,134                                                                                                               to the Government
  / Research etc.

 Total                                  5,581,000          5,202,380

Page 183

      2.  Planned and delivered Key performance targets

 Outputs                KPI’s Description        Planned Target        Delivered Target   Results/ Remarks
                                                                             and Reasons
 Overall effectiveness of   Meeting of National                                      100% Target achieved.                                                    130               130
 the National Assembly    Assembly (In days)
                               Facilitation to MNAs                                      100% Target achieved.
                                                    285               285
                           (No.of MNAs)
                                                                       100% Target achieved.                                  Bills passed (Numbers)            29                51
                                                                       100% Target achieved.
                          Resolutions (Numbers)            14                17

                                                                       100% Target achieved.                          Notices (Numbers)               246               303
                         Questions received in                                     100% Target achieved.
                                                   5033              5680                           Sectt (Numbers)
                                                                       100% Target achieved.
                         Motions (Numbers)               349               449

 Committee              Meeting of Public                                        100% Target achieved.
 effectiveness   /  Public   Accounts Committees             38                62
 Accounts Committees /   (Numbers)
 Research etc.            Monitoring and
                         Implementation                  20                12
                        committee (Numbers)

                     Sub committees of PAC
                                                     12                 7                        (numbers)

 The Senate:
 PAO: Secretary
 Total Demands: Current 02

      1.  Budget and expenditure Analysis by Outputs for the period July-21 to June-22

                                                                                                          In Rs. 000’
    Output          Office      Original Budget      Actual Expenditure     Results / Remarks and
                                                                     Reasons
Administrative
                       Senate
services to                                 2,199,318                  1,972,151              As per Parliamentary                          Secretariat
legislation (Senate)                                                                                   requirements
Overall
                       Senate
effectiveness of the                          1,548,373                  1,131,140
                          SecretariatSenate

            Total                  3,747,691              3,103,291

Page 184

     2.  Planned and delivered Key performance targets

Outputs            KPI’s Description    Planned    Delivered      Results/ Remarks
                                        Target      Target        and Reasons
Overall effectiveness of  Number of days, the       110          118             Minimum  110  days  required  as  per
the Senate             Senate shall meet during                                         Constitutional requirements under
                     a year                                                                  Article 61 read with 54

                    Number of Senator to be   100          99             One Senator have not taken oath, hence
                               facilitated                                                    seat remained suspended
                    Number of Chairmen      40           40            100%   Target   achieved   As   per
                        Standing Committees to                                       parliamentary requirements
                     be facilitated