Skip to content
Qanoon Digest

Details of Demands for Grants and Appropriations - Vol-IV (Development), part 3

FY 2025-26Details of demandsPages 201 to 300 of 671

The Details of Demands for Grants and Appropriations - Vol-IV (Development) is part of the federal budget for FY 2025-26. This page reproduces the text of its 671 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.

Go to a page or part

This text was extracted automatically from the PDF's text layer. Tables may lose their column alignment, and a page with no text layer is marked rather than guessed. Check the official PDF before relying on any figure.

Page 201

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

RN0094 CONSTRUCTION OF APPROACHES ON BOTH SIDES OF SHIEKH KHALIFA BRIDGE (UAE) OVER RIVER
INDUS LENGTH 1521
014101- A05    Grants, Subsidies and Write off Loans            200,000,000          200,000,000            30,000,000
014101- A052   Grants Domestic                                  200,000,000          200,000,000            30,000,000
        Total- CONSTRUCTION OF APPROACHES ON         200,000,000        200,000,000          30,000,000
          BOTH SIDES OF SHIEKH KHALIFA
           BRIDGE (UAE) OVER RIVER INDUS
          LENGTH 1521
RP8111 CONSTRUCTION OF DEC OFFICE RAJANPUR
014101- A05    Grants, Subsidies and Write off Loans                                 100,600,000
014101- A052   Grants Domestic                                                        100,600,000
        Total- CONSTRUCTION OF DEC OFFICE                                  100,600,000
          RAJANPUR
SG0175 CONSTRUCTION OF DUAL CARRIAGE WAY FROM SALAM TO SARGODHA VIA BHALWAL AJNALA ROAD
014101- A05    Grants, Subsidies and Write off Loans            500,000,000          500,000,000            30,000,000
014101- A052   Grants Domestic                                  500,000,000          500,000,000            30,000,000
        Total- CONSTRUCTION OF DUAL CARRIAGE          500,000,000        500,000,000          30,000,000
         WAY FROM SALAM TO SARGODHA VIA
          BHALWAL AJNALA ROAD
SG8111 CONSTRUCTION OF ROAD / PCC/ TUFF PAVER / NALLAH / SOLING / DRAIN /CULVERT IN CHAK 105 SB
AND RUKHAN DISTRICT
014101- A05    Grants, Subsidies and Write off Loans                                  91,166,000
014101- A052   Grants Domestic                                                          91,166,000
        Total- CONSTRUCTION OF ROAD / PCC/ TUFF                             91,166,000
          PAVER / NALLAH / SOLING / DRAIN
           /CULVERT IN CHAK 105 SB AND
          RUKHAN DISTRICT
SG8112 MISCELLANEOUS DEVELOPMENT SCHEMES IN TEHSIL KOT MOMIN & TEHSIL SARGODHA DISTRICT
SARGODHA (REVISED)
014101- A05    Grants, Subsidies and Write off Loans                                 100,000,000          184,000,000
014101- A052   Grants Domestic                                                        100,000,000          184,000,000
        Total- MISCELLANEOUS DEVELOPMENT                                 100,000,000        184,000,000
          SCHEMES IN TEHSIL KOT MOMIN &
            TEHSIL SARGODHA DISTRICT
          SARGODHA (REVISED)

Page 202

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

SL8111 CONSTRUCTION / WIDENING OF KACHA PAKKA NOOR SHAH ROAD DISTRICT SAHIWAL
014101- A05    Grants, Subsidies and Write off Loans                                 419,790,000          250,000,000
014101- A052   Grants Domestic                                                        419,790,000          250,000,000
        Total- CONSTRUCTION / WIDENING OF                                   419,790,000        250,000,000
          KACHA PAKKA NOOR SHAH ROAD
             DISTRICT SAHIWAL
SL8112 CONSTRUCTION OF DEC OFFICE SAHIWAL
014101- A05    Grants, Subsidies and Write off Loans                                 244,836,000          244,836,000
014101- A052   Grants Domestic                                                        244,836,000          244,836,000
        Total- CONSTRUCTION OF DEC OFFICE                                  244,836,000        244,836,000
           SAHIWAL
ST0121 ROAD FROM SIALKOT CANNTT TO JASSAR GARRISON.
014101- A05    Grants, Subsidies and Write off Loans          2,000,000,000         2,000,000,000          750,000,000
014101- A052   Grants Domestic                                  2,000,000,000         2,000,000,000          750,000,000
        Total- ROAD FROM SIALKOT CANNTT TO           2,000,000,000       2,000,000,000        750,000,000
           JASSAR GARRISON.
ST5555 DUAKIZATION OF SIALKOT EMINABAD ROAD UP KAMOKE INCLUDING LINK TO MOTOR WAY (LENGTH
65.1 KM) DISTRICT SIALKOT
014101- A05    Grants, Subsidies and Write off Loans            500,000,000          500,000,000
014101- A052   Grants Domestic                                  500,000,000          500,000,000
        Total- DUAKIZATION OF SIALKOT EMINABAD         500,000,000        500,000,000
          ROAD UP KAMOKE INCLUDING LINK TO
          MOTOR WAY (LENGTH 65.1 KM)
             DISTRICT SIALKOT
ST8111 REHABILITATION / IMPROVEMENT OF ROAD FROM DUGRI TO SATRA SINDHWAN TEHSIL DASKA
DISTRICT SIALKOT
014101- A05    Grants, Subsidies and Write off Loans                                  77,420,000
014101- A052   Grants Domestic                                                          77,420,000
        Total- REHABILITATION / IMPROVEMENT OF                               77,420,000
          ROAD FROM DUGRI TO SATRA
          SINDHWAN TEHSIL DASKA DISTRICT
           SIALKOT
ST8112 INCLUSION OF ROAD FROM ADDA GULBAHAR TO CHAPAR MARAKIWAL AND LINK ROADS DISTRICT
SIALKOT
014101- A05    Grants, Subsidies and Write off Loans                                 346,190,000
014101- A052   Grants Domestic                                                        346,190,000
        Total- INCLUSION OF ROAD FROM ADDA                                346,190,000
          GULBAHAR TO CHAPAR MARAKIWAL
          AND LINK ROADS DISTRICT SIALKOT

Page 203

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

ST8113 CONSTRUCTION OF ROAD FROM BHAGWAL AWAN TO DABOLA VIA KOTLI BHUTTA RORAS ROAD WITH
LINK INFRASTRUCTURE
014101- A05    Grants, Subsidies and Write off Loans                                 269,460,000
014101- A052   Grants Domestic                                                        269,460,000
        Total- CONSTRUCTION OF ROAD FROM                                  269,460,000
         BHAGWAL AWAN TO DABOLA VIA
            KOTLI BHUTTA RORAS ROAD WITH
            LINK INFRASTRUCTURE
ST8114 CONSTRUCTION OF ROAD FROM JURIYAN KALAN TO MALKE KALAN VIA OLAKH AWAN & MALO CHAK
WITH LINK INFRASTRUCTURE
014101- A05    Grants, Subsidies and Write off Loans                                 346,823,000
014101- A052   Grants Domestic                                                        346,823,000
        Total- CONSTRUCTION OF ROAD FROM                                  346,823,000
           JURIYAN KALAN TO MALKE KALAN VIA
          OLAKH AWAN & MALO CHAK WITH
            LINK INFRASTRUCTURE
TS8111 CONSTRUCTION OF RAILWAY UNDER PASS GOJRA TOBA TEK SINGH (REVISED)
014101- A05    Grants, Subsidies and Write off Loans                                 334,485,000          150,000,000
014101- A052   Grants Domestic                                                        334,485,000          150,000,000
        Total- CONSTRUCTION OF RAILWAY UNDER                             334,485,000        150,000,000
          PASS GOJRA TOBA TEK SINGH
             (REVISED)
TS8112 URBAN SEWERAGE / DRAINAGE PCC AND TUFF TILE STREET FOR ZONE-D GOJRA CITY TEHSIL GOJRA
DISTRICT TOBA TEK
014101- A05    Grants, Subsidies and Write off Loans                                 304,389,000          150,000,000
014101- A052   Grants Domestic                                                        304,389,000          150,000,000
        Total- URBAN SEWERAGE / DRAINAGE PCC                             304,389,000        150,000,000
          AND TUFF TILE STREET FOR ZONE-D
          GOJRA CITY TEHSIL GOJRA DISTRICT
          TOBA TEK
     014101   Total-  To provinces                           7,850,000,000      19,073,458,000       7,641,836,000
     0141     Total-  Transfers (Inter-Governmental)           7,850,000,000      19,073,458,000       7,641,836,000
     014      Total-  Transfers                              7,850,000,000      19,073,458,000       7,641,836,000
     01        Total-  General Public Service                  7,850,000,000      19,073,458,000       7,641,836,000
               Total- ACCOUNTANT GENERAL                 7,850,000,000        19,073,458,000         7,641,836,000
                PAKISTAN REVENUES
                  SUB-OFFICE, LAHORE

Page 204

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

01     General Public Service:
014    Transfers:
0141   Transfers (Inter-Governmental):
014101 To provinces  :
BU8111 VARIOUS DEVELOPMENTAL IE BLACK TOP FLOOD PROTECTION WALL AND COMMUNITY CENTER IN
SUB DIVISION
014101- A05    Grants, Subsidies and Write off Loans                                  30,000,000          274,471,000
014101- A052   Grants Domestic                                                          30,000,000          274,471,000
        Total- VARIOUS DEVELOPMENTAL IE BLACK                              30,000,000        274,471,000
          TOP FLOOD PROTECTION WALL AND
          COMMUNITY CENTER IN SUB DIVISION
BU8112 INSTALLATION OF PRESSURE PUMPS / TUBEWELLS IN DISTRICT BANNU
014101- A05    Grants, Subsidies and Write off Loans                                 230,000,000          305,743,000
014101- A052   Grants Domestic                                                        230,000,000          305,743,000
        Total- INSTALLATION OF PRESSURE PUMPS /                            230,000,000        305,743,000
          TUBEWELLS IN DISTRICT BANNU
CL0027 WIDENING & CARPETING OF BOONI BUZAND- TORKHOW ROAD CHITRAL
014101- A05    Grants, Subsidies and Write off Loans             57,616,000            57,616,000             7,497,000
014101- A052   Grants Domestic                                    57,616,000            57,616,000             7,497,000
        Total- WIDENING & CARPETING OF BOONI             57,616,000         57,616,000           7,497,000
           BUZAND- TORKHOW ROAD CHITRAL
DI8111 CONSTRUCTION OF IB OFFICES (03) AT GHALLANAI TD MOHMAND KOHAT AND DI KHAN
014101- A05    Grants, Subsidies and Write off Loans                                 144,000,000          124,004,000
014101- A052   Grants Domestic                                                        144,000,000          124,004,000
        Total- CONSTRUCTION OF IB OFFICES (03) AT                           144,000,000        124,004,000
           GHALLANAI TD MOHMAND KOHAT AND
              DI KHAN
KD8111 CONSTRUCTION OF OFFICE FOR IB AT DASSU
014101- A05    Grants, Subsidies and Write off Loans                                  45,000,000            54,500,000
014101- A052   Grants Domestic                                                          45,000,000            54,500,000
        Total- CONSTRUCTION OF OFFICE FOR IB AT                             45,000,000          54,500,000
          DASSU
KM8111 CONSTRUCTION OF BRIDGES/CULVERT AT VARIOUS PLACES DISTRICT UPPER AND LOWER KURRUM
014101- A05    Grants, Subsidies and Write off Loans                                 100,000,000
014101- A052   Grants Domestic                                                        100,000,000
        Total- CONSTRUCTION OF                                              100,000,000
           BRIDGES/CULVERT AT VARIOUS
          PLACES DISTRICT UPPER AND LOWER
          KURRUM

Page 205

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

KM8112 CONSTRUCTION OF BLACK TOP ROAD AT VARIOUS PLACES OF DISTRICT UPPER AND LOWER KURRUM
014101- A05    Grants, Subsidies and Write off Loans                                  48,000,000          219,600,000
014101- A052   Grants Domestic                                                          48,000,000          219,600,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                             48,000,000        219,600,000
           AT VARIOUS PLACES OF DISTRICT
          UPPER AND LOWER KURRUM
LK8111 DEVELOPMENT WORK AT VARIOUS PLACES TEHSIL SARAI NAURANG DISTRICT LAKKI
014101- A05    Grants, Subsidies and Write off Loans                                 100,000,000            15,000,000
014101- A052   Grants Domestic                                                        100,000,000            15,000,000
        Total- DEVELOPMENT WORK AT VARIOUS                               100,000,000          15,000,000
          PLACES TEHSIL SARAI NAURANG
            DISTRICT LAKKI
LK8112 CONSTRUCTION OF ROAD AND PCC STREET AT DISTRUCT LAKKI MARWAT
014101- A05    Grants, Subsidies and Write off Loans                                 193,000,000          100,000,000
014101- A052   Grants Domestic                                                        193,000,000          100,000,000
        Total- CONSTRUCTION OF ROAD AND PCC                              193,000,000        100,000,000
           STREET AT DISTRUCT LAKKI MARWAT
MD0081 ESTABLISHMENT OF CARDIOLOGY UNIT & BURN / TRUAMA UNIT AT CAT-A DHQ HOSPITAL MALAKAND
AT BATKHELA
014101- A05    Grants, Subsidies and Write off Loans            100,000,000          100,000,000            15,000,000
014101- A052   Grants Domestic                                  100,000,000          100,000,000            15,000,000
        Total- ESTABLISHMENT OF CARDIOLOGY            100,000,000        100,000,000          15,000,000
            UNIT & BURN / TRUAMA UNIT AT CAT-A
          DHQ HOSPITAL MALAKAND AT
          BATKHELA
PR0671 KHYBER INSTITUTE OF CHILD HEALTH & CHILD HOSPITAL
014101- A05    Grants, Subsidies and Write off Loans          1,500,000,000         1,500,000,000          400,000,000
014101- A052   Grants Domestic                                  1,500,000,000         1,500,000,000          400,000,000
        Total- KHYBER INSTITUTE OF CHILD HEALTH       1,500,000,000       1,500,000,000        400,000,000
          & CHILD HOSPITAL

Page 206

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

PR1194 ESTAB. OF INSTITUTE OF PETROLEUM TECHNOLOGY KARAK
014101- A05    Grants, Subsidies and Write off Loans            200,000,000          200,000,000            15,000,000
014101- A052   Grants Domestic                                  200,000,000          200,000,000            15,000,000
        Total- ESTAB. OF INSTITUTE OF PETROLEUM         200,000,000        200,000,000          15,000,000
          TECHNOLOGY KARAK
PR3102 UPGRADATION & REHAB. OF LAWRENCEPUR-TARBELA ROAD
014101- A05    Grants, Subsidies and Write off Loans            100,000,000          100,000,000            92,503,000
014101- A052   Grants Domestic                                  100,000,000          100,000,000            92,503,000
        Total- UPGRADATION & REHAB. OF                  100,000,000        100,000,000          92,503,000
          LAWRENCEPUR-TARBELA ROAD
PR3103 MERGED DISTRICT OF KHYBER PAKHTUNKHWA
014101- A05    Grants, Subsidies and Write off Loans         27,000,000,000        27,000,000,000        28,000,000,000
014101- A052   Grants Domestic                                27,000,000,000        27,000,000,000        28,000,000,000
        Total- MERGED DISTRICT OF KHYBER             27,000,000,000      27,000,000,000      28,000,000,000
          PAKHTUNKHWA
PR3107 ZYARA TO DABORI ROAD ORKAZAI AGENCY
014101- A05    Grants, Subsidies and Write off Loans            684,521,000          684,521,000          444,329,000
014101- A052   Grants Domestic                                  684,521,000          684,521,000          444,329,000
        Total- ZYARA TO DABORI ROAD ORKAZAI            684,521,000        684,521,000        444,329,000
          AGENCY
PR3108 MERGED AREAS OF (ERSTWHILE FATA) 10 YEAR DEVELOPMENT PLAN
014101- A05    Grants, Subsidies and Write off Loans         42,315,479,000        42,315,479,000        37,000,000,000
014101- A052   Grants Domestic                                42,315,479,000        42,315,479,000        37,000,000,000
        Total- MERGED AREAS OF (ERSTWHILE           42,315,479,000      42,315,479,000      37,000,000,000
            FATA) 10 YEAR DEVELOPMENT PLAN
PR5000 LAND ACQUISITION SWAT MOTORWAY (PHASE-II)
014101- A05    Grants, Subsidies and Write off Loans          1,000,000,000         1,000,000,000            15,000,000
014101- A052   Grants Domestic                                  1,000,000,000         1,000,000,000            15,000,000
        Total- LAND ACQUISITION SWAT MOTORWAY       1,000,000,000       1,000,000,000          15,000,000
              (PHASE-II)
PR8111 CONSTRUCTION OF AUDITORIUM BACHELOR HOSTEL AND OFFICER 'S MESS FOR NAB (KP) AT
PESHAWAR
014101- A05    Grants, Subsidies and Write off Loans                                 100,000,000            40,000,000
014101- A052   Grants Domestic                                                        100,000,000            40,000,000
        Total- CONSTRUCTION OF AUDITORIUM                                 100,000,000          40,000,000
          BACHELOR HOSTEL AND OFFICER 'S
          MESS FOR NAB (KP) AT PESHAWAR

Page 207

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

SW0166 CONSTRUCTION OF GRAVITY BASED WATER SUPPLY SCHEME FOR MATTA AND SURROUNDING AREAS
014101- A05    Grants, Subsidies and Write off Loans            200,000,000          200,000,000
014101- A052   Grants Domestic                                  200,000,000          200,000,000
        Total- CONSTRUCTION OF GRAVITY BASED          200,000,000        200,000,000
          WATER SUPPLY SCHEME FOR MATTA
          AND SURROUNDING AREAS
SW8111 CONSTRUCTION OF OPERATION THEATER AT CENTRAL HOSPITAL AT MINGORA SWAT (REVISED PC-I)
014101- A05    Grants, Subsidies and Write off Loans                                 131,381,000            52,552,000
014101- A052   Grants Domestic                                                        131,381,000            52,552,000
        Total- CONSTRUCTION OF OPERATION                                  131,381,000          52,552,000
          THEATER AT CENTRAL HOSPITAL AT
          MINGORA SWAT (REVISED PC-I)
TK8111 CONSTRUCTION OF PCC ROADS AND DRAIN AT DISTRICT TANK
014101- A05    Grants, Subsidies and Write off Loans                                  86,490,000            34,596,000
014101- A052   Grants Domestic                                                          86,490,000            34,596,000
        Total- CONSTRUCTION OF PCC ROADS AND                              86,490,000          34,596,000
           DRAIN AT DISTRICT TANK
TU8111 SOLARISATTION OF HOMES AT VARIOUS VILLAGES OF TRIBAL DISTRICT NORTH WAZIRISRAN
PACKAGE-III III IV V
014101- A05    Grants, Subsidies and Write off Loans                                  40,000,000
014101- A052   Grants Domestic                                                          40,000,000
        Total- SOLARISATTION OF HOMES AT                                     40,000,000
           VARIOUS VILLAGES OF TRIBAL
            DISTRICT NORTH WAZIRISRAN
             PACKAGE-III III IV V
TU8112 100 NOS WATER BORE FOR TUEB WELL AT DISTRICT SOUTH WAZIRSITAN
014101- A05    Grants, Subsidies and Write off Loans                                  98,640,000
014101- A052   Grants Domestic                                                          98,640,000
        Total- 100 NOS WATER BORE FOR TUEB                                  98,640,000
          WELL AT DISTRICT SOUTH
           WAZIRSITAN
TU8113 SOLARISATION OF HOMES AT DISTRICT SOUTH WAZIRISRAN (AT REDUCED COST OF RS 340915 MN
AGAINST APPROVED COST OF
014101- A05    Grants, Subsidies and Write off Loans                                  48,960,000
014101- A052   Grants Domestic                                                          48,960,000
        Total- SOLARISATION OF HOMES AT                                      48,960,000
            DISTRICT SOUTH WAZIRISRAN (AT
          REDUCED COST OF RS 340915 MN
           AGAINST APPROVED COST OF

Page 208

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

TU8114 CONSTRUCTION OF BLACK TOP ROAD PCC STREET AND JEEPABLE TRACKS AT TRIBAL DISTRICT
UPPER SOUTH
014101- A05    Grants, Subsidies and Write off Loans                                  50,000,000          471,100,000
014101- A052   Grants Domestic                                                          50,000,000          471,100,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                             50,000,000        471,100,000
          PCC STREET AND JEEPABLE TRACKS
           AT TRIBAL DISTRICT UPPER SOUTH
TU8115 CONSTRUCTION OF CAT-D HOSPITAL AT AZAM WARSAK TEHSIL BIRMAL SWTD WANA
014101- A05    Grants, Subsidies and Write off Loans                                 300,000,000          372,315,000
014101- A052   Grants Domestic                                                        300,000,000          372,315,000
        Total- CONSTRUCTION OF CAT-D HOSPITAL                             300,000,000        372,315,000
           AT AZAM WARSAK TEHSIL BIRMAL
          SWTD WANA
     014101   Total-  To provinces                          73,157,616,000      74,903,087,000      68,053,210,000
     0141     Total-  Transfers (Inter-Governmental)          73,157,616,000      74,903,087,000      68,053,210,000
     014      Total-  Transfers                             73,157,616,000      74,903,087,000      68,053,210,000
     01        Total-  General Public Service                 73,157,616,000      74,903,087,000      68,053,210,000
               Total- ACCOUNTANT GENERAL                73,157,616,000        74,903,087,000        68,053,210,000
                PAKISTAN REVENUES
                  SUB-OFFICE, PESHAWAR

Page 209

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01     General Public Service:
014    Transfers:
0141   Transfers (Inter-Governmental):
014101 To provinces  :
BN8111 11 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN
014101- A05    Grants, Subsidies and Write off Loans                                  10,000,000
014101- A052   Grants Domestic                                                          10,000,000
        Total- 11 NOS DEVELOPMENT SCHEMES IN                               10,000,000
            DISTRICT BADIN
BN8112 15 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN
014101- A05    Grants, Subsidies and Write off Loans                                  10,000,000
014101- A052   Grants Domestic                                                          10,000,000
        Total- 15 NOS DEVELOPMENT SCHEMES IN                               10,000,000
            DISTRICT BADIN
BN8113 19 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN
014101- A05    Grants, Subsidies and Write off Loans                                  10,000,000
014101- A052   Grants Domestic                                                          10,000,000
        Total- 19 NOS DEVELOPMENT SCHEMES IN                               10,000,000
            DISTRICT BADIN
HD0065 EXP RAW WATER FILT PLANT & SUPPLY NW FOR SUPP CLEAN WATER TO HYDERABAD
014101- A05    Grants, Subsidies and Write off Loans             10,000,000            10,000,000
014101- A052   Grants Domestic                                    10,000,000            10,000,000
        Total- EXP RAW WATER FILT PLANT &                 10,000,000         10,000,000
           SUPPLY NW FOR SUPP CLEAN WATER
          TO HYDERABAD
HD0069 CONST. OF EASTERN AND EXPANSION OF SOUTHERN SEWAGE TREATMENT PLANTS HYDERABAD
PACKAGE.
014101- A05    Grants, Subsidies and Write off Loans             10,000,000            10,000,000
014101- A052   Grants Domestic                                    10,000,000            10,000,000
        Total- CONST. OF EASTERN AND EXPANSION          10,000,000         10,000,000
          OF SOUTHERN SEWAGE TREATMENT
           PLANTS HYDERABAD PACKAGE.
HD0232 HYDERABAD URBAN INFRASTRUCTURE DEVELOPMENT PACKAGE (REVAMPING & REHABILITATION)
014101- A05    Grants, Subsidies and Write off Loans          5,000,000,000         5,000,000,000
014101- A052   Grants Domestic                                  5,000,000,000         5,000,000,000
        Total- HYDERABAD URBAN                         5,000,000,000       5,000,000,000
           INFRASTRUCTURE DEVELOPMENT
          PACKAGE (REVAMPING &
            REHABILITATION)

Page 210

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA1387 PRIME MINISTER'S PROGRAM FOR CONSTRUCTION/RECONSTRUCTION OF EXISTING SCHOOLS IN
SINDH AFFECTED
014101- A05    Grants, Subsidies and Write off Loans          5,000,000,000         5,000,000,000         3,169,000,000
014101- A052   Grants Domestic                                  5,000,000,000         5,000,000,000         3,169,000,000
        Total- PRIME MINISTER'S PROGRAM FOR           5,000,000,000       5,000,000,000       3,169,000,000
           CONSTRUCTION/RECONSTRUCTION OF
            EXISTING SCHOOLS IN SINDH
           AFFECTED
KA1460 PRIME MINISTER'S PROGRAMME FOR RE-BUILDING OF HOUSES IN FLOOD AFFECTED AREAS OF SINDH
UNDER 4RF
014101- A05    Grants, Subsidies and Write off Loans                                                     20,000,000,000
014101- A052   Grants Domestic                                                                            20,000,000,000
        Total- PRIME MINISTER'S PROGRAMME FOR                                              20,000,000,000
            RE-BUILDING OF HOUSES IN FLOOD
           AFFECTED AREAS OF SINDH UNDER
           4RF
KA7307 EXTENSION / CONSTRUCTION OF SINDH COASTAL HIGHWAY (36KMS) (50:50)
014101- A05    Grants, Subsidies and Write off Loans          3,000,000,000         3,000,000,000         8,000,000,000
014101- A052   Grants Domestic                                  3,000,000,000         3,000,000,000         8,000,000,000
        Total- EXTENSION / CONSTRUCTION OF             3,000,000,000       3,000,000,000       8,000,000,000
           SINDH COASTAL HIGHWAY (36KMS)
                (50:50)
KA7308 KARACHI URBAN INFRASTRUCTURE DEVELOPMENT PACKAGE
014101- A05    Grants, Subsidies and Write off Loans         10,000,000,000        10,000,000,000
014101- A052   Grants Domestic                                10,000,000,000        10,000,000,000
        Total- KARACHI URBAN INFRASTRUCTURE        10,000,000,000      10,000,000,000
          DEVELOPMENT PACKAGE
KA8111 DEVELOPMENT SCHEMES UNDER PM'S PROGRAMME IN SINDH LARKANA SUKKUR AND SHAEED
BENAZEERABAD DIVISION
014101- A05    Grants, Subsidies and Write off Loans                                  50,000,000
014101- A052   Grants Domestic                                                          50,000,000
        Total- DEVELOPMENT SCHEMES UNDER PM'S                             50,000,000
         PROGRAMME IN SINDH LARKANA
          SUKKUR AND SHAEED
          BENAZEERABAD DIVISION

Page 211

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA9000 FLOOD RESPONSE EMERGENCY HOUSING Project (1st Revised)
014101- A05    Grants, Subsidies and Write off Loans                               30,000,000,000
014101- A052   Grants Domestic                                                      30,000,000,000
        Total- FLOOD RESPONSE EMERGENCY                                30,000,000,000
           HOUSING Project (1st Revised)
KA9601 REHABILITATION / CONSTRUCTION OF ROADS IN SITE INDUSTRIAL AREA KARACHI
014101- A05    Grants, Subsidies and Write off Loans          3,000,000,000         3,000,000,000         3,015,611,000
014101- A052   Grants Domestic                                  3,000,000,000         3,000,000,000         3,015,611,000
        Total- REHABILITATION / CONSTRUCTION OF       3,000,000,000       3,000,000,000       3,015,611,000
          ROADS IN SITE INDUSTRIAL AREA
           KARACHI
LA0026 DUALIZATION OF ROAD FROM LARKANO TO LAKHI (@N-65) = 45.50 KMS.(50:50)
014101- A05    Grants, Subsidies and Write off Loans            480,000,000          480,000,000
014101- A052   Grants Domestic                                  480,000,000          480,000,000
        Total- DUALIZATION OF ROAD FROM                 480,000,000        480,000,000
          LARKANO TO LAKHI (@N-65) = 45.50
              KMS.(50:50)
NH5000 CONTRACTION OF ADDITION CARRIAGEWAY ALONG MEHRAN HIGHWAY FROM NAWABSHAH TO
RANIPUR
014101- A05    Grants, Subsidies and Write off Loans          6,000,000,000         6,000,000,000        10,000,000,000
014101- A052   Grants Domestic                                  6,000,000,000         6,000,000,000        10,000,000,000
        Total- CONTRACTION OF ADDITION                 6,000,000,000       6,000,000,000      10,000,000,000
          CARRIAGEWAY ALONG MEHRAN
          HIGHWAY FROM NAWABSHAH TO
           RANIPUR
SK0324 IMPROVEMENT OF ROAD FROM ROHRI TO GUDDO BARRAGE @M-5 INTERCHANGE SADIQABAD VIA
KHAIRPUR MAHAR MIR PUR MATHELO
014101- A05    Grants, Subsidies and Write off Loans          6,000,000,000         6,000,000,000         4,856,137,000
014101- A052   Grants Domestic                                  6,000,000,000         6,000,000,000         4,856,137,000
        Total- IMPROVEMENT OF ROAD FROM ROHRI       6,000,000,000       6,000,000,000       4,856,137,000
          TO GUDDO BARRAGE @M-5
           INTERCHANGE SADIQABAD VIA
           KHAIRPUR MAHAR MIR PUR MATHELO

Page 212

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

SK5000 IMPROVEMENT OF ROAD FROM SANGHAR TO NATIONAL HIGHWAY N-5 AT POINT ROHRI VIA MUDH
JAMRAO AND SALEHPUT
014101- A05    Grants, Subsidies and Write off Loans          5,000,000,000         5,000,000,000        11,856,073,000
014101- A052   Grants Domestic                                  5,000,000,000         5,000,000,000        11,856,073,000
        Total- IMPROVEMENT OF ROAD FROM              5,000,000,000       5,000,000,000      11,856,073,000
          SANGHAR TO NATIONAL HIGHWAY N-5
           AT POINT ROHRI VIA MUDH JAMRAO
          AND SALEHPUT
SK8111 CONSTRUCTION OF OFFICE OF THE NAB SUKKUR AT AIRPORT ROAD SUKKUR
014101- A05    Grants, Subsidies and Write off Loans                                 165,785,000          115,000,000
014101- A052   Grants Domestic                                                        165,785,000          115,000,000
        Total- CONSTRUCTION OF OFFICE OF THE                               165,785,000        115,000,000
          NAB SUKKUR AT AIRPORT ROAD
          SUKKUR
SP8111 CONSTRUCTION OF MATTELED ROADS AT TALUKA LAKHI DISTRICT SHIKARPUR SINDH (09 SCHEMES)
014101- A05    Grants, Subsidies and Write off Loans                                  10,000,000
014101- A052   Grants Domestic                                                          10,000,000
        Total- CONSTRUCTION OF MATTELED ROADS                             10,000,000
           AT TALUKA LAKHI DISTRICT
           SHIKARPUR SINDH (09 SCHEMES)
TD0002 DUALAIZATION OF TANDO ALLAHYAR TO TANDO ADAM ROAD 31.40 KMS
014101- A05    Grants, Subsidies and Write off Loans          1,500,000,000         1,500,000,000         5,270,237,000
014101- A052   Grants Domestic                                  1,500,000,000         1,500,000,000         5,270,237,000
        Total- DUALAIZATION OF TANDO ALLAHYAR        1,500,000,000       1,500,000,000       5,270,237,000
          TO TANDO ADAM ROAD 31.40 KMS
     014101   Total-  To provinces                          45,000,000,000      75,255,785,000      66,282,058,000
     0141     Total-  Transfers (Inter-Governmental)          45,000,000,000      75,255,785,000      66,282,058,000
     014      Total-  Transfers                             45,000,000,000      75,255,785,000      66,282,058,000
     01        Total-  General Public Service                 45,000,000,000      75,255,785,000      66,282,058,000
               Total- ACCOUNTANT GENERAL                45,000,000,000        75,255,785,000        66,282,058,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI

Page 213

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

01     General Public Service:
014    Transfers:
0141   Transfers (Inter-Governmental):
014101 To provinces  :
CG0009 CONSTRUCTION OF BLACK TOP ROADS FROM KILLI SARDAR ABDUL RAHIM KHILJI TAFTAN DISTRICT
CHAGHI
014101- A05    Grants, Subsidies and Write off Loans                                                        75,000,000
014101- A052   Grants Domestic                                                                               75,000,000
        Total- CONSTRUCTION OF BLACK TOP                                                       75,000,000
          ROADS FROM KILLI SARDAR ABDUL
           RAHIM KHILJI TAFTAN DISTRICT
           CHAGHI
CG8111 CONSTRUCTION OF BLACK TOP ROAD CHINKINDIK TO MASKEECHAH DISTRICT CHAGHI
014101- A05    Grants, Subsidies and Write off Loans                                 100,039,000
014101- A052   Grants Domestic                                                        100,039,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                            100,039,000
            CHINKINDIK TO MASKEECHAH
            DISTRICT CHAGHI
CG8112 CHAGHI DEVELOPMENT PACKAGE( HOME SOLAR KITS SOLAR PUMPING STATION WATER SUPPLY
TUFF TILE STREETS LIGHTS)
014101- A05    Grants, Subsidies and Write off Loans                                  50,000,000          225,000,000
014101- A052   Grants Domestic                                                          50,000,000          225,000,000
        Total- CHAGHI DEVELOPMENT PACKAGE(                                50,000,000        225,000,000
         HOME SOLAR KITS SOLAR PUMPING
           STATION WATER SUPPLY TUFF TILE
           STREETS LIGHTS)
CG8113 COMMUNITY HOME SOLAR ENERGY SYSTEM & AGRICULTURE CUM WATER SUPPLY SCHEMES IN
VARIOUS KILLIS OF
014101- A05    Grants, Subsidies and Write off Loans                                  54,000,000
014101- A052   Grants Domestic                                                          54,000,000
        Total- COMMUNITY HOME SOLAR ENERGY                                54,000,000
          SYSTEM & AGRICULTURE CUM WATER
           SUPPLY SCHEMES IN VARIOUS KILLIS
          OF
CG8114 COMMUNITY HOME SOLAR ENERGY SYSTEM IN TEHSIL AMORI TAFTAN DALBANDIN CHILGHAZAI AND
CHAGHI DISTRICT
014101- A05    Grants, Subsidies and Write off Loans                                  50,000,000          130,000,000
014101- A052   Grants Domestic                                                          50,000,000          130,000,000
        Total- COMMUNITY HOME SOLAR ENERGY                                50,000,000        130,000,000
          SYSTEM IN TEHSIL AMORI TAFTAN
           DALBANDIN CHILGHAZAI AND CHAGHI
            DISTRICT

Page 214

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

CN8111 CONSTRUCTION OF INTERNAL BLACK TOP ROADS AT TEHSIL & DISTRICT CHAMAN
014101- A05    Grants, Subsidies and Write off Loans                                  80,000,000          110,000,000
014101- A052   Grants Domestic                                                          80,000,000          110,000,000
        Total- CONSTRUCTION OF INTERNAL BLACK                              80,000,000        110,000,000
          TOP ROADS AT TEHSIL & DISTRICT
          CHAMAN
CN8112 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR BORING OF TUBE WELL AND INSTALLATION OF SOLAR
ENERGY
014101- A05    Grants, Subsidies and Write off Loans                                  97,200,000
014101- A052   Grants Domestic                                                          97,200,000
        Total- PUBLIC SECTOR DEVELOPMENT                                   97,200,000
         PROGRAM FOR BORING OF TUBE
          WELL AND INSTALLATION OF SOLAR
          ENERGY
CN8113 CONSTRUCTION OF OFFICE FOR IB AT DISTRICT CHAMAN
014101- A05    Grants, Subsidies and Write off Loans                                  25,000,000            40,250,000
014101- A052   Grants Domestic                                                          25,000,000            40,250,000
        Total- CONSTRUCTION OF OFFICE FOR IB AT                             25,000,000          40,250,000
            DISTRICT CHAMAN
DB0014 CONSTRUCTION OF BLACKTOP ROADS FROM SUI TO KASHMORE 53 KM
014101- A05    Grants, Subsidies and Write off Loans          1,450,000,000         1,450,000,000         2,000,000,000
014101- A052   Grants Domestic                                  1,450,000,000         1,450,000,000         2,000,000,000
        Total- CONSTRUCTION OF BLACKTOP ROADS      1,450,000,000       1,450,000,000       2,000,000,000
          FROM SUI TO KASHMORE 53 KM
DB0024 CONST. OF B/T ROAD FROM LEHRI TO SANGSILA ROAD PHASE - I DERA BUGTI PACKAGE
014101- A05    Grants, Subsidies and Write off Loans            323,260,000                                517,260,000
014101- A052   Grants Domestic                                  323,260,000                                517,260,000
        Total- CONST. OF B/T ROAD FROM LEHRI TO         323,260,000                            517,260,000
           SANGSILA ROAD PHASE - I DERA
           BUGTI PACKAGE

Page 215

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

DB0025 CONST. OF BB/T ROAD FROM SUR TO UCH FIELD (57 KM) DERA BUGTI PACKAGE)
014101- A05    Grants, Subsidies and Write off Loans            250,757,000                                250,000,000
014101- A052   Grants Domestic                                  250,757,000                                250,000,000
        Total- CONST. OF BB/T ROAD FROM SUR TO          250,757,000                            250,000,000
          UCH FIELD (57 KM) DERA BUGTI
           PACKAGE)
DB0032 CONSTRUCTION OF BLACKTOPPING ROAD FROM PIRKOH TO PEER SOHRI
014101- A05    Grants, Subsidies and Write off Loans            136,534,000          136,534,000
014101- A052   Grants Domestic                                  136,534,000          136,534,000
        Total- CONSTRUCTION OF BLACKTOPPING           136,534,000        136,534,000
          ROAD FROM PIRKOH TO PEER SOHRI
DB0034 CONSTRUCTION OF BLACKTOPPING OF ROAD FROM PIRKOH TO PATHAR NALA
014101- A05    Grants, Subsidies and Write off Loans            170,534,000          170,534,000
014101- A052   Grants Domestic                                  170,534,000          170,534,000
        Total- CONSTRUCTION OF BLACKTOPPING           170,534,000        170,534,000
          OF ROAD FROM PIRKOH TO PATHAR
          NALA
DB0035 CONSTRUCTION OF ROAD FROM SUI TO BIJO QABRISTAN-ASRELLI DISTRICT DERA BUGTI (25 KM)
014101- A05    Grants, Subsidies and Write off Loans            179,428,000          179,428,000
014101- A052   Grants Domestic                                  179,428,000          179,428,000
        Total- CONSTRUCTION OF ROAD FROM SUI          179,428,000        179,428,000
          TO BIJO QABRISTAN-ASRELLI
            DISTRICT DERA BUGTI (25 KM)
DB0036 CONSTRICTION OF ROAD FROM BAIKAR TO MARI TOP (56.00 KM) DISTRICT DERA BUGTI
014101- A05    Grants, Subsidies and Write off Loans                                                        25,000,000
014101- A052   Grants Domestic                                                                               25,000,000
        Total- CONSTRICTION OF ROAD FROM                                                       25,000,000
           BAIKAR TO MARI TOP (56.00 KM)
            DISTRICT DERA BUGTI
DB0037 CONSTRUCTION OF GHAND DAM BAKER DERA BUGTI
014101- A05    Grants, Subsidies and Write off Loans                                                      250,000,000
014101- A052   Grants Domestic                                                                             250,000,000
        Total- CONSTRUCTION OF GHAND DAM                                                     250,000,000
          BAKER DERA BUGTI

Page 216

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

DK8111 CONSTRUCTION OF BLACK TOP ROADS PURANA DUKI AND RABBAT VILLAGES DISTRICT DUKI
014101- A05    Grants, Subsidies and Write off Loans                                 121,000,000            60,000,000
014101- A052   Grants Domestic                                                        121,000,000            60,000,000
        Total- CONSTRUCTION OF BLACK TOP                                  121,000,000          60,000,000
          ROADS PURANA DUKI AND RABBAT
           VILLAGES DISTRICT DUKI
GR0047 GWADAR DEVELOPMENT AUTHORITY
014101- A05    Grants, Subsidies and Write off Loans          1,800,000,000         1,800,000,000          250,000,000
014101- A052   Grants Domestic                                  1,800,000,000         1,800,000,000          250,000,000
        Total- GWADAR DEVELOPMENT AUTHORITY        1,800,000,000       1,800,000,000        250,000,000
GR0081 GWADAR SAFE CITY PROJECT PHASE-1
014101- A05    Grants, Subsidies and Write off Loans          1,000,000,000         1,000,000,000         1,500,000,000
014101- A052   Grants Domestic                                  1,000,000,000         1,000,000,000         1,500,000,000
        Total- GWADAR SAFE CITY PROJECT               1,000,000,000       1,000,000,000       1,500,000,000
           PHASE-1
GR0116 REHABILITATION OF OLD TOWN GAWADAR
014101- A05    Grants, Subsidies and Write off Loans            230,000,000          230,000,000          400,000,000
014101- A052   Grants Domestic                                  230,000,000          230,000,000          400,000,000
        Total- REHABILITATION OF OLD TOWN               230,000,000        230,000,000        400,000,000
         GAWADAR
GR8111 CONSTRUCTION OF OFFICES FOR IB ALONG WITH CPEC (MANSEHRA) GAWADAR KHUZDAR
TURBAT(06-NOS TOTAL COST
014101- A05    Grants, Subsidies and Write off Loans                                  71,349,000          170,000,000
014101- A052   Grants Domestic                                                          71,349,000          170,000,000
        Total- CONSTRUCTION OF OFFICES FOR IB                               71,349,000        170,000,000
          ALONG WITH CPEC (MANSEHRA)
         GAWADAR KHUZDAR TURBAT(06-NOS
           TOTAL COST
GR8112 DEC GAWADAR & LASBELLA
014101- A05    Grants, Subsidies and Write off Loans                                 333,061,000
014101- A052   Grants Domestic                                                        333,061,000
        Total- DEC GAWADAR & LASBELLA                                     333,061,000

Page 217

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

GR9003 NECESSARY FACILITIES OF FRESH WATER TREATMENT WATER SUPPLY AND DISTRIBUTION
GAWADAR(CPEC)
014101- A05    Grants, Subsidies and Write off Loans            500,000,000          500,000,000          470,648,000
014101- A052   Grants Domestic                                  500,000,000          500,000,000          470,648,000
        Total- NECESSARY FACILITIES OF FRESH            500,000,000        500,000,000        470,648,000
          WATER TREATMENT WATER SUPPLY
          AND DISTRIBUTION GAWADAR(CPEC)
GR9007 GAWADAR SMART ENVIRONMENTAL AND SANITATION SYSTEM AND LANDFILL (CEPEC)
014101- A05    Grants, Subsidies and Write off Loans            200,000,000          200,000,000          200,000,000
014101- A052   Grants Domestic                                  200,000,000          200,000,000          200,000,000
        Total- GAWADAR SMART ENVIRONMENTAL          200,000,000        200,000,000        200,000,000
          AND SANITATION SYSTEM AND
            LANDFILL (CEPEC)
HU8111 DEVELOPMENT SCHEMES IN PIRHYAN ARI PEER BARAK BEHLOOR DISTRICT HUB (04 SCHEMES)
014101- A05    Grants, Subsidies and Write off Loans                                 103,137,000
014101- A052   Grants Domestic                                                        103,137,000
        Total- DEVELOPMENT SCHEMES IN PIRHYAN                            103,137,000
            ARI PEER BARAK BEHLOOR DISTRICT
          HUB (04 SCHEMES)
JF8111 DEC JAFFARABAD & MASTUNG
014101- A05    Grants, Subsidies and Write off Loans                                 338,887,000
014101- A052   Grants Domestic                                                        338,887,000
        Total- DEC JAFFARABAD & MASTUNG                                   338,887,000
JH8111 DEVELOPMENT SCHEMES IN DISTRICT KACHHI JHAL MAGSI AND NASEERABAD (10 NOS SCHEMES)
014101- A05    Grants, Subsidies and Write off Loans                                 129,987,000            50,015,000
014101- A052   Grants Domestic                                                        129,987,000            50,015,000
        Total- DEVELOPMENT SCHEMES IN DISTRICT                            129,987,000          50,015,000
           KACHHI JHAL MAGSI AND
          NASEERABAD (10 NOS SCHEMES)
JH8112 CONSTRUCTION OF BLACK TOP ROAD FROM REHABILITATION BAND MAHMOOD TO BARIJA DISTRICT
JHAL MAGSI
014101- A05    Grants, Subsidies and Write off Loans                                  80,000,000            50,624,000
014101- A052   Grants Domestic                                                          80,000,000            50,624,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                             80,000,000          50,624,000
          FROM REHABILITATION BAND
         MAHMOOD TO BARIJA DISTRICT JHAL
           MAGSI

Page 218

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

KL8111 COMMUNITY BASED DEVELOPMENT SCHEMES FOR INSTALLATION OF COMMUNITY HOME SOLAR
SYSTEM IN VARIOUS KILLIS OF
014101- A05    Grants, Subsidies and Write off Loans                                  39,600,000
014101- A052   Grants Domestic                                                          39,600,000
        Total- COMMUNITY BASED DEVELOPMENT                                39,600,000
          SCHEMES FOR INSTALLATION OF
          COMMUNITY HOME SOLAR SYSTEM IN
           VARIOUS KILLIS OF
KL8112 CONSTRUCTION OF BLACK TOP ROAD 24 KM LALA LEHAD CROSS VIA HUMARI ROSH SHOB DISTRICT
KALAT BALOCHISTAN
014101- A05    Grants, Subsidies and Write off Loans                                 100,000,000          300,000,000
014101- A052   Grants Domestic                                                        100,000,000          300,000,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                            100,000,000        300,000,000
             24 KM LALA LEHAD CROSS VIA
           HUMARI ROSH SHOB DISTRICT KALAT
           BALOCHISTAN
KL8113 DEVELOPMENT SCHEMES IN KALAT SURAB & MASTUNG DISTRICTS
014101- A05    Grants, Subsidies and Write off Loans                                  50,000,000          300,000,000
014101- A052   Grants Domestic                                                          50,000,000          300,000,000
        Total- DEVELOPMENT SCHEMES IN KALAT                                50,000,000        300,000,000
          SURAB & MASTUNG DISTRICTS
KN0012 CADET COLLEGE KHARAN
014101- A05    Grants, Subsidies and Write off Loans            302,649,000          302,649,000
014101- A052   Grants Domestic                                  302,649,000          302,649,000
        Total- CADET COLLEGE KHARAN                    302,649,000        302,649,000
KN8111 KHARAN DEVELOPMENT PACKAGE(SOLAR PUMPING HOME SOLAR KITS ROADS WATER SUPPLY)
(REVISED)
014101- A05    Grants, Subsidies and Write off Loans                                  41,747,000          100,074,000
014101- A052   Grants Domestic                                                          41,747,000          100,074,000
        Total- KHARAN DEVELOPMENT                                           41,747,000        100,074,000
          PACKAGE(SOLAR PUMPING HOME
          SOLAR KITS ROADS WATER SUPPLY)
             (REVISED)

Page 219

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

KN8112 SOLARISATION OF EXISTING TUBEWELLS/BORES FOR AGRICULTURE PURPOSE IN VARIOUS KILLIS OF
014101- A05    Grants, Subsidies and Write off Loans                                  36,000,000
014101- A052   Grants Domestic                                                          36,000,000
        Total- SOLARISATION OF EXISTING                                       36,000,000
           TUBEWELLS/BORES FOR
           AGRICULTURE PURPOSE IN VARIOUS
             KILLIS OF
KR8111 CONSTRUCTION OF BLACK TOP ROAD FROM RCD TO HINAMI BENT TESHIL WADH DISTRICT KHUZDAR
014101- A05    Grants, Subsidies and Write off Loans                                 200,000,000          250,000,000
014101- A052   Grants Domestic                                                        200,000,000          250,000,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                            200,000,000        250,000,000
          FROM RCD TO HINAMI BENT TESHIL
         WADH DISTRICT KHUZDAR
KR8112 CONSTRUCTION OF BLACK TOP ROAD FROM MARVI TOWARDS MADRESSA TOOK TEHSIL WADH
DISTRICT KHUZDAR
014101- A05    Grants, Subsidies and Write off Loans                                 195,586,000
014101- A052   Grants Domestic                                                        195,586,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                            195,586,000
          FROM MARVI TOWARDS MADRESSA
          TOOK TEHSIL WADH DISTRICT
          KHUZDAR
KR8113 CONSTRUCTION OF BLACK TOP ROAD FROM RCD TOWARDS KILLI ABDUL HANAN TEHSIL WADH
DISTRICT KHUZDAR
014101- A05    Grants, Subsidies and Write off Loans                                  83,024,000          150,000,000
014101- A052   Grants Domestic                                                          83,024,000          150,000,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                             83,024,000        150,000,000
          FROM RCD TOWARDS KILLI ABDUL
          HANAN TEHSIL WADH DISTRICT
          KHUZDAR
KR8114 CONSTRUCTION OF 11 KM BT- BLACK TOP ROAD FROM ZEEDI WEIR TO GHOUR DHAI KHUNJ ZEEDI AT
DISTRICT KHUZDAR
014101- A05    Grants, Subsidies and Write off Loans                                  86,000,000
014101- A052   Grants Domestic                                                          86,000,000
        Total- CONSTRUCTION OF 11 KM BT- BLACK                              86,000,000
          TOP ROAD FROM ZEEDI WEIR TO
          GHOUR DHAI KHUNJ ZEEDI AT
            DISTRICT KHUZDAR

Page 220

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

KR8115 BLACKTOP ROAD AT VARIOUS PLACES IN KHUZDAR CITY
014101- A05    Grants, Subsidies and Write off Loans                                  85,521,000
014101- A052   Grants Domestic                                                          85,521,000
        Total- BLACKTOP ROAD AT VARIOUS                                     85,521,000
           PLACES IN KHUZDAR CITY
KR8116 CUTTING AND IMPROVEMENT OF KACHA ROAD HIGHWAY TO ARANJI VIA AWAK INCLUDING
STRUCTURE WORKS DISTRICT
014101- A05    Grants, Subsidies and Write off Loans                                  50,000,000          125,000,000
014101- A052   Grants Domestic                                                          50,000,000          125,000,000
        Total- CUTTING AND IMPROVEMENT OF                                   50,000,000        125,000,000
          KACHA ROAD HIGHWAY TO ARANJI
             VIA AWAK INCLUDING STRUCTURE
         WORKS DISTRICT
KR8117 CONSTRUCTION OF B/T ROAD IN MUNICIPLE CORPORATION KHUZDAR
014101- A05    Grants, Subsidies and Write off Loans                                  73,925,000          130,000,000
014101- A052   Grants Domestic                                                          73,925,000          130,000,000
        Total- CONSTRUCTION OF B/T ROAD IN                                   73,925,000        130,000,000
            MUNICIPLE CORPORATION KHUZDAR
KR8118 CONSTRUCTION OF 50 NOS SOLAR WATER SUPPLY SCHEMES IN DISTRICT KHUZDAR
014101- A05    Grants, Subsidies and Write off Loans                                 237,987,000          115,000,000
014101- A052   Grants Domestic                                                        237,987,000          115,000,000
        Total- CONSTRUCTION OF 50 NOS SOLAR                               237,987,000        115,000,000
          WATER SUPPLY SCHEMES IN DISTRICT
          KHUZDAR
LI0030 CONSTRUCTION OF BLACK TOP NORTHERN BYPASS ROAD LORALAI (15.50 KM)
014101- A05    Grants, Subsidies and Write off Loans                                                        75,000,000
014101- A052   Grants Domestic                                                                               75,000,000
        Total- CONSTRUCTION OF BLACK TOP                                                       75,000,000
          NORTHERN BYPASS ROAD LORALAI
               (15.50 KM)
LI8111 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY AND COMMUNITY
HOME SOLAR ENERGY SYSTEM
014101- A05    Grants, Subsidies and Write off Loans                                  20,000,000          120,000,000
014101- A052   Grants Domestic                                                          20,000,000          120,000,000
        Total- PUBLIC SECTOR DEVELOPMENT                                   20,000,000        120,000,000
         PROGRAM FOR AGRICULTURE CUM
          WATER SUPPLY AND COMMUNITY
         HOME SOLAR ENERGY SYSTEM

Page 221

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

LI8112 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY AND COMMUNITY
HOME SOLAR ENERGY SYSTEM
014101- A05    Grants, Subsidies and Write off Loans                                  90,000,000
014101- A052   Grants Domestic                                                          90,000,000
        Total- PUBLIC SECTOR DEVELOPMENT                                   90,000,000
         PROGRAM FOR AGRICULTURE CUM
          WATER SUPPLY AND COMMUNITY
         HOME SOLAR ENERGY SYSTEM
LS8111 REHABILITATION / UPGRADATION SAKRAN DUREJI ROAD DIFFERENT REACHES (PHASE-I KM 16 TO 50)
DISTRICT
014101- A05    Grants, Subsidies and Write off Loans                                  39,311,000
014101- A052   Grants Domestic                                                          39,311,000
        Total- REHABILITATION / UPGRADATION                                  39,311,000
          SAKRAN DUREJI ROAD DIFFERENT
          REACHES (PHASE-I KM 16 TO 50)
            DISTRICT
LS8112 REHABILITATION / UPGRADATION SAKRAN DUREJI ROAD DIFFERENT REACHES (PHASE-I KM 50 TO 75)
DISTRICT
014101- A05    Grants, Subsidies and Write off Loans                                  34,822,000
014101- A052   Grants Domestic                                                          34,822,000
        Total- REHABILITATION / UPGRADATION                                  34,822,000
          SAKRAN DUREJI ROAD DIFFERENT
          REACHES (PHASE-I KM 50 TO 75)
            DISTRICT
ML8111 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN
VARIOUS KILLIS TEHSIL DUKI
014101- A05    Grants, Subsidies and Write off Loans                                  93,922,000            83,992,000
014101- A052   Grants Domestic                                                          93,922,000            83,992,000
        Total- PUBLIC SECTOR DEVELOPMENT                                   93,922,000          83,992,000
          PROGRAM FOR COMMUNITY HOME
          SOLAR ENERGY SYSTEM IN VARIOUS
              KILLIS TEHSIL DUKI

Page 222

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

MU8111 CONSTRUCTION OF OFFICE FOR IB AT MASTUNG
014101- A05    Grants, Subsidies and Write off Loans                                  35,000,000            44,740,000
014101- A052   Grants Domestic                                                          35,000,000            44,740,000
        Total- CONSTRUCTION OF OFFICE FOR IB AT                             35,000,000          44,740,000
          MASTUNG
NI8111 NUSHKI DEVELOPMENT PACKAGE (ROADS) (REVISED)
014101- A05    Grants, Subsidies and Write off Loans                                  50,000,000          130,000,000
014101- A052   Grants Domestic                                                          50,000,000          130,000,000
        Total- NUSHKI DEVELOPMENT PACKAGE                                 50,000,000        130,000,000
            (ROADS) (REVISED)
NI8112 CONSTRUCTION/REHABILITATION OF BLACK TOP ROAD IN 07 KILLIS OF DISTRICT NUSHKI
014101- A05    Grants, Subsidies and Write off Loans                                  36,000,000
014101- A052   Grants Domestic                                                          36,000,000
        Total- CONSTRUCTION/REHABILITATION OF                              36,000,000
          BLACK TOP ROAD IN 07 KILLIS OF
            DISTRICT NUSHKI
PI8111 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN
VARIOUS KILLIS OF DISTRICT
014101- A05    Grants, Subsidies and Write off Loans                                  50,000,000          150,000,000
014101- A052   Grants Domestic                                                          50,000,000          150,000,000
        Total- PUBLIC SECTOR DEVELOPMENT                                   50,000,000        150,000,000
         PROGRAM FOR COMMUNITY HOME
          SOLAR ENERGY SYSTEM IN VARIOUS
             KILLIS OF DISTRICT
PI8112 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY IN VARIOUS KILLIS
OF DISTRICT PISHIN
014101- A05    Grants, Subsidies and Write off Loans                                  50,000,000          125,002,000
014101- A052   Grants Domestic                                                          50,000,000          125,002,000
        Total- PUBLIC SECTOR DEVELOPMENT                                   50,000,000        125,002,000
         PROGRAM FOR AGRICULTURE CUM
          WATER SUPPLY IN VARIOUS KILLIS OF
            DISTRICT PISHIN

Page 223

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

PI8113 CONSTRUCTION OF OFFICE FOR IB AT PISHIN
014101- A05    Grants, Subsidies and Write off Loans                                  25,000,000            35,250,000
014101- A052   Grants Domestic                                                          25,000,000            35,250,000
        Total- CONSTRUCTION OF OFFICE FOR IB AT                             25,000,000          35,250,000
             PISHIN
PJ0027 CONSTRUCTION OF PANJGUR-GICHAK-AWARAN ROAD DISTRICT PANJGUR/AWARAN (LENGTH
22800KM)(SB)
014101- A05    Grants, Subsidies and Write off Loans          2,000,000,000         2,000,000,000         1,900,000,000
014101- A052   Grants Domestic                                  2,000,000,000         2,000,000,000         1,900,000,000
        Total- CONSTRUCTION OF                          2,000,000,000       2,000,000,000       1,900,000,000
           PANJGUR-GICHAK-AWARAN ROAD
            DISTRICT PANJGUR/AWARAN (LENGTH
             22800KM)(SB)
PJ0028 CONSTRUCTION OF ROAD FROM PROOM-JALGAI (65KM) (SB)
014101- A05    Grants, Subsidies and Write off Loans            500,000,000          500,000,000          700,000,000
014101- A052   Grants Domestic                                  500,000,000          500,000,000          700,000,000
        Total- CONSTRUCTION OF ROAD FROM              500,000,000        500,000,000        700,000,000
           PROOM-JALGAI (65KM) (SB)
PJ0029 CONSTRUCTION OF ROAD FROM CHEDGI-PROOM (70KM)(SB)
014101- A05    Grants, Subsidies and Write off Loans            500,000,000          500,000,000          700,000,000
014101- A052   Grants Domestic                                  500,000,000          500,000,000          700,000,000
        Total- CONSTRUCTION OF ROAD FROM              500,000,000        500,000,000        700,000,000
           CHEDGI-PROOM (70KM)(SB)
PJ0030 CONSTRUCTION OF ROAD FROM NAAG-GICHAK (46KM) (SB)
014101- A05    Grants, Subsidies and Write off Loans            500,000,000          500,000,000          700,000,000
014101- A052   Grants Domestic                                  500,000,000          500,000,000          700,000,000
        Total- CONSTRUCTION OF ROAD FROM              500,000,000        500,000,000        700,000,000
           NAAG-GICHAK (46KM) (SB)
PJ0032 CONSTRUCTION OF 110 KM ROAD CHEDAGI IRAN BORDER TO PANJGUR
014101- A05    Grants, Subsidies and Write off Loans                                                        75,000,000
014101- A052   Grants Domestic                                                                               75,000,000
        Total- CONSTRUCTION OF 110 KM ROAD                                                     75,000,000
           CHEDAGI IRAN BORDER TO PANJGUR

Page 224

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

QA0643 CONSTRUCTION/UPGRADATION OF DIRGI SHABOZAI (N-70) TO TAUNSA (N-55) ROAD (FEDERAL SHARE
60%)
014101- A05    Grants, Subsidies and Write off Loans            800,000,000         1,712,017,000          750,000,000
014101- A052   Grants Domestic                                  800,000,000         1,712,017,000          750,000,000
        Total- CONSTRUCTION/UPGRADATION OF            800,000,000       1,712,017,000        750,000,000
             DIRGI SHABOZAI (N-70) TO TAUNSA
               (N-55) ROAD (FEDERAL SHARE 60%)
QA0683 CONSTRUCTION OF PROVINCIAL ASSEMBLY BUILDING QUETTA
014101- A05    Grants, Subsidies and Write off Loans                                                      250,000,000
014101- A052   Grants Domestic                                                                             250,000,000
        Total- CONSTRUCTION OF PROVINCIAL                                                     250,000,000
          ASSEMBLY BUILDING QUETTA
QA0804 CONSTRUCTION OF FLYOVERS AT VARIOUS LOCATIONS OF QUETTA CITY TO MITIGATE TRAFFIC
CONGESTION
014101- A05    Grants, Subsidies and Write off Loans          1,450,000,000         1,450,000,000          700,000,000
014101- A052   Grants Domestic                                  1,450,000,000         1,450,000,000          700,000,000
        Total- CONSTRUCTION OF FLYOVERS AT           1,450,000,000       1,450,000,000        700,000,000
           VARIOUS LOCATIONS OF QUETTA CITY
          TO MITIGATE TRAFFIC CONGESTION
QA0818 FEASIBILITY STUDY FOR METRO BUS ROUTE IN QUETTA.
014101- A05    Grants, Subsidies and Write off Loans             50,000,000                                 50,000,000
014101- A052   Grants Domestic                                    50,000,000                                 50,000,000
        Total- FEASIBILITY STUDY FOR METRO BUS           50,000,000                             50,000,000
          ROUTE IN QUETTA.
QA3107 CONSTR. OF ROAD FROM SIBI TALI(20KM & KOHLU-RAKHANI(80 KM)
014101- A05    Grants, Subsidies and Write off Loans            500,000,000          500,000,000          500,000,000
014101- A052   Grants Domestic                                  500,000,000          500,000,000          500,000,000
        Total- CONSTR. OF ROAD FROM SIBI                 500,000,000        500,000,000        500,000,000
            TALI(20KM & KOHLU-RAKHANI(80 KM)
QA7044 DEVELOPMENT OF ZIARAT TOWN
014101- A05    Grants, Subsidies and Write off Loans            300,000,000          300,000,000          300,000,000
014101- A052   Grants Domestic                                  300,000,000          300,000,000          300,000,000
        Total- DEVELOPMENT OF ZIARAT TOWN             300,000,000        300,000,000        300,000,000

Page 225

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

QA7045 WIDENING/IMPROVEMENT/RECONSTRUCTION OF 134-KM LONG ROAD KHANI CROSS TO ZIARAT (70-KM)
AND ZIARAT SINJAVI
014101- A05    Grants, Subsidies and Write off Loans          1,000,000,000         1,000,000,000         2,500,000,000
014101- A052   Grants Domestic                                  1,000,000,000         1,000,000,000         2,500,000,000
        Total- WIDENING/IMPROVEMENT/RECONSTRU      1,000,000,000       1,000,000,000       2,500,000,000
            CTION OF 134-KM LONG ROAD KHANI
          CROSS TO ZIARAT (70-KM) AND ZIARAT
             SINJAVI
QA7046 CONSTRUCTION OF BLACK TOP ROAD FROM DUKI TO CHAMALANG (105 KM) WITH WITH LINK ROADS
(55 KM)
014101- A05    Grants, Subsidies and Write off Loans          1,500,000,000         1,500,000,000          750,000,000
014101- A052   Grants Domestic                                  1,500,000,000         1,500,000,000          750,000,000
        Total- CONSTRUCTION OF BLACK TOP ROAD       1,500,000,000       1,500,000,000        750,000,000
          FROM DUKI TO CHAMALANG (105 KM)
           WITH WITH LINK ROADS (55 KM)
QA8107 CONSTRUCTION OF ADDITIONAL CLASS ROOMS & EXAMINATION CENTRE/MULTIPURPOSE HALL AT
DIFFERENT SCHOOLS DISTRICT
014101- A05    Grants, Subsidies and Write off Loans                                  65,000,000             1,996,000
014101- A052   Grants Domestic                                                          65,000,000             1,996,000
        Total- CONSTRUCTION OF ADDITIONAL                                   65,000,000           1,996,000
           CLASS ROOMS & EXAMINATION
           CENTRE/MULTIPURPOSE HALL AT
           DIFFERENT SCHOOLS DISTRICT
QA8109 CONSTRUCTION OF INTERNAL ROADS AT PANJPAI AGHBARG CHASHMA & SURROUNDING AREAS OF
DISTRICT
014101- A05    Grants, Subsidies and Write off Loans                                  68,588,000            60,500,000
014101- A052   Grants Domestic                                                          68,588,000            60,500,000
        Total- CONSTRUCTION OF INTERNAL ROADS                             68,588,000          60,500,000
           AT PANJPAI AGHBARG CHASHMA &
          SURROUNDING AREAS OF DISTRICT
QA8110 CONSTRUCTION OF INTERNAL ROADS IN KUCHLAAK AND SURROUNDING AREAS DISTRICT QUETTA
014101- A05    Grants, Subsidies and Write off Loans                                  61,412,000            98,412,000
014101- A052   Grants Domestic                                                          61,412,000            98,412,000
        Total- CONSTRUCTION OF INTERNAL ROADS                             61,412,000          98,412,000
              IN KUCHLAAK AND SURROUNDING
          AREAS DISTRICT QUETTA

Page 226

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

QA8111 CONSTRUCTION OF BUILDING FOR GIRLS COLLEGE AT KACHI BAIG SARYAB ROAD QUETTA
014101- A05    Grants, Subsidies and Write off Loans                                 196,727,000          102,487,000
014101- A052   Grants Domestic                                                        196,727,000          102,487,000
        Total- CONSTRUCTION OF BUILDING FOR                               196,727,000        102,487,000
            GIRLS COLLEGE AT KACHI BAIG
          SARYAB ROAD QUETTA
QA8112 CONSTRUCTION OF INTERNAL ROADS IN QUETTA
014101- A05    Grants, Subsidies and Write off Loans                                  93,400,000
014101- A052   Grants Domestic                                                          93,400,000
        Total- CONSTRUCTION OF INTERNAL ROADS                             93,400,000
              IN QUETTA
QA8113 CONSTRUCTION OF BLACK TOP ROAD AND TUFF TILES IN QUETTA
014101- A05    Grants, Subsidies and Write off Loans                                  78,000,000          100,000,000
014101- A052   Grants Domestic                                                          78,000,000          100,000,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                             78,000,000        100,000,000
          AND TUFF TILES IN QUETTA
QA8114 CONSTRUCTION OF SOLAR TUBEWELLS AND STREET LIGHTS IN QUETTA (REVISED)
014101- A05    Grants, Subsidies and Write off Loans                                  93,076,000
014101- A052   Grants Domestic                                                          93,076,000
        Total- CONSTRUCTION OF SOLAR                                        93,076,000
          TUBEWELLS AND STREET LIGHTS IN
          QUETTA (REVISED)
QA8115 CONSTRUCTION OF GIRLS MIDDLE SCHOOL AT KHALAQ HAJI ABDUL BASIT QUETTA
014101- A05    Grants, Subsidies and Write off Loans                                  47,000,000
014101- A052   Grants Domestic                                                          47,000,000
        Total- CONSTRUCTION OF GIRLS MIDDLE                                 47,000,000
          SCHOOL AT KHALAQ HAJI ABDUL
            BASIT QUETTA
QA8116 CONSTRUCTION OF 24 KM BLACK TOP ROAD IN NAWAN KILLI KILLI KOTWAL AND SURROUNDING
AREAS OF NAWAN KILLI
014101- A05    Grants, Subsidies and Write off Loans                                 132,091,000
014101- A052   Grants Domestic                                                        132,091,000
        Total- CONSTRUCTION OF 24 KM BLACK TOP                            132,091,000
          ROAD IN NAWAN KILLI KILLI KOTWAL
          AND SURROUNDING AREAS OF
         NAWAN KILLI

Page 227

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

QA8117 ESTABLISHMENT COMMUNITY HALL AT LOUD KAREZ
014101- A05    Grants, Subsidies and Write off Loans                                  62,000,000            47,404,000
014101- A052   Grants Domestic                                                          62,000,000            47,404,000
        Total- ESTABLISHMENT COMMUNITY HALL AT                            62,000,000          47,404,000
          LOUD KAREZ
QA8118 IMPROVEMENT OF SEWAGE SYSTEM TUFF TILES AND BLACK TOP IN DIFFERENT AREA QUETTA-3
014101- A05    Grants, Subsidies and Write off Loans                                  54,000,000
014101- A052   Grants Domestic                                                          54,000,000
        Total- IMPROVEMENT OF SEWAGE SYSTEM                               54,000,000
           TUFF TILES AND BLACK TOP IN
           DIFFERENT AREA QUETTA-3
QA8119 INSTALLATION OF SOLAR KITS FOR ELECTRIFICATION DIGARI MERGED ZEDCO SIMDIGI ZARGHOON
DASHT MIAN
014101- A05    Grants, Subsidies and Write off Loans                                  72,000,000
014101- A052   Grants Domestic                                                          72,000,000
        Total- INSTALLATION OF SOLAR KITS FOR                                72,000,000
            ELECTRIFICATION DIGARI MERGED
          ZEDCO SIMDIGI ZARGHOON DASHT
           MIAN
QA9080 IMPROVEMENT WIDENING OF SPERA RAGHA ROAD FROM KHANOZAI CROSS TO LORALAI KILA
SAIFULLAH ROAD
014101- A05    Grants, Subsidies and Write off Loans          1,687,653,000         1,687,653,000          200,000,000
014101- A052   Grants Domestic                                  1,687,653,000         1,687,653,000          200,000,000
        Total- IMPROVEMENT WIDENING OF SPERA         1,687,653,000       1,687,653,000        200,000,000
          RAGHA ROAD FROM KHANOZAI CROSS
          TO LORALAI KILA SAIFULLAH ROAD
QD8111 COMMUNITY BASED DEVELOPMENT SCHEMES FOR INSTALLATION OF COMMUNITY HOME SOLAR
SYSTEM IN VARIOUS KILLIS OF
014101- A05    Grants, Subsidies and Write off Loans                                  72,402,000
014101- A052   Grants Domestic                                                          72,402,000
        Total- COMMUNITY BASED DEVELOPMENT                                72,402,000
          SCHEMES FOR INSTALLATION OF
          COMMUNITY HOME SOLAR SYSTEM IN
           VARIOUS KILLIS OF

Page 228

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

QS0017 FEASIBILITY STUDY FOR CONSTRUCTION OF BOARDER TERMINAL 8 PAK AFGHAN BOARDER BADINI
WITH BT ROAD FROM
014101- A05    Grants, Subsidies and Write off Loans             50,000,000          562,000,000         2,500,000,000
014101- A052   Grants Domestic                                    50,000,000          562,000,000         2,500,000,000
        Total- FEASIBILITY STUDY FOR                       50,000,000        562,000,000       2,500,000,000
           CONSTRUCTION OF BOARDER
           TERMINAL 8 PAK AFGHAN BOARDER
            BADINI WITH BT ROAD FROM
QS8108 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN
VARIOUS KILLIS OF DISTRICT
014101- A05    Grants, Subsidies and Write off Loans                                  30,000,000          160,000,000
014101- A052   Grants Domestic                                                          30,000,000          160,000,000
        Total- PUBLIC SECTOR DEVELOPMENT                                   30,000,000        160,000,000
         PROGRAM FOR COMMUNITY HOME
          SOLAR ENERGY SYSTEM IN VARIOUS
             KILLIS OF DISTRICT
QS8111 CONSTRUCTION OF 15 KM BLACK TOP ROAD N-50 TO MURGHA FAQIRZAI DISTRICT KILLA SAIFULLAH
(PACKAGE-II)
014101- A05    Grants, Subsidies and Write off Loans                                 200,000,000          325,000,000
014101- A052   Grants Domestic                                                        200,000,000          325,000,000
        Total- CONSTRUCTION OF 15 KM BLACK TOP                            200,000,000        325,000,000
          ROAD N-50 TO MURGHA FAQIRZAI
            DISTRICT KILLA SAIFULLAH
             (PACKAGE-II)
QS8116 CONSTRUCTION OF 18 KM BLACK TOP ROAD N-50 TO MURGHA FAQIRZAI DISTRICT KILLA SAIFULLAH
(PACKAGE-I)
014101- A05    Grants, Subsidies and Write off Loans                                 200,000,000          330,000,000
014101- A052   Grants Domestic                                                        200,000,000          330,000,000
        Total- CONSTRUCTION OF 18 KM BLACK TOP                            200,000,000        330,000,000
          ROAD N-50 TO MURGHA FAQIRZAI
            DISTRICT KILLA SAIFULLAH
            (PACKAGE-I)
SV0002 ESTABLISHMENT OF DANISH SCHOOL JIA KHAN SOHBATPUR (80/20)
014101- A05    Grants, Subsidies and Write off Loans            800,000,000                               1,350,000,000
014101- A052   Grants Domestic                                  800,000,000                               1,350,000,000
        Total- ESTABLISHMENT OF DANISH SCHOOL         800,000,000                           1,350,000,000
              JIA KHAN SOHBATPUR (80/20)

Page 229

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

TB0073 RECONSTRUCTION OF TURBAT-MAND ROAD M-8 (130KM TILL IRANIAN BORDER REDEEM) (SB)
014101- A05    Grants, Subsidies and Write off Loans          5,000,000,000         5,000,000,000         2,000,000,000
014101- A052   Grants Domestic                                  5,000,000,000         5,000,000,000         2,000,000,000
        Total- RECONSTRUCTION OF TURBAT-MAND       5,000,000,000       5,000,000,000       2,000,000,000
          ROAD M-8 (130KM TILL IRANIAN
          BORDER REDEEM) (SB)
TB0074 CONSTRUCTION OF ROAD FROM BULEDA-PROOM (60KM) (SB)
014101- A05    Grants, Subsidies and Write off Loans            500,000,000          500,000,000         1,500,000,000
014101- A052   Grants Domestic                                  500,000,000          500,000,000         1,500,000,000
        Total- CONSTRUCTION OF ROAD FROM              500,000,000        500,000,000       1,500,000,000
          BULEDA-PROOM (60KM) (SB)
TB0075 COMPLETION OF NIHENG BRIDGE AT RODBUN DISTRICT KECH (SB)
014101- A05    Grants, Subsidies and Write off Loans            227,668,000          227,668,000          227,668,000
014101- A052   Grants Domestic                                  227,668,000          227,668,000          227,668,000
        Total- COMPLETION OF NIHENG BRIDGE AT          227,668,000        227,668,000        227,668,000
          RODBUN DISTRICT KECH (SB)
TB8111 CONSTRUCTION OF TEACHERS HOSTEL IN MAND
014101- A05    Grants, Subsidies and Write off Loans                                  20,000,000
014101- A052   Grants Domestic                                                          20,000,000
        Total- CONSTRUCTION OF TEACHERS                                    20,000,000
          HOSTEL IN MAND
TB8112 MISSING FACILITIES TOILETS OF VARIOUS SCHOOLS OF MAND
014101- A05    Grants, Subsidies and Write off Loans                                  64,000,000
014101- A052   Grants Domestic                                                          64,000,000
        Total- MISSING FACILITIES TOILETS OF                                   64,000,000
           VARIOUS SCHOOLS OF MAND
WS8111 DEVELOPMENT SCHEME FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS UCS OF TEHSIL
MASHKEL AND BASIMA
014101- A05    Grants, Subsidies and Write off Loans                                 150,000,000
014101- A052   Grants Domestic                                                        150,000,000
        Total- DEVELOPMENT SCHEME FOR                                     150,000,000
          COMMUNITY HOME SOLAR ENERGY
          SYSTEM IN VARIOUS UCS OF TEHSIL
          MASHKEL AND BASIMA

Page 230

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

WS8112 DEVELOPMENT SCHEME FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS UCS OF TEHSIL
WASHUK DISTRICT WASHUK
014101- A05    Grants, Subsidies and Write off Loans                                 135,000,000
014101- A052   Grants Domestic                                                        135,000,000
        Total- DEVELOPMENT SCHEME FOR                                     135,000,000
          COMMUNITY HOME SOLAR ENERGY
          SYSTEM IN VARIOUS UCS OF TEHSIL
         WASHUK DISTRICT WASHUK
WS8113 CONSTRUCTION OF BLACK TOP ROAD KAMANROD TO NOKCHAH WASHUK MASHKEL ROAD DISTRICT
WASHUK
014101- A05    Grants, Subsidies and Write off Loans                                 163,983,000
014101- A052   Grants Domestic                                                        163,983,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                            163,983,000
          KAMANROD TO NOKCHAH WASHUK
          MASHKEL ROAD DISTRICT WASHUK
WS8114 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY IN VARIOUS
KILLIS OF TEHSIL BESIMA
014101- A05    Grants, Subsidies and Write off Loans                                  20,000,000          115,000,000
014101- A052   Grants Domestic                                                          20,000,000          115,000,000
        Total- PUBLIC SECTOR DEVELOPMENT                                   20,000,000        115,000,000
         PROGRAM FOR AGRICULTURE CUM
          WATER SUPPLY IN VARIOUS KILLIS OF
            TEHSIL BESIMA
WS8115 DEVELOPMENT SCHEMES IN PLANTAK BASIMA ASFANDABAD DISTRICT WASHUK (4 SCHEMES) (AT
REDUCED COST OF RS
014101- A05    Grants, Subsidies and Write off Loans                                 103,242,000
014101- A052   Grants Domestic                                                        103,242,000
        Total- DEVELOPMENT SCHEMES IN PLANTAK                            103,242,000
           BASIMA ASFANDABAD DISTRICT
         WASHUK (4 SCHEMES) (AT REDUCED
          COST OF RS

Page 231

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

ZB0021 CONSTRUCTION OF BLACK TOP ROAD FROM ZHOB TO MEKHTAR VIA MURGHA KIBZAI (N-50 AND N 70)
LENGTH 103 KM
014101- A05    Grants, Subsidies and Write off Loans                                                        75,000,000
014101- A052   Grants Domestic                                                                               75,000,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                                                 75,000,000
          FROM ZHOB TO MEKHTAR VIA
          MURGHA KIBZAI (N-50 AND N 70)
          LENGTH 103 KM
ZB8111 CONSTRUCTION OF 19 KM BLACK TOP ROAD CHINGEE TO KANKOO KAKAR KHURASAAN DISTRICT
ZHOB
014101- A05    Grants, Subsidies and Write off Loans                                 200,000,000          280,000,000
014101- A052   Grants Domestic                                                        200,000,000          280,000,000
        Total- CONSTRUCTION OF 19 KM BLACK TOP                            200,000,000        280,000,000
          ROAD CHINGEE TO KANKOO KAKAR
          KHURASAAN DISTRICT ZHOB
ZB8112 RESTORATION/ REHABILITATION OF FLOOD DAMAGED AGRICULTURE TUBE WELLS IN VARIOUS KILLIS
OF TEHSIL AND
014101- A05    Grants, Subsidies and Write off Loans                                  30,000,000          145,118,000
014101- A052   Grants Domestic                                                          30,000,000          145,118,000
        Total- RESTORATION/ REHABILITATION OF                               30,000,000        145,118,000
          FLOOD DAMAGED AGRICULTURE TUBE
          WELLS IN VARIOUS KILLIS OF TEHSIL
          AND
ZT0009 CONSTRUCTION OF ROAD FROM MAIN DUK ROAD TO KHARSHANG VIA BAGHAW AND SHINLAIZ SINJAWI
DISTRICT ZIARAT
014101- A05    Grants, Subsidies and Write off Loans            500,000,000          500,000,000          751,565,000
014101- A052   Grants Domestic                                  500,000,000          500,000,000          751,565,000
        Total- CONSTRUCTION OF ROAD FROM MAIN         500,000,000        500,000,000        751,565,000
          DUK ROAD TO KHARSHANG VIA
         BAGHAW AND SHINLAIZ SINJAWI
            DISTRICT ZIARAT
     014101   Total-  To provinces                          24,408,483,000      30,257,509,000      29,253,005,000
     0141     Total-  Transfers (Inter-Governmental)          24,408,483,000      30,257,509,000      29,253,005,000
     014      Total-  Transfers                             24,408,483,000      30,257,509,000      29,253,005,000
     01        Total-  General Public Service                 24,408,483,000      30,257,509,000      29,253,005,000
               Total- ACCOUNTANT GENERAL                24,408,483,000        30,257,509,000        29,253,005,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA

Page 232

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT

01     General Public Service:
014    Transfers:
0141   Transfers (Inter-Governmental):
014101 To provinces  :
GL0386 20MW HYDRO POWER PROJECT HENZAL GILGIT
014101- A05    Grants, Subsidies and Write off Loans             20,000,000            20,000,000            10,000,000
014101- A052   Grants Domestic                                    20,000,000            20,000,000            10,000,000
        Total- 20MW HYDRO POWER PROJECT                20,000,000         20,000,000          10,000,000
          HENZAL GILGIT
GL0387 4 MW HYDEL POWER PROJECT THACK NALLAH (CHILAS). (CHILAS).
014101- A05    Grants, Subsidies and Write off Loans             20,000,000            20,000,000
014101- A052   Grants Domestic                                    20,000,000            20,000,000
        Total- 4 MW HYDEL POWER PROJECT THACK          20,000,000         20,000,000
          NALLAH (CHILAS). (CHILAS).
GL0388 CONSTRUCTION OF 16 MW HYDEL POWER PROJECT NALTAR-III NALTAR-III
014101- A05    Grants, Subsidies and Write off Loans          1,818,173,000         1,818,173,000         1,000,000,000
014101- A052   Grants Domestic                                  1,818,173,000         1,818,173,000         1,000,000,000
        Total- CONSTRUCTION OF 16 MW HYDEL            1,818,173,000       1,818,173,000       1,000,000,000
         POWER PROJECT NALTAR-III
             NALTAR-III
GL0389 DEVELOPMENT SCHEMES IN GILGIT-BALTISTAN. GILGIT-BALTISTAN.
014101- A05    Grants, Subsidies and Write off Loans         20,000,000,000        20,000,000,000        21,500,000,000
014101- A052   Grants Domestic                                20,000,000,000        20,000,000,000        21,500,000,000
        Total- DEVELOPMENT SCHEMES IN                20,000,000,000      20,000,000,000      21,500,000,000
             GILGIT-BALTISTAN. GILGIT-BALTISTAN.
GL0390 26 MW HYDRO POWER PROJECT SHAGRTHANG.
014101- A05    Grants, Subsidies and Write off Loans          1,200,000,000         2,000,000,000         1,000,000,000
014101- A052   Grants Domestic                                  1,200,000,000         2,000,000,000         1,000,000,000
        Total- 26 MW HYDRO POWER PROJECT             1,200,000,000       2,000,000,000       1,000,000,000
          SHAGRTHANG.
GL0392 SEWERAGE & SANITATION SYS. TO GILGIT CITY. CITY.
014101- A05    Grants, Subsidies and Write off Loans            871,827,000          871,827,000         1,000,000,000
014101- A052   Grants Domestic                                  871,827,000          871,827,000         1,000,000,000
        Total- SEWERAGE & SANITATION SYS. TO            871,827,000        871,827,000       1,000,000,000
             GILGIT CITY. CITY.

Page 233

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT

GL0393 ESTABLISHMENT OF REGIONAL GRID GILGIT GILGIT-BALTISTAN GILGIT-BALTISTAN
014101- A05    Grants, Subsidies and Write off Loans            800,000,000         1,600,000,000         1,200,000,000
014101- A052   Grants Domestic                                  800,000,000         1,600,000,000         1,200,000,000
        Total- ESTABLISHMENT OF REGIONAL GRID          800,000,000       1,600,000,000       1,200,000,000
             GILGIT GILGIT-BALTISTAN
            GILGIT-BALTISTAN
GL0394 ESTABLISHMENT OF 50 BEDDED CARDIAC HOSPITAL AT GILGIT- GILGIT BALTISTAN PHASE I HOSPITAL
AT
014101- A05    Grants, Subsidies and Write off Loans          1,000,000,000         1,000,000,000          300,000,000
014101- A052   Grants Domestic                                  1,000,000,000         1,000,000,000          300,000,000
        Total- ESTABLISHMENT OF 50 BEDDED             1,000,000,000       1,000,000,000        300,000,000
           CARDIAC HOSPITAL AT GILGIT- GILGIT
           BALTISTAN PHASE I HOSPITAL AT
GL0396 ESTABLISHMENT OF 250 BEDDED HOSPITAL AT SKARDU (PHASE-1) SKARDU (PHASE-1)
014101- A05    Grants, Subsidies and Write off Loans            600,000,000          600,000,000         1,000,000,000
014101- A052   Grants Domestic                                  600,000,000          600,000,000         1,000,000,000
        Total- ESTABLISHMENT OF 250 BEDDED             600,000,000        600,000,000       1,000,000,000
           HOSPITAL AT SKARDU (PHASE-1)
          SKARDU (PHASE-1)
GL0397 PROJECT DIRECTOR CONSTRUCTION OF DAREL AND TANGIR EXPRESSWAY ALONG WITH ROADS IN
KHANBURY AND BUNAR (GBP)
014101- A05    Grants, Subsidies and Write off Loans            500,000,000         1,200,000,000         1,000,000,000
014101- A052   Grants Domestic                                  500,000,000         1,200,000,000         1,000,000,000
        Total- PROJECT DIRECTOR CONSTRUCTION         500,000,000       1,200,000,000       1,000,000,000
          OF DAREL AND TANGIR EXPRESSWAY
          ALONG WITH ROADS IN KHANBURY
          AND BUNAR (GBP)
GL0398 CONSTRUCTION OF ROAD FROM PISSAN TO HOPE NAGAR (SHAHRA-ENAGAR) 40 KM HOPE NAGAR
(SHAHRA-ENAGAR) 40 KM
014101- A05    Grants, Subsidies and Write off Loans            700,000,000          700,000,000          790,000,000
014101- A052   Grants Domestic                                  700,000,000          700,000,000          790,000,000
        Total- CONSTRUCTION OF ROAD FROM              700,000,000        700,000,000        790,000,000
           PISSAN TO HOPE NAGAR
           (SHAHRA-ENAGAR) 40 KM HOPE
          NAGAR (SHAHRA-ENAGAR) 40 KM

Page 234

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT

GL0399 INTERPROVINCIAL CONNECTIVITY ECONOMIC CORRIDOR THROUGH GILGIT-BALTISTAN AND AJK
(THALICCHI GB-SHOUNTER
014101- A05    Grants, Subsidies and Write off Loans            500,000,000         1,300,000,000         1,500,000,000
014101- A052   Grants Domestic                                  500,000,000         1,300,000,000         1,500,000,000
        Total- INTERPROVINCIAL CONNECTIVITY             500,000,000       1,300,000,000       1,500,000,000
          ECONOMIC CORRIDOR THROUGH
            GILGIT-BALTISTAN AND AJK
            (THALICCHI GB-SHOUNTER
GL0438 PROJECT DIRECTOR INTER REGIONAL CONNECTIVITY BETWEEN BALTISTAN DIVISION -ASTORE
DIVISION
014101- A05    Grants, Subsidies and Write off Loans            100,000,000          100,000,000          300,000,000
014101- A052   Grants Domestic                                  100,000,000          100,000,000          300,000,000
        Total- PROJECT DIRECTOR INTER REGIONAL        100,000,000        100,000,000        300,000,000
           CONNECTIVITY BETWEEN BALTISTAN
             DIVISION -ASTORE DIVISION
GL0439 30 MW HYDRO POWER PROJECT GHOWARI GHANCHE GHANCHE
014101- A05    Grants, Subsidies and Write off Loans             20,000,000            20,000,000
014101- A052   Grants Domestic                                    20,000,000            20,000,000
        Total- 30 MW HYDRO POWER PROJECT                20,000,000         20,000,000
          GHOWARI GHANCHE GHANCHE
GL0440 UP-GRADATION OF PROVINCIAL HQ GILGIT BASED ON MASTER PLAN (GBP) BASED ON MASTER PLAN
(GBP)
014101- A05    Grants, Subsidies and Write off Loans            500,000,000          500,000,000          500,000,000
014101- A052   Grants Domestic                                  500,000,000          500,000,000          500,000,000
        Total- UP-GRADATION OF PROVINCIAL HQ           500,000,000        500,000,000        500,000,000
             GILGIT BASED ON MASTER PLAN (GBP)
          BASED ON MASTER PLAN (GBP)
GL0441 ESTABLISHMENT OF MEDICAL AND NURSING COLLEGE AT GILGIT COLLEGE AT GILGIT
014101- A05    Grants, Subsidies and Write off Loans             50,000,000            50,000,000          300,000,000
014101- A052   Grants Domestic                                    50,000,000            50,000,000          300,000,000
        Total- ESTABLISHMENT OF MEDICAL AND             50,000,000         50,000,000        300,000,000
           NURSING COLLEGE AT GILGIT
          COLLEGE AT GILGIT

Page 235

NO. 109.- FC22D52 OTHER DEVELOPMENT EXPENDITURE                      DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT

GL0442 GREATER HUNZA WATER SUPPLY
014101- A05    Grants, Subsidies and Write off Loans            500,000,000          900,000,000          600,000,000
014101- A052   Grants Domestic                                  500,000,000          900,000,000          600,000,000
        Total- GREATER HUNZA WATER SUPPLY             500,000,000        900,000,000        600,000,000
GL0444 PM'S SPECIAL PACKAGE FOR GILGIT BALITISTAN
014101- A05    Grants, Subsidies and Write off Loans          4,000,000,000          300,000,000         4,000,000,000
014101- A052   Grants Domestic                                  4,000,000,000          300,000,000         4,000,000,000
        Total- PM'S SPECIAL PACKAGE FOR GILGIT         4,000,000,000        300,000,000       4,000,000,000
            BALITISTAN
GL7110 ESTABLISHMENT OF 300 BEDDED ICT HOSPITAL MOTHER AND CHILD HOSPITAL IN CHILAS
014101- A05    Grants, Subsidies and Write off Loans            300,000,000          300,000,000          300,000,000
014101- A052   Grants Domestic                                  300,000,000          300,000,000          300,000,000
        Total- ESTABLISHMENT OF 300 BEDDED ICT          300,000,000        300,000,000        300,000,000
           HOSPITAL MOTHER AND CHILD
           HOSPITAL IN CHILAS
GL7111 ESTABLISHMENT OF MOUNTAINEERING INSTITUTE SHIGAR GB
014101- A05    Grants, Subsidies and Write off Loans                                                      200,000,000
014101- A052   Grants Domestic                                                                             200,000,000
        Total- ESTABLISHMENT OF                                                                 200,000,000
           MOUNTAINEERING INSTITUTE SHIGAR
         GB
     014101   Total-  To provinces                          33,500,000,000      33,300,000,000      36,500,000,000
     0141     Total-  Transfers (Inter-Governmental)          33,500,000,000      33,300,000,000      36,500,000,000
     014      Total-  Transfers                             33,500,000,000      33,300,000,000      36,500,000,000
     01        Total-  General Public Service                 33,500,000,000      33,300,000,000      36,500,000,000
               Total- ACCOUNTANT GENERAL                33,500,000,000        33,300,000,000        36,500,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, GILGIT
          TOTAL - DEMAND                          220,456,099,000    269,329,839,000    251,130,109,000

Page 236

NO. 110.- DEVELOPMENT EXPENDITURE OF REVENUE DIVISION                 DEMANDS FOR GRANTS
                                DEMAND NO. 110
                                                                            ( FC22D49 )
                     DEVELOPMENT EXPENDITURE OF REVENUE DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2026 to defray the Salaries and Other
Expenses of the DEVELOPMENT EXPENDITURE OF REVENUE DIVISION.

                                Voted           Rs. 7,150,000,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF FINANCE AND REVENUE  .

                                                           2024-2025         2024-2025         2025-2026
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
011    Executive & Legislative Organs,Financial and Fiscal       17,696,000,000        14,696,000,000         7,150,000,000
         Affairs, External Affairs
               Total                                              17,696,000,000        14,696,000,000         7,150,000,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                           25,800,000         25,800,000         34,285,000
A011  Pay                                                          25,500,000            25,500,000            33,785,000
A011-1 Pay of Officers                                                 (17,500,000)           (17,327,000)           (22,750,000)
A011-2 Pay of Other Staff                                                (8,000,000)            (8,173,000)           (11,035,000)
A012  Allowances                                                    300,000              300,000              500,000
A012-1 Regular Allowances
A012-2 Other Allowances (Excluding TA)                                 (300,000)             (300,000)             (500,000)
A03   Operating Expenses                                 8,532,542,000       6,040,611,000       2,981,806,000
A09   Physical Assets                                      1,189,339,000       1,835,733,000        152,600,000
A12    Civil works                                          7,947,119,000       6,792,656,000       3,980,109,000
A13   Repairs and Maintenance                                1,200,000           1,200,000           1,200,000
               Total                                        17,696,000,000      14,696,000,000       7,150,000,000
                  (In Foreign Exchange)                             (13,363,830,000)                               (4,493,191,000)
            (Own Resources)
               (Foreign Aid)                                      (13,363,830,000)                               (4,493,191,000)
                  (In Local Currency)                                  (4,332,170,000)       (14,696,000,000)        (2,656,809,000)
                                                  __________________________________________________

Page 237

NO. 110.- FC22D49 DEVELOPMENT EXPENDITURE OF REVENUE DIVISION           DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2024-2025         2024-2025       2025-2026
                                       2024-25 2025-26       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
011    Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs:
0112   Financial and Fiscal Affairs:
011205 Tax Management (Customs, Income Tax, Excise etc.) :
IB2047 PAKISTAN RAISES REVENUE PROGRAMME (PRRP)
011205- A03    Operating Expenses                             7,363,830,000         4,363,830,000         2,493,191,000
011205- A039   General                                          7,363,830,000         4,363,830,000         2,493,191,000
        Total- PAKISTAN RAISES REVENUE                 7,363,830,000       4,363,830,000       2,493,191,000
         PROGRAMME (PRRP)
                  (In Foreign Exchange)                          (7,363,830,000)                          (2,493,191,000)
               (Foreign Aid)                                   (7,363,830,000)                          (2,493,191,000)
                  (In Local Currency)                                                  (4,363,830,000)
                                                  __________________________________________________
ID7176 DEVELOPMENT OF INTEGRATED TRANSIT TRADE MANAGEMENT SYSTEM (ITTMS) UNDER ADB's
REGIONAL IMPROVING BORDER
011205- A01    Employees Related Expenses                      25,800,000            25,800,000            34,285,000
011205- A011   Pay                      60     38           25,500,000            25,500,000            33,785,000
011205- A011-1 Pay of Officers               (26)    (15)         (17,500,000)         (17,327,000)         (22,750,000)
011205- A011-2 Pay of Other Staff            (34)    (23)          (8,000,000)          (8,173,000)         (11,035,000)
011205- A012   Allowances                                           300,000              300,000              500,000
011205- A012-2  Other Allowances (Excluding TA)                    (300,000)            (300,000)            (500,000)
011205- A03    Operating Expenses                             1,168,712,000         1,676,781,000          488,615,000
011205- A032   Communications                                     800,000              719,000              700,000
011205- A033     Utilities                                               3,800,000             2,261,000             3,300,000
011205- A034   Occupancy Costs                                  839,112,000         1,359,674,000          212,965,000
011205- A035   Operating Leases                                 200,000,000          195,439,000          145,000,000
011205- A037   Consultancy and Contractual Work                 100,000,000          100,000,000          100,000,000
011205- A038    Travel & Transportation                               8,800,000             6,051,000             7,150,000
011205- A039   General                                             16,200,000            12,637,000            19,500,000
011205- A09    Physical Assets                                   503,200,000         1,149,594,000             2,600,000
011205- A091   Purchase of Building                                  100,000                                   100,000
011205- A092   Computer Equipment                              501,500,000          720,053,000             1,800,000
011205- A096   Purchase of Plant and Machinery                     1,500,000            35,841,000              600,000

Page 238

NO. 110.- FC22D49 DEVELOPMENT EXPENDITURE OF REVENUE DIVISION           DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

011205- A097   Purchase of Furniture and Fixture                     100,000          393,700,000              100,000
011205- A12     Civil works                                       5,801,088,000         6,609,960,000         1,973,300,000
011205- A124    Building and Structures                           5,801,088,000         6,609,960,000         1,973,300,000
011205- A13    Repairs and Maintenance                            1,200,000             1,200,000             1,200,000
011205- A130    Transport                                            500,000              500,000              500,000
011205- A131   Machinery and Equipment                             500,000              500,000              500,000
011205- A137   Computer Equipment                                 200,000              200,000              200,000
        Total- DEVELOPMENT OF INTEGRATED             7,500,000,000       9,463,335,000       2,500,000,000
           TRANSIT TRADE MANAGEMENT
          SYSTEM (ITTMS) UNDER ADB's
           REGIONAL IMPROVING BORDER
                  (In Foreign Exchange)                          (6,000,000,000)                          (2,000,000,000)
               (Foreign Aid)                                   (6,000,000,000)                          (2,000,000,000)
                  (In Local Currency)                             (1,500,000,000)      (9,463,335,000)       (500,000,000)
                                                  __________________________________________________
ID9384 CONSTRUCTION. OF CUSTOMS COMPLX.AT SOST INVOLVING SEPOY BARKS.- E-FACLTN
CENTR-TRANSIT ACCOMD. & CUSTOMS
011205- A12     Civil works                                        182,696,000          182,696,000          539,629,000
011205- A124    Building and Structures                            182,696,000          182,696,000          539,629,000
        Total- CONSTRUCTION. OF CUSTOMS                182,696,000        182,696,000        539,629,000
           COMPLX.AT SOST INVOLVING SEPOY
            BARKS.- E-FACLTN CENTR-TRANSIT
          ACCOMD. & CUSTOMS
     011205   Total-  Tax Management (Customs,            15,046,526,000      14,009,861,000       5,532,820,000
                   Income Tax, Excise etc.)
     0112     Total-  Financial and Fiscal Affairs             15,046,526,000      14,009,861,000       5,532,820,000
     011      Total-  Executive & Legislative                 15,046,526,000      14,009,861,000       5,532,820,000
                      Organs,Financial and Fiscal Affairs,
                       External Affairs
     01        Total-  General Public Service                 15,046,526,000      14,009,861,000       5,532,820,000
               Total- ACCOUNTANT GENERAL                15,046,526,000        14,009,861,000         5,532,820,000
                PAKISTAN REVENUES
                       (In Foreign Exchange)                         (13,363,830,000)                               (4,493,191,000)
               (Own Resources)
                   (Foreign Aid)                                  (13,363,830,000)                               (4,493,191,000)
                       (In Local Currency)                             (1,682,696,000)       (14,009,861,000)        (1,039,629,000)

Page 239

NO. 110.- FC22D49 DEVELOPMENT EXPENDITURE OF REVENUE DIVISION           DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

01     General Public Service:
011    Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs:
0112   Financial and Fiscal Affairs:
011205 Tax Management (Customs, Income Tax, Excise etc.) :
SG0201 CONSTRUCTION OF REGIONAL TAX OFFICE SARGODHA
011205- A12     Civil works                                        490,981,000                                490,981,000
011205- A124    Building and Structures                            490,981,000                                490,981,000
        Total- CONSTRUCTION OF REGIONAL TAX           490,981,000                            490,981,000
            OFFICE SARGODHA
SL0059 CONSTRUCTION OF ADDITIONAL OFFICE BLOCK FOR RTO SAHIWAL
011205- A12     Civil works                                        222,483,000                                222,483,000
011205- A124    Building and Structures                            222,483,000                                222,483,000
        Total- CONSTRUCTION OF ADDITIONAL              222,483,000                            222,483,000
            OFFICE BLOCK FOR RTO SAHIWAL
ST0122 PURCHASE OF LAND FOR REGIONAL TAX OFFICE SIALKOT
011205- A09    Physical Assets                                   686,139,000          686,139,000          150,000,000
011205- A091   Purchase of Building                               686,139,000          686,139,000          150,000,000
        Total- PURCHASE OF LAND FOR REGIONAL          686,139,000        686,139,000        150,000,000
           TAX OFFICE SIALKOT
     011205   Total-  Tax Management (Customs,             1,399,603,000        686,139,000        863,464,000
                   Income Tax, Excise etc.)
     0112     Total-  Financial and Fiscal Affairs              1,399,603,000        686,139,000        863,464,000
     011      Total-  Executive & Legislative                  1,399,603,000        686,139,000        863,464,000
                      Organs,Financial and Fiscal Affairs,
                       External Affairs
     01        Total-  General Public Service                  1,399,603,000        686,139,000        863,464,000
               Total- ACCOUNTANT GENERAL                 1,399,603,000          686,139,000          863,464,000
                PAKISTAN REVENUES
                  SUB-OFFICE, LAHORE

Page 240

NO. 110.- FC22D49 DEVELOPMENT EXPENDITURE OF REVENUE DIVISION           DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

01     General Public Service:
011    Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs:
0112   Financial and Fiscal Affairs:
011205 Tax Management (Customs, Income Tax, Excise etc.) :
PR9602 CONSTRUCTION OF TRANSIT ACCOMMODATION AT LANDI KOTAL (KPK) FOR TORKHAM CUSTOMS
STATION
011205- A12     Civil works                                        256,509,000
011205- A124    Building and Structures                            256,509,000
        Total- CONSTRUCTION OF TRANSIT                  256,509,000
          ACCOMMODATION AT LANDI KOTAL
             (KPK) FOR TORKHAM CUSTOMS
           STATION
     011205   Total-  Tax Management (Customs,              256,509,000
                   Income Tax, Excise etc.)
     0112     Total-  Financial and Fiscal Affairs                256,509,000
     011      Total-  Executive & Legislative                   256,509,000
                      Organs,Financial and Fiscal Affairs,
                       External Affairs
     01        Total-  General Public Service                   256,509,000
               Total- ACCOUNTANT GENERAL                  256,509,000
                PAKISTAN REVENUES
                  SUB-OFFICE, PESHAWAR

Page 241

NO. 110.- FC22D49 DEVELOPMENT EXPENDITURE OF REVENUE DIVISION           DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01     General Public Service:
011    Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs:
0112   Financial and Fiscal Affairs:
011205 Tax Management (Customs, Income Tax, Excise etc.) :
KA1298 CONST. OF OFFICE OF INTELLIGENCE & INVESTIGATION (IRS) KARACHI
011205- A12     Civil works                                         72,883,000                                 72,883,000
011205- A124    Building and Structures                             72,883,000                                 72,883,000
        Total- CONST. OF OFFICE OF INTELLIGENCE          72,883,000                             72,883,000
          & INVESTIGATION (IRS) KARACHI
     011205   Total-  Tax Management (Customs,                72,883,000                             72,883,000
                   Income Tax, Excise etc.)
     0112     Total-  Financial and Fiscal Affairs                 72,883,000                             72,883,000
     011      Total-  Executive & Legislative                    72,883,000                             72,883,000
                      Organs,Financial and Fiscal Affairs,
                       External Affairs
     01        Total-  General Public Service                    72,883,000                             72,883,000
               Total- ACCOUNTANT GENERAL                    72,883,000                                 72,883,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI

Page 242

NO. 110.- FC22D49 DEVELOPMENT EXPENDITURE OF REVENUE DIVISION           DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

01     General Public Service:
011    Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs:
0112   Financial and Fiscal Affairs:
011205 Tax Management (Customs, Income Tax, Excise etc.) :
QA0332 CONSTRUCTION OF MODEL CUSTOM COLLECTTORATE (ENFORCEMENT & COMPLIANCE) AT BALLELI
QUETTA
011205- A12     Civil works                                        239,646,000
011205- A124    Building and Structures                            239,646,000
        Total- CONSTRUCTION OF MODEL CUSTOM          239,646,000
          COLLECTTORATE (ENFORCEMENT &
           COMPLIANCE) AT BALLELI QUETTA
QA3056 CONSTRUCTION OF MODEL CUSTOM COLLECTORATE AT GAWADAR
011205- A12     Civil works                                        680,833,000                                680,833,000
011205- A124    Building and Structures                            680,833,000                                680,833,000
        Total- CONSTRUCTION OF MODEL CUSTOM          680,833,000                            680,833,000
          COLLECTORATE AT GAWADAR
     011205   Total-  Tax Management (Customs,              920,479,000                            680,833,000
                   Income Tax, Excise etc.)
     0112     Total-  Financial and Fiscal Affairs                920,479,000                            680,833,000
     011      Total-  Executive & Legislative                   920,479,000                            680,833,000
                      Organs,Financial and Fiscal Affairs,
                       External Affairs
     01        Total-  General Public Service                   920,479,000                            680,833,000
               Total- ACCOUNTANT GENERAL                  920,479,000                                680,833,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
          TOTAL - DEMAND                           17,696,000,000      14,696,000,000       7,150,000,000
                  (In Foreign Exchange)                         (13,363,830,000)                          (4,493,191,000)
            (Own Resources)
               (Foreign Aid)                                 (13,363,830,000)                          (4,493,191,000)
                  (In Local Currency)                             (4,332,170,000)     (14,696,000,000)      (2,656,809,000)
                                                  __________________________________________________

Page 243

                                  SECTION X

                             MINISTRY OF HUMAN RIGHTS

                                                            *******

                                                                                2025-2026
                                                                            Budget
                                                                                   Estimate

                                                                     (Rupees in Thousand)

Demands presented on behalf of the
Ministry of Human Rights .

Development Expenditure on Revenue Account

           111.  Development Expenditure of Human Rights Division                        23,000

                                                                        Total :                23,000

Page 244

No text layer on this page, see the official PDF.

Page 245

NO. 111.- DEVELOPMENT EXPENDITURE OF HUMAN RIGHTS DIVISION             DEMANDS FOR GRANTS
                                DEMAND NO. 111
                                                                            ( FC22D71 )
                   DEVELOPMENT EXPENDITURE OF HUMAN RIGHTS DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2026 to defray the Salaries and Other
Expenses of the DEVELOPMENT EXPENDITURE OF HUMAN RIGHTS DIVISION.

                                Voted           Rs. 23,000,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF HUMAN RIGHTS  .

                                                           2024-2025         2024-2025         2025-2026
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
036    Administration Of Public Order                               104,000,000          104,000,000            23,000,000
               Total                                                104,000,000          104,000,000            23,000,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                           61,407,000         61,407,000         18,200,000
A011  Pay                                                          61,407,000            61,407,000            18,200,000
A011-1 Pay of Officers                                                 (50,461,000)           (50,461,000)           (15,700,000)
A011-2 Pay of Other Staff                                              (10,946,000)           (10,946,000)            (2,500,000)
A03   Operating Expenses                                    21,795,000         21,645,000           4,480,000
A09   Physical Assets                                         8,253,000           8,403,000            300,000
A12    Civil works                                            11,795,000         11,795,000
A13   Repairs and Maintenance                                 750,000            750,000             20,000
               Total                                          104,000,000        104,000,000         23,000,000

Page 246

NO. 111.- FC22D71 DEVELOPMENT EXPENDITURE OF HUMAN RIGHTS DIVISION       DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2024-2025         2024-2025       2025-2026
                                       2024-25 2025-26       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
03     Public Order And Safety Affairs:
036    Administration Of Public Order:
0361   Administration:
036101 SECRETARIAT/ADMINISTRATION  :
IB0293 ESTABLISHMENT OF PROJECT PLANNING AND MONITORING UNIT(PMU) IN MOHR
036101- A01    Employees Related Expenses                      17,180,000            17,180,000            10,500,000
036101- A011   Pay                      11                   17,180,000            17,180,000            10,500,000
036101- A011-1 Pay of Officers                  (5)                (14,868,000)         (14,868,000)          (8,000,000)
036101- A011-2 Pay of Other Staff               (6)                  (2,312,000)          (2,312,000)          (2,500,000)
036101- A03    Operating Expenses                                 1,816,000             1,666,000             1,200,000
036101- A032   Communications                                       21,000               21,000               50,000
036101- A036   Motor Vehicles                                         50,000               50,000
036101- A038    Travel & Transportation                               213,000              213,000              500,000
036101- A039   General                                              1,532,000             1,382,000              650,000
036101- A09    Physical Assets                                      984,000             1,134,000              300,000
036101- A092   Computer Equipment                                 233,000              233,000
036101- A095   Purchase of Transport                                350,000              500,000
036101- A096   Purchase of Plant and Machinery                      400,000              400,000              300,000
036101- A097   Purchase of Furniture and Fixture                        1,000                 1,000
036101- A13    Repairs and Maintenance                              20,000               20,000
036101- A131   Machinery and Equipment                              10,000               10,000
036101- A133    Buildings and Structure                                 10,000               10,000
        Total- ESTABLISHMENT OF PROJECT                 20,000,000         20,000,000          12,000,000
           PLANNING AND MONITORING
            UNIT(PMU) IN MOHR
IB0720 HUMAN RIGHTS AWARENESS PROGRAMME
036101- A01    Employees Related Expenses                       2,400,000             2,400,000             2,500,000
036101- A011   Pay                       3                    2,400,000             2,400,000             2,500,000
036101- A011-1 Pay of Officers                  (3)                  (2,400,000)          (2,400,000)          (2,500,000)
036101- A03    Operating Expenses                                 6,500,000             6,500,000             1,500,000
036101- A032   Communications                                     125,000              125,000              100,000
036101- A038    Travel & Transportation                               610,000              610,000              500,000
036101- A039   General                                              5,765,000             5,765,000              900,000
        Total- HUMAN RIGHTS AWARENESS                    8,900,000           8,900,000           4,000,000
          PROGRAMME

Page 247

NO. 111.- FC22D71 DEVELOPMENT EXPENDITURE OF HUMAN RIGHTS DIVISION       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB1975 PILOT PROJECT FOR ESTABLISHMENT OF TRANSGENDER PROTECTION CENTRE ISLAMABAD
036101- A01    Employees Related Expenses                       9,018,000             9,018,000
036101- A011   Pay                      10                    9,018,000             9,018,000
036101- A011-1 Pay of Officers                  (3)                  (7,009,000)          (7,009,000)
036101- A011-2 Pay of Other Staff               (7)                  (2,009,000)          (2,009,000)
036101- A03    Operating Expenses                                 3,573,000             3,573,000
036101- A032   Communications                                     136,000              136,000
036101- A033     Utilities                                               670,000              670,000
036101- A038    Travel & Transportation                               600,000              600,000
036101- A039   General                                              2,167,000             2,167,000
036101- A09    Physical Assets                                      229,000              229,000
036101- A092   Computer Equipment                                   29,000               29,000
036101- A096   Purchase of Plant and Machinery                      200,000              200,000
036101- A13    Repairs and Maintenance                            180,000              180,000
036101- A130    Transport                                              50,000               50,000
036101- A131   Machinery and Equipment                              50,000               50,000
036101- A132    Furniture and Fixture                                   50,000               50,000
036101- A137   Computer Equipment                                   30,000               30,000
        Total- PILOT PROJECT FOR ESTABLISHMENT          13,000,000         13,000,000
          OF TRANSGENDER PROTECTION
          CENTRE ISLAMABAD
IB1976 HUMAN RIGHTS COORDINATION AND MONITORING UNIT FOR NATIONAL MECHANISM FOR REPORTING
AND
036101- A01    Employees Related Expenses                       7,655,000             7,655,000             5,200,000
036101- A011   Pay                       5                    7,655,000             7,655,000             5,200,000
036101- A011-1 Pay of Officers                  (5)                  (7,655,000)          (7,655,000)          (5,200,000)
036101- A03    Operating Expenses                                 5,866,000             5,866,000             1,780,000
036101- A032   Communications                                       30,000               30,000               30,000
036101- A038    Travel & Transportation                               726,000              726,000              700,000
036101- A039   General                                              5,110,000             5,110,000             1,050,000
036101- A13    Repairs and Maintenance                              60,000               60,000               20,000

Page 248

NO. 111.- FC22D71 DEVELOPMENT EXPENDITURE OF HUMAN RIGHTS DIVISION       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

036101- A131   Machinery and Equipment                              60,000               60,000               20,000
        Total- HUMAN RIGHTS COORDINATION AND           13,581,000         13,581,000           7,000,000
           MONITORING UNIT FOR NATIONAL
          MECHANISM FOR REPORTING AND
IB9184 ACQUISITION OF LAND AND FEASIBILITY STUDY/CONSTRUCTION OF BOUNDARY WALL/GUARD ROOM
FOR CHILD
036101- A12     Civil works                                         11,795,000            11,795,000
036101- A124    Building and Structures                             11,795,000            11,795,000
        Total- ACQUISITION OF LAND AND                    11,795,000         11,795,000
             FEASIBILITY STUDY/CONSTRUCTION
          OF BOUNDARY WALL/GUARD ROOM
          FOR CHILD
ID9201 INSTITUTIONAL STRENGTHENING OF M/O HUMAN RIGHTS
036101- A01    Employees Related Expenses                      11,282,000            11,282,000
036101- A011   Pay                       9                   11,282,000            11,282,000
036101- A011-1 Pay of Officers                  (4)                  (9,128,000)          (9,128,000)
036101- A011-2 Pay of Other Staff               (5)                  (2,154,000)          (2,154,000)
036101- A03    Operating Expenses                                 280,000              280,000
036101- A032   Communications                                       70,000               70,000
036101- A039   General                                              210,000              210,000
036101- A09    Physical Assets                                      2,762,000             2,762,000
036101- A092   Computer Equipment                                 2,762,000              150,000
036101- A096   Purchase of Plant and Machinery                                           2,612,000
        Total- INSTITUTIONAL STRENGTHENING OF           14,324,000         14,324,000
           M/O HUMAN RIGHTS
ID9677 ETAB. OF HUMAN RIGHTS INFORMATION MANAGEMENT SYSTEM (HRIMS)
036101- A01    Employees Related Expenses                       6,600,000             6,600,000
036101- A011   Pay                      10                    6,600,000             6,600,000
036101- A011-1 Pay of Officers                  (6)                  (5,300,000)          (5,300,000)
036101- A011-2 Pay of Other Staff               (4)                  (1,300,000)          (1,300,000)
036101- A03    Operating Expenses                                 1,450,000             1,450,000
036101- A032   Communications                                     740,000              740,000
036101- A038    Travel & Transportation                               610,000              610,000
036101- A039   General                                              100,000              100,000

Page 249

NO. 111.- FC22D71 DEVELOPMENT EXPENDITURE OF HUMAN RIGHTS DIVISION       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

036101- A13    Repairs and Maintenance                            350,000              350,000
036101- A130    Transport                                            250,000              250,000
036101- A131   Machinery and Equipment                             100,000              100,000
        Total- ETAB. OF HUMAN RIGHTS                        8,400,000           8,400,000
           INFORMATION MANAGEMENT SYSTEM
             (HRIMS)
     036101   Total-  SECRETARIAT/ADMINISTRATION         90,000,000         90,000,000         23,000,000

     0361     Total-  Administration                            90,000,000         90,000,000         23,000,000
     036      Total-  Administration Of Public Order              90,000,000         90,000,000         23,000,000
     03        Total-  Public Order And Safety Affairs             90,000,000         90,000,000         23,000,000
               Total- ACCOUNTANT GENERAL                    90,000,000            90,000,000            23,000,000
                PAKISTAN REVENUES

Page 250

NO. 111.- FC22D71 DEVELOPMENT EXPENDITURE OF HUMAN RIGHTS DIVISION       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR
03     Public Order And Safety Affairs:
036    Administration Of Public Order:
0361   Administration:
036101 SECRETARIAT/ADMINISTRATION  :
PR9622 ESTABLISHMENT OF SUB OFFICE OF HUMAN RIGHTS IN MERGED DISTRICTS OF KP
036101- A01    Employees Related Expenses                       7,272,000             7,272,000
036101- A011   Pay                      10                    7,272,000             7,272,000
036101- A011-1 Pay of Officers                  (3)                  (4,101,000)          (4,101,000)
036101- A011-2 Pay of Other Staff               (7)                  (3,171,000)          (3,171,000)
036101- A03    Operating Expenses                                 2,310,000             2,310,000
036101- A032   Communications                                     200,000              200,000
036101- A033     Utilities                                                20,000               20,000
036101- A034   Occupancy Costs                                      10,000               10,000
036101- A036   Motor Vehicles                                         20,000               20,000
036101- A038    Travel & Transportation                               350,000              350,000
036101- A039   General                                              1,710,000             1,710,000
036101- A09    Physical Assets                                      4,278,000             4,278,000
036101- A092   Computer Equipment                                 1,150,000             1,150,000
036101- A095   Purchase of Transport                                2,827,000             2,827,000
036101- A096   Purchase of Plant and Machinery                      300,000              300,000
036101- A097   Purchase of Furniture and Fixture                        1,000                 1,000
036101- A13    Repairs and Maintenance                            140,000              140,000
036101- A130    Transport                                              10,000               10,000
036101- A131   Machinery and Equipment                              40,000               40,000
036101- A132    Furniture and Fixture                                   47,000               47,000
036101- A133    Buildings and Structure                                 40,000               40,000
036101- A137   Computer Equipment                                    3,000                 3,000
        Total- ESTABLISHMENT OF SUB OFFICE OF           14,000,000         14,000,000
         HUMAN RIGHTS IN MERGED DISTRICTS
          OF KP
     036101   Total-  SECRETARIAT/ADMINISTRATION         14,000,000         14,000,000
     0361     Total-  Administration                            14,000,000         14,000,000
     036      Total-  Administration Of Public Order              14,000,000         14,000,000
     03        Total-  Public Order And Safety Affairs             14,000,000         14,000,000
               Total- ACCOUNTANT GENERAL                    14,000,000            14,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, PESHAWAR
          TOTAL - DEMAND                              104,000,000        104,000,000         23,000,000

Page 251

                                  SECTION XI

                    MINISTRY OF INFORMATION AND BROADCASTING
                                                           *******

                                                                                2025-2026
                                                                           Budget
                                                                                  Estimate

                                                                   (Rupees in Thousand)

Demand presented on behalf of the Ministry of
Information and Broadcasting

Development Expenditure on Revenue Account.

           112.  Development Expenditure of Information and                             1,616,321
                Broadcasting Division

                                                                        Total :             1,616,321

Page 252

No text layer on this page, see the official PDF.

Page 253

NO. 112.- DEVELOPMENT EXPENDITURE OF INFORMATION AND BROADCASTING     DEMANDS FOR GRANTS
         DIVISION
                                DEMAND NO. 112
                                                                            ( FC22D22 )
           DEVELOPMENT EXPENDITURE OF INFORMATION AND BROADCASTING DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2026 to defray the Salaries and Other
Expenses of the DEVELOPMENT EXPENDITURE OF INFORMATION AND BROADCASTING DIVISION.

                                Voted           Rs. 1,616,321,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF INFORMATION AND BROADCASTING  .

                                                           2024-2025         2024-2025         2025-2026
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
083    Broadcasting and Publishing                                1,075,000,000         1,374,663,000         1,616,321,000
               Total                                               1,075,000,000         1,374,663,000         1,616,321,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                         133,059,000        104,950,000        154,937,000
A011  Pay                                                        133,059,000          104,826,000          154,649,000
A011-1 Pay of Officers                                               (116,155,000)           (90,598,000)         (130,000,000)
A011-2 Pay of Other Staff                                              (16,904,000)           (14,228,000)           (24,649,000)
A012  Allowances                                                                         124,000              288,000
A012-1 Regular Allowances
A012-2 Other Allowances (Excluding TA)                                                       (124,000)             (288,000)
A03   Operating Expenses                                    85,091,000         91,890,000        250,761,000
A09   Physical Assets                                      856,850,000       1,177,823,000       1,210,623,000
               Total                                         1,075,000,000       1,374,663,000       1,616,321,000

Page 254

NO. 112.- FC22D22 DEVELOPMENT EXPENDITURE OF INFORMATION AND           DEMANDS FOR GRANTS
              BROADCASTING DIVISION
III.  - DETAILS are as follows :-
                                 No of Posts        2024-2025         2024-2025       2025-2026
                                       2024-25 2025-26       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
08     Recreation, Culture and Religion:
083    Broadcasting and Publishing:
0831   Broadcasting and Publishing:
083120 Others  :
IB3242 ESTABLISHMENT OF NATIONAL COMMUNICATION AND STRATEGY UNIT (THINK TANK)
083120- A01    Employees Related Expenses                      21,500,000            21,500,000            21,500,000
083120- A011   Pay                      22     22           21,500,000            21,500,000            21,500,000
083120- A011-1 Pay of Officers               (14)    (14)         (20,000,000)         (20,000,000)         (20,000,000)
083120- A011-2 Pay of Other Staff               (8)      (8)          (1,500,000)          (1,500,000)          (1,500,000)
083120- A03    Operating Expenses                               19,500,000            20,722,000            33,900,000
083120- A032   Communications                                     1,000,000             1,000,000             1,000,000
083120- A038    Travel & Transportation                               1,000,000             3,000,000             3,000,000
083120- A039   General                                             17,500,000            16,722,000            29,900,000
083120- A09    Physical Assets                                    29,000,000            57,778,000            52,005,000
083120- A092   Computer Equipment                               20,000,000            30,524,000            25,005,000
083120- A096   Purchase of Plant and Machinery                     3,000,000            10,878,000            11,000,000
083120- A097   Purchase of Furniture and Fixture                     6,000,000            16,376,000            16,000,000
        Total- ESTABLISHMENT OF NATIONAL                 70,000,000        100,000,000        107,405,000
           COMMUNICATION AND STRATEGY UNIT
             (THINK TANK)
IB3243 CITIZEN COLLABORATION FACILITATION CENTER (CCFC)
083120- A01    Employees Related Expenses                      33,000,000                                 33,000,000
083120- A011   Pay                      22     22           33,000,000                                 33,000,000
083120- A011-1 Pay of Officers               (14)    (14)         (31,000,000)                             (31,000,000)
083120- A011-2 Pay of Other Staff               (8)      (8)          (2,000,000)                               (2,000,000)
083120- A03    Operating Expenses                               39,018,000                                148,018,000
083120- A032   Communications                                     1,000,000                                   1,000,000
083120- A037   Consultancy and Contractual Work                  30,000,000                                124,000,000
083120- A038    Travel & Transportation                               518,000                                   518,000
083120- A039   General                                              7,500,000                                 22,500,000
083120- A09    Physical Assets                                    27,982,000                                 68,982,000
083120- A092   Computer Equipment                               19,800,000                                 41,982,000
083120- A096   Purchase of Plant and Machinery                     2,584,000                                 15,000,000
083120- A097   Purchase of Furniture and Fixture                     5,598,000                                 12,000,000
        Total- CITIZEN COLLABORATION                     100,000,000                            250,000,000
            FACILITATION CENTER (CCFC)

Page 255

NO. 112.- FC22D22 DEVELOPMENT EXPENDITURE OF INFORMATION AND           DEMANDS FOR GRANTS
              BROADCASTING DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3709 ESTABLISHMENT OF DEDICATED PID MEDIA CELL TO COUNTER VIOLENT EXTREMISM (CVE) PHASE-I
083120- A01    Employees Related Expenses                                           21,366,000            42,413,000
083120- A011   Pay                                32                                 21,366,000            42,413,000
083120- A011-1 Pay of Officers                       (12)                             (15,256,000)         (30,000,000)
083120- A011-2 Pay of Other Staff                    (20)                               (6,110,000)         (12,413,000)
083120- A03    Operating Expenses                                                     32,350,000            25,000,000
083120- A032   Communications                                                           1,000,000             2,000,000
083120- A038    Travel & Transportation                                                     7,180,000             7,000,000
083120- A039   General                                                                  24,170,000            16,000,000
083120- A09    Physical Assets                                                          46,284,000            24,210,000
083120- A092   Computer Equipment                                                     45,208,000            23,787,000
083120- A097   Purchase of Furniture and Fixture                                           1,076,000              423,000
        Total- ESTABLISHMENT OF DEDICATED PID                             100,000,000          91,623,000
           MEDIA CELL TO COUNTER VIOLENT
           EXTREMISM (CVE) PHASE-I
IB3710 DEVELOPMENT AND STRENGTHENING OF THE OFFICE OF THE PRESS REGISTRAR
083120- A01    Employees Related Expenses                                             210,000
083120- A011   Pay                                                                       210,000
083120- A011-2 Pay of Other Staff                                                       (210,000)
083120- A03    Operating Expenses                                                       3,835,000
083120- A038    Travel & Transportation                                                    500,000
083120- A039   General                                                                    3,335,000
083120- A09    Physical Assets                                                            8,877,000
083120- A092   Computer Equipment                                                       6,682,000
083120- A095   Purchase of Transport                                                     300,000
083120- A096   Purchase of Plant and Machinery                                           1,130,000
083120- A097   Purchase of Furniture and Fixture                                          765,000
        Total- DEVELOPMENT AND STRENGTHENING                             12,922,000
          OF THE OFFICE OF THE PRESS
           REGISTRAR

Page 256

NO. 112.- FC22D22 DEVELOPMENT EXPENDITURE OF INFORMATION AND           DEMANDS FOR GRANTS
              BROADCASTING DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs
                       ACCOUNTANT GENERAL PAKISTAN REVENUES
IB5300 NATIONAL INFORMATION AND MEDIA ARCHIVAL REPOSITORY (NIMAR)
083120- A01    Employees Related Expenses                      24,559,000            24,683,000            23,024,000
083120- A011   Pay                      19     29           24,559,000            24,559,000            22,736,000
083120- A011-1 Pay of Officers               (13)    (10)         (22,155,000)         (22,155,000)         (20,000,000)
083120- A011-2 Pay of Other Staff               (6)    (19)          (2,404,000)          (2,404,000)          (2,736,000)
083120- A012   Allowances                                                                124,000              288,000
083120- A012-2  Other Allowances (Excluding TA)                                        (124,000)            (288,000)
083120- A03    Operating Expenses                               11,373,000            13,873,000            27,550,000
083120- A032   Communications                                     900,000              900,000              500,000
083120- A033     Utilities                                                                                           9,000,000
083120- A034   Occupancy Costs                                     2,873,000             2,873,000            10,000,000
083120- A038    Travel & Transportation                               2,000,000             3,000,000             2,000,000
083120- A039   General                                              5,600,000             7,100,000             6,050,000
083120- A09    Physical Assets                                   464,068,000          861,568,000          749,426,000
083120- A092   Computer Equipment                              463,568,000          861,068,000          743,926,000
083120- A095   Purchase of Transport                                                                            5,000,000
083120- A097   Purchase of Furniture and Fixture                     500,000              500,000              500,000
        Total- NATIONAL INFORMATION AND MEDIA          500,000,000        900,124,000        800,000,000
           ARCHIVAL REPOSITORY (NIMAR)
IB5302 CENTRAL MONITORING UNIT
083120- A01    Employees Related Expenses                      54,000,000            37,191,000            35,000,000
083120- A011   Pay                      39     26           54,000,000            37,191,000            35,000,000
083120- A011-1 Pay of Officers               (24)    (17)         (43,000,000)         (33,187,000)         (29,000,000)
083120- A011-2 Pay of Other Staff            (15)      (9)         (11,000,000)          (4,004,000)          (6,000,000)
083120- A03    Operating Expenses                               15,200,000            21,110,000            16,293,000
083120- A033     Utilities                                               500,000             1,000,000              200,000
083120- A034   Occupancy Costs                                     5,200,000             5,110,000             5,000,000
083120- A038    Travel & Transportation                               5,500,000             1,000,000              200,000
083120- A039   General                                              4,000,000            14,000,000            10,893,000
083120- A09    Physical Assets                                   335,800,000          203,316,000          316,000,000
083120- A092   Computer Equipment                              335,800,000          203,316,000          316,000,000
        Total- CENTRAL MONITORING UNIT                  405,000,000        261,617,000        367,293,000
     083120   Total-  Others                                 1,075,000,000       1,374,663,000       1,616,321,000
     0831     Total-  Broadcasting and Publishing             1,075,000,000       1,374,663,000       1,616,321,000
     083      Total-  Broadcasting and Publishing             1,075,000,000       1,374,663,000       1,616,321,000
     08        Total-  Recreation, Culture and Religion         1,075,000,000       1,374,663,000       1,616,321,000
                Total- ACCOUNTANT GENERAL                 1,075,000,000         1,374,663,000         1,616,321,000
                PAKISTAN REVENUES
           TOTAL - DEMAND                             1,075,000,000       1,374,663,000       1,616,321,000

Page 257

                                  SECTION XII

           MINISTRY OF INFORMATION TECHNOLOGY AND TELECOMMUNICATION

                                                           *******

                                                                                2025-2026
                                                                           Budget
                                                                                  Estimate

                                                                   (Rupees in Thousand)

Demand presented on behalf of the Ministry of
Information Technology and Telecommunication

Development Expenditure on Revenue Account.

           113.  Development Expenditure of Information Technology                    16,227,493
              and Telecommunication Division

                                                                        Total :            16,227,493

Page 258

No text layer on this page, see the official PDF.

Page 259

NO. 113.- DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY AND      DEMANDS FOR GRANTS
       TELECOMMUNICATION DIVISION
                                DEMAND NO. 113
                                                                            ( FC22D48 )
    DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY AND TELECOMMUNICATION DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2026 to defray the Salaries and Other
Expenses of the DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY AND TELECOMMUNICATION
DIVISION.

                                Voted           Rs. 16,227,493,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF INFORMATION TECHNOLOGY AND TELECOMMUNICATION .

                                                           2024-2025         2024-2025         2025-2026
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
016    Basic Research                                           28,007,861,000         9,914,258,000        15,477,493,000
046    Communications                                            921,139,000         1,232,247,000          750,000,000
               Total                                              28,929,000,000        11,146,505,000        16,227,493,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                         799,773,000        318,912,000        653,987,000
A011  Pay                                                        787,773,000          314,940,000          650,957,000
A011-1 Pay of Officers                                               (694,417,000)         (278,944,000)         (600,960,000)
A011-2 Pay of Other Staff                                              (93,356,000)           (35,996,000)           (49,997,000)
A012  Allowances                                                   12,000,000             3,972,000             3,030,000
A012-1 Regular Allowances                                            (11,000,000)            (3,972,000)            (1,530,000)
A012-2 Other Allowances (Excluding TA)                                (1,000,000)                                   (1,500,000)
A02    Project Pre-Investment Analysis                                          184,875,000
A03   Operating Expenses                                23,680,624,000       8,591,175,000      13,911,924,000
A05   Grants, Subsidies and Write off Loans                2,080,000,000        103,439,000        198,000,000
A09   Physical Assets                                      1,073,802,000        295,937,000        697,412,000
A12    Civil works                                          1,270,184,000       1,649,206,000        752,000,000
A13   Repairs and Maintenance                               24,617,000           2,961,000         14,170,000
               Total                                        28,929,000,000      11,146,505,000      16,227,493,000
                  (In Foreign Exchange)                             (21,318,649,000)                             (11,880,000,000)
            (Own Resources)
               (Foreign Aid)                                      (21,318,649,000)                             (11,880,000,000)
                  (In Local Currency)                                  (7,610,351,000)       (11,146,505,000)        (4,347,493,000)
                                                  __________________________________________________

Page 260

NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY    DEMANDS FOR GRANTS
             AND TELECOMMUNICATION DIVISION
III.  - DETAILS are as follows :-
                                 No of Posts        2024-2025         2024-2025       2025-2026
                                       2024-25 2025-26       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
016    Basic Research:
0161   Basic Research:
016101 Administration  :
IB0278 ESTABLISHMENT OF 25 STPS IN PAKISTAN WITH RENTAL SUBSIDY
016101- A01    Employees Related Expenses                      48,000,000            32,456,000
016101- A011   Pay                      70                   48,000,000            32,456,000
016101- A011-1 Pay of Officers                  (9)                (28,000,000)         (17,281,000)
016101- A011-2 Pay of Other Staff            (61)                (20,000,000)         (15,175,000)
016101- A03    Operating Expenses                               97,000,000            50,962,000
016101- A032   Communications                                     6,000,000             9,744,000
016101- A033     Utilities                                               2,500,000
016101- A034   Occupancy Costs                                   67,500,000            32,366,000
016101- A038    Travel & Transportation                               1,400,000              619,000
016101- A039   General                                             19,600,000             8,233,000
016101- A09    Physical Assets                                    29,000,000            14,966,000
016101- A092   Computer Equipment                               25,000,000            12,904,000
016101- A096   Purchase of Plant and Machinery                     2,500,000             2,062,000
016101- A097   Purchase of Furniture and Fixture                     1,000,000
016101- A098   Purchase of Other Assets                             500,000
016101- A12     Civil works                                           500,000
016101- A124    Building and Structures                               500,000
016101- A13    Repairs and Maintenance                            500,000               81,000
016101- A131   Machinery and Equipment                             500,000               81,000
        Total- ESTABLISHMENT OF 25 STPS IN               175,000,000         98,465,000
           PAKISTAN WITH RENTAL SUBSIDY
IB0285 STRENGTHENING OF ICT INFRASTRUCTURE AND OFFICE AUTOMATION OF PRESIDENT SECRETARIAT
(AWAN E SADDAR)
016101- A09    Physical Assets                                                          13,370,000
016101- A092   Computer Equipment                                                     13,370,000
        Total- STRENGTHENING OF ICT                                           13,370,000
           INFRASTRUCTURE AND OFFICE
          AUTOMATION OF PRESIDENT
           SECRETARIAT (AWAN E SADDAR)

Page 261

NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY    DEMANDS FOR GRANTS
             AND TELECOMMUNICATION DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0629 CERTIFICATION OF IT PROFESSIONALS
016101- A01    Employees Related Expenses                      14,050,000            14,050,000
016101- A011   Pay                       9                   14,050,000            14,050,000
016101- A011-1 Pay of Officers                  (5)                (12,010,000)         (12,010,000)
016101- A011-2 Pay of Other Staff               (4)                  (2,040,000)          (2,040,000)
016101- A03    Operating Expenses                               85,950,000          232,080,000
016101- A032   Communications                                     200,000              200,000
016101- A037   Consultancy and Contractual Work                  85,000,000          231,130,000
016101- A038    Travel & Transportation                               590,000              590,000
016101- A039   General                                              160,000              160,000
        Total- CERTIFICATION OF IT PROFESSIONALS        100,000,000        246,130,000

IB0659 HIGH IMPACT SKILLS BOOT MAP
016101- A01    Employees Related Expenses                       5,381,000             2,463,000
016101- A011   Pay                       4                    5,381,000             2,463,000
016101- A011-1 Pay of Officers                  (2)                  (4,226,000)          (2,021,000)
016101- A011-2 Pay of Other Staff               (2)                  (1,155,000)            (442,000)
016101- A03    Operating Expenses                               73,719,000             7,256,000
016101- A032   Communications                                     300,000               94,000
016101- A038    Travel & Transportation                               2,000,000              500,000
016101- A039   General                                             71,419,000             6,662,000
016101- A09    Physical Assets                                      600,000
016101- A092   Computer Equipment                                 600,000
016101- A13    Repairs and Maintenance                            300,000
016101- A137   Computer Equipment                                 300,000
        Total- HIGH IMPACT SKILLS BOOT MAP                80,000,000           9,719,000
IB0660 PROJECT MONITORING & DIGITAL TRANSFORMATION CELL (KNOWLEDGE ECONOMY INITIATIVE)
016101- A01    Employees Related Expenses                      81,500,000            58,416,000            81,500,000
016101- A011   Pay                      33     33           81,500,000            58,416,000            81,500,000
016101- A011-1 Pay of Officers               (23)    (23)         (75,000,000)         (54,188,000)         (75,000,000)
016101- A011-2 Pay of Other Staff            (10)    (10)          (6,500,000)          (4,228,000)          (6,500,000)

Page 262

NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY    DEMANDS FOR GRANTS
             AND TELECOMMUNICATION DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

016101- A03    Operating Expenses                               12,100,000             2,394,000            11,100,000
016101- A032   Communications                                     1,000,000              750,000             1,000,000
016101- A038    Travel & Transportation                               6,100,000             1,245,000             6,100,000
016101- A039   General                                              5,000,000              399,000             4,000,000
016101- A09    Physical Assets                                      5,400,000              200,000             6,400,000
016101- A092   Computer Equipment                                 4,400,000                                   5,400,000
016101- A097   Purchase of Furniture and Fixture                     1,000,000              200,000             1,000,000
016101- A13    Repairs and Maintenance                            1,000,000                                   1,000,000
016101- A137   Computer Equipment                                 1,000,000                                   1,000,000
        Total- PROJECT MONITORING & DIGITAL             100,000,000         61,010,000        100,000,000
          TRANSFORMATION CELL
          (KNOWLEDGE ECONOMY INITIATIVE)
IB2001 ONE PATIENT ONE ID
016101- A01    Employees Related Expenses                      29,044,000            16,681,000            21,854,000
016101- A011   Pay                      12     12           29,044,000            16,681,000            21,854,000
016101- A011-1 Pay of Officers                  (4)      (4)         (20,644,000)         (16,681,000)         (11,774,000)
016101- A011-2 Pay of Other Staff               (8)      (8)          (8,400,000)                             (10,080,000)
016101- A03    Operating Expenses                                 3,454,000             6,462,000            56,039,000
016101- A038    Travel & Transportation                               1,100,000              100,000             6,839,000
016101- A039   General                                              2,354,000             6,362,000            49,200,000
016101- A09    Physical Assets                                      2,502,000             4,962,000            19,600,000
016101- A092   Computer Equipment                                 2,502,000             4,962,000            19,600,000
        Total- ONE PATIENT ONE ID                           35,000,000         28,105,000          97,493,000
IB2002 SMART OFFICE ALL FEDERAL GOVERNMENT ORGANIZATION DEPARTMENT
016101- A01    Employees Related Expenses                      28,200,000            26,720,000            26,623,000
016101- A011   Pay                      21     21           28,200,000            26,720,000            26,623,000
016101- A011-1 Pay of Officers               (15)    (15)         (26,300,000)         (24,820,000)         (24,687,000)
016101- A011-2 Pay of Other Staff               (6)      (6)          (1,900,000)          (1,900,000)          (1,936,000)
016101- A03    Operating Expenses                                 2,800,000              615,000            15,807,000
016101- A038    Travel & Transportation                               400,000              395,000              400,000
016101- A039   General                                              2,400,000              220,000            15,407,000
016101- A09    Physical Assets                                   269,000,000          105,330,000          157,570,000

Page 263

NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY    DEMANDS FOR GRANTS
             AND TELECOMMUNICATION DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

016101- A092   Computer Equipment                              269,000,000          105,330,000          157,570,000
        Total- SMART OFFICE ALL FEDERAL                 300,000,000        132,665,000        200,000,000
          GOVERNMENT ORGANIZATION
          DEPARTMENT
IB2979 REVAMPING IT INDUSTRY LANDSCAPE
016101- A01    Employees Related Expenses                    140,175,000                                 57,663,000
016101- A011   Pay                      62     33          140,175,000                                 57,663,000
016101- A011-1 Pay of Officers               (40)    (20)       (114,975,000)                             (46,638,000)
016101- A011-2 Pay of Other Staff            (22)    (13)         (25,200,000)                             (11,025,000)
016101- A03    Operating Expenses                              558,325,000                                421,037,000
016101- A031   Fees                                                                                           50,000,000
016101- A032   Communications                                     7,517,000                                   1,500,000
016101- A033     Utilities                                               9,600,000
016101- A034   Occupancy Costs                                                                                6,000,000
016101- A037   Consultancy and Contractual Work                 483,808,000                                318,204,000
016101- A038    Travel & Transportation                             14,733,000                                   2,000,000
016101- A039   General                                             42,667,000                                 43,333,000
016101- A09    Physical Assets                                    67,700,000                                 21,300,000
016101- A092   Computer Equipment                               42,700,000                                 19,300,000
016101- A095   Purchase of Transport                              15,000,000
016101- A097   Purchase of Furniture and Fixture                   10,000,000                                   2,000,000
016101- A12     Civil works                                         33,333,000
016101- A124    Building and Structures                             33,333,000
016101- A13    Repairs and Maintenance                            467,000
016101- A130    Transport                                            467,000
        Total- REVAMPING IT INDUSTRY LANDSCAPE        800,000,000                            500,000,000

IB3051 NATIONAL SEMICONDUCTOR HR DEVELOPMENT PROGRAM (NSHRDP) PHASE-I
016101- A01    Employees Related Expenses                      61,000,000                                 47,863,000
016101- A011   Pay                      46     33           61,000,000                                 47,863,000
016101- A011-1 Pay of Officers               (45)    (32)         (60,000,000)                             (47,338,000)
016101- A011-2 Pay of Other Staff               (1)      (1)          (1,000,000)                                (525,000)

Page 264

NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY    DEMANDS FOR GRANTS
             AND TELECOMMUNICATION DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

016101- A03    Operating Expenses                              614,000,000                                277,547,000
016101- A032   Communications                                     1,000,000                                   499,000
016101- A037   Consultancy and Contractual Work                                                            273,048,000
016101- A038    Travel & Transportation                               5,000,000                                   1,000,000
016101- A039   General                                           608,000,000                                   3,000,000
016101- A09    Physical Assets                                   125,000,000                                174,590,000
016101- A092   Computer Equipment                              115,000,000                                169,590,000
016101- A097   Purchase of Furniture and Fixture                   10,000,000                                   5,000,000
        Total- NATIONAL SEMICONDUCTOR HR              800,000,000                            500,000,000
          DEVELOPMENT PROGRAM (NSHRDP)
            PHASE-I
IB3494 TECHNOLOGY MARKETING EXPORT PROGRAM
016101- A02     Project Pre-Investment Analysis                                       184,875,000
016101- A021    Feasibility Studies                                                      184,875,000
        Total- TECHNOLOGY MARKETING EXPORT                              184,875,000
         PROGRAM
IB3497 ESTABLISHMENT OF IT PARK KARACHI
016101- A01    Employees Related Expenses                      50,000,000            16,875,000            50,000,000
016101- A011   Pay                      17     17           50,000,000            16,875,000            50,000,000
016101- A011-1 Pay of Officers                  (9)      (9)         (46,296,000)         (14,704,000)         (45,727,000)
016101- A011-2 Pay of Other Staff               (8)      (8)          (3,704,000)          (2,171,000)          (4,273,000)
016101- A03    Operating Expenses                             8,013,364,000          534,533,000         5,918,052,000
016101- A032   Communications                                     3,000,000                                   3,000,000
016101- A033     Utilities                                               4,000,000               70,000             6,000,000
016101- A034   Occupancy Costs                                  153,000,000            52,348,000          362,734,000
016101- A037   Consultancy and Contractual Work                7,840,864,000          481,043,000         5,531,318,000
016101- A038    Travel & Transportation                               4,000,000              494,000             3,000,000
016101- A039   General                                              8,500,000              578,000            12,000,000
016101- A09    Physical Assets                                    24,500,000             6,800,000            31,948,000
016101- A092   Computer Equipment                                 7,000,000             5,300,000             2,000,000
016101- A095   Purchase of Transport                                9,500,000                                 17,948,000
016101- A096   Purchase of Plant and Machinery                     6,000,000             1,500,000             7,000,000

Page 265

NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY    DEMANDS FOR GRANTS
             AND TELECOMMUNICATION DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

016101- A097   Purchase of Furniture and Fixture                     2,000,000                                   5,000,000
        Total- ESTABLISHMENT OF IT PARK KARACHI      8,087,864,000        558,208,000       6,000,000,000
                  (In Foreign Exchange)                          (7,787,864,000)                          (5,500,000,000)
               (Foreign Aid)                                   (7,787,864,000)                          (5,500,000,000)
                  (In Local Currency)                              (300,000,000)       (558,208,000)       (500,000,000)
                                                  __________________________________________________
IB3859 GDPR- DRIVEN ISO COMPLIANCE & IT EXPORTS ENHANCEMENT PROGRAM
016101- A01    Employees Related Expenses                                                                 10,500,000
016101- A011   Pay                                 4                                                      10,500,000
016101- A011-1 Pay of Officers                           (4)                                                  (10,500,000)
016101- A03    Operating Expenses                                                                           83,600,000
016101- A032   Communications                                                                                 3,200,000
016101- A037   Consultancy and Contractual Work                                                             69,100,000
016101- A038    Travel & Transportation                                                                           3,700,000
016101- A039   General                                                                                          7,600,000
016101- A09    Physical Assets                                                                                 5,900,000
016101- A092   Computer Equipment                                                                             3,400,000
016101- A097   Purchase of Furniture and Fixture                                                                 2,500,000
        Total- GDPR- DRIVEN ISO COMPLIANCE & IT                                                100,000,000
          EXPORTS ENHANCEMENT PROGRAM
IB3860 NATIONAL ARTITICAL INTELLIGENCE (AI) ADVANCEMENT INITIATIVE (NAAI)
016101- A01    Employees Related Expenses                                                                 33,000,000
016101- A011   Pay                                21                                                      33,000,000
016101- A011-1 Pay of Officers                       (15)                                                  (30,000,000)
016101- A011-2 Pay of Other Staff                       (6)                                                    (3,000,000)
016101- A03    Operating Expenses                                                                           45,500,000
016101- A032   Communications                                                                               500,000
016101- A037   Consultancy and Contractual Work                                                             19,000,000
016101- A038    Travel & Transportation                                                                           5,700,000
016101- A039   General                                                                                        20,300,000
016101- A05    Grants, Subsidies and Write off Loans                                                        15,000,000
016101- A052   Grants Domestic                                                                               15,000,000

Page 266

NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY    DEMANDS FOR GRANTS
             AND TELECOMMUNICATION DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

016101- A09    Physical Assets                                                                                 6,500,000
016101- A092   Computer Equipment                                                                             5,500,000
016101- A097   Purchase of Furniture and Fixture                                                                 1,000,000
        Total- NATIONAL ARTITICAL INTELLIGENCE                                                 100,000,000
                 (AI) ADVANCEMENT INITIATIVE (NAAI)
IB3861 SMART ISLAMABAD INITATIVE
016101- A01    Employees Related Expenses                                                                 20,400,000
016101- A011   Pay                                37                                                      20,400,000
016101- A011-1 Pay of Officers                       (36)                                                  (20,000,000)
016101- A011-2 Pay of Other Staff                       (1)                                                     (400,000)
016101- A03    Operating Expenses                                                                           64,507,000
016101- A032   Communications                                                                               33,800,000
016101- A033     Utilities                                                                                           5,000,000
016101- A038    Travel & Transportation                                                                           4,000,000
016101- A039   General                                                                                        21,707,000
016101- A09    Physical Assets                                                                             165,093,000
016101- A092   Computer Equipment                                                                         165,093,000
        Total- SMART ISLAMABAD INITATIVE                                                       250,000,000
IB9597 PRIME MINISTER'S INITIATIVES SUPPORT FOR I.T STARTUPS AND VENTURE CAPITAL
016101- A01    Employees Related Expenses                                           55,305,000          105,817,000
016101- A011   Pay                                37                                 55,233,000          104,287,000
016101- A011-1 Pay of Officers                       (29)                             (52,724,000)       (101,229,000)
016101- A011-2 Pay of Other Staff                       (8)                               (2,509,000)          (3,058,000)
016101- A012   Allowances                                                                  72,000             1,530,000
016101- A012-1  Regular Allowances                                                       (72,000)             (30,000)
016101- A012-2  Other Allowances (Excluding TA)                                                            (1,500,000)
016101- A03    Operating Expenses                                                     19,683,000          210,802,000
016101- A032   Communications                                                            20,000               24,000
016101- A033     Utilities                                                                                           2,700,000
016101- A034   Occupancy Costs                                                           2,500,000             5,748,000
016101- A037   Consultancy and Contractual Work                                                            107,939,000
016101- A038    Travel & Transportation                                                     3,877,000            13,250,000

Page 267

NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY    DEMANDS FOR GRANTS
             AND TELECOMMUNICATION DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

016101- A039   General                                                                  13,286,000            81,141,000
016101- A05    Grants, Subsidies and Write off Loans          2,000,000,000            23,439,000          183,000,000
016101- A052   Grants Domestic                                  2,000,000,000            23,439,000          183,000,000
016101- A09    Physical Assets                                                           705,000              311,000
016101- A092   Computer Equipment                                                      705,000              311,000
016101- A13    Repairs and Maintenance                                                                        70,000
016101- A131   Machinery and Equipment                                                                        20,000
016101- A137   Computer Equipment                                                                             50,000
        Total- PRIME MINISTER'S INITIATIVES               2,000,000,000         99,132,000        500,000,000
          SUPPORT FOR I.T STARTUPS AND
          VENTURE CAPITAL
ID8130 TECHNOLOGY PARKS DEVELOPMENT PROJECTS AT ISLAMABAD PHASE-I
016101- A01    Employees Related Expenses                      29,423,000            23,135,000            30,267,000
016101- A011   Pay                      10     10           29,423,000            23,135,000            30,267,000
016101- A011-1 Pay of Officers                           (6)         (27,466,000)         (21,178,000)         (28,067,000)
016101- A011-2 Pay of Other Staff                       (4)          (1,957,000)          (1,957,000)          (2,200,000)
016101- A03    Operating Expenses                            10,595,162,000         7,671,510,000         4,872,933,000
016101- A032   Communications                                     425,000              399,000              430,000
016101- A033     Utilities                                               3,350,000             7,401,000            50,842,000
016101- A034   Occupancy Costs                                  548,502,000          949,642,000          277,328,000
016101- A037   Consultancy and Contractual Work              10,040,785,000         6,712,516,000         4,541,333,000
016101- A038    Travel & Transportation                               600,000              600,000             1,500,000
016101- A039   General                                              1,500,000              952,000             1,500,000
016101- A09    Physical Assets                                      4,600,000                                   3,200,000
016101- A092   Computer Equipment                                 4,000,000                                   2,000,000
016101- A095   Purchase of Transport                                200,000                                   1,000,000
016101- A096   Purchase of Plant and Machinery                      200,000                                   100,000
016101- A097   Purchase of Furniture and Fixture                     200,000                                   100,000
016101- A13    Repairs and Maintenance                            1,600,000              546,000             1,600,000
016101- A130    Transport                                            200,000              200,000              200,000
016101- A131   Machinery and Equipment                             500,000                                   500,000
016101- A132    Furniture and Fixture                                  200,000               52,000              200,000

Page 268

NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY    DEMANDS FOR GRANTS
             AND TELECOMMUNICATION DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

016101- A133    Buildings and Structure                               200,000                                   200,000
016101- A137   Computer Equipment                                 500,000              294,000              500,000
        Total- TECHNOLOGY PARKS DEVELOPMENT      10,630,785,000       7,695,191,000       4,908,000,000
          PROJECTS AT ISLAMABAD PHASE-I
                  (In Foreign Exchange)                         (10,030,785,000)                          (4,408,000,000)
               (Foreign Aid)                                 (10,030,785,000)                          (4,408,000,000)
                  (In Local Currency)                              (600,000,000)      (7,695,191,000)       (500,000,000)
                                                  __________________________________________________
     016101   Total-  Administration                        23,108,649,000       9,126,870,000      13,255,493,000
016120 OTHERS  :
IB0283 CYBER SECURITY DIGITAL PAKISTAN PHASE-I N-12
016120- A01    Employees Related Expenses                    168,000,000            59,900,000            93,500,000
016120- A011   Pay                      57     57          157,000,000            56,000,000            92,000,000
016120- A011-1 Pay of Officers               (49)    (49)       (150,000,000)         (54,000,000)         (85,000,000)
016120- A011-2 Pay of Other Staff               (8)      (8)          (7,000,000)          (2,000,000)          (7,000,000)
016120- A012   Allowances                                         11,000,000             3,900,000             1,500,000
016120- A012-1  Regular Allowances                             (11,000,000)          (3,900,000)          (1,500,000)
016120- A03    Operating Expenses                              241,000,000            61,300,000            59,000,000
016120- A031   Fees                                                 5,000,000             2,000,000             1,500,000
016120- A032   Communications                                    15,000,000             3,500,000             3,000,000
016120- A033     Utilities                                             32,000,000            13,000,000             5,000,000
016120- A038    Travel & Transportation                             45,000,000             8,000,000             8,000,000
016120- A039   General                                           144,000,000            34,800,000            41,500,000
016120- A09    Physical Assets                                   425,000,000          149,604,000            85,000,000
016120- A092   Computer Equipment                              425,000,000          149,604,000            83,000,000
016120- A096   Purchase of Plant and Machinery                                                                 1,000,000
016120- A097   Purchase of Furniture and Fixture                                                                 1,000,000
016120- A12     Civil works                                        146,000,000          253,000,000             2,000,000
016120- A124    Building and Structures                            146,000,000          253,000,000             2,000,000
016120- A13    Repairs and Maintenance                          20,000,000             2,334,000            10,500,000
016120- A130    Transport                                             3,000,000              500,000              500,000
016120- A131   Machinery and Equipment                            7,000,000             1,834,000             4,000,000
016120- A132    Furniture and Fixture                                                                             1,000,000
016120- A133    Buildings and Structure                             10,000,000                                   2,000,000
016120- A137   Computer Equipment                                                                             3,000,000
        Total- CYBER SECURITY DIGITAL PAKISTAN        1,000,000,000        526,138,000        250,000,000
            PHASE-I N-12

Page 269

NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY    DEMANDS FOR GRANTS
             AND TELECOMMUNICATION DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs
                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5471 EXPANSION OF GPON FTTH SERVICE IN NEW AND EXISTING CITIES (SCO)
016120- A12     Civil works                                        169,212,000          163,959,000
016120- A126   Telecommunication Works                         169,212,000          163,959,000
        Total- EXPANSION OF GPON FTTH SERVICE          169,212,000        163,959,000
              IN NEW AND EXISTING CITIES (SCO)
IB5474 DIGITAL ECONOMY ENHANCEMENT PROJECT (WB FUNDED)
016120- A01    Employees Related Expenses                    115,000,000             5,000,000            75,000,000
016120- A011   Pay                      42     13          115,000,000             5,000,000            75,000,000
016120- A011-1 Pay of Officers               (39)    (13)       (113,000,000)          (5,000,000)         (75,000,000)
016120- A011-2 Pay of Other Staff               (3)                  (2,000,000)
016120- A03    Operating Expenses                             3,354,500,000             4,000,000         1,876,000,000
016120- A032   Communications                                     2,000,000                                   2,000,000
016120- A036   Motor Vehicles                                       1,000,000
016120- A037   Consultancy and Contractual Work                3,327,000,000             4,000,000         1,780,000,000
016120- A038    Travel & Transportation                               8,000,000                                 13,000,000
016120- A039   General                                             16,500,000                                 81,000,000
016120- A09    Physical Assets                                    30,000,000                                 20,000,000
016120- A092   Computer Equipment                               13,000,000                                 13,000,000
016120- A095   Purchase of Transport                              10,000,000
016120- A097   Purchase of Furniture and Fixture                     7,000,000                                   7,000,000
016120- A13    Repairs and Maintenance                            500,000                                   1,000,000
016120- A130    Transport                                            100,000
016120- A137   Computer Equipment                                 400,000                                   1,000,000
        Total- DIGITAL ECONOMY ENHANCEMENT          3,500,000,000           9,000,000       1,972,000,000
           PROJECT (WB FUNDED)
                  (In Foreign Exchange)                          (3,500,000,000)                          (1,972,000,000)
               (Foreign Aid)                                   (3,500,000,000)                          (1,972,000,000)
                  (In Local Currency)                                                       (9,000,000)
                                                  __________________________________________________
     016120   Total- OTHERS                              4,669,212,000        699,097,000       2,222,000,000
     0161     Total-  Basic Research                       27,777,861,000       9,825,967,000      15,477,493,000
     016      Total-  Basic Research                       27,777,861,000       9,825,967,000      15,477,493,000
     01        Total-  General Public Service                 27,777,861,000       9,825,967,000      15,477,493,000
04     Economic Affairs:
046    Communications:
0461   Communications:
046103 Telegraph and Telephone  :
IB0274 HYBRID POWER SOLUTION (SOLARIZATION) FOR REMOTE SITES OF SCO IN AJK
046103- A12     Civil works                                        221,042,000          218,402,000

Page 270

NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY    DEMANDS FOR GRANTS
             AND TELECOMMUNICATION DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

046103- A126   Telecommunication Works                         221,042,000          218,402,000
        Total- HYBRID POWER SOLUTION                    221,042,000        218,402,000
            (SOLARIZATION) FOR REMOTE SITES
          OF SCO IN AJK
IB0275 HYBRID POWER SOLUTION (SOLARIZATION) FOR REMOTE SITES OF SCO IN GB
046103- A12     Civil works                                        206,097,000          200,667,000
046103- A126   Telecommunication Works                         206,097,000          200,667,000
        Total- HYBRID POWER SOLUTION                    206,097,000        200,667,000
            (SOLARIZATION) FOR REMOTE SITES
          OF SCO IN GB
IB2977 EXPANSION OF CELLULAR SERVICES IN AJ&K AND GB PHASE-IV
046103- A12     Civil works                                        194,000,000          198,125,000          500,000,000
046103- A126   Telecommunication Works                         194,000,000          198,125,000          500,000,000
        Total- EXPANSION OF CELLULAR SERVICES         194,000,000        198,125,000        500,000,000
              IN AJ&K AND GB PHASE-IV
IB2978 NGMS CORE UP-GRADATION
046103- A12     Civil works                                        100,000,000          212,636,000          250,000,000
046103- A126   Telecommunication Works                         100,000,000          212,636,000          250,000,000
        Total- NGMS CORE UP-GRADATION                  100,000,000        212,636,000        250,000,000
IB9337 EXPANSION OF GPON FTTH SERVICES IN ELEVEN NEW & EXISTING CITIES PHASE-IV
046103- A12     Civil works                                        200,000,000          402,417,000
046103- A126   Telecommunication Works                         200,000,000          402,417,000
        Total- EXPANSION OF GPON FTTH SERVICES         200,000,000        402,417,000
              IN ELEVEN NEW & EXISTING CITIES
            PHASE-IV
    046103   Total-  Telegraph and Telephone                 921,139,000       1,232,247,000        750,000,000
    0461     Total-  Communications                         921,139,000       1,232,247,000        750,000,000
    046      Total-  Communications                         921,139,000       1,232,247,000        750,000,000
    04        Total-  Economic Affairs                        921,139,000       1,232,247,000        750,000,000
               Total- ACCOUNTANT GENERAL                28,699,000,000        11,058,214,000        16,227,493,000
                PAKISTAN REVENUES
                      (In Foreign Exchange)                         (21,318,649,000)                             (11,880,000,000)
              (Own Resources)
                   (Foreign Aid)                                  (21,318,649,000)                             (11,880,000,000)
                      (In Local Currency)                             (7,380,351,000)       (11,058,214,000)        (4,347,493,000)

Page 271

NO. 113.- FC22D48 DEVELOPMENT EXPENDITURE OF INFORMATION TECHNOLOGY    DEMANDS FOR GRANTS
             AND TELECOMMUNICATION DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs
               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
01     General Public Service:
016    Basic Research:
0161   Basic Research:
016101 ADMINISTRATION  :
LO1404 CRIME ANALYTICS AND SMART POLICING IN PAKISTAN
016101- A05    Grants, Subsidies and Write off Loans             80,000,000            80,000,000
016101- A052   Grants Domestic                                    80,000,000            80,000,000
        Total- CRIME ANALYTICS AND SMART                 80,000,000         80,000,000
            POLICING IN PAKISTAN
LO3116 BLENDED VIRTUAL EDUCATION PROJECT FOR KNOWLEDGE ECONOMY
016101- A01    Employees Related Expenses                      30,000,000             7,911,000
016101- A011   Pay                    1168                   29,000,000             7,911,000
016101- A011-1 Pay of Officers               (66)                (16,500,000)          (4,337,000)
016101- A011-2 Pay of Other Staff         (1102)                (12,500,000)          (3,574,000)
016101- A012   Allowances                                           1,000,000
016101- A012-2  Other Allowances (Excluding TA)                  (1,000,000)
016101- A03    Operating Expenses                               29,250,000              380,000
016101- A036   Motor Vehicles                                       550,000              350,000
016101- A038    Travel & Transportation                               1,500,000               30,000
016101- A039   General                                             27,200,000
016101- A09    Physical Assets                                    90,500,000
016101- A092   Computer Equipment                               90,500,000
016101- A13    Repairs and Maintenance                            250,000
016101- A132    Furniture and Fixture                                  100,000
016101- A137   Computer Equipment                                 150,000
        Total- BLENDED VIRTUAL EDUCATION               150,000,000           8,291,000
          PROJECT FOR KNOWLEDGE ECONOMY
     016101   Total-  Administration                           230,000,000         88,291,000
     0161     Total-  Basic Research                         230,000,000         88,291,000
     016      Total-  Basic Research                         230,000,000         88,291,000
     01        Total-  General Public Service                   230,000,000         88,291,000
               Total- ACCOUNTANT GENERAL                  230,000,000            88,291,000
                PAKISTAN REVENUES
                  SUB-OFFICE, LAHORE
          TOTAL - DEMAND                           28,929,000,000      11,146,505,000      16,227,493,000
                  (In Foreign Exchange)                         (21,318,649,000)                         (11,880,000,000)
            (Own Resources)
               (Foreign Aid)                                 (21,318,649,000)                         (11,880,000,000)
                  (In Local Currency)                             (7,610,351,000)     (11,146,505,000)      (4,347,493,000)
                                                  __________________________________________________

Page 272

No text layer on this page, see the official PDF.

Page 273

                                  SECTION XIII

                    MINISTRY OF INTERIOR AND NARCOTICS CONTROL
                                                            *******

                                                                                2025-2026
                                                                            Budget
                                                                                   Estimate

                                                                     (Rupees in Thousand)

Demand presented on behalf of the Ministry of Interior and
Narcotics Control

Development Expenditure on Revenue Account.

           114. Development Expenditure of Interior                                    12,908,444
              and Narcotics Control Division

                                                                        Total :             12,908,444

Page 274

No text layer on this page, see the official PDF.

Page 275

NO. 114.- DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS CONTROL    DEMANDS FOR GRANTS
         DIVISION
                                DEMAND NO. 114
                                                                            ( FC22D23 )
           DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS CONTROL DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2026 to defray the Salaries and Other
Expenses of the DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS CONTROL DIVISION.

                                Voted           Rs. 12,908,444,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF INTERIOR AND NARCOTICS CONTROL .

                                                           2024-2025         2024-2025         2025-2026
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
011    Executive & Legislative Organs,Financial and Fiscal                                                       50,000,000
         Affairs, External Affairs
015    General Services                                                                   84,999,000         2,589,700,000
019    General Public Service Not Elsewhere Defined               250,000,000          279,370,000          377,204,000
032    Police                                                       780,592,000         1,606,342,000          794,671,000
042    Agriculture,Food,Irrigation,Forestry and Fishing                50,000,000            50,000,000            40,296,000
045    Construction and Transport                                 1,154,234,000         3,168,358,000         1,380,951,000
062   Community Development                                   6,835,174,000         4,830,141,000         7,675,622,000
               Total                                               9,070,000,000        10,019,210,000        12,908,444,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                         246,622,000        170,105,000        138,091,000
A011  Pay                                                        234,348,000          168,205,000          129,694,000
A011-1 Pay of Officers                                                 (88,932,000)           (55,719,000)           (70,090,000)
A011-2 Pay of Other Staff                                            (145,416,000)         (112,486,000)           (59,604,000)
A012  Allowances                                                   12,274,000             1,900,000             8,397,000
A012-1 Regular Allowances                                            (12,050,000)            (1,900,000)            (6,700,000)
A012-2 Other Allowances (Excluding TA)                                 (224,000)                                   (1,697,000)
A03   Operating Expenses                                  211,983,000        276,581,000       1,117,834,000
A06   Transfers                                               400,000            500,000           2,000,000
A09   Physical Assets                                      522,842,000       1,436,483,000       5,296,982,000
A12    Civil works                                          6,496,810,000       7,114,240,000       5,903,737,000
A13   Repairs and Maintenance                             1,591,343,000       1,021,301,000        449,800,000
               Total                                         9,070,000,000      10,019,210,000      12,908,444,000
                  (In Foreign Exchange)                                 (19,716,000)                               (2,589,700,000)
            (Own Resources)                                      (19,716,000)
               (Foreign Aid)                                                                                     (2,589,700,000)
                  (In Local Currency)                                  (9,050,284,000)       (10,019,210,000)       (10,318,744,000)
                                                  __________________________________________________

Page 276

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
III.  - DETAILS are as follows :-
                                 No of Posts        2024-2025         2024-2025       2025-2026
                                       2024-25 2025-26       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
011    Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs:
0111   Executive and Legislative Organs:
011105 District Administration  :
IB3902 LAND REVENUE RECORD MANAGEMENT SYSTEM IN ICT
011105- A09    Physical Assets                                                                               50,000,000
011105- A092   Computer Equipment                                                                           50,000,000
        Total- LAND REVENUE RECORD                                                              50,000,000
          MANAGEMENT SYSTEM IN ICT
     011105   Total-   District Administration                                                            50,000,000
     0111     Total-  Executive and Legislative Organs                                                  50,000,000
     011      Total-  Executive & Legislative                                                           50,000,000
                      Organs,Financial and Fiscal Affairs,
                       External Affairs
015    General Services:
0154   Other General Services:
015420 OTHERS  :
IB9983 DIGITAL ECONOMY ENHANCEMENT PROJECT (DEEP)
015420- A03    Operating Expenses                                                     84,999,000          563,174,000
015420- A039   General                                                                  84,999,000          563,174,000
015420- A09    Physical Assets                                                                              2,026,526,000
015420- A092   Computer Equipment                                                                         2,011,526,000
015420- A098   Purchase of Other Assets                                                                      15,000,000
        Total- DIGITAL ECONOMY ENHANCEMENT                                84,999,000       2,589,700,000
          PROJECT (DEEP)
                  (In Foreign Exchange)                                                                    (2,589,700,000)
               (Foreign Aid)                                                                            (2,589,700,000)
                  (In Local Currency)                                                     (84,999,000)
                                                  __________________________________________________
     015420   Total- OTHERS                                                    84,999,000       2,589,700,000
     0154     Total-  Other General Services                                       84,999,000       2,589,700,000
     015      Total-  General Services                                             84,999,000       2,589,700,000
019    General Public Service Not Elsewhere Defined:
0191  Gen Public Service Not Elsewhere Defined:
019102 Administrative Research  :

Page 277

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB2043 REVAMPING OF CYBER CRIMES WING FIA
019102- A09    Physical Assets                                   100,000,000
019102- A092   Computer Equipment                              100,000,000
        Total- REVAMPING OF CYBER CRIMES WING         100,000,000
             FIA
IB2044 INTEGRATED BORDER MANAGEMENT SYSTEM-II
019102- A01    Employees Related Expenses                      35,750,000            15,120,000
019102- A011   Pay                      62                   35,750,000            15,120,000
019102- A011-1 Pay of Officers               (30)                (25,150,000)         (14,620,000)
019102- A011-2 Pay of Other Staff            (32)                (10,600,000)            (500,000)
019102- A03    Operating Expenses                                 9,050,000             9,912,000
019102- A038    Travel & Transportation                               8,600,000             7,450,000
019102- A039   General                                              450,000             2,462,000
019102- A06    Transfers                                            300,000              500,000
019102- A061    Scholarship                                          300,000              500,000
019102- A09    Physical Assets                                   104,500,000          253,438,000          377,204,000
019102- A092   Computer Equipment                               98,000,000          187,988,000          377,204,000
019102- A095   Purchase of Transport                                100,000
019102- A096   Purchase of Plant and Machinery                     6,400,000            65,450,000
019102- A13    Repairs and Maintenance                            400,000              400,000
019102- A130    Transport                                            200,000              200,000
019102- A131   Machinery and Equipment                             200,000              200,000
        Total- INTEGRATED BORDER MANAGEMENT         150,000,000        279,370,000        377,204,000
             SYSTEM-II
     019102   Total-  Administrative Research                  250,000,000        279,370,000        377,204,000
     0191     Total-  Gen Public Service Not Elsewhere         250,000,000        279,370,000        377,204,000
                      Defined
     019      Total-  General Public Service Not                250,000,000        279,370,000        377,204,000
                    Elsewhere Defined
     01        Total-  General Public Service                   250,000,000        364,369,000       3,016,904,000
03     Public Order And Safety Affairs:
032     Police:
0321   Police:

Page 278

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

032109 Immigration and Passport  :
IB0777 CONSTRUCTION OF 13 REGIONAL PASSPORT OFFICES IN SINDH PROVINCE
032109- A12     Civil works                                        108,652,000                                368,671,000
032109- A124    Building and Structures                            108,652,000                                368,671,000
        Total- CONSTRUCTION OF 13 REGIONAL             108,652,000                            368,671,000
          PASSPORT OFFICES IN SINDH
           PROVINCE
IB3435 NATIONAL FORENSICS AND CYBERCRIME AGENCY
032109- A01    Employees Related Expenses                      10,500,000             4,680,000
032109- A011   Pay                                                 10,500,000             4,680,000
032109- A011-1 Pay of Officers                                    (5,500,000)          (4,680,000)
032109- A011-2 Pay of Other Staff                                 (5,000,000)
032109- A03    Operating Expenses                               90,500,000            81,750,000
032109- A032   Communications                                    10,500,000             2,200,000
032109- A033     Utilities                                             30,000,000             6,000,000
032109- A034   Occupancy Costs                                   10,000,000              150,000
032109- A037   Consultancy and Contractual Work                                        40,000,000
032109- A038    Travel & Transportation                             10,000,000             2,200,000
032109- A039   General                                             30,000,000            31,200,000
032109- A09    Physical Assets                                    44,000,000          991,943,000
032109- A092   Computer Equipment                               10,000,000          484,298,000
032109- A094   Other Stores and Stocks                            30,000,000          304,760,000
032109- A095   Purchase of Transport                                1,000,000            53,800,000
032109- A097   Purchase of Furniture and Fixture                     2,000,000            17,360,000
032109- A098   Purchase of Other Assets                             1,000,000          131,725,000
032109- A12     Civil works                                         50,000,000          146,600,000
032109- A124    Building and Structures                             50,000,000          146,600,000
032109- A13    Repairs and Maintenance                            5,000,000            15,427,000
032109- A130    Transport                                             1,000,000             2,000,000
032109- A131   Machinery and Equipment                             500,000            11,500,000
032109- A132    Furniture and Fixture                                 2,000,000
032109- A133    Buildings and Structure                                                     1,927,000

Page 279

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

032109- A137   Computer Equipment                                 1,500,000
        Total- NATIONAL FORENSICS AND                   200,000,000       1,240,400,000
           CYBERCRIME AGENCY
IB3613 UPGRADATION OF BIOMETRIC IDENTIFICATION SYSTEM FOR PASSPORT APPLICATION
032109- A01    Employees Related Expenses                      15,782,000             2,923,000            22,067,000
032109- A011   Pay                      10                   15,782,000             2,923,000            20,370,000
032109- A011-1 Pay of Officers               (10)                (15,782,000)          (2,923,000)         (20,370,000)
032109- A012   Allowances                                                                                       1,697,000
032109- A012-2  Other Allowances (Excluding TA)                                                            (1,697,000)
032109- A03    Operating Expenses                                 2,699,000              450,000             2,600,000
032109- A038    Travel & Transportation                               1,100,000                                   1,100,000
032109- A039   General                                              1,599,000              450,000             1,500,000
032109- A09    Physical Assets                                   126,519,000            56,628,000          165,333,000
032109- A092   Computer Equipment                              126,519,000            56,628,000          165,333,000
032109- A12     Civil works                                           5,000,000                                 10,000,000
032109- A124    Building and Structures                               5,000,000                                 10,000,000
        Total- UPGRADATION OF BIOMETRIC                 150,000,000         60,001,000        200,000,000
            IDENTIFICATION SYSTEM FOR
          PASSPORT APPLICATION
IB3616 UPGRADATION OF 163 REGIONAL PASSPORT OFFICES AND MRP FACILITY AT 49 PAKISTAN MISSION
ABROAD
032109- A01    Employees Related Expenses                       2,240,000
032109- A011   Pay                       8                    2,016,000
032109- A011-2 Pay of Other Staff               (8)                  (2,016,000)
032109- A012   Allowances                                           224,000
032109- A012-2  Other Allowances (Excluding TA)                    (224,000)
032109- A03    Operating Expenses                                 7,100,000             5,000,000
032109- A036   Motor Vehicles                                       5,100,000             5,000,000
032109- A038    Travel & Transportation                               500,000
032109- A039   General                                              1,500,000
032109- A09    Physical Assets                                    33,483,000            34,353,000
032109- A092   Computer Equipment                               28,125,000            28,671,000
032109- A096   Purchase of Plant and Machinery                     2,358,000             2,358,000

Page 280

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

032109- A097   Purchase of Furniture and Fixture                     3,000,000             3,324,000
032109- A12     Civil works                                         71,000,000            73,631,000
032109- A124    Building and Structures                             71,000,000            73,631,000
032109- A13    Repairs and Maintenance                            900,000             1,740,000
032109- A130    Transport                                            900,000             1,740,000
        Total- UPGRADATION OF 163 REGIONAL             114,723,000        114,724,000
          PASSPORT OFFICES AND MRP
             FACILITY AT 49 PAKISTAN MISSION
          ABROAD
                  (In Foreign Exchange)                             (19,716,000)
            (Own Resources)                                 (19,716,000)
                  (In Local Currency)                                (95,007,000)       (114,724,000)
                                                  __________________________________________________
IB3897 INTERNATIONAL STANDARD PURPOSE BUILD CONVENTIONAL FORENSICS FACILITIES FOR NFA
032109- A01    Employees Related Expenses                                                                 10,000,000
032109- A011   Pay                                                                                            10,000,000
032109- A011-1 Pay of Officers                                                                            (10,000,000)
032109- A03    Operating Expenses                                                                           90,000,000
032109- A039   General                                                                                        90,000,000
        Total- INTERNATIONAL STANDARD PURPOSE                                               100,000,000
            BUILD CONVENTIONAL FORENSICS
             FACILITIES FOR NFA
     032109   Total-  Immigration and Passport                 573,375,000       1,415,125,000        668,671,000
032110 Narcotics Control Administration  :
IB3896 CONSTRUCTION ADDICTION TREATMENT AND REHABILITATION CENTRE ISLAMABAD
032110- A12     Civil works                                                                                   110,000,000
032110- A124    Building and Structures                                                                       110,000,000
        Total- CONSTRUCTION ADDICTION                                                         110,000,000
          TREATMENT AND REHABILITATION
          CENTRE ISLAMABAD
     032110   Total-  Narcotics Control Administration                                                  110,000,000

Page 281

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

032114 ANTI TERRORISM  :
IB9383 ACQUISITION OF LAND FOR CONSTRUCTION OF NATIONAL COUNTER TERRORISM AUTHORITY HQS
MAUVE AREA G-11
032114- A12     Civil works                                        142,217,000          142,217,000
032114- A124    Building and Structures                            142,217,000          142,217,000
        Total- ACQUISITION OF LAND FOR                   142,217,000        142,217,000
           CONSTRUCTION OF NATIONAL
          COUNTER TERRORISM AUTHORITY
          HQS MAUVE AREA G-11
     032114   Total-  ANTI TERRORISM                      142,217,000        142,217,000
     0321     Total-  Police                                  715,592,000       1,557,342,000        778,671,000
     032      Total-  Police                                  715,592,000       1,557,342,000        778,671,000
     03        Total-  Public Order And Safety Affairs            715,592,000       1,557,342,000        778,671,000
04     Economic Affairs:
042     Agriculture,Food,Irrigation,Forestry and Fishing:
0421   Agriculture:
042101 Administration/land commission  :
IB9409 RAIN WATER HARVESTING IN RURAL AREA OF ICT ISLAMABAD
042101- A01    Employees Related Expenses                        600,000              600,000              700,000
042101- A012   Allowances                                           600,000              600,000              700,000
042101- A012-1  Regular Allowances                                (600,000)            (600,000)            (700,000)
042101- A03    Operating Expenses                                 5,600,000             5,600,000             4,100,000
042101- A038    Travel & Transportation                               800,000              800,000
042101- A039   General                                              4,800,000             4,800,000             4,100,000
042101- A12     Civil works                                         43,800,000            43,800,000            35,496,000
042101- A124    Building and Structures                             43,800,000            43,800,000            35,496,000
        Total- RAIN WATER HARVESTING IN RURAL           50,000,000         50,000,000          40,296,000
          AREA OF ICT ISLAMABAD
     042101   Total-  Administration/land commission             50,000,000         50,000,000         40,296,000
     0421     Total-  Agriculture                               50,000,000         50,000,000         40,296,000
     042      Total-  Agriculture,Food,Irrigation,Forestry          50,000,000         50,000,000         40,296,000
                   and Fishing
045    Construction and Transport:
0457   Construction (Works):
045702 Buildings and Structures  :
IB5002 ESTABLISHMENT OF LAND REVENUE RECORDS MANAGEMENT INFORMATION SYSTEM IN ICT
045702- A01    Employees Related Expenses                      12,750,000

Page 282

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A011   Pay                                                  6,300,000
045702- A011-1 Pay of Officers                                    (4,500,000)
045702- A011-2 Pay of Other Staff                                 (1,800,000)
045702- A012   Allowances                                           6,450,000
045702- A012-1  Regular Allowances                               (6,450,000)
045702- A03    Operating Expenses                               12,750,000
045702- A032   Communications                                     2,400,000
045702- A033     Utilities                                               1,200,000
045702- A036   Motor Vehicles                                       450,000
045702- A038    Travel & Transportation                               1,500,000
045702- A039   General                                              7,200,000
045702- A09    Physical Assets                                      4,200,000
045702- A092   Computer Equipment                                 3,000,000
045702- A095   Purchase of Transport                                300,000
045702- A096   Purchase of Plant and Machinery                      300,000
045702- A097   Purchase of Furniture and Fixture                     600,000
045702- A13    Repairs and Maintenance                            300,000
045702- A137   Computer Equipment                                 300,000
        Total- ESTABLISHMENT OF LAND REVENUE           30,000,000
          RECORDS MANAGEMENT
           INFORMATION SYSTEM IN ICT
IB5490 FOREIGN NATIONALS SECURITY CELL DASHBOARD & ALLIED FACILITIES
045702- A01    Employees Related Expenses                      49,500,000            41,992,000            46,500,000
045702- A011   Pay                      41                   49,000,000            41,992,000            46,500,000
045702- A011-1 Pay of Officers               (22)                (37,000,000)         (32,696,000)         (36,000,000)
045702- A011-2 Pay of Other Staff            (19)                (12,000,000)          (9,296,000)         (10,500,000)
045702- A012   Allowances                                           500,000
045702- A012-1  Regular Allowances                                (500,000)
045702- A03    Operating Expenses                               13,284,000            14,020,000          111,700,000
045702- A032   Communications                                     1,020,000                                   100,000
045702- A038    Travel & Transportation                               8,164,000             8,064,000             2,336,000
045702- A039   General                                              4,100,000             5,956,000          109,264,000

Page 283

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A06    Transfers                                            100,000                                   2,000,000
045702- A061    Scholarship                                          100,000                                   2,000,000
045702- A09    Physical Assets                                    45,140,000            45,977,000            38,000,000
045702- A092   Computer Equipment                               33,690,000            45,977,000            37,000,000
045702- A095   Purchase of Transport                              10,950,000                                   500,000
045702- A097   Purchase of Furniture and Fixture                     500,000                                   500,000
045702- A13    Repairs and Maintenance                            1,650,000              177,000             1,800,000
045702- A130    Transport                                            100,000                                   200,000
045702- A131   Machinery and Equipment                             450,000               46,000              400,000
045702- A132    Furniture and Fixture                                  450,000               41,000              400,000
045702- A137   Computer Equipment                                 650,000               90,000              800,000
        Total- FOREIGN NATIONALS SECURITY CELL         109,674,000        102,166,000        200,000,000
          DASHBOARD & ALLIED FACILITIES
ID3671 CONSTRUCTION OF MODEL PRISION IN SECTOR H-16 ISLAMABAD
045702- A12     Civil works                                        500,000,000         1,324,218,000         1,180,951,000
045702- A122    Irrigation Works                                                                               1,180,951,000
045702- A124    Building and Structures                            500,000,000         1,324,218,000
        Total- CONSTRUCTION OF MODEL PRISION IN        500,000,000       1,324,218,000       1,180,951,000
          SECTOR H-16 ISLAMABAD
     045702   Total-  Buildings and Structures                  639,674,000       1,426,384,000       1,380,951,000
     0457     Total-  Construction (Works)                     639,674,000       1,426,384,000       1,380,951,000
     045      Total-  Construction and Transport               639,674,000       1,426,384,000       1,380,951,000
     04        Total-  Economic Affairs                        689,674,000       1,476,384,000       1,421,247,000
06     Housing And Community Amenities:
062    Community Development:
0621   Urban Development:
062120 Others  :
IB0651 KORANG RIVER & RAWAL LAKE WATER TREATMENT PLANT SIB
062120- A12     Civil works                                         50,000,000                                100,000,000
062120- A124    Building and Structures                             50,000,000                                100,000,000
        Total- KORANG RIVER & RAWAL LAKE                50,000,000                            100,000,000
          WATER TREATMENT PLANT SIB

Page 284

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0773 BALANCE WORK FOR OPERATIONALIZATION OF METRO BUS FROM PESHAWAR MOR TO NEW
ISLAMABAD INTERNATIONAL AIRPORT
062120- A12     Civil works                                        100,000,000          300,000,000          424,079,000
062120- A124    Building and Structures                            100,000,000          300,000,000          424,079,000
        Total- BALANCE WORK FOR                         100,000,000        300,000,000        424,079,000
           OPERATIONALIZATION OF METRO BUS
          FROM PESHAWAR MOR TO NEW
           ISLAMABAD INTERNATIONAL AIRPORT
IB0775 ESTABLISHMENT OF CHANGE MANAGEMENT UNIT WITHIN ICT POLICE ISLAMABAD
062120- A01    Employees Related Expenses                    111,000,000          103,490,000            30,824,000
062120- A011   Pay                                               111,000,000          103,490,000            30,824,000
062120- A011-1 Pay of Officers                                    (1,000,000)            (800,000)            (720,000)
062120- A011-2 Pay of Other Staff                              (110,000,000)       (102,690,000)         (30,104,000)
062120- A03    Operating Expenses                               10,000,000             8,312,000
062120- A034   Occupancy Costs                                     2,000,000
062120- A039   General                                              8,000,000             8,312,000
062120- A09    Physical Assets                                    65,000,000            54,144,000             6,719,000
062120- A092   Computer Equipment                               25,000,000            16,456,000                 2,000
062120- A095   Purchase of Transport                                                    15,542,000
062120- A096   Purchase of Plant and Machinery                    20,000,000            20,000,000             1,717,000
062120- A097   Purchase of Furniture and Fixture                   20,000,000             2,146,000             5,000,000
062120- A12     Civil works                                         97,174,000            97,174,000            14,000,000
062120- A124    Building and Structures                             97,174,000            97,174,000            14,000,000
062120- A13    Repairs and Maintenance                            2,000,000              635,000
062120- A131   Machinery and Equipment                            2,000,000              635,000
        Total- ESTABLISHMENT OF CHANGE                 285,174,000        263,755,000          51,543,000
          MANAGEMENT UNIT WITHIN ICT
           POLICE ISLAMABAD
IB2206 CONSTRUCTION OF FLYOVER AND APPROACHES AT RAILWAY LINE SIHALA ISLAMABAD
062120- A12     Civil works                                         50,000,000
062120- A124    Building and Structures                             50,000,000
        Total- CONSTRUCTION OF FLYOVER AND             50,000,000
          APPROACHES AT RAILWAY LINE
           SIHALA ISLAMABAD

Page 285

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB2212 CONSTRUCTION OF 10TH AVENUE ISLAMABAD
062120- A12     Civil works                                        400,000,000          627,088,000
062120- A124    Building and Structures                            400,000,000          627,088,000
        Total- CONSTRUCTION OF 10TH AVENUE             400,000,000        627,088,000
           ISLAMABAD
IB5491 NATIONAL POLICE HOSPITAL ISLAMABAD
062120- A12     Civil works                                        600,000,000          600,000,000          100,000,000
062120- A124    Building and Structures                            600,000,000          600,000,000          100,000,000
        Total- NATIONAL POLICE HOSPITAL                  600,000,000        600,000,000        100,000,000
           ISLAMABAD
IB8796 EXPANSION OF SAFE CITY ISLAMABAD
062120- A01    Employees Related Expenses                                                                 18,000,000
062120- A011   Pay                                                                                            18,000,000
062120- A011-1 Pay of Officers                                                                              (3,000,000)
062120- A011-2 Pay of Other Staff                                                                         (15,000,000)
062120- A03    Operating Expenses                                                                         268,800,000
062120- A032   Communications                                                                               500,000
062120- A033     Utilities                                                                                         15,000,000
062120- A039   General                                                                                      253,300,000
062120- A09    Physical Assets                                                                              2,633,200,000
062120- A092   Computer Equipment                                                                         2,609,200,000
062120- A096   Purchase of Plant and Machinery                                                               12,000,000
062120- A097   Purchase of Furniture and Fixture                                                               12,000,000
062120- A13    Repairs and Maintenance                                                                     80,000,000
062120- A131   Machinery and Equipment                                                                      10,000,000
062120- A133    Buildings and Structure                                                                         70,000,000
        Total- EXPANSION OF SAFE CITY ISLAMABAD                                              3,000,000,000
ID9450 CONSTRUCTION OF ADDITIONAL FAMILY SUITS FOR THE MEMBERS OF PARLIAMENT INCLUDING 500
SERVANTS
062120- A12     Civil works                                        350,000,000
062120- A124    Building and Structures                            350,000,000
        Total- CONSTRUCTION OF ADDITIONAL              350,000,000
            FAMILY SUITS FOR THE MEMBERS OF
           PARLIAMENT INCLUDING 500
           SERVANTS

Page 286

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

     062120   Total-  Others                                 1,835,174,000       1,790,843,000       3,675,622,000
     0621     Total-  Urban Development                     1,835,174,000       1,790,843,000       3,675,622,000
0622   Rural Development:
062203 Integrated rural development programme  :
IB3276 PRODUCTIVITY ENHANCEMENT THROUGH THE INSTALLATION OF SOLAR POWERED HIGH EFFICIENCY
IRRIGATION SYSTEMS ICT
062203- A01    Employees Related Expenses                                             1,300,000             1,500,000
062203- A012   Allowances                                                                 1,300,000             1,500,000
062203- A012-1  Regular Allowances                                                    (1,300,000)          (1,500,000)
062203- A03    Operating Expenses                                                       5,538,000            15,460,000
062203- A032   Communications                                                                               100,000
062203- A037   Consultancy and Contractual Work                                         700,000             9,800,000
062203- A038    Travel & Transportation                                                    210,000              800,000
062203- A039   General                                                                    4,628,000             4,760,000
062203- A12     Civil works                                        150,000,000            45,662,000          133,040,000
062203- A122    Irrigation Works                                                           45,662,000          133,040,000
062203- A125   Other Works                                      150,000,000
        Total- PRODUCTIVITY ENHANCEMENT                150,000,000         52,500,000        150,000,000
          THROUGH THE INSTALLATION OF
          SOLAR POWERED HIGH EFFICIENCY
            IRRIGATION SYSTEMS ICT
IB3277 PC-1 FOR THE CONSTRUCTION OF POLICE STATION AND STAF APARTMENTS AT SUMBAL G-14 MAUVE
AREA ISLAMABAD
062203- A12     Civil works                                        200,000,000
062203- A125   Other Works                                      200,000,000
        Total- PC-1 FOR THE CONSTRUCTION OF             200,000,000
           POLICE STATION AND STAF
          APARTMENTS AT SUMBAL G-14 MAUVE
          AREA ISLAMABAD
IB3895 ISLAMABAD INFRASTRUCTURE DEVELOPMENT
062203- A12     Civil works                                                                                   2,000,000,000

Page 287

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

062203- A124    Building and Structures                                                                       2,000,000,000
        Total- ISLAMABAD INFRASTRUCTURE                                                      2,000,000,000
          DEVELOPMENT
IB9408 PROVISION AND INSTALLATION OF LIFT AT ICT AGRICULTURE COMPLEX G-11/4 ISLAMABAD
062203- A03    Operating Expenses                                                                           980,000
062203- A039   General                                                                                        980,000
062203- A12     Civil works                                         16,000,000                                 12,000,000
062203- A124    Building and Structures                             16,000,000                                 12,000,000
        Total- PROVISION AND INSTALLATION OF             16,000,000                             12,980,000
             LIFT AT ICT AGRICULTURE COMPLEX
              G-11/4 ISLAMABAD
IB9411 WATER SUPPLY SCHEMES MOHALLAH USMANIA & MOHALLAH BILAL U.C SARE-I- KHARBOZA AND
KALINGER U.C GOLRA
062203- A03    Operating Expenses                                 4,000,000             4,000,000             1,928,000
062203- A039   General                                              4,000,000             4,000,000             1,928,000
062203- A12     Civil works                                         88,000,000            37,593,000            49,000,000
062203- A125   Other Works                                        88,000,000            37,593,000            49,000,000
        Total- WATER SUPPLY SCHEMES MOHALLAH         92,000,000         41,593,000          50,928,000
           USMANIA & MOHALLAH BILAL U.C
             SARE-I- KHARBOZA AND KALINGER
            U.C GOLRA
IB9412 REHABILITATION OF 5 RURAL ROADS FALLS IN ICT ISLAMABAD
062203- A03    Operating Expenses                                 6,000,000             6,000,000             4,823,000
062203- A039   General                                              6,000,000             6,000,000             4,823,000
062203- A12     Civil works                                        374,696,000          342,577,000          155,000,000
062203- A125   Other Works                                      374,696,000          342,577,000          155,000,000
        Total- REHABILITATION OF 5 RURAL ROADS         380,696,000        348,577,000        159,823,000
           FALLS IN ICT ISLAMABAD
IB9413 CONSTRUCTION OF REVENUE CENTERS AT TARNOL & SIHALA ICT ISLAMABAD
062203- A03    Operating Expenses                                 6,000,000             6,000,000             8,472,000
062203- A039   General                                              6,000,000             6,000,000             8,472,000
062203- A12     Civil works                                         41,920,000            26,961,000          261,000,000
062203- A124    Building and Structures                             41,920,000            26,961,000          261,000,000
        Total- CONSTRUCTION OF REVENUE                  47,920,000         32,961,000        269,472,000
          CENTERS AT TARNOL & SIHALA ICT
           ISLAMABAD

Page 288

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9414 PROVISION OF DRINKING WATER FACILITIES IN 16 U.CS OF RURAL AREA OF ICT ISLAMABAD
062203- A01    Employees Related Expenses                       8,500,000                                   8,500,000
062203- A011   Pay                      26                    4,000,000                                   4,000,000
062203- A011-2 Pay of Other Staff            (26)                  (4,000,000)                               (4,000,000)
062203- A012   Allowances                                           4,500,000                                   4,500,000
062203- A012-1  Regular Allowances                               (4,500,000)                               (4,500,000)
062203- A03    Operating Expenses                                 5,000,000             5,000,000             5,000,000
062203- A039   General                                              5,000,000             5,000,000             5,000,000
062203- A12     Civil works                                        286,500,000          146,587,000          136,500,000
062203- A125   Other Works                                      286,500,000          146,587,000          136,500,000
        Total- PROVISION OF DRINKING WATER              300,000,000        151,587,000        150,000,000
             FACILITIES IN 16 U.CS OF RURAL AREA
          OF ICT ISLAMABAD
IB9415 DESIGN - CUM- CONSTRUCTION OF RETAINING WALLS AT TALHAR
062203- A03    Operating Expenses                                 3,000,000             3,000,000
062203- A039   General                                              3,000,000             3,000,000
062203- A12     Civil works                                         62,226,000            62,226,000
062203- A125   Other Works                                        62,226,000            62,226,000
        Total- DESIGN - CUM- CONSTRUCTION OF             65,226,000         65,226,000
            RETAINING WALLS AT TALHAR
IB9416 CONSTRUCTION OF NULLAH/ R.C.C LINE AT SHAH PUR U.C PHULGRAN
062203- A12     Civil works                                         75,921,000            75,921,000
062203- A125   Other Works                                        75,921,000            75,921,000
        Total- CONSTRUCTION OF NULLAH/ R.C.C             75,921,000         75,921,000
            LINE AT SHAH PUR U.C PHULGRAN
IB9417 SEWERAGE SYSTEM AT BANI GALA
062203- A03    Operating Expenses                                                                             9,000,000
062203- A039   General                                                                                          9,000,000
062203- A12     Civil works                                        400,000,000          246,460,000          291,000,000
062203- A125   Other Works                                      400,000,000          246,460,000          291,000,000
        Total- SEWERAGE SYSTEM AT BANI GALA           400,000,000        246,460,000        300,000,000

Page 289

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9418 CONSTRUCION OF NULLAH IN VILLAGE SHAH ALLAH DITTA
062203- A12     Civil works                                         54,000,000            54,000,000
062203- A125   Other Works                                        54,000,000            54,000,000
        Total- CONSTRUCION OF NULLAH IN VILLAGE         54,000,000         54,000,000
          SHAH ALLAH DITTA
IB9419 STREET PAVEMENT AND NULLAH JABBA TOWN NEAR KHANNA DAK ISLAMABAD
062203- A12     Civil works                                           9,645,000             9,645,000
062203- A125   Other Works                                          9,645,000             9,645,000
        Total- STREET PAVEMENT AND NULLAH                9,645,000           9,645,000
          JABBA TOWN NEAR KHANNA DAK
           ISLAMABAD
IB9420 REHABILITATION / UP-GRADATION OF INTERNAL ROADS IN 16 U.CS OF RURAL AREA IN ICT ISLAMABAD
062203- A03    Operating Expenses                                 6,000,000             6,000,000             6,000,000
062203- A039   General                                              6,000,000             6,000,000             6,000,000
062203- A12     Civil works                                        694,000,000          408,135,000          194,000,000
062203- A125   Other Works                                      694,000,000          408,135,000          194,000,000
        Total- REHABILITATION / UP-GRADATION OF         700,000,000        414,135,000        200,000,000
           INTERNAL ROADS IN 16 U.CS OF
          RURAL AREA IN ICT ISLAMABAD
IB9421 REHABILITATION OF GOLRA MORE TO LINK HAJI CAMP ROAD
062203- A03    Operating Expenses                                 4,000,000             4,000,000
062203- A039   General                                              4,000,000             4,000,000
062203- A12     Civil works                                         61,829,000            61,829,000
062203- A125   Other Works                                        61,829,000            61,829,000
        Total- REHABILITATION OF GOLRA MORE TO          65,829,000         65,829,000
            LINK HAJI CAMP ROAD
IB9422 REHABILITATION / UP-GRADATION OF KORANG ROAD BANI GALA
062203- A03    Operating Expenses                                 4,000,000             4,000,000             3,868,000
062203- A039   General                                              4,000,000             4,000,000             3,868,000
062203- A12     Civil works                                                                                     97,000,000
062203- A125   Other Works                                                                                   97,000,000
062203- A13    Repairs and Maintenance                         199,820,000            98,951,000

Page 290

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

062203- A136   Roads, Highways and Bridges                     199,820,000            98,951,000
        Total- REHABILITATION / UP-GRADATION OF         203,820,000        102,951,000        100,868,000
          KORANG ROAD BANI GALA
IB9423 CONSTRUCTION OF RETAINING WALL AT PRINCE ROAD
062203- A03    Operating Expenses                                 5,000,000             5,000,000             1,987,000
062203- A039   General                                              5,000,000             5,000,000             1,987,000
062203- A12     Civil works                                        278,019,000          256,793,000            22,000,000
062203- A125   Other Works                                      278,019,000          256,793,000            22,000,000
        Total- CONSTRUCTION OF RETAINING WALL         283,019,000        261,793,000          23,987,000
           AT PRINCE ROAD
IB9424 REHABILITATION / UP-GRADATION OF LINK ROADS TO VILLAGE JOHD DHOK RAMAZANIA SARA -I
KHARBOOZA GOLRA
062203- A03    Operating Expenses                                 6,000,000             6,000,000             8,942,000
062203- A039   General                                              6,000,000             6,000,000             8,942,000
062203- A13    Repairs and Maintenance                         813,242,000          531,300,000          273,000,000
062203- A136   Roads, Highways and Bridges                     813,242,000          531,300,000          273,000,000
        Total- REHABILITATION / UP-GRADATION OF         819,242,000        537,300,000        281,942,000
            LINK ROADS TO VILLAGE JOHD DHOK
           RAMAZANIA SARA -I KHARBOOZA
          GOLRA
IB9425 STRUCTRAL REHABILITATION AND UP-GRADATION OF INFRASTRUCTURE OF FRUIT Y VEGETABLE
WHOLE SALE
062203- A03    Operating Expenses                                 6,000,000             6,000,000             6,000,000
062203- A039   General                                              6,000,000             6,000,000             6,000,000
062203- A12     Civil works                                        556,651,000          194,149,000          194,000,000
062203- A125   Other Works                                      556,651,000          194,149,000          194,000,000
        Total- STRUCTRAL REHABILITATION AND            562,651,000        200,149,000        200,000,000
           UP-GRADATION OF INFRASTRUCTURE
          OF FRUIT Y VEGETABLE WHOLE SALE
IB9426 REHABILITATION OF RURAL ROADS IN U.C GOLRA SHARIF SHAH ALLAH DITTA & SARE -I- KHARBOOZA
062203- A03    Operating Expenses                                 6,000,000             6,000,000             5,000,000
062203- A039   General                                              6,000,000             6,000,000             5,000,000
062203- A13    Repairs and Maintenance                         568,031,000          372,671,000            95,000,000

Page 291

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

062203- A136   Roads, Highways and Bridges                     568,031,000          372,671,000            95,000,000
        Total- REHABILITATION OF RURAL ROADS IN        574,031,000        378,671,000        100,000,000
            U.C GOLRA SHARIF SHAH ALLAH
            DITTA & SARE -I- KHARBOOZA
     062203   Total-  Integrated rural development             5,000,000,000       3,039,298,000       4,000,000,000
                   programme
     0622     Total-  Rural Development                     5,000,000,000       3,039,298,000       4,000,000,000
     062      Total-  Community Development                6,835,174,000       4,830,141,000       7,675,622,000
     06        Total-  Housing And Community Amenities       6,835,174,000       4,830,141,000       7,675,622,000
               Total- ACCOUNTANT GENERAL                 8,490,440,000         8,228,236,000        12,892,444,000
                PAKISTAN REVENUES
                       (In Foreign Exchange)                             (19,716,000)                               (2,589,700,000)
               (Own Resources)                                  (19,716,000)
                   (Foreign Aid)                                                                                 (2,589,700,000)
                       (In Local Currency)                             (8,470,724,000)        (8,228,236,000)       (10,302,744,000)

Page 292

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR
03     Public Order And Safety Affairs:
032     Police:
0321   Police:
032106 Frontier Watch and Ward  :
PR1389 CONSTRUCTION OF OFFICERS AND TROOPS ACCOMMODATION BOQ WITH QUARTER GUARD
032106- A12     Civil works                                         65,000,000            49,000,000            16,000,000
032106- A122    Irrigation Works                                                                                16,000,000
032106- A124    Building and Structures                             65,000,000            49,000,000
        Total- CONSTRUCTION OF OFFICERS AND             65,000,000         49,000,000          16,000,000
          TROOPS ACCOMMODATION BOQ WITH
          QUARTER GUARD
     032106   Total-  Frontier Watch and Ward                   65,000,000         49,000,000         16,000,000
     0321     Total-  Police                                   65,000,000         49,000,000         16,000,000
     032      Total-  Police                                   65,000,000         49,000,000         16,000,000
     03        Total-  Public Order And Safety Affairs             65,000,000         49,000,000         16,000,000
04     Economic Affairs:
045    Construction and Transport:
0457   Construction (Works):
045702 Building and Structures  :
PR0940 CONSTRUCTION OF 1 X WING HEADQUARTER AT AHMEDWAM (SOUTH WAZIRISTAN DISTRICT
045702- A12     Civil works                                        277,280,000          277,280,000
045702- A124    Building and Structures                            277,280,000          277,280,000
        Total- CONSTRUCTION OF 1 X WING                  277,280,000        277,280,000
          HEADQUARTER AT AHMEDWAM
           (SOUTH WAZIRISTAN DISTRICT
PR0942 CONSTRUCTION OF 1 X WING HEADQUARTER AT GOMALZAM (SOUTH WAZIRISTAN DISTRICT)
045702- A12     Civil works                                        237,280,000          237,280,000
045702- A124    Building and Structures                            237,280,000          237,280,000
        Total- CONSTRUCTION OF 1 X WING                  237,280,000        237,280,000
          HEADQUARTER AT GOMALZAM
           (SOUTH WAZIRISTAN DISTRICT)
PR0949 REHABILITATION OF EXISTING SOURCE TO DEVELOP 0.5 MW THROUGH MINI HYDROPOWER PTOJECT
AND 2 X
045702- A12     Civil works                                                               50,000,000
045702- A124    Building and Structures                                                   50,000,000
        Total- REHABILITATION OF EXISTING                                     50,000,000
          SOURCE TO DEVELOP 0.5 MW
          THROUGH MINI HYDROPOWER
           PTOJECT AND 2 X

Page 293

NO. 114.- FC22D23 DEVELOPMENT EXPENDITURE OF INTERIOR AND NARCOTICS      DEMANDS FOR GRANTS
             CONTROL DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

PR0950 CONSTRUCTION OF 60 X WATER SUPPLY SCHEME IN TRIBAL DISTRICTS
045702- A12     Civil works                                                             226,250,000
045702- A124    Building and Structures                                                  226,250,000
        Total- CONSTRUCTION OF 60 X WATER                                  226,250,000
           SUPPLY SCHEME IN TRIBAL DISTRICTS
PR0952 CONSTRUCTION OF 3 X 128 SINGLE MEN BARRACKS FOR SPECIAL OPERATION COMPANIES IN KHYBER
BAJAUR AND
045702- A12     Civil works                                                             149,868,000
045702- A124    Building and Structures                                                  149,868,000
        Total- CONSTRUCTION OF 3 X 128 SINGLE                               149,868,000
          MEN BARRACKS FOR SPECIAL
           OPERATION COMPANIES IN KHYBER
          BAJAUR AND
PR0953 CONSTRUCTION OF 5 MALE/FEMALE CHECK POSTS IN KHYBER/BAJAUR TRIBLE DISTRICT
045702- A12     Civil works                                                             344,696,000
045702- A124    Building and Structures                                                  344,696,000
        Total- CONSTRUCTION OF 5 MALE/FEMALE                              344,696,000
          CHECK POSTS IN KHYBER/BAJAUR
            TRIBLE DISTRICT
PR9997 CONSTRUCTION OF EIGHT(8) WOMEN FACILITIES IN TRIBAL DISTRICTS
045702- A12     Civil works                                                             456,600,000
045702- A124    Building and Structures                                                  456,600,000
        Total- CONSTRUCTION OF EIGHT(8) WOMEN                             456,600,000
             FACILITIES IN TRIBAL DISTRICTS
     045702   Total-  Buildings and Structures                  514,560,000       1,741,974,000
     0457     Total-  Construction (Works)                     514,560,000       1,741,974,000
     045      Total-  Construction and Transport               514,560,000       1,741,974,000
     04        Total-  Economic Affairs                        514,560,000       1,741,974,000
               Total- ACCOUNTANT GENERAL                  579,560,000         1,790,974,000            16,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, PESHAWAR
          TOTAL - DEMAND                             9,070,000,000      10,019,210,000      12,908,444,000
                  (In Foreign Exchange)                             (19,716,000)                          (2,589,700,000)
            (Own Resources)                                 (19,716,000)
               (Foreign Aid)                                                                            (2,589,700,000)
                  (In Local Currency)                             (9,050,284,000)     (10,019,210,000)     (10,318,744,000)
                                                  __________________________________________________

Page 294

No text layer on this page, see the official PDF.

Page 295

                                   SECTION XIV

                      MINISTRY OF INTER-PROVINCIAL COORDINATION

                                                              *******
                                                                                   2025-2026
                                                                              Budget
                                                                                     Estimate

                                                                       (Rupees in Thousand)

Demand presented on behalf of the Ministry of
Inter-Provincial Coordination

Development Expenditure on Revenue Account.

              115. Development Expenditure of Inter-Provincial                              1,179,840
                  Coordination Division

                                                                          Total :               1,179,840

Page 296

No text layer on this page, see the official PDF.

Page 297

NO. 115.- DEVELOPMENT EXPENDITURE OF INTER PROVINCIAL COORDINATION      DEMANDS FOR GRANTS
         DIVISION
                                DEMAND NO. 115
                                                                            ( FC22D67 )
            DEVELOPMENT EXPENDITURE OF INTER PROVINCIAL COORDINATION DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2026 for DEVELOPMENT EXPENDITURE
OF INTER PROVINCIAL COORDINATION DIVISION.

                                Voted           Rs. 1,179,840,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF INTER-PROVINCIAL COORDINATION .

                                                           2024-2025         2024-2025         2025-2026
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
081    Recreation and Sporting Services                           3,650,000,000         1,539,500,000         1,179,840,000
               Total                                               3,650,000,000         1,539,500,000         1,179,840,000
     OBJECT CLASSIFICATION
A02    Project Pre-Investment Analysis                       500,000,000
A03   Operating Expenses                                                      385,000,000
A12    Civil works                                          3,150,000,000       1,154,500,000       1,179,840,000
               Total                                         3,650,000,000       1,539,500,000       1,179,840,000

Page 298

NO. 115.- FC22D67 DEVELOPMENT EXPENDITURE OF INTER PROVINCIAL           DEMANDS FOR GRANTS
              COORDINATION DIVISION
III.  - DETAILS are as follows :-
                                 No of Posts        2024-2025         2024-2025       2025-2026
                                       2024-25 2025-26       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
08     Recreation, Culture and Religion:
081    Recreation and Sporting Services:
0811   Recreational and Sporting Services:
081101 STADIUM AND SPORTS COMPLEXES  :
IB0295 HIRING OF FOREIGN COACHES FOR TRAINING OF NATIONAL ATHLETES FOR PARTICIPATION IN THE
MEGA EVENTS
081101- A03    Operating Expenses                                                    160,000,000
081101- A039   General                                                                160,000,000
081101- A12     Civil works                                        160,000,000
081101- A124    Building and Structures                            160,000,000
        Total- HIRING OF FOREIGN COACHES FOR           160,000,000        160,000,000
            TRAINING OF NATIONAL ATHLETES
          FOR PARTICIPATION IN THE MEGA
           EVENTS
IB0296 CONSTRUCTION REHABILITATION / REVAMPING OF ROADS FOOTPATHS MAIN GATE SECURITY SYSTEMS
AND LANDSCAPING
081101- A12     Civil works                                         60,000,000            60,000,000
081101- A124    Building and Structures                             60,000,000            60,000,000
        Total- CONSTRUCTION REHABILITATION /             60,000,000         60,000,000
           REVAMPING OF ROADS FOOTPATHS
           MAIN GATE SECURITY SYSTEMS AND
           LANDSCAPING
IB0297 REHABILITATION /UP-GRADATION OF EXISTING FACILITIES AT PSB COACHING CENTRE AT KARACHI
081101- A12     Civil works                                        180,000,000            87,000,000            70,000,000
081101- A124    Building and Structures                            180,000,000            87,000,000            70,000,000
        Total- REHABILITATION /UP-GRADATION OF          180,000,000         87,000,000          70,000,000
            EXISTING FACILITIES AT PSB
          COACHING CENTRE AT KARACHI
IB0298 LAYING OF SYNTHETIC ATHLETIC TRACK / FOOTBALL GROUND SPRINKLING SYSTEM AND FLOOD
LIGHTS AT PSB COACHING
081101- A12     Civil works                                        104,893,000            23,000,000          108,000,000
081101- A124    Building and Structures                            104,893,000            23,000,000          108,000,000
        Total- LAYING OF SYNTHETIC ATHLETIC             104,893,000         23,000,000        108,000,000
          TRACK / FOOTBALL GROUND
            SPRINKLING SYSTEM AND FLOOD
           LIGHTS AT PSB COACHING

Page 299

NO. 115.- FC22D67 DEVELOPMENT EXPENDITURE OF INTER PROVINCIAL           DEMANDS FOR GRANTS
              COORDINATION DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB2316 REHABILITATION & UPGRADATION OF EXISTING FACILITIES AT PSC ISLAMABAD FOR
PREPARATION /HOLDING
081101- A12     Civil works                                        312,083,000          280,000,000            53,105,000
081101- A124    Building and Structures                            312,083,000          280,000,000            53,105,000
        Total- REHABILITATION & UPGRADATION OF         312,083,000        280,000,000          53,105,000
            EXISTING FACILITIES AT PSC
           ISLAMABAD FOR PREPARATION
            /HOLDING
IB3036 AIRCONDITIONING OF LIAQUAT GYMNASIUM AT PAKISTAN SPORTS COMPLEX ISLAMABAD
081101- A12     Civil works                                        250,000,000          250,000,000          108,000,000
081101- A124    Building and Structures                            250,000,000          250,000,000          108,000,000
        Total- AIRCONDITIONING OF LIAQUAT                250,000,000        250,000,000        108,000,000
          GYMNASIUM AT PAKISTAN SPORTS
          COMPLEX ISLAMABAD
IB3739 CONSTRUCTION OF PSB COACHING CENTRE AT SKARDU
081101- A12     Civil works                                                             120,000,000            50,000,000
081101- A124    Building and Structures                                                  120,000,000            50,000,000
        Total- CONSTRUCTION OF PSB COACHING                              120,000,000          50,000,000
          CENTRE AT SKARDU
IB5285 REHABILITATION / UPGRADATION OF EXISTING FACILITIES AT PSB COACHING CENTRE QUETTA
081101- A12     Civil works                                        150,000,000
081101- A124    Building and Structures                            150,000,000
        Total- REHABILITATION / UPGRADATION OF          150,000,000
            EXISTING FACILITIES AT PSB
          COACHING CENTRE QUETTA
IB5286 CONSTRUCTION OF SWIMMING POOL AT PSB COACHING CENTRE AT KARACHI
081101- A12     Civil works                                        200,000,000
081101- A124    Building and Structures                            200,000,000
        Total- CONSTRUCTION OF SWIMMING POOL          200,000,000
           AT PSB COACHING CENTRE AT
           KARACHI

Page 300

NO. 115.- FC22D67 DEVELOPMENT EXPENDITURE OF INTER PROVINCIAL           DEMANDS FOR GRANTS
              COORDINATION DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5290 PROVIDING AND INSTALLATION OF ELECTRONIC DISPLAYS AND SCORING SYSTEM AT DIFFERENT
FACILITIES OF
081101- A12     Civil works                                        735,394,000             6,000,000          150,000,000
081101- A124    Building and Structures                            735,394,000             6,000,000          150,000,000
        Total- PROVIDING AND INSTALLATION OF            735,394,000           6,000,000        150,000,000
           ELECTRONIC DISPLAYS AND SCORING
          SYSTEM AT DIFFERENT FACILITIES OF
IB5291 PROVISION OF MISSING FACILITIES FOR SOUTH ASIAN GAMES VIZ WARM-UP TRACK HEAT EXCHANGER
RESIDENTIAL
081101- A12     Civil works                                        388,429,000          225,000,000          200,000,000
081101- A124    Building and Structures                            388,429,000          225,000,000          200,000,000
        Total- PROVISION OF MISSING FACILITIES            388,429,000        225,000,000        200,000,000
          FOR SOUTH ASIAN GAMES VIZ
          WARM-UP TRACK HEAT EXCHANGER
            RESIDENTIAL
IB8788 CONSTRUCTION OF MULTIPURPOSE SPORTS COMPLEX/COURTS AND TWO PEDAL COURTS AT
FAISALABAD
081101- A12     Civil works                                                                                   100,000,000
081101- A124    Building and Structures                                                                       100,000,000
        Total- CONSTRUCTION OF MULTIPURPOSE                                                 100,000,000
          SPORTS COMPLEX/COURTS AND TWO
          PEDAL COURTS AT FAISALABAD
IB8789 ESTABLISHMENT OF ARSHAD NADEEM/SHEHBAZ SHARIF HIGH PERFORMANCE SPORTS ACADEMY
081101- A12     Civil works                                                                                   300,000,000
081101- A124    Building and Structures                                                                       300,000,000
        Total- ESTABLISHMENT OF ARSHAD                                                        300,000,000
          NADEEM/SHEHBAZ SHARIF HIGH
          PERFORMANCE SPORTS ACADEMY
IB9339 CONSTRUCTION OF 250 MINI SPORTS COMPLEXES (50:50) (PC-II)
081101- A02     Project Pre-Investment Analysis                  500,000,000
081101- A021    Feasibility Studies                                 500,000,000
        Total- CONSTRUCTION OF 250 MINI SPORTS          500,000,000
          COMPLEXES (50:50) (PC-II)
ID6852 ESTABLISHMENT OF BIO MECHANICAL LAB AT PAKISTAN SPORTS COMPLEX ISLAMABAD
081101- A12     Civil works                                        120,735,000            63,500,000            40,735,000