Details of Demands for Grants and Appropriations - Vol-IV (Development), part 6

FY 2024-25Details of demandsPages 501 to 600 of 627

The Details of Demands for Grants and Appropriations - Vol-IV (Development) is part of the federal budget for FY 2024-25. This page reproduces the text of its 627 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.

Go to a page or part

This text was extracted automatically from the PDF's text layer. Tables may lose their column alignment, and a page with no text layer is marked rather than guessed. Check the official PDF before relying on any figure.

Page 501

NO. 128.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

LO9700 ACQUISITION OF LAND FOR SOLAR POWER PLANT AT MUZAFFARGRAG
014202- A08    Loans and Advances                                                   178,000,000          350,734,000
014202- A085   Loans to Non Financial Institutions                                       178,000,000          350,734,000
        Total- ACQUISITION OF LAND FOR SOLAR                               178,000,000        350,734,000
         POWER PLANT AT MUZAFFARGRAG
LO9800 LAND ACQUISITION FOR INSTALLATION OF 600 MW SOLAR POWER PLANT AT TEHSIL ATHARA HAZARI
DISTT JHANG
014202- A08    Loans and Advances                            1,133,000,000         1,425,000,000          633,002,000
014202- A085   Loans to Non Financial Institutions                1,133,000,000         1,425,000,000          633,002,000
        Total- LAND ACQUISITION FOR                     1,133,000,000       1,425,000,000        633,002,000
            INSTALLATION OF 600 MW SOLAR
         POWER PLANT AT TEHSIL ATHARA
           HAZARI DISTT JHANG
     014202   Total-  Trasfer To Non-Financial                6,361,000,000       6,361,000,000      18,269,961,000
                           Institutions
     0142     Total-  Transfers (Others)                      6,361,000,000       6,361,000,000      18,269,961,000
     014      Total-  Transfers                              6,361,000,000       6,361,000,000      18,269,961,000
     01        Total-  General Public Service                  6,361,000,000       6,361,000,000      18,269,961,000
               Total- ACCOUNTANT GENERAL                 6,361,000,000         6,361,000,000        18,269,961,000
                PAKISTAN REVENUES
                  SUB-OFFICE, LAHORE

Page 502

NO. 128.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
PR3129 ELECTRIFICATION WORKS AT DIFFERENT VALLEYS OF DISTRICT CHITRAL (PESCO)
014202- A08    Loans and Advances                             964,036,000          964,036,000         1,824,360,000
014202- A085   Loans to Non Financial Institutions                 964,036,000          964,036,000         1,824,360,000
        Total- ELECTRIFICATION WORKS AT                 964,036,000        964,036,000       1,824,360,000
           DIFFERENT VALLEYS OF DISTRICT
           CHITRAL (PESCO)
PR3130 ESTAB OF 132 KV GRID SYS. ALONG WITH UPG RADIATION OF EXTG.33KV GRID SYS. TO 132KV IN DISTT.
CHITRAL (PESCO)
014202- A08    Loans and Advances                             151,459,000          151,459,000            10,001,000
014202- A085   Loans to Non Financial Institutions                 151,459,000          151,459,000            10,001,000
        Total- ESTAB OF 132 KV GRID SYS. ALONG           151,459,000        151,459,000          10,001,000
           WITH UPG RADIATION OF EXTG.33KV
           GRID SYS. TO 132KV IN DISTT. CHITRAL
            (PESCO)
PR3131 EVACUATION OF POWER FROM 220-KV/132-KV GRID STATION SAWABI (PESCO)
014202- A08    Loans and Advances                             260,849,000          260,849,000          110,793,000
014202- A085   Loans to Non Financial Institutions                 260,849,000          260,849,000          110,793,000
        Total- EVACUATION OF POWER FROM               260,849,000        260,849,000        110,793,000
             220-KV/132-KV GRID STATION SAWABI
            (PESCO)
PR7018 SUPPLY OF POWER TO RASHAKAI ECONOMIC ZONE KPK
014202- A08    Loans and Advances                               61,265,000            61,265,000          934,787,000
014202- A085   Loans to Non Financial Institutions                  61,265,000            61,265,000          934,787,000
        Total- SUPPLY OF POWER TO RASHAKAI              61,265,000         61,265,000        934,787,000
          ECONOMIC ZONE KPK
PR7019 SUPPLY OF POWER TO HATTAR SPECIAL ECONOMIC ZONE KPK
014202- A08    Loans and Advances                               94,589,000            94,589,000          340,011,000

Page 503

NO. 128.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

     014202- A085   Loans to Non Financial Institutions            94,589,000            94,589,000          340,011,000
             Total- SUPPLY OF POWER TO HATTAR           94,589,000         94,589,000        340,011,000
           SPECIAL ECONOMIC ZONE KPK
     014202   Total-  Trasfer To Non-Financial                1,532,198,000       1,532,198,000       3,219,952,000
                           Institutions
     0142     Total-  Transfers (Others)                      1,532,198,000       1,532,198,000       3,219,952,000
     014      Total-  Transfers                              1,532,198,000       1,532,198,000       3,219,952,000
     01        Total-  General Public Service                  1,532,198,000       1,532,198,000       3,219,952,000
               Total- ACCOUNTANT GENERAL                 1,532,198,000         1,532,198,000         3,219,952,000
                PAKISTAN REVENUES
                  SUB-OFFICE, PESHAWAR

Page 504

NO. 128.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
HD0201 INSTALLATION OF 2X600 MW (NET) COAL FIRED POWER PROJECT JAMSHORO (GENCO-I)
014202- A08    Loans and Advances                            9,000,000,000         9,000,000,000        11,000,000,000
014202- A085   Loans to Non Financial Institutions                9,000,000,000         9,000,000,000        11,000,000,000
        Total- INSTALLATION OF 2X600 MW (NET)           9,000,000,000       9,000,000,000      11,000,000,000
          COAL FIRED POWER PROJECT
          JAMSHORO (GENCO-I)
HD5341 SECONDARY TRANSMISSION AND LINE AND GIRD STATION PLAN FOR 2021-2022(HARSCO)
014202- A08    Loans and Advances                             500,000,000          500,000,000
014202- A085   Loans to Non Financial Institutions                 500,000,000          500,000,000
        Total- SECONDARY TRANSMISSION AND LINE        500,000,000        500,000,000
          AND GIRD STATION PLAN FOR
            2021-2022(HARSCO)
KA1386 500 KV MATIARI-MORO-R.Y.KHAN T/L
014202- A08    Loans and Advances                                                                       16,000,000,000
014202- A085   Loans to Non Financial Institutions                                                          16,000,000,000
        Total- 500 KV MATIARI-MORO-R.Y.KHAN T/L                                               16,000,000,000
SK0072 SECONDARY TRANSMISSION LINES AND GRID STATION FOR 2021-2022 TO 2023-2024 (SEPCO)
014202- A08    Loans and Advances                             500,000,000          500,000,000
014202- A085   Loans to Non Financial Institutions                 500,000,000          500,000,000
        Total- SECONDARY TRANSMISSION LINES           500,000,000        500,000,000
          AND GRID STATION FOR 2021-2022 TO
             2023-2024 (SEPCO)
     014202   Total-  Trasfer To Non-Financial               10,000,000,000      10,000,000,000      27,000,000,000
                           Institutions
     0142     Total-  Transfers (Others)                     10,000,000,000      10,000,000,000      27,000,000,000
     014      Total-  Transfers                             10,000,000,000      10,000,000,000      27,000,000,000
     01        Total-  General Public Service                 10,000,000,000      10,000,000,000      27,000,000,000
               Total- ACCOUNTANT GENERAL                10,000,000,000        10,000,000,000        27,000,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI

Page 505

NO. 128.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA
01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
QA3112 CONSTRUCTION OF 132-KV MASHKAY G/S WITH ALLIED 132-KV NAI-MASHKAY T/LINE (QESCO)
014202- A08    Loans and Advances                             105,816,000          105,816,000
014202- A085   Loans to Non Financial Institutions                 105,816,000          105,816,000
        Total- CONSTRUCTION OF 132-KV MASHKAY         105,816,000        105,816,000
            G/S WITH ALLIED 132-KV NAI-MASHKAY
             T/LINE (QESCO)
QA4101 CONSTRUCTION OF 132 KV GRID STATION ATKHAN MEHTERZAI WITH ALLIED T/LINE
014202- A08    Loans and Advances                               64,556,000            64,556,000          207,500,000
014202- A085   Loans to Non Financial Institutions                  64,556,000            64,556,000          207,500,000
        Total- CONSTRUCTION OF 132 KV GRID                64,556,000         64,556,000        207,500,000
           STATION ATKHAN MEHTERZAI WITH
            ALLIED T/LINE
QA4104 INTER CONNECTION OF ISOLATED MAKRAN NETWORK AT BASIMA VIA NAG G/STATION FROM
PANJGOOR G/STATION
014202- A08    Loans and Advances                            2,536,471,000         2,536,471,000         2,500,000,000
014202- A085   Loans to Non Financial Institutions                2,536,471,000         2,536,471,000         2,500,000,000
        Total- INTER CONNECTION OF ISOLATED           2,536,471,000       2,536,471,000       2,500,000,000
          MAKRAN NETWORK AT BASIMA VIA
          NAG G/STATION FROM PANJGOOR
            G/STATION
     014202   Total-  Trasfer To Non-Financial                2,706,843,000       2,706,843,000       2,707,500,000
                           Institutions
     0142     Total-  Transfers (Others)                      2,706,843,000       2,706,843,000       2,707,500,000
     014      Total-  Transfers                              2,706,843,000       2,706,843,000       2,707,500,000
     01        Total-  General Public Service                  2,706,843,000       2,706,843,000       2,707,500,000
               Total- ACCOUNTANT GENERAL                 2,706,843,000         2,706,843,000         2,707,500,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
          TOTAL - DEMAND                          157,313,555,000    152,294,542,000    206,911,413,000
                  (In Foreign Exchange)                                                                    (2,605,615,000)
            (Own Resources)                                                                        (2,605,615,000)
               (Foreign Aid)
                  (In Local Currency)                          (157,313,555,000)   (152,294,542,000)   (204,305,798,000)
                                                  __________________________________________________

Page 506

NO. 129.- EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL      DEMANDS FOR GRANTS
       GOVERNMENT
                                DEMAND NO. 129
                                                                    ( FC12E14 / FC15E14 )
          EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2025 for EXTERNAL DEVELOPMENT
LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT.

                                        Total                Rs.    745,317,642,000
                                      (Charged)            Rs.    617,000,000,000
                                         (Voted)               Rs.    128,317,642,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF FINANCE AND REVENUE  .

                                                           2023-2024         2023-2024         2024-2025
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                700,522,753,000       700,522,753,000       745,317,642,000
               Total                                            700,522,753,000       700,522,753,000       745,317,642,000
              (Charged)                                  658,644,140,000    658,644,140,000    617,000,000,000
               (Voted)                                      41,878,613,000      41,878,613,000    128,317,642,000
                                                  __________________________________________________
     OBJECT CLASSIFICATION
A05   Grants, Subsidies and Write off Loans                2,000,000,000       2,000,000,000
A08   Loans and Advances                              698,522,753,000    698,522,753,000    745,317,642,000
       (Charged)                                         658,644,140,000    658,644,140,000    617,000,000,000
        (Voted)                                             39,878,613,000      39,878,613,000    128,317,642,000
               Total                                      700,522,753,000    700,522,753,000    745,317,642,000
              (Charged)                                       658,644,140,000       658,644,140,000       617,000,000,000
               (Voted)                                            41,878,613,000        41,878,613,000       128,317,642,000
                                                  __________________________________________________
                  (In Foreign Exchange)                           (700,522,753,000)                            (745,317,642,000)
            (Own Resources)
               (Foreign Aid)                                     (700,522,753,000)                            (745,317,642,000)
                  (In Local Currency)                                                     (700,522,753,000)
                                                  __________________________________________________

Page 507

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
III.  - DETAILS are as follows :-
                                 No of Posts        2023-2024         2023-2024       2024-2025
                                       2023-24 2024-25       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
014    Transfers:
0141   Transfers (Inter-Governmental):
014101 TO PROVINCES  :
ID8871 PUNJAB PROGRAMME LOAN
014101- A08    Loans and Advances                           54,592,500,000        54,592,500,000
                (Charged)                                  54,592,500,000      54,592,500,000
014101- A082   Provinces                                       54,592,500,000        54,592,500,000
                (Charged)                                  54,592,500,000      54,592,500,000
        Total- PUNJAB PROGRAMME LOAN                54,592,500,000      54,592,500,000
                  (In Foreign Exchange)                         (54,592,500,000)
               (Foreign Aid)                                 (54,592,500,000)
                  (In Local Currency)                                                (54,592,500,000)
                                                  __________________________________________________
ID8873 KPK PROGRAMME LOAN
014101- A08    Loans and Advances                           35,510,000,000        35,510,000,000
                (Charged)                                  35,510,000,000      35,510,000,000
014101- A082   Provinces                                       35,510,000,000        35,510,000,000
                (Charged)                                  35,510,000,000      35,510,000,000
        Total- KPK PROGRAMME LOAN                    35,510,000,000      35,510,000,000
                  (In Foreign Exchange)                         (35,510,000,000)
               (Foreign Aid)                                 (35,510,000,000)
                  (In Local Currency)                                                (35,510,000,000)
                                                  __________________________________________________
ID8986 SINDH
014101- A08    Loans and Advances                          266,691,250,000       266,691,250,000       334,000,000,000
                (Charged)                                266,691,250,000    266,691,250,000    334,000,000,000
014101- A082   Provinces                                      266,691,250,000       266,691,250,000       334,000,000,000
                (Charged)                                266,691,250,000    266,691,250,000    334,000,000,000
        Total- SINDH                                     266,691,250,000    266,691,250,000     334,000,000,000
                  (In Foreign Exchange)                       (266,691,250,000)                        (334,000,000,000)
               (Foreign Aid)                                (266,691,250,000)                        (334,000,000,000)
                  (In Local Currency)                                               (266,691,250,000)
                                                  __________________________________________________

Page 508

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
ID8987 PUNJAB
014101- A08    Loans and Advances                          125,977,300,000       125,977,300,000       123,000,000,000
                (Charged)                                125,977,300,000    125,977,300,000    123,000,000,000
014101- A082   Provinces                                      125,977,300,000       125,977,300,000       123,000,000,000
                (Charged)                                125,977,300,000    125,977,300,000    123,000,000,000
        Total- PUNJAB                                   125,977,300,000    125,977,300,000     123,000,000,000
                  (In Foreign Exchange)                       (125,977,300,000)                        (123,000,000,000)
               (Foreign Aid)                                (125,977,300,000)                        (123,000,000,000)
                  (In Local Currency)                                               (125,977,300,000)
                                                  __________________________________________________
ID8988 KHYBER PAKHTUNKHWA
014101- A08    Loans and Advances                          138,269,800,000       138,269,800,000       131,000,000,000
                (Charged)                                138,269,800,000    138,269,800,000    131,000,000,000
014101- A082   Provinces                                      138,269,800,000       138,269,800,000       131,000,000,000
                (Charged)                                138,269,800,000    138,269,800,000    131,000,000,000
        Total- KHYBER PAKHTUNKHWA                  138,269,800,000    138,269,800,000     131,000,000,000
                  (In Foreign Exchange)                       (138,269,800,000)                        (131,000,000,000)
               (Foreign Aid)                                (138,269,800,000)                        (131,000,000,000)
                  (In Local Currency)                                               (138,269,800,000)
                                                  __________________________________________________
ID8989 BALOCHISTAN
014101- A08    Loans and Advances                           37,603,290,000        37,603,290,000        29,000,000,000
                (Charged)                                  37,603,290,000      37,603,290,000      29,000,000,000
014101- A082   Provinces                                       37,603,290,000        37,603,290,000        29,000,000,000
                (Charged)                                  37,603,290,000      37,603,290,000      29,000,000,000
        Total- BALOCHISTAN                              37,603,290,000      37,603,290,000      29,000,000,000
                  (In Foreign Exchange)                         (37,603,290,000)                         (29,000,000,000)
               (Foreign Aid)                                 (37,603,290,000)                         (29,000,000,000)
                  (In Local Currency)                                                (37,603,290,000)
                                                  __________________________________________________
     014101   Total- TO PROVINCES                     658,644,140,000    658,644,140,000    617,000,000,000
014110 OTHERS  :
IB0688 40 MW DOWARIAN
014110- A08    Loans and Advances                               50,000,000            50,000,000            10,000,000
014110- A086   Loans to Others                                     50,000,000            50,000,000            10,000,000
        Total- 40 MW DOWARIAN                              50,000,000         50,000,000          10,000,000

Page 509

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                             (50,000,000)                             (10,000,000)
               (Foreign Aid)                                      (50,000,000)                             (10,000,000)
                  (In Local Currency)                                                     (50,000,000)
                                                  __________________________________________________
IB5368 22 MW/JAGRAN-IV HYDRO POWER PROJECT AJK
014110- A08    Loans and Advances                               50,000,000            50,000,000
014110- A086   Loans to Others                                     50,000,000            50,000,000
        Total- 22 MW/JAGRAN-IV HYDRO POWER              50,000,000         50,000,000
          PROJECT AJK
                  (In Foreign Exchange)                             (50,000,000)
               (Foreign Aid)                                      (50,000,000)
                  (In Local Currency)                                                     (50,000,000)
                                                  __________________________________________________
ID8222 48 MW JAGRAN HYDRO POWER PROJECT AJK
014110- A08    Loans and Advances                               50,000,000            50,000,000          450,000,000
014110- A086   Loans to Others                                     50,000,000            50,000,000          450,000,000
        Total- 48 MW JAGRAN HYDRO POWER                 50,000,000         50,000,000        450,000,000
          PROJECT AJK
                  (In Foreign Exchange)                             (50,000,000)                            (450,000,000)
               (Foreign Aid)                                      (50,000,000)                            (450,000,000)
                  (In Local Currency)                                                     (50,000,000)
                                                  __________________________________________________
ID8994 AJK
014110- A05    Grants, Subsidies and Write off Loans          2,000,000,000         2,000,000,000
014110- A052   Grants Domestic                                  2,000,000,000         2,000,000,000
        Total- AJK                                          2,000,000,000       2,000,000,000
                  (In Foreign Exchange)                          (2,000,000,000)
               (Foreign Aid)                                   (2,000,000,000)
                  (In Local Currency)                                                  (2,000,000,000)
                                                  __________________________________________________
     014110   Total- OTHERS                              2,150,000,000       2,150,000,000        460,000,000
     0141     Total-  Transfers (Inter-Governmental)        660,794,140,000    660,794,140,000    617,460,000,000
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :

Page 510

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
IB0783 CAREC CORRIDOR DEVELOPMENT INVESTMENT PROGRAMME TRANCHE-I PROJECTS
ADBAD
014202- A08    Loans and Advances                            2,000,000,000         2,000,000,000         2,000,000,000
014202- A085   Loans to Non Financial Institutions                2,000,000,000         2,000,000,000         2,000,000,000
        Total- CAREC CORRIDOR DEVELOPMENT           2,000,000,000       2,000,000,000       2,000,000,000
           INVESTMENT PROGRAMME TRANCHE-I
           PROJECTS ADB
                   (In Foreign Exchange)                          (2,000,000,000)                          (2,000,000,000)
               (Foreign Aid)                                   (2,000,000,000)                          (2,000,000,000)
                   (In Local Currency)                                                  (2,000,000,000)
                                                  __________________________________________________
IB0784 CONSTRUCTION OF KKH PHASE-II HAVELIAN-THAKOT (118.057 KM) PART OF CHINA PAKISTAN
ECONOMIC
014202- A08    Loans and Advances                             300,000,000          300,000,000
014202- A085   Loans to Non Financial Institutions                 300,000,000          300,000,000
        Total- CONSTRUCTION OF KKH PHASE-II             300,000,000        300,000,000
           HAVELIAN-THAKOT (118.057 KM) PART
          OF CHINA PAKISTAN ECONOMIC
                   (In Foreign Exchange)                           (300,000,000)
               (Foreign Aid)                                    (300,000,000)
                   (In Local Currency)                                                   (300,000,000)
                                                  __________________________________________________
IB0785 PESHAWAR KARACHI MOTORWAY (PKM) PROJECT CONSTRUCTION OF SUKKUR-MULTAN SECTION (392
KM) REVISED
014202- A08    Loans and Advances                             500,000,000          500,000,000
014202- A085   Loans to Non Financial Institutions                 500,000,000          500,000,000
        Total- PESHAWAR KARACHI MOTORWAY            500,000,000        500,000,000
            (PKM) PROJECT CONSTRUCTION OF
           SUKKUR-MULTAN SECTION (392 KM)
           REVISED
                   (In Foreign Exchange)                           (500,000,000)
               (Foreign Aid)                                    (500,000,000)
                   (In Local Currency)                                                   (500,000,000)
                                                  __________________________________________________
IB0786 REHABILITATION OF NATIONAL HIGHWAYS NETWORK DAMAGED DUE TO UNPRECEDENTED MONSOON
RAINS &
014202- A08    Loans and Advances                             200,000,000          200,000,000
014202- A085   Loans to Non Financial Institutions                 200,000,000          200,000,000
        Total- REHABILITATION OF NATIONAL               200,000,000        200,000,000
          HIGHWAYS NETWORK DAMAGED DUE TO
          UNPRECEDENTED MONSOON RAINS &

Page 511

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                           (200,000,000)
               (Foreign Aid)                                    (200,000,000)
                  (In Local Currency)                                                   (200,000,000)
                                                  __________________________________________________
IB0787 WIDENING AND STRENGTHENING OF NATIONAL HIGHWAY N-70 (RAKHI GAJJ BEWATA) 32.651 KM (EAST
WEST ROAD
014202- A08    Loans and Advances                             250,000,000          250,000,000
014202- A085   Loans to Non Financial Institutions                 250,000,000          250,000,000
        Total- WIDENING AND STRENGTHENING OF          250,000,000        250,000,000
           NATIONAL HIGHWAY N-70 (RAKHI GAJJ
          BEWATA) 32.651 KM (EAST WEST
          ROAD
                  (In Foreign Exchange)                           (250,000,000)
               (Foreign Aid)                                    (250,000,000)
                  (In Local Currency)                                                   (250,000,000)
                                                  __________________________________________________
IB0788 CONSTRUCTION OF ADDITIONAL CARRIAGE WAY SHIKARPUR-RANJANPUR SECTION ON N-55 CAREC
CORRIDOR (ADB)
014202- A08    Loans and Advances                            3,000,000,000         3,000,000,000         7,500,000,000
014202- A085   Loans to Non Financial Institutions                3,000,000,000         3,000,000,000         7,500,000,000
        Total- CONSTRUCTION OF ADDITIONAL             3,000,000,000       3,000,000,000       7,500,000,000
           CARRIAGE WAY
           SHIKARPUR-RANJANPUR SECTION ON
             N-55 CAREC CORRIDOR (ADB)
                  (In Foreign Exchange)                          (3,000,000,000)                          (7,500,000,000)
               (Foreign Aid)                                   (3,000,000,000)                          (7,500,000,000)
                  (In Local Currency)                                                  (3,000,000,000)
                                                  __________________________________________________
IB0789 CONSTRUCTION OF ATHMUQAM- SHARDRA KEL TAOBAT ROAD SECTION (109.2 KM) INCLUDING TWO
TUNNELS AT KAHORI
014202- A08    Loans and Advances                             540,000,000          540,000,000          200,000,000
014202- A085   Loans to Non Financial Institutions                 540,000,000          540,000,000          200,000,000
        Total- CONSTRUCTION OF ATHMUQAM-              540,000,000        540,000,000        200,000,000
          SHARDRA KEL TAOBAT ROAD
           SECTION (109.2 KM) INCLUDING TWO
          TUNNELS AT KAHORI

Page 512

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                           (540,000,000)                            (200,000,000)
               (Foreign Aid)                                    (540,000,000)                            (200,000,000)
                  (In Local Currency)                                                   (540,000,000)
                                                  __________________________________________________
IB0800 CONSTRUCTION OF MALAKAND TUNNEL (PHASE-I)
014202- A08    Loans and Advances                             400,000,000          400,000,000          100,000,000
014202- A085   Loans to Non Financial Institutions                 400,000,000          400,000,000          100,000,000
        Total- CONSTRUCTION OF MALAKAND               400,000,000        400,000,000        100,000,000
          TUNNEL (PHASE-I)
                  (In Foreign Exchange)                           (400,000,000)                            (100,000,000)
               (Foreign Aid)                                    (400,000,000)                            (100,000,000)
                  (In Local Currency)                                                   (400,000,000)
                                                  __________________________________________________
IB0801 CONSTRUCTION OF RAJANPUR-DG KHAN AS A 4-LANE HIGHWAY (ADB)
014202- A08    Loans and Advances                            1,000,000,000         1,000,000,000         3,000,000,000
014202- A085   Loans to Non Financial Institutions                1,000,000,000         1,000,000,000         3,000,000,000
        Total- CONSTRUCTION OF RAJANPUR-DG          1,000,000,000       1,000,000,000       3,000,000,000
          KHAN AS A 4-LANE HIGHWAY (ADB)
                  (In Foreign Exchange)                          (1,000,000,000)                          (3,000,000,000)
               (Foreign Aid)                                   (1,000,000,000)                          (3,000,000,000)
                  (In Local Currency)                                                  (1,000,000,000)
                                                  __________________________________________________
IB0802 D.G KHAN-D.I KHAN (ACW) (N-55)-245 KMS CAREC CORRIDOR ADB
014202- A08    Loans and Advances                            1,000,000,000         1,000,000,000         3,000,000,000
014202- A085   Loans to Non Financial Institutions                1,000,000,000         1,000,000,000         3,000,000,000
        Total- D.G KHAN-D.I KHAN (ACW) (N-55)-245         1,000,000,000       1,000,000,000       3,000,000,000
          KMS CAREC CORRIDOR ADB
                  (In Foreign Exchange)                          (1,000,000,000)                          (3,000,000,000)
               (Foreign Aid)                                   (1,000,000,000)                          (3,000,000,000)
                  (In Local Currency)                                                  (1,000,000,000)
                                                  __________________________________________________

Page 513

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0804 IMPROVEMENT AND WIDENING OOF N-45 (130.22 KM)
014202- A08    Loans and Advances                             400,000,000          400,000,000          100,000,000
014202- A085   Loans to Non Financial Institutions                 400,000,000          400,000,000          100,000,000
        Total- IMPROVEMENT AND WIDENING OF N-45        400,000,000        400,000,000        100,000,000
               (130.22 KM)
                  (In Foreign Exchange)                           (400,000,000)                            (100,000,000)
               (Foreign Aid)                                    (400,000,000)                            (100,000,000)
                  (In Local Currency)                                                   (400,000,000)
                                                  __________________________________________________
IB0805 KHYBER PASS ECONOMIC CORRIDOR PROJECT REVISED WORLD BANK
014202- A08    Loans and Advances                            2,000,000,000         2,000,000,000         3,000,000,000
014202- A085   Loans to Non Financial Institutions                2,000,000,000         2,000,000,000         3,000,000,000
        Total- KHYBER PASS ECONOMIC CORRIDOR        2,000,000,000       2,000,000,000       3,000,000,000
           PROJECT REVISED WORLD BANK
                  (In Foreign Exchange)                          (2,000,000,000)                          (3,000,000,000)
               (Foreign Aid)                                   (2,000,000,000)                          (3,000,000,000)
                  (In Local Currency)                                                  (2,000,000,000)
                                                  __________________________________________________
IB3287 CONSTRUCTION OF CHAKDARA CHITRAL ROAD PROJECT (N-45) SECTION III KALKATAK CHITRAL (48KM)
014202- A08    Loans and Advances                                                                        100,000,000
014202- A085   Loans to Non Financial Institutions                                                            100,000,000
        Total- CONSTRUCTION OF CHAKDARA                                                      100,000,000
           CHITRAL ROAD PROJECT (N-45)
           SECTION III KALKATAK CHITRAL
             (48KM)
                  (In Foreign Exchange)                                                                    (100,000,000)
               (Foreign Aid)                                                                             (100,000,000)
                                                  __________________________________________________
IB3294 RELOCATION OF KARAKORUM HIGHWAY BETWEEN THAKOT & RAIKOT DUE TO CONSTRUCTION OF
DAMS ON RIVER
014202- A08    Loans and Advances                                                                        5,000,000,000
014202- A085   Loans to Non Financial Institutions                                                            5,000,000,000
        Total- RELOCATION OF KARAKORUM                                                       5,000,000,000
          HIGHWAY BETWEEN THAKOT &
           RAIKOT DUE TO CONSTRUCTION OF
          DAMS ON RIVER
                  (In Foreign Exchange)                                                                    (5,000,000,000)
               (Foreign Aid)                                                                            (5,000,000,000)
                                                  __________________________________________________

Page 514

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3623 EXTENSION AND AUGMENTATION OF 500KV AND 2 KV TRANSFORMERS AT THE EXISTING GRID STATION
FOR REMOVAL OF NTDC
014202- A08    Loans and Advances                                                                        3,500,000,000
014202- A085   Loans to Non Financial Institutions                                                            3,500,000,000
        Total- EXTENSION AND AUGMENTATION OF                                                3,500,000,000
            500KV AND 2 KV TRANSFORMERS AT
           THE EXISTING GRID STATION FOR
          REMOVAL OF NTDC
                  (In Foreign Exchange)                                                                    (3,500,000,000)
               (Foreign Aid)                                                                            (3,500,000,000)
                                                  __________________________________________________
IB3624 220 KV GUJRANWALA-II SUBSTATION
014202- A08    Loans and Advances                                                                          50,000,000
014202- A085   Loans to Non Financial Institutions                                                              50,000,000
        Total- 220 KV GUJRANWALA-II SUBSTATION                                                  50,000,000
                  (In Foreign Exchange)                                                                      (50,000,000)
               (Foreign Aid)                                                                               (50,000,000)
                                                  __________________________________________________
IB3625 600 MW SOLAR POWER PLANT NEAR MUZAFFARGARH
014202- A08    Loans and Advances                                                                          20,000,000
014202- A085   Loans to Non Financial Institutions                                                              20,000,000
        Total- 600 MW SOLAR POWER PLANT NEAR                                                  20,000,000
          MUZAFFARGARH
                  (In Foreign Exchange)                                                                      (20,000,000)
               (Foreign Aid)                                                                               (20,000,000)
                                                  __________________________________________________
IB3626 600 MW SOLAR POWER PLANT NEAR TRIMMUR JHANG
014202- A08    Loans and Advances                                                                          20,000,000
014202- A085   Loans to Non Financial Institutions                                                              20,000,000
        Total- 600 MW SOLAR POWER PLANT NEAR                                                  20,000,000
           TRIMMUR JHANG
                  (In Foreign Exchange)                                                                      (20,000,000)
               (Foreign Aid)                                                                               (20,000,000)
                                                  __________________________________________________

Page 515

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs
                       ACCOUNTANT GENERAL PAKISTAN REVENUES
IB3627 1200 MW SOLAR POWER PLANT NEAR HAVELLI BHADUR SHAH
014202- A08    Loans and Advances                                                                          10,000,000
014202- A085   Loans to Non Financial Institutions                                                              10,000,000
        Total- 1200 MW SOLAR POWER PLANT NEAR                                                 10,000,000
            HAVELLI BHADUR SHAH
                  (In Foreign Exchange)                                                                      (10,000,000)
               (Foreign Aid)                                                                               (10,000,000)
                                                  __________________________________________________
IB3628 220 KV NAG SHAH GRID STATION
014202- A08    Loans and Advances                                                                          50,000,000
014202- A085   Loans to Non Financial Institutions                                                              50,000,000
        Total- 220 KV NAG SHAH GRID STATION                                                      50,000,000
                  (In Foreign Exchange)                                                                      (50,000,000)
               (Foreign Aid)                                                                               (50,000,000)
                                                  __________________________________________________
IB3629 INSTITUTION OF SVCS AT 220 KV INDUSTRIAL (REVISED NAME 250 MVR SVS AT 132 KV QUETTA
INDUSTRIAL)
014202- A08    Loans and Advances                                                                          10,000,000
014202- A085   Loans to Non Financial Institutions                                                              10,000,000
        Total- INSTITUTION OF SVCS AT 220 KV                                                       10,000,000
            INDUSTRIAL (REVISED NAME 250 MVR
           SVS AT 132 KV QUETTA INDUSTRIAL)
                  (In Foreign Exchange)                                                                      (10,000,000)
               (Foreign Aid)                                                                               (10,000,000)
                                                  __________________________________________________
IB3630 INTERLINKING OF 765 KV MANSEHRA WITH 220 KV MANSEHRA
014202- A08    Loans and Advances                                                                          10,000,000
014202- A085   Loans to Non Financial Institutions                                                              10,000,000
        Total- INTERLINKING OF 765 KV MANSEHRA                                                  10,000,000
           WITH 220 KV MANSEHRA
                  (In Foreign Exchange)                                                                      (10,000,000)
               (Foreign Aid)                                                                               (10,000,000)
                                                  __________________________________________________
IB3631 REINFORCEMENT OF SAHIWAL ALONGWITH 2X 500 KV LINE BAY
014202- A08    Loans and Advances                                                                          10,000,000
014202- A085   Loans to Non Financial Institutions                                                              10,000,000
        Total- REINFORCEMENT OF SAHIWAL                                                        10,000,000
          ALONGWITH 2X 500 KV LINE BAY
                  (In Foreign Exchange)                                                                      (10,000,000)
               (Foreign Aid)                                                                               (10,000,000)
                                                  __________________________________________________

Page 516

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
IB3632 2ND SOURCE OF SUPPLY TO 500 KV SHEIKH MUHAMMADI
014202- A08    Loans and Advances                                                                          10,000,000
014202- A085   Loans to Non Financial Institutions                                                              10,000,000
        Total- 2ND SOURCE OF SUPPLY TO 500 KV                                                   10,000,000
           SHEIKH MUHAMMADI
                  (In Foreign Exchange)                                                                      (10,000,000)
               (Foreign Aid)                                                                               (10,000,000)
                                                  __________________________________________________
IB3633 220 MVAR SVS AT 132 KV KHUZDAR
014202- A08    Loans and Advances                                                                          10,000,000
014202- A085   Loans to Non Financial Institutions                                                              10,000,000
        Total- 220 MVAR SVS AT 132 KV KHUZDAR                                                    10,000,000
                  (In Foreign Exchange)                                                                      (10,000,000)
               (Foreign Aid)                                                                               (10,000,000)
                                                  __________________________________________________
IB3634 AUGMENTATION OF REMAINING 2X 160 MVA TRANSFORMERS WITH 2X 250 MVA YOUSAF WALA
014202- A08    Loans and Advances                                                                          10,000,000
014202- A085   Loans to Non Financial Institutions                                                              10,000,000
        Total- AUGMENTATION OF REMAINING 2X 160                                                10,000,000
          MVA TRANSFORMERS WITH 2X 250
          MVA YOUSAF WALA
                  (In Foreign Exchange)                                                                      (10,000,000)
               (Foreign Aid)                                                                               (10,000,000)
                                                  __________________________________________________
IB3635 AFD SUPPORT TO PPIB FOR TARIFF BASED BIDDING AND REVIEW OF FEASIBILITY STUDIES AND
CAPACITY BUILDING
014202- A08    Loans and Advances                                                                          51,000,000
014202- A085   Loans to Non Financial Institutions                                                              51,000,000
        Total- AFD SUPPORT TO PPIB FOR TARIFF                                                    51,000,000
          BASED BIDDING AND REVIEW OF
             FEASIBILITY STUDIES AND CAPACITY
            BUILDING

Page 517

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                                                                      (51,000,000)
               (Foreign Aid)                                                                               (51,000,000)
                                                  __________________________________________________
IB5430 ELECTRICITY DISTRIBUTION EFFICIENCY IMPROVEMENT PROJECT (MEPCO)
014202- A08    Loans and Advances                            3,000,000,000         3,000,000,000
014202- A085   Loans to Non Financial Institutions                3,000,000,000         3,000,000,000
        Total- ELECTRICITY DISTRIBUTION                 3,000,000,000       3,000,000,000
            EFFICIENCY IMPROVEMENT PROJECT
           (MEPCO)
                  (In Foreign Exchange)                          (3,000,000,000)
               (Foreign Aid)                                   (3,000,000,000)
                  (In Local Currency)                                                  (3,000,000,000)
                                                  __________________________________________________
IB5431 THERMAL FOR INSTALLATION OF NEW COAL FIRED POWER PLANT HAVING CAPACITY 2X660 MW AT
JAMSHORO
014202- A08    Loans and Advances                            3,000,000,000         3,000,000,000        12,000,000,000
014202- A085   Loans to Non Financial Institutions                3,000,000,000         3,000,000,000        12,000,000,000
        Total- THERMAL FOR INSTALLATION OF NEW       3,000,000,000       3,000,000,000      12,000,000,000
          COAL FIRED POWER PLANT HAVING
           CAPACITY 2X660 MW AT JAMSHORO
                  (In Foreign Exchange)                          (3,000,000,000)                         (12,000,000,000)
               (Foreign Aid)                                   (3,000,000,000)                         (12,000,000,000)
                  (In Local Currency)                                                  (3,000,000,000)
                                                  __________________________________________________
IB5432 500 KV FAISALABAD NEW 2X750 NOW 500 KV FAISALABAD WEST
014202- A08    Loans and Advances                             200,000,000          200,000,000            10,000,000
014202- A085   Loans to Non Financial Institutions                 200,000,000          200,000,000            10,000,000
        Total- 500 KV FAISALABAD NEW 2X750 NOW         200,000,000        200,000,000          10,000,000
             500 KV FAISALABAD WEST
                  (In Foreign Exchange)                           (200,000,000)                             (10,000,000)
               (Foreign Aid)                                    (200,000,000)                             (10,000,000)
                  (In Local Currency)                                                   (200,000,000)
                                                  __________________________________________________
IB5433 DI KHAN-ZHOB T/L AND ZHOB S/S
014202- A08    Loans and Advances                               90,300,000            90,300,000          900,000,000
014202- A085   Loans to Non Financial Institutions                  90,300,000            90,300,000          900,000,000
       Total-  DI KHAN-ZHOB T/L AND ZHOB S/S               90,300,000         90,300,000        900,000,000

Page 518

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                             (90,300,000)                            (900,000,000)
               (Foreign Aid)                                      (90,300,000)                            (900,000,000)
                  (In Local Currency)                                                     (90,300,000)
                                                  __________________________________________________
IB5434 220KV MIRPUR KHAS G/S & T/L
014202- A08    Loans and Advances                             153,000,000          153,000,000         1,700,000,000
014202- A085   Loans to Non Financial Institutions                 153,000,000          153,000,000         1,700,000,000
        Total- 220KV MIRPUR KHAS G/S & T/L                153,000,000        153,000,000       1,700,000,000
                  (In Foreign Exchange)                           (153,000,000)                          (1,700,000,000)
               (Foreign Aid)                                    (153,000,000)                          (1,700,000,000)
                  (In Local Currency)                                                   (153,000,000)
                                                  __________________________________________________
IB5435 GUDDU-SIBBI T/L
014202- A08    Loans and Advances                               60,000,000            60,000,000          300,000,000
014202- A085   Loans to Non Financial Institutions                  60,000,000            60,000,000          300,000,000
        Total- GUDDU-SIBBI T/L                               60,000,000         60,000,000        300,000,000
                  (In Foreign Exchange)                             (60,000,000)                            (300,000,000)
               (Foreign Aid)                                      (60,000,000)                            (300,000,000)
                  (In Local Currency)                                                     (60,000,000)
                                                  __________________________________________________
IB5436 UPGRADATION OF NTDC SCADA SYSTEM
014202- A08    Loans and Advances                             664,000,000          664,000,000         7,000,000,000
014202- A085   Loans to Non Financial Institutions                 664,000,000          664,000,000         7,000,000,000
        Total- UPGRADATION OF NTDC SCADA               664,000,000        664,000,000       7,000,000,000
          SYSTEM
                  (In Foreign Exchange)                           (664,000,000)                          (7,000,000,000)
               (Foreign Aid)                                    (664,000,000)                          (7,000,000,000)
                  (In Local Currency)                                                   (664,000,000)
                                                  __________________________________________________
IB5437 EVACUATION OF POWER FROM 500 MW WIND POWER PLANTS JHIMPIR & GHARO CLUSTERS
014202- A08    Loans and Advances                             100,000,000          100,000,000          400,000,000
014202- A085   Loans to Non Financial Institutions                 100,000,000          100,000,000          400,000,000
        Total- EVACUATION OF POWER FROM 500 MW       100,000,000        100,000,000        400,000,000
           WIND POWER PLANTS JHIMPIR &
          GHARO CLUSTERS

Page 519

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                 (In Foreign Exchange)                            (100,000,000)                            (400,000,000)
              (Foreign Aid)                                     (100,000,000)                            (400,000,000)
                 (In Local Currency)                                                    (100,000,000)
                                                  __________________________________________________
IB5438 ADVANCE METERING PROJECT FOR IESCO
014202- A08    Loans and Advances                            1,000,000,000         1,000,000,000         3,808,000,000
014202- A085   Loans to Non Financial Institutions                1,000,000,000         1,000,000,000         3,808,000,000
        Total- ADVANCE METERING PROJECT FOR         1,000,000,000       1,000,000,000       3,808,000,000
           IESCO
                  (In Foreign Exchange)                          (1,000,000,000)                          (3,808,000,000)
               (Foreign Aid)                                   (1,000,000,000)                          (3,808,000,000)
                  (In Local Currency)                                                  (1,000,000,000)
                                                  __________________________________________________
IB5439 200 KV JAUHARABAD G/S
014202- A08    Loans and Advances                             150,000,000          150,000,000         1,800,000,000
014202- A085   Loans to Non Financial Institutions                 150,000,000          150,000,000         1,800,000,000
        Total- 200 KV JAUHARABAD G/S                     150,000,000        150,000,000       1,800,000,000
                  (In Foreign Exchange)                           (150,000,000)                          (1,800,000,000)
               (Foreign Aid)                                    (150,000,000)                          (1,800,000,000)
                  (In Local Currency)                                                   (150,000,000)
                                                  __________________________________________________
IB5440 500 KV LAHORE NORTH
014202- A08    Loans and Advances                             959,000,000          959,000,000         6,000,000,000
014202- A085   Loans to Non Financial Institutions                 959,000,000          959,000,000         6,000,000,000
        Total- 500 KV LAHORE NORTH                       959,000,000        959,000,000       6,000,000,000
                  (In Foreign Exchange)                           (959,000,000)                          (6,000,000,000)
               (Foreign Aid)                                    (959,000,000)                          (6,000,000,000)
                  (In Local Currency)                                                   (959,000,000)
                                                  __________________________________________________
IB5442 ELECTRICITY TRANS & TRADE PRO CASA
014202- A08    Loans and Advances                            3,513,000,000         3,513,000,000         3,500,000,000
014202- A085   Loans to Non Financial Institutions                3,513,000,000         3,513,000,000         3,500,000,000
        Total- ELECTRICITY TRANS & TRADE PRO          3,513,000,000       3,513,000,000       3,500,000,000
          CASA

Page 520

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                          (3,513,000,000)                          (3,500,000,000)
               (Foreign Aid)                                   (3,513,000,000)                          (3,500,000,000)
                  (In Local Currency)                                                  (3,513,000,000)
                                                  __________________________________________________
IB5443 220 KV TRANSMISSION LINE REINFORCEMENT OF ISLAMABAD BURHAN TRANSMISSION LINE
014202- A08    Loans and Advances                             100,000,000          100,000,000         1,500,000,000
014202- A085   Loans to Non Financial Institutions                 100,000,000          100,000,000         1,500,000,000
        Total- 220 KV TRANSMISSION LINE                   100,000,000        100,000,000       1,500,000,000
           REINFORCEMENT OF ISLAMABAD
          BURHAN TRANSMISSION LINE
                  (In Foreign Exchange)                           (100,000,000)                          (1,500,000,000)
               (Foreign Aid)                                    (100,000,000)                          (1,500,000,000)
                  (In Local Currency)                                                   (100,000,000)
                                                  __________________________________________________
IB5445 500 KV CHAKWAL G/S ALONG WITH ALLIED T/LS
014202- A08    Loans and Advances                               10,000,000            10,000,000
014202- A085   Loans to Non Financial Institutions                  10,000,000            10,000,000
        Total- 500 KV CHAKWAL G/S ALONG WITH             10,000,000         10,000,000
            ALLIED T/LS
                  (In Foreign Exchange)                             (10,000,000)
               (Foreign Aid)                                      (10,000,000)
                  (In Local Currency)                                                     (10,000,000)
                                                  __________________________________________________
IB5446 EVACUATION OF POWER FROM TERBELLA 5TH EXTENSION
014202- A08    Loans and Advances                             100,000,000          100,000,000         1,500,000,000
014202- A085   Loans to Non Financial Institutions                 100,000,000          100,000,000         1,500,000,000
        Total- EVACUATION OF POWER FROM               100,000,000        100,000,000       1,500,000,000
           TERBELLA 5TH EXTENSION
                  (In Foreign Exchange)                           (100,000,000)                          (1,500,000,000)
               (Foreign Aid)                                    (100,000,000)                          (1,500,000,000)
                  (In Local Currency)                                                   (100,000,000)
                                                  __________________________________________________
IB5447 CONVERSION FROM 220 KV AIS GRID STATIONS IN GIS GRID STATIONS
014202- A08    Loans and Advances                            4,000,000,000         4,000,000,000
014202- A085   Loans to Non Financial Institutions                4,000,000,000         4,000,000,000
        Total- CONVERSION FROM 220 KV AIS GRID         4,000,000,000       4,000,000,000
           STATIONS IN GIS GRID STATIONS

Page 521

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                           (4,000,000,000)
               (Foreign Aid)                                   (4,000,000,000)
                  (In Local Currency)                                                  (4,000,000,000)
                                                  __________________________________________________
IB5449 220 KV BUND ROAD
014202- A08    Loans and Advances                                                                        100,000,000
014202- A085   Loans to Non Financial Institutions                                                            100,000,000
        Total- 220 KV BUND ROAD                                                                  100,000,000
                  (In Foreign Exchange)                                                                    (100,000,000)
               (Foreign Aid)                                                                             (100,000,000)
                                                  __________________________________________________
IB5452 500 KV ISLAMABAD WEST
014202- A08    Loans and Advances                             700,000,000          700,000,000         3,500,000,000
014202- A085   Loans to Non Financial Institutions                 700,000,000          700,000,000         3,500,000,000
        Total- 500 KV ISLAMABAD WEST                     700,000,000        700,000,000       3,500,000,000
                  (In Foreign Exchange)                           (700,000,000)                          (3,500,000,000)
               (Foreign Aid)                                    (700,000,000)                          (3,500,000,000)
                  (In Local Currency)                                                   (700,000,000)
                                                  __________________________________________________
IB5453 ENHANCEMENT IN TRANSFORMATION CAPACITY OF NTDC SYSTEM BY EXTENSION & AUGMENTATION
OF EXISTING GRID
014202- A08    Loans and Advances                            1,915,000,000         1,915,000,000         3,500,000,000
014202- A085   Loans to Non Financial Institutions                1,915,000,000         1,915,000,000         3,500,000,000
        Total- ENHANCEMENT IN TRANSFORMATION       1,915,000,000       1,915,000,000       3,500,000,000
           CAPACITY OF NTDC SYSTEM BY
           EXTENSION & AUGMENTATION OF
            EXISTING GRID
                  (In Foreign Exchange)                          (1,915,000,000)                          (3,500,000,000)
               (Foreign Aid)                                   (1,915,000,000)                          (3,500,000,000)
                  (In Local Currency)                                                  (1,915,000,000)
                                                  __________________________________________________
IB5454 ENTERPRISE RESOURCE PLANNING AUTOMATION
014202- A08    Loans and Advances                             215,313,000          215,313,000         2,000,000,000
014202- A085   Loans to Non Financial Institutions                 215,313,000          215,313,000         2,000,000,000
        Total- ENTERPRISE RESOURCE PLANNING           215,313,000        215,313,000       2,000,000,000
           AUTOMATION

Page 522

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                           (215,313,000)                          (2,000,000,000)
               (Foreign Aid)                                    (215,313,000)                          (2,000,000,000)
                  (In Local Currency)                                                   (215,313,000)
                                                  __________________________________________________
IB5456 EVACUATION OF POWER FROM 2160MW DASU HPP STAGE I
014202- A08    Loans and Advances                            2,446,000,000         2,446,000,000        18,973,642,000
014202- A085   Loans to Non Financial Institutions                2,446,000,000         2,446,000,000        18,973,642,000
        Total- EVACUATION OF POWER FROM              2,446,000,000       2,446,000,000      18,973,642,000
           2160MW DASU HPP STAGE I
                  (In Foreign Exchange)                          (2,446,000,000)                         (18,973,642,000)
               (Foreign Aid)                                   (2,446,000,000)                         (18,973,642,000)
                  (In Local Currency)                                                  (2,446,000,000)
                                                  __________________________________________________
IB5458 220 KV ARIFWALA SUBSTATION
014202- A08    Loans and Advances                               10,000,000            10,000,000         2,000,000,000
014202- A085   Loans to Non Financial Institutions                  10,000,000            10,000,000         2,000,000,000
        Total- 220 KV ARIFWALA SUBSTATION                10,000,000         10,000,000       2,000,000,000
                  (In Foreign Exchange)                             (10,000,000)                          (2,000,000,000)
               (Foreign Aid)                                      (10,000,000)                          (2,000,000,000)
                  (In Local Currency)                                                     (10,000,000)
                                                  __________________________________________________
IB5459 220 KV HEAD FAQIRAN G/S ALONG WITH ALLIED T/L
014202- A08    Loans and Advances                               10,000,000            10,000,000            20,000,000
014202- A085   Loans to Non Financial Institutions                  10,000,000            10,000,000            20,000,000
        Total- 220 KV HEAD FAQIRAN G/S ALONG             10,000,000         10,000,000          20,000,000
           WITH ALLIED T/L
                  (In Foreign Exchange)                             (10,000,000)                             (20,000,000)
               (Foreign Aid)                                      (10,000,000)                             (20,000,000)
                  (In Local Currency)                                                     (10,000,000)
                                                  __________________________________________________
IB5460 220 KV LARKANA SUBSTATION
014202- A08    Loans and Advances                               10,000,000            10,000,000            25,000,000
014202- A085   Loans to Non Financial Institutions                  10,000,000            10,000,000            25,000,000
        Total- 220 KV LARKANA SUBSTATION                 10,000,000         10,000,000          25,000,000

Page 523

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                             (10,000,000)                             (25,000,000)
               (Foreign Aid)                                      (10,000,000)                             (25,000,000)
                  (In Local Currency)                                                     (10,000,000)
                                                  __________________________________________________
IB5461 220 KV MASTUNG G/S ALONG WITH ALLIED T/LS
014202- A08    Loans and Advances                               10,000,000            10,000,000            25,000,000
014202- A085   Loans to Non Financial Institutions                  10,000,000            10,000,000            25,000,000
        Total- 220 KV MASTUNG G/S ALONG WITH             10,000,000         10,000,000          25,000,000
            ALLIED T/LS
                  (In Foreign Exchange)                             (10,000,000)                             (25,000,000)
               (Foreign Aid)                                      (10,000,000)                             (25,000,000)
                  (In Local Currency)                                                     (10,000,000)
                                                  __________________________________________________
IB5462 500 KV VEHARI GRID STATION
014202- A08    Loans and Advances                             100,000,000          100,000,000          815,000,000
014202- A085   Loans to Non Financial Institutions                 100,000,000          100,000,000          815,000,000
        Total- 500 KV VEHARI GRID STATION                 100,000,000        100,000,000        815,000,000
                  (In Foreign Exchange)                           (100,000,000)                            (815,000,000)
               (Foreign Aid)                                    (100,000,000)                            (815,000,000)
                  (In Local Currency)                                                   (100,000,000)
                                                  __________________________________________________
IB5463 INSTALLATION OF PILOT BATTERY ENERGY STORAGE SYSTEM BESS AT 220 KV JHIMPIR G/STATION
014202- A08    Loans and Advances                             200,000,000          200,000,000         2,000,000,000
014202- A085   Loans to Non Financial Institutions                 200,000,000          200,000,000         2,000,000,000
        Total- INSTALLATION OF PILOT BATTERY            200,000,000        200,000,000       2,000,000,000
          ENERGY STORAGE SYSTEM BESS AT
             220 KV JHIMPIR G/STATION
                  (In Foreign Exchange)                           (200,000,000)                          (2,000,000,000)
               (Foreign Aid)                                    (200,000,000)                          (2,000,000,000)
                  (In Local Currency)                                                   (200,000,000)
                                                  __________________________________________________
IB5464 EVACUATION OF POWER FROM SUKI KINARI KOHALA MAHAL HPPS NTDC
014202- A08    Loans and Advances                            2,800,000,000         2,800,000,000         5,000,000,000
014202- A085   Loans to Non Financial Institutions                2,800,000,000         2,800,000,000         5,000,000,000
        Total- EVACUATION OF POWER FROM SUKI         2,800,000,000       2,800,000,000       5,000,000,000
            KINARI KOHALA MAHAL HPPS NTDC

Page 524

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                          (2,800,000,000)                          (5,000,000,000)
               (Foreign Aid)                                   (2,800,000,000)                          (5,000,000,000)
                  (In Local Currency)                                                  (2,800,000,000)
                                                  __________________________________________________
IB5466 AFD SUPPORT TO PPIB FOR TARIFF BASED BIDDING AND REVIEW OF FEASIBILITY STUDIES AND
CAPACITY BUILDING
014202- A08    Loans and Advances                             112,000,000          112,000,000
014202- A085   Loans to Non Financial Institutions                 112,000,000          112,000,000
        Total- AFD SUPPORT TO PPIB FOR TARIFF           112,000,000        112,000,000
          BASED BIDDING AND REVIEW OF
             FEASIBILITY STUDIES AND CAPACITY
            BUILDING
                  (In Foreign Exchange)                           (112,000,000)
               (Foreign Aid)                                    (112,000,000)
                  (In Local Currency)                                                   (112,000,000)
                                                  __________________________________________________
IB5467 500 220 KV SIALKOT SUB STATION NTDC
014202- A08    Loans and Advances                               10,000,000            10,000,000         2,500,000,000
014202- A085   Loans to Non Financial Institutions                  10,000,000            10,000,000         2,500,000,000
        Total- 500 220 KV SIALKOT SUB STATION              10,000,000         10,000,000       2,500,000,000
          NTDC
                  (In Foreign Exchange)                             (10,000,000)                          (2,500,000,000)
               (Foreign Aid)                                      (10,000,000)                          (2,500,000,000)
                  (In Local Currency)                                                     (10,000,000)
                                                  __________________________________________________
IB5468 220KV DHARKI RAHIM YAR KHAN BHAWALPUR D/C T/L NTDC
014202- A08    Loans and Advances                                1,000,000             1,000,000         3,000,000,000
014202- A085   Loans to Non Financial Institutions                    1,000,000             1,000,000         3,000,000,000
        Total- 220KV DHARKI RAHIM YAR KHAN                1,000,000           1,000,000       3,000,000,000
          BHAWALPUR D/C T/L NTDC
                  (In Foreign Exchange)                               (1,000,000)                          (3,000,000,000)
               (Foreign Aid)                                        (1,000,000)                          (3,000,000,000)
                  (In Local Currency)                                                       (1,000,000)
                                                  __________________________________________________
IB5469 CONSTRUCTION OF MUZAFFARABAD - MANSEHRA ROAD (26.6 KM APPROX)
014202- A08    Loans and Advances                             100,000,000          100,000,000         5,220,000,000

Page 525

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

014202- A085   Loans to Non Financial Institutions                 100,000,000          100,000,000         5,220,000,000
        Total- CONSTRUCTION OF MUZAFFARABAD -        100,000,000        100,000,000       5,220,000,000
          MANSEHRA ROAD (26.6 KM APPROX)
                  (In Foreign Exchange)                           (100,000,000)                          (5,220,000,000)
               (Foreign Aid)                                    (100,000,000)                          (5,220,000,000)
                  (In Local Currency)                                                   (100,000,000)
                                                  __________________________________________________
IB9407 PROVISION FOR DEVELOPMENT EXPENDITURE OF DEVELOPMENT LOANS AND ADVANCES BY THE
FEDERAL GOVERNMENT
014202- A08    Loans and Advances                            1,000,000,000         1,000,000,000         4,000,000,000
014202- A085   Loans to Non Financial Institutions                1,000,000,000         1,000,000,000         4,000,000,000
        Total- PROVISION FOR DEVELOPMENT              1,000,000,000       1,000,000,000       4,000,000,000
           EXPENDITURE OF DEVELOPMENT
          LOANS AND ADVANCES BY THE
          FEDERAL GOVERNMENT
                  (In Foreign Exchange)                          (1,000,000,000)                          (4,000,000,000)
               (Foreign Aid)                                   (1,000,000,000)                          (4,000,000,000)
                  (In Local Currency)                                                  (1,000,000,000)
                                                  __________________________________________________
IB9436 REHABILITATION & RECONSTRUCTION OF N-5 FROM MORO TO RANIPUR KM. 318-404 (NBC/SBC) & 32 X
DAMAGED BRIDGES
014202- A08    Loans and Advances                            1,300,000,000         1,300,000,000         6,000,000,000
014202- A085   Loans to Non Financial Institutions                1,300,000,000         1,300,000,000         6,000,000,000
        Total- REHABILITATION & RECONSTRUCTION       1,300,000,000       1,300,000,000       6,000,000,000
          OF N-5 FROM MORO TO RANIPUR KM.
              318-404 (NBC/SBC) & 32 X DAMAGED
           BRIDGES
                  (In Foreign Exchange)                          (1,300,000,000)                          (6,000,000,000)
               (Foreign Aid)                                   (1,300,000,000)                          (6,000,000,000)
                  (In Local Currency)                                                  (1,300,000,000)
                                                  __________________________________________________
IB9446 CHINA AIDED PROJECTS OF PAKISTAN NATIONAL HIGHWAY N-5 SECTIONAL REHABILITATION
HALA-MORO 66 KM
014202- A08    Loans and Advances                             100,000,000          100,000,000         1,000,000,000
014202- A085   Loans to Non Financial Institutions                 100,000,000          100,000,000         1,000,000,000
        Total- CHINA AIDED PROJECTS OF PAKISTAN        100,000,000        100,000,000       1,000,000,000
           NATIONAL HIGHWAY N-5 SECTIONAL
            REHABILITATION HALA-MORO 66 KM

Page 526

NO. 129.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                   (In Foreign Exchange)                           (100,000,000)                          (1,000,000,000)
               (Foreign Aid)                                    (100,000,000)                          (1,000,000,000)
                  (In Local Currency)                                                   (100,000,000)
                                                  __________________________________________________
     014202   Total-  Trasfer To Non-Financial               39,728,613,000      39,728,613,000    127,857,642,000
                           Institutions
     0142     Total-  Transfers (Others)                     39,728,613,000      39,728,613,000    127,857,642,000
     014      Total-  Transfers                           700,522,753,000    700,522,753,000    745,317,642,000
     01        Total-  General Public Service               700,522,753,000    700,522,753,000    745,317,642,000
               Total- ACCOUNTANT GENERAL               700,522,753,000       700,522,753,000       745,317,642,000
                PAKISTAN REVENUES
              (Charged)                                        658,644,140,000       658,644,140,000       617,000,000,000
               (Voted)                                            41,878,613,000        41,878,613,000       128,317,642,000
                       (In Foreign Exchange)                       (700,522,753,000)                            (745,317,642,000)
               (Own Resources)
                   (Foreign Aid)                                 (700,522,753,000)                            (745,317,642,000)
                       (In Local Currency)                                                 (700,522,753,000)
          TOTAL - DEMAND                          700,522,753,000    700,522,753,000    745,317,642,000
              (Charged)                                  658,644,140,000    658,644,140,000    617,000,000,000
               (Voted)                                      41,878,613,000      41,878,613,000    128,317,642,000
                                                  __________________________________________________
                  (In Foreign Exchange)                       (700,522,753,000)                        (745,317,642,000)
            (Own Resources)
               (Foreign Aid)                                (700,522,753,000)                        (745,317,642,000)
                  (In Local Currency)                                               (700,522,753,000)
                                                  __________________________________________________

Page 527

                               SECTION IV
                       MINISTRY OF HOUSING AND WORKS
                                                                  **********

                                                                                  2024-2025
                                                                             Budget
                                                                                     Estimate

                                                                      (Rupees in Thousand)

Demand presented on behalf of the
Ministry of Housing and Works

Development Expenditure on Capital Account
             130.  Capital Outlay on Civil Works                                           28,188,072

                                                                           Total :             28,188,072

Page 528

No text layer on this page, see the official PDF.

Page 529

NO. 130.- CAPITAL OUTLAY ON CIVIL WORKS                              DEMANDS FOR GRANTS
                                DEMAND NO. 130
                                                                            ( FC12C28 )
                               CAPITAL OUTLAY ON CIVIL WORKS

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2025 for CAPITAL OUTLAY ON CIVIL
WORKS.

                                Voted           Rs. 28,188,072,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF HOUSING AND WORKS  .

                                                           2023-2024         2023-2024         2024-2025
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
045    Construction and Transport                                41,880,872,000        86,038,750,000        28,188,072,000
               Total                                              41,880,872,000        86,038,750,000        28,188,072,000
     OBJECT CLASSIFICATION
A03   Operating Expenses                                 2,447,346,000       2,351,805,000       1,663,025,000
A12    Civil works                                         39,433,526,000      83,686,945,000      26,525,047,000
               Total                                        41,880,872,000      86,038,750,000      28,188,072,000

Page 530

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2023-2024         2023-2024       2024-2025
                                       2023-24 2024-25       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
045    Construction and Transport:
0457   Construction (Works):
045701 Administration  :
IB3461 ESTABLISHMENT OF NATIONAL INSTITUTE OF MANAGEMENT (NIM) IN SAARC BUILDING ISLAMABAD
045701- A03    Operating Expenses                                 3,652,000             3,652,000
045701- A039   General                                              3,652,000             3,652,000
045701- A12     Civil works                                         56,181,000            56,181,000
045701- A124    Building and Structures                             56,181,000            56,181,000
        Total- ESTABLISHMENT OF NATIONAL                 59,833,000         59,833,000
            INSTITUTE OF MANAGEMENT (NIM) IN
          SAARC BUILDING ISLAMABAD
IB3463 STRENGTHENING OF TRAINING FACILITIES OF PAKISTAN ADMINISTRATIVE SERVICE OFFICERS AT CIVIL
SERVICES PAS
045701- A03    Operating Expenses                                 6,862,000             4,252,000
045701- A039   General                                              6,862,000             4,252,000
045701- A12     Civil works                                        105,572,000            65,422,000
045701- A124    Building and Structures                            105,572,000            65,422,000
        Total- STRENGTHENING OF TRAINING                112,434,000         69,674,000
             FACILITIES OF PAKISTAN
            ADMINISTRATIVE SERVICE OFFICERS
           AT CIVIL SERVICES PAS
IB3524 CONSTRUCTION OF ADDITIONAL FLOORS PROVISION OF FACILITIES AND REHABILITATION OF PAK PWD
COMPLEX
045701- A03    Operating Expenses                                                                           18,310,000
045701- A039   General                                                                                        18,310,000
045701- A12     Civil works                                                                                   281,690,000
045701- A124    Building and Structures                                                                       281,690,000
        Total- CONSTRUCTION OF ADDITIONAL                                                     300,000,000
          FLOORS PROVISION OF FACILITIES
          AND REHABILITATION OF PAK PWD
          COMPLEX
IB5317 CONSTRUCTION OF HAJJ COMPLEX LAHORE
045701- A03    Operating Expenses                                                     38,753,000            30,517,000

Page 531

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045701- A039   General                                                                  38,753,000            30,517,000
045701- A12     Civil works                                        634,952,000          596,199,000          469,483,000
045701- A124    Building and Structures                            634,952,000          596,199,000          469,483,000
        Total- CONSTRUCTION OF HAJJ COMPLEX           634,952,000        634,952,000        500,000,000
          LAHORE
IB5318 ESTABLISHMENT OF RECYCLING PLANT FOR SHAHEED QURAN PAPERS IN ISLAMABAD
045701- A03    Operating Expenses                                                     10,073,000
045701- A039   General                                                                  10,073,000
045701- A12     Civil works                                        165,048,000          154,975,000
045701- A124    Building and Structures                            165,048,000          154,975,000
        Total- ESTABLISHMENT OF RECYCLING              165,048,000        165,048,000
           PLANT FOR SHAHEED QURAN PAPERS
              IN ISLAMABAD
IB5351 124 COL ON CIVIL WORK CONSTRUCTION OF REC/DEC SARGODHA
045701- A03    Operating Expenses                                 6,981,000            26,806,000
045701- A039   General                                              6,981,000            26,806,000
045701- A12     Civil works                                        107,392,000          412,387,000
045701- A124    Building and Structures                            107,392,000          412,387,000
        Total- 124 COL ON CIVIL WORK                      114,373,000        439,193,000
           CONSTRUCTION OF REC/DEC
          SARGODHA
IB5352 124 COL ON CIVIL WORK CONSTRUCTION OF DEC OKARA
045701- A03    Operating Expenses                                 932,000             6,360,000
045701- A039   General                                              932,000             6,360,000
045701- A12     Civil works                                         14,336,000            97,846,000
045701- A124    Building and Structures                             14,336,000            97,846,000
        Total- 124 COL ON CIVIL WORK                        15,268,000        104,206,000
           CONSTRUCTION OF DEC OKARA
IB5353 124 COL ON CIVIL WORK CONSTRUCTION OF REC/DEC LAYYAH
045701- A03    Operating Expenses                                 927,000             8,974,000
045701- A039   General                                              927,000             8,974,000
045701- A12     Civil works                                         14,259,000          138,056,000
045701- A124    Building and Structures                             14,259,000          138,056,000
        Total- 124 COL ON CIVIL WORK                        15,186,000        147,030,000

Page 532

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

           CONSTRUCTION OF REC/DEC LAYYAH
IB5354 124 COL ON CIVIL WORK CONSTRUCTION OF REC/DEC JHELUM
045701- A03    Operating Expenses                                 6,219,000            10,819,000
045701- A039   General                                              6,219,000            10,819,000
045701- A12     Civil works                                         95,683,000          166,451,000
045701- A124    Building and Structures                             95,683,000          166,451,000
        Total- 124 COL ON CIVIL WORK                      101,902,000        177,270,000
           CONSTRUCTION OF REC/DEC JHELUM
IB5355 124 COL ON CIVIL WORK CONSTRUCTION OF DEC ATTOCK
045701- A03    Operating Expenses                                 6,180,000            10,570,000
045701- A039   General                                              6,180,000            10,570,000
045701- A12     Civil works                                         95,074,000          162,610,000
045701- A124    Building and Structures                             95,074,000          162,610,000
        Total- 124 COL ON CIVIL WORK                      101,254,000        173,180,000
           CONSTRUCTION OF DEC ATTOCK
IB5363 124 COL ON CIVIL WORK CONSTRUCTION OF CARPET ROAD FROM KOT SHER TO JAJOKI DISTRICT
GUJRANWALA
045701- A03    Operating Expenses                               15,258,000            15,258,000            23,670,000
045701- A039   General                                             15,258,000            15,258,000            23,670,000
045701- A12     Civil works                                        234,742,000          234,742,000          364,156,000
045701- A124    Building and Structures                            234,742,000          234,742,000          364,156,000
        Total- 124 COL ON CIVIL WORK                      250,000,000        250,000,000        387,826,000
           CONSTRUCTION OF CARPET ROAD
          FROM KOT SHER TO JAJOKI DISTRICT
          GUJRANWALA
IB5496 124-COL ON CIVIL WORK ROAD FROM LALAMUSA TO NOONA WALI BHAGO AND MALWANA WITH LINK
INFRASTRUCTURE
045701- A03    Operating Expenses                               21,362,000            23,978,000             3,052,000
045701- A039   General                                             21,362,000            23,978,000             3,052,000
045701- A12     Civil works                                        328,638,000          368,871,000            46,948,000
045701- A124    Building and Structures                            328,638,000          368,871,000            46,948,000
        Total- 124-COL ON CIVIL WORK ROAD FROM         350,000,000        392,849,000          50,000,000
          LALAMUSA TO NOONA WALI BHAGO
          AND MALWANA WITH LINK

Page 533

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

           INFRASTRUCTURE
IB5497 124-COL ON CIVIL WORK CONSTRUCTION OF RAILWAY UNDERPASS GOJRA
045701- A03    Operating Expenses                               30,516,000            30,516,000            20,415,000
045701- A039   General                                             30,516,000            30,516,000            20,415,000
045701- A12     Civil works                                        469,484,000          469,484,000          314,070,000
045701- A124    Building and Structures                            469,484,000          469,484,000          314,070,000
        Total- 124-COL ON CIVIL WORK                      500,000,000        500,000,000        334,485,000
           CONSTRUCTION OF RAILWAY
          UNDERPASS GOJRA
     045701   Total-  Administration                          2,420,250,000       3,113,235,000       1,572,311,000
045702 Buildings and Structures  :
IB2232 CONSTRUCTION OF OFFICE OF THE NAB SUKKUR AT AIRPORT ROAD SUKKUR
045702- A03    Operating Expenses                                 1,831,000             1,831,000            10,118,000
045702- A039   General                                              1,831,000             1,831,000            10,118,000
045702- A12     Civil works                                         28,169,000            28,169,000          155,667,000
045702- A124    Building and Structures                             28,169,000            28,169,000          155,667,000
        Total- CONSTRUCTION OF OFFICE OF THE             30,000,000         30,000,000        165,785,000
          NAB SUKKUR AT AIRPORT ROAD
          SUKKUR
IB2235 CONSTRUCTION OF BRIDGE OVER RIVER RAVI AT MAL FATYANA DISTRICT TOBA TEK SINGH
045702- A03    Operating Expenses                                 6,103,000             6,103,000
045702- A039   General                                              6,103,000             6,103,000
045702- A12     Civil works                                         93,897,000            93,897,000
045702- A124    Building and Structures                             93,897,000            93,897,000
        Total- CONSTRUCTION OF BRIDGE OVER             100,000,000        100,000,000
            RIVER RAVI AT MAL FATYANA
            DISTRICT TOBA TEK SINGH
IB2239 CONSTRUCTION OF OFFICES FOR INTELLIGENCE BUREAU ALONG-WITH CPEC
045702- A03    Operating Expenses                                 6,897,000             6,897,000             9,155,000
045702- A039   General                                              6,897,000             6,897,000             9,155,000
045702- A12     Civil works                                        106,112,000          106,112,000          140,845,000
045702- A124    Building and Structures                            106,112,000          106,112,000          140,845,000
        Total- CONSTRUCTION OF OFFICES FOR             113,009,000        113,009,000        150,000,000
            INTELLIGENCE BUREAU ALONG-WITH

Page 534

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          CPEC
IB2240 DUALIZATION AND IMPROVEMENT OF MANDRA TO CHAKWAL ROAD (64 KM)
045702- A12     Civil works                                        200,000,000          450,000,000          940,214,000
045702- A124    Building and Structures                            200,000,000          450,000,000          940,214,000
        Total- DUALIZATION AND IMPROVEMENT OF         200,000,000        450,000,000        940,214,000
          MANDRA TO CHAKWAL ROAD (64 KM)
IB2241 DUALIZATION AND IMPROVEMENT OF SOHAWA TO CHAKWAL ROAD (70 KM)
045702- A12     Civil works                                        782,000,000          782,000,000
045702- A124    Building and Structures                            782,000,000          782,000,000
        Total- DUALIZATION AND IMPROVEMENT OF         782,000,000        782,000,000
         SOHAWA TO CHAKWAL ROAD (70 KM)
IB2244 REPLACEMENT OF OLD AND UNSERVICEABLE ELEVATORS WITH NEW ELEVATORS AT
SHAHEED-E-MILLAT SECRETARIAT
045702- A03    Operating Expenses                                                                             3,273,000
045702- A039   General                                                                                          3,273,000
045702- A12     Civil works                                                                                     50,358,000
045702- A124    Building and Structures                                                                         50,358,000
        Total- REPLACEMENT OF OLD AND                                                           53,631,000
           UNSERVICEABLE ELEVATORS WITH
         NEW ELEVATORS AT
           SHAHEED-E-MILLAT SECRETARIAT
IB2251 WIDENING / REHABILITATION / CONSTRUCTION OF 08 NOS ROADS IN UC MANDA KHEL UC QAMAR
MASHANI MC
045702- A03    Operating Expenses                                 6,103,000                                   3,052,000
045702- A039   General                                              6,103,000                                   3,052,000
045702- A12     Civil works                                         93,897,000                                 46,948,000
045702- A124    Building and Structures                             93,897,000                                 46,948,000
        Total- WIDENING / REHABILITATION /                 100,000,000                             50,000,000
           CONSTRUCTION OF 08 NOS ROADS IN
          UC MANDA KHEL UC QAMAR MASHANI
         MC
IB2252 WIDENING / REHABILITATION / CONSTRUCTION OF 05 ROADS IN UC PAKI SHAH MARDIAN UC NAMAL UC
KOT
045702- A03    Operating Expenses                                 6,103,000                                   3,052,000

Page 535

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A039   General                                              6,103,000                                   3,052,000
045702- A12     Civil works                                         93,897,000                                 46,948,000
045702- A124    Building and Structures                             93,897,000                                 46,948,000
        Total- WIDENING / REHABILITATION /                 100,000,000                             50,000,000
           CONSTRUCTION OF 05 ROADS IN UC
            PAKI SHAH MARDIAN UC NAMAL UC
          KOT
IB2253 WIDENING / REHABILITATION / CONSTRUCTION OF 07 NOS ROADS IN UC SHAHBAZ KHEL UC ROKHRI UC
PAI KHEL
045702- A03    Operating Expenses                                 6,103,000                                   3,052,000
045702- A039   General                                              6,103,000                                   3,052,000
045702- A12     Civil works                                         93,897,000                                 46,948,000
045702- A124    Building and Structures                             93,897,000                                 46,948,000
        Total- WIDENING / REHABILITATION /                 100,000,000                             50,000,000
           CONSTRUCTION OF 07 NOS ROADS IN
          UC SHAHBAZ KHEL UC ROKHRI UC PAI
          KHEL
IB2257 CONSTRUCTION OF OFFICER'S MESS AT NAB (L) |COMPLEX LAHORE
045702- A03    Operating Expenses                                                                             3,052,000
045702- A039   General                                                                                          3,052,000
045702- A12     Civil works                                                                                     46,948,000
045702- A124    Building and Structures                                                                         46,948,000
        Total- CONSTRUCTION OF OFFICER'S MESS                                                  50,000,000
           AT NAB (L) |COMPLEX LAHORE
IB2259 CONSTRUCTION OF INDUSTRIAL AREA ROAD FROM GT ROAD TO GHAZI CHAK INCLUDING BRIDGES ON
BHIMER NALLAH
045702- A03    Operating Expenses                                 6,103,000             6,103,000            15,036,000
045702- A039   General                                              6,103,000             6,103,000            15,036,000
045702- A12     Civil works                                         93,897,000            93,897,000          231,317,000
045702- A124    Building and Structures                             93,897,000            93,897,000          231,317,000
        Total- CONSTRUCTION OF INDUSTRIAL AREA        100,000,000        100,000,000        246,353,000
          ROAD FROM GT ROAD TO GHAZI CHAK
           INCLUDING BRIDGES ON BHIMER
          NALLAH
IB2264 CONSTRUCTION OF SERVICE MORE FLYOVER AND INDUSTRIAL AREA LINK ROAD GUJRAT DISTRICT

Page 536

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

GUJRAT-II
045702- A03    Operating Expenses                                 5,188,000                                 13,724,000
045702- A039   General                                              5,188,000                                 13,724,000
045702- A12     Civil works                                         79,812,000                                211,142,000
045702- A124    Building and Structures                             79,812,000                                211,142,000
        Total- CONSTRUCTION OF SERVICE MORE            85,000,000                            224,866,000
          FLYOVER AND INDUSTRIAL AREA LINK
          ROAD GUJRAT DISTRICT GUJRAT-II
IB2267 CONSTRUCTION OF 20 BEDDED HOSPITAL AT VILLAGE LATIFAL DISTRICT CHAKWAL
045702- A03    Operating Expenses                               10,991,000            10,991,000             6,103,000
045702- A039   General                                             10,991,000            10,991,000             6,103,000
045702- A12     Civil works                                        169,086,000          169,086,000            93,897,000
045702- A124    Building and Structures                            169,086,000          169,086,000            93,897,000
        Total- CONSTRUCTION OF 20 BEDDED               180,077,000        180,077,000        100,000,000
           HOSPITAL AT VILLAGE LATIFAL
            DISTRICT CHAKWAL
IB2268 WIDENING/REHABILITATION OF ROAD FROM QUAIDABAD TO WARCHHA VIA FATEHPUR DISTRICT
KHUSHAB
045702- A03    Operating Expenses                                 610,000              610,000             9,155,000
045702- A039   General                                              610,000              610,000             9,155,000
045702- A12     Civil works                                           9,390,000             9,390,000          140,845,000
045702- A124    Building and Structures                               9,390,000             9,390,000          140,845,000
        Total- WIDENING/REHABILITATION OF ROAD          10,000,000         10,000,000        150,000,000
          FROM QUAIDABAD TO WARCHHA VIA
          FATEHPUR DISTRICT KHUSHAB
IB2271 CONSTRUCTION / REHABILITATION OF FLOOD AFFECTED ROAD DISTRICT MUZAFFARGARH-I
045702- A03    Operating Expenses                                 9,155,000             9,155,000             6,103,000
045702- A039   General                                              9,155,000             9,155,000             6,103,000
045702- A12     Civil works                                        140,845,000          140,845,000            93,897,000
045702- A124    Building and Structures                            140,845,000          140,845,000            93,897,000
        Total- CONSTRUCTION / REHABILITATION OF         150,000,000        150,000,000        100,000,000
          FLOOD AFFECTED ROAD DISTRICT
           MUZAFFARGARH-I
IB2273 CONSTRUCTION OF 2ND FLOOR OF BOLAN HOSTEL AT CIVIL SERVICES ACADEMY WALTON LAHORE

Page 537

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A03    Operating Expenses                                 488,000              488,000
045702- A039   General                                              488,000              488,000
045702- A12     Civil works                                           7,512,000             7,512,000
045702- A124    Building and Structures                               7,512,000             7,512,000
        Total- CONSTRUCTION OF 2ND FLOOR OF              8,000,000           8,000,000
          BOLAN HOSTEL AT CIVIL SERVICES
          ACADEMY WALTON LAHORE
IB2285 CONSTRUCTION OF AUDITORIUM BACHELOR HOSTEL AND OFFICERS MESS FOR NAB (KP) AT
PESHAWAR
045702- A03    Operating Expenses                                 4,203,000             4,203,000             6,103,000
045702- A039   General                                              4,203,000             4,203,000             6,103,000
045702- A12     Civil works                                         64,657,000            64,657,000            93,897,000
045702- A124    Building and Structures                             64,657,000            64,657,000            93,897,000
        Total- CONSTRUCTION OF AUDITORIUM               68,860,000         68,860,000        100,000,000
          BACHELOR HOSTEL AND OFFICERS
          MESS FOR NAB (KP) AT PESHAWAR
IB2296 CONSTRUCTION OF BUILDING FOR GIRLS COLLEGE AT KACHI BAIG SARYAB ROAD QUETTA
045702- A03    Operating Expenses                                 3,662,000             3,662,000            12,007,000
045702- A039   General                                              3,662,000             3,662,000            12,007,000
045702- A12     Civil works                                         56,338,000            56,338,000          184,720,000
045702- A124    Building and Structures                             56,338,000            56,338,000          184,720,000
        Total- CONSTRUCTION OF BUILDING FOR             60,000,000         60,000,000        196,727,000
            GIRLS COLLEGE AT KACHI BAIG
          SARYAB ROAD QUETTA
IB2311 CONSTRUCTION OF BRIDGE OVER RIVER KOTIRA AND 17 KMS ROAD IN UC LOHI DISTRICT LASBELA
BALOCHISTAN
045702- A03    Operating Expenses                               12,678,000            12,678,000
045702- A039   General                                             12,678,000            12,678,000
045702- A12     Civil works                                        195,040,000          195,040,000
045702- A124    Building and Structures                            195,040,000          195,040,000
        Total- CONSTRUCTION OF BRIDGE OVER             207,718,000        207,718,000
            RIVER KOTIRA AND 17 KMS ROAD IN
          UC LOHI DISTRICT LASBELA
           BALOCHISTAN

Page 538

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB2360 CONSTRUCTION OF DHUDIAL BY PASS DISTRICT CHAKWAL
045702- A03    Operating Expenses                                 4,272,000             4,272,000            21,715,000
045702- A039   General                                              4,272,000             4,272,000            21,715,000
045702- A12     Civil works                                         65,728,000            65,728,000          334,082,000
045702- A124    Building and Structures                             65,728,000            65,728,000          334,082,000
        Total- CONSTRUCTION OF DHUDIAL BY PASS         70,000,000         70,000,000        355,797,000
            DISTRICT CHAKWAL
IB3250 CONSTRUCTION OF OFFICE BUILDING OF IB IN DIPLOMATIC ENCLAVE ISLAMABAD
045702- A03    Operating Expenses                                                                             9,155,000
045702- A039   General                                                                                          9,155,000
045702- A12     Civil works                                                                                   140,845,000
045702- A124    Building and Structures                                                                       140,845,000
        Total- CONSTRUCTION OF OFFICE BUILDING                                                150,000,000
          OF IB IN DIPLOMATIC ENCLAVE
           ISLAMABAD
IB3257 CONSTRUCTION OF OFFICE FOR IB AT DASSU
045702- A03    Operating Expenses                                                                             2,746,000
045702- A039   General                                                                                          2,746,000
045702- A12     Civil works                                                                                     42,254,000
045702- A124    Building and Structures                                                                         42,254,000
        Total- CONSTRUCTION OF OFFICE FOR IB AT                                                 45,000,000
          DASSU
IB3258 CONSTRUCTION OF OFFICE FOR IB AT MASTUNG
045702- A03    Operating Expenses                                                                             2,136,000
045702- A039   General                                                                                          2,136,000
045702- A12     Civil works                                                                                     32,864,000
045702- A124    Building and Structures                                                                         32,864,000
        Total- CONSTRUCTION OF OFFICE FOR IB AT                                                 35,000,000
          MASTUNG
IB3259 CONSTRUCTION OF OFFICE FOR IB AT PISHIN
045702- A03    Operating Expenses                                                                             1,526,000
045702- A039   General                                                                                          1,526,000
045702- A12     Civil works                                                                                     23,474,000
045702- A124    Building and Structures                                                                         23,474,000

Page 539

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- CONSTRUCTION OF OFFICE FOR IB AT                                                 25,000,000
             PISHIN
IB3272 CONSTRUCTION OF OFFICE FOR IB AT DISTRICT CHAMAN
045702- A03    Operating Expenses                                                                             1,526,000
045702- A039   General                                                                                          1,526,000
045702- A12     Civil works                                                                                     23,474,000
045702- A124    Building and Structures                                                                         23,474,000
        Total- CONSTRUCTION OF OFFICE FOR IB AT                                                 25,000,000
            DISTRICT CHAMAN
IB3273 CONSTRUCTION OF NAB COMPLEX LAHORE (2ND REVISED PC-I)
045702- A03    Operating Expenses                                                                             3,052,000
045702- A039   General                                                                                          3,052,000
045702- A12     Civil works                                                                                     46,948,000
045702- A124    Building and Structures                                                                         46,948,000
        Total- CONSTRUCTION OF NAB COMPLEX                                                    50,000,000
          LAHORE (2ND REVISED PC-I)
IB3274 CONSTRUCTION OF 12 NOS. APARTMENTS IN MINISTER'S ENCLAVE ISLAMABAD
045702- A03    Operating Expenses                                                                             8,100,000
045702- A039   General                                                                                          8,100,000
045702- A12     Civil works                                                                                   124,622,000
045702- A124    Building and Structures                                                                       124,622,000
        Total- CONSTRUCTION OF 12 NOS.                                                          132,722,000
          APARTMENTS IN MINISTER'S ENCLAVE
           ISLAMABAD
IB3354 CONSTRUCTION OF OPERATION THEATRE AT CENTRAL HOSPITAL AT MINGORA SWAT (REVISED PC-1)
045702- A03    Operating Expenses                                 4,050,000             4,050,000             8,019,000
045702- A039   General                                              4,050,000             4,050,000             8,019,000
045702- A12     Civil works                                         62,301,000            62,301,000          123,362,000
045702- A124    Building and Structures                             62,301,000            62,301,000          123,362,000
        Total- CONSTRUCTION OF OPERATION                66,351,000         66,351,000        131,381,000
          THEATRE AT CENTRAL HOSPITAL AT
          MINGORA SWAT (REVISED PC-1)
IB3436 CONST. OF ROAD FROM CHAAL TO DHOLAN MORR VIA NONAR MUSALMANIA KILLA AHMEDABAD
(PHASE-I & II)

Page 540

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A03    Operating Expenses                                                                           29,184,000
045702- A039   General                                                                                        29,184,000
045702- A12     Civil works                                                                                   448,984,000
045702- A124    Building and Structures                                                                       448,984,000
        Total- CONST. OF ROAD FROM CHAAL TO                                                   478,168,000
          DHOLAN MORR VIA NONAR
          MUSALMANIA KILLA AHMEDABAD
             (PHASE-I & II)
IB3621 CONSTRUCTION OF ELECTION ACADEMY AND OTHER OFFICES OF ELECTION COMMISSION OF
PAKISTAN
045702- A03    Operating Expenses                                                                           24,413,000
045702- A039   General                                                                                        24,413,000
045702- A12     Civil works                                                                                   375,587,000
045702- A124    Building and Structures                                                                       375,587,000
        Total- CONSTRUCTION OF ELECTION                                                       400,000,000
          ACADEMY AND OTHER OFFICES OF
           ELECTION COMMISSION OF PAKISTAN
IB5137 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAM (SAP) (H&W) (KPK)
045702- A12     Civil works                                                             9,251,531,000
045702- A124    Building and Structures                                                 9,251,531,000
        Total- SUSTAINABLE DEVELOPMENT GOALS                           9,251,531,000
           ACHIEVEMENT PROGRAM (SAP) (H&W)
             (KPK)
IB5179 CONSTRUCTION OF RAILWAYS UNDERPASS JAHNIAN DISTRICT KHANEWAL
045702- A03    Operating Expenses                               40,469,000            12,141,000            15,258,000
045702- A039   General                                             40,469,000            12,141,000            15,258,000
045702- A12     Civil works                                        622,604,000          186,781,000          234,742,000
045702- A124    Building and Structures                            622,604,000          186,781,000          234,742,000
        Total- CONSTRUCTION OF RAILWAYS                663,073,000        198,922,000        250,000,000
          UNDERPASS JAHNIAN DISTRICT
          KHANEWAL
IB9005 CONSTRUCTION OF METALLED ROAD FROM KOT RADHA KISHEN ROAD (PAJIAN BYPASS) TO GOHAR
JAGEER VIA KHUDIAN AND
045702- A03    Operating Expenses                                 610,000                                   1,831,000

Page 541

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A039   General                                              610,000                                   1,831,000
045702- A12     Civil works                                           9,390,000                                 28,169,000
045702- A124    Building and Structures                               9,390,000                                 28,169,000
        Total- CONSTRUCTION OF METALLED ROAD          10,000,000                             30,000,000
          FROM KOT RADHA KISHEN ROAD
            (PAJIAN BYPASS) TO GOHAR JAGEER
             VIA KHUDIAN AND
IB9007 CONSTRUCTION OF METALLED ROAD FROM GANDA SINGH TO KANGAN PUR ALONG DEPALPUR CANAL
DISTRICT KASUR (54
045702- A03    Operating Expenses                                 614,000                                   1,831,000
045702- A039   General                                              614,000                                   1,831,000
045702- A12     Civil works                                           9,454,000                                 28,169,000
045702- A124    Building and Structures                               9,454,000                                 28,169,000
        Total- CONSTRUCTION OF METALLED ROAD          10,068,000                             30,000,000
          FROM GANDA SINGH TO KANGAN PUR
          ALONG DEPALPUR CANAL DISTRICT
          KASUR (54
IB9119 REHABILITATION/UPGRADATION SAKRAN DUREJI ROAD DIFFERENT REACHES (PHASE-1 KM 16 TO 50)
DISTRICT
045702- A03    Operating Expenses                                 6,103,000             6,103,000             2,399,000
045702- A039   General                                              6,103,000             6,103,000             2,399,000
045702- A12     Civil works                                         93,897,000            93,897,000            36,912,000
045702- A124    Building and Structures                             93,897,000            93,897,000            36,912,000
        Total- REHABILITATION/UPGRADATION              100,000,000        100,000,000          39,311,000
          SAKRAN DUREJI ROAD DIFFERENT
          REACHES (PHASE-1 KM 16 TO 50)
            DISTRICT
IB9120 CONSTRUCTION OF BLACK TOP ROAD FROM RCD TOWARDS KILLI ABDUL HANAN TEHSIL WADH
DISTRICT KHUZDAR
045702- A03    Operating Expenses                                 3,357,000             3,357,000             5,067,000
045702- A039   General                                              3,357,000             3,357,000             5,067,000
045702- A12     Civil works                                         51,643,000            51,643,000            77,957,000
045702- A124    Building and Structures                             51,643,000            51,643,000            77,957,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          55,000,000         55,000,000          83,024,000
          FROM RCD TOWARDS KILLI ABDUL

Page 542

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          HANAN TEHSIL WADH DISTRICT
          KHUZDAR
IB9121 CONSTRUCTION OF 25 KM BT ROAD FROM ZEEDI TO GORU DHAL KHUNJ KHUZDAR
045702- A03    Operating Expenses                                 6,103,000             6,103,000             5,249,000
045702- A039   General                                              6,103,000             6,103,000             5,249,000
045702- A12     Civil works                                         93,897,000            93,897,000            80,751,000
045702- A124    Building and Structures                             93,897,000            93,897,000            80,751,000
        Total- CONSTRUCTION OF 25 KM BT ROAD           100,000,000        100,000,000          86,000,000
          FROM ZEEDI TO GORU DHAL KHUNJ
          KHUZDAR
IB9124 CONSTRUCTION OF INTERNAL ROADS IN QUETTA
045702- A03    Operating Expenses                                 3,967,000             3,967,000             5,700,000
045702- A039   General                                              3,967,000             3,967,000             5,700,000
045702- A12     Civil works                                         61,033,000            61,033,000            87,700,000
045702- A124    Building and Structures                             61,033,000            61,033,000            87,700,000
        Total- CONSTRUCTION OF INTERNAL ROADS          65,000,000         65,000,000          93,400,000
              IN QUETTA
IB9125 CONSTRUCTION OF BLACK TOP ROAD AND TUFF TILES IN NA-266 QUETTA
045702- A03    Operating Expenses                                 6,103,000             6,103,000             4,761,000
045702- A039   General                                              6,103,000             6,103,000             4,761,000
045702- A12     Civil works                                         93,897,000            93,897,000            73,239,000
045702- A124    Building and Structures                             93,897,000            93,897,000            73,239,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        100,000,000        100,000,000          78,000,000
          AND TUFF TILES IN NA-266 QUETTA
IB9126 CONSTRUCTION OF SOLAR TUBE WELLS AND STREET LIGHTS IN NA-266 QUETTA
045702- A03    Operating Expenses                                 2,222,000             2,222,000             5,681,000
045702- A039   General                                              2,222,000             2,222,000             5,681,000
045702- A12     Civil works                                         34,178,000            34,178,000            87,395,000
045702- A124    Building and Structures                             34,178,000            34,178,000            87,395,000
        Total- CONSTRUCTION OF SOLAR TUBE               36,400,000         36,400,000          93,076,000
          WELLS AND STREET LIGHTS IN NA-266
          QUETTA
IB9127 CONSTRUCTION OF GIRLS MIDDLE SCHOOL AT KHALAQ HAJI ABDUL BASIT QUETTA
045702- A03    Operating Expenses                                 9,155,000             9,155,000             2,869,000

Page 543

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A039   General                                              9,155,000             9,155,000             2,869,000
045702- A12     Civil works                                        140,845,000          140,845,000            44,131,000
045702- A124    Building and Structures                            140,845,000          140,845,000            44,131,000
        Total- CONSTRUCTION OF GIRLS MIDDLE            150,000,000        150,000,000          47,000,000
          SCHOOL AT KHALAQ HAJI ABDUL
            BASIT QUETTA
IB9128 CHAGHI DEVELOPMENT PACKAGE(HOME SOLAR PUMPING STATION WATER ELECTRICITY ROADS
IRRIGATION TUFF TILES STREET
045702- A03    Operating Expenses                                 6,103,000             6,103,000             3,052,000
045702- A039   General                                              6,103,000             6,103,000             3,052,000
045702- A12     Civil works                                         93,897,000            93,897,000            46,948,000
045702- A124    Building and Structures                             93,897,000            93,897,000            46,948,000
        Total- CHAGHI DEVELOPMENT                       100,000,000        100,000,000          50,000,000
          PACKAGE(HOME SOLAR PUMPING
           STATION WATER ELECTRICITY ROADS
            IRRIGATION TUFF TILES STREET
IB9129 NUSHKI DEVELOPMENT PACHAGE (ROADS ELECTRICITY) NA-268
045702- A03    Operating Expenses                                 6,103,000             6,103,000             3,052,000
045702- A039   General                                              6,103,000             6,103,000             3,052,000
045702- A12     Civil works                                         93,897,000            93,897,000            46,948,000
045702- A124    Building and Structures                             93,897,000            93,897,000            46,948,000
        Total- NUSHKI DEVELOPMENT PACHAGE             100,000,000        100,000,000          50,000,000
           (ROADS ELECTRICITY) NA-268
IB9130 CONSTRUCTION ON 19 KM BLACK TOP ROAD CHINGEE TO KANKOO KAKR KHURASAAN DISTRICT ZOHB
045702- A03    Operating Expenses                                 4,914,000             4,914,000            12,207,000
045702- A039   General                                              4,914,000             4,914,000            12,207,000
045702- A12     Civil works                                         75,606,000            75,606,000          187,793,000
045702- A124    Building and Structures                             75,606,000            75,606,000          187,793,000
        Total- CONSTRUCTION ON 19 KM BLACK TOP         80,520,000         80,520,000        200,000,000
          ROAD CHINGEE TO KANKOO KAKR
          KHURASAAN DISTRICT ZOHB
IB9131 CONSTRUCTION OF 18 KM BLACK TOP ROAD N-50 MURGHA FAQIRZAI DISTRICT KILLI SAIFULLAH
(PACKAGE-I)
045702- A03    Operating Expenses                                 5,396,000             5,396,000            12,207,000

Page 544

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A039   General                                              5,396,000             5,396,000            12,207,000
045702- A12     Civil works                                         83,014,000            83,014,000          187,793,000
045702- A124    Building and Structures                             83,014,000            83,014,000          187,793,000
        Total- CONSTRUCTION OF 18 KM BLACK TOP          88,410,000         88,410,000        200,000,000
          ROAD N-50 MURGHA FAQIRZAI
            DISTRICT KILLI SAIFULLAH
            (PACKAGE-I)
IB9132 CONSTRUCTION OF 15 KM BLACK TOP ROAD N-50 MURGHA FAQIRZAI DISTRICT KILLI SAIFULLAH
(PACKAGE-II)
045702- A03    Operating Expenses                                 7,262,000             7,262,000            12,207,000
045702- A039   General                                              7,262,000             7,262,000            12,207,000
045702- A12     Civil works                                        111,718,000          111,718,000          187,793,000
045702- A124    Building and Structures                            111,718,000          111,718,000          187,793,000
        Total- CONSTRUCTION OF 15 KM BLACK TOP        118,980,000        118,980,000        200,000,000
          ROAD N-50 MURGHA FAQIRZAI
            DISTRICT KILLI SAIFULLAH
             (PACKAGE-II)
IB9133 REHABILITATION / IMPROVEMENT OF ROADS MAIN GT ROAD GUJRAT LALAMUSA (GHAKHRI STOP) TO
GUJRAT DINGA
045702- A03    Operating Expenses                               61,193,000            61,193,000
045702- A039   General                                             61,193,000            61,193,000
045702- A12     Civil works                                        941,427,000          941,427,000
045702- A124    Building and Structures                            941,427,000          941,427,000
        Total- REHABILITATION / IMPROVEMENT OF        1,002,620,000       1,002,620,000
          ROADS MAIN GT ROAD GUJRAT
          LALAMUSA (GHAKHRI STOP) TO
          GUJRAT DINGA
IB9134 CONSTRUCTION OF BLACK TOP ROAD SANGET ABAD VIA ZANGI ABAD TO BHATOO LANDHI DISTRICT
NOSHKI
045702- A03    Operating Expenses                                 4,990,000             4,990,000             4,419,000
045702- A039   General                                              4,990,000             4,990,000             4,419,000
045702- A12     Civil works                                         76,775,000            76,775,000            67,983,000
045702- A124    Building and Structures                             76,775,000            76,775,000            67,983,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          81,765,000         81,765,000          72,402,000
          SANGET ABAD VIA ZANGI ABAD TO

Page 545

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          BHATOO LANDHI DISTRICT NOSHKI
IB9136 DEVELOPMENT SCHEME FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS UCS OF TEHSIL
MASHKHEL AND BASIMA
045702- A03    Operating Expenses                                 9,155,000             9,155,000             9,155,000
045702- A039   General                                              9,155,000             9,155,000             9,155,000
045702- A12     Civil works                                        140,845,000          140,845,000          140,845,000
045702- A124    Building and Structures                            140,845,000          140,845,000          140,845,000
        Total- DEVELOPMENT SCHEME FOR                 150,000,000        150,000,000        150,000,000
          COMMUNITY HOME SOLAR ENERGY
          SYSTEM IN VARIOUS UCS OF TEHSIL
          MASHKHEL AND BASIMA
IB9137 DEVELOPMENT SCHEME FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS UCS OF TEHSIL
WASHUK DISTRICT WASHUK
045702- A03    Operating Expenses                                 6,103,000             6,103,000             8,239,000
045702- A039   General                                              6,103,000             6,103,000             8,239,000
045702- A12     Civil works                                         93,897,000            93,897,000          126,761,000
045702- A124    Building and Structures                             93,897,000            93,897,000          126,761,000
        Total- DEVELOPMENT SCHEME FOR                 100,000,000        100,000,000        135,000,000
          COMMUNITY HOME SOLAR ENERGY
          SYSTEM IN VARIOUS UCS OF TEHSIL
         WASHUK DISTRICT WASHUK
IB9143 CONSTRUCTION OF BLACK TOP ROAD KAMANROD TO MOKCHAH WASHUK MASHKHEL ROAD DISTRICT
WASHUK
045702- A03    Operating Expenses                                 6,103,000             6,103,000            10,008,000
045702- A039   General                                              6,103,000             6,103,000            10,008,000
045702- A12     Civil works                                         93,897,000            93,897,000          153,975,000
045702- A124    Building and Structures                             93,897,000            93,897,000          153,975,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        100,000,000        100,000,000        163,983,000
          KAMANROD TO MOKCHAH WASHUK
          MASHKHEL ROAD DISTRICT WASHUK
IB9149 REHABILITATION UPGRADATION SAKRAN DUREJI ROAD DIFFERENT REACHES (PHASE-I KM 50 TO 75)
DISTRICT
045702- A03    Operating Expenses                                 6,103,000             6,103,000             2,125,000
045702- A039   General                                              6,103,000             6,103,000             2,125,000
045702- A12     Civil works                                         93,897,000            93,897,000            32,697,000

Page 546

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                             93,897,000            93,897,000            32,697,000
        Total- REHABILITATION UPGRADATION              100,000,000        100,000,000          34,822,000
          SAKRAN DUREJI ROAD DIFFERENT
          REACHES (PHASE-I KM 50 TO 75)
            DISTRICT
IB9150 CONSTRUCTION OF BLACK TOP ROAD FROM RCD TO HINAMI BENT TEHSIL WAD DISTRICT KHUZDAR
045702- A03    Operating Expenses                                 6,103,000             6,103,000            12,207,000
045702- A039   General                                              6,103,000             6,103,000            12,207,000
045702- A12     Civil works                                         93,897,000            93,897,000          187,793,000
045702- A124    Building and Structures                             93,897,000            93,897,000          187,793,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        100,000,000        100,000,000        200,000,000
          FROM RCD TO HINAMI BENT TEHSIL
         WAD DISTRICT KHUZDAR
IB9151 CONSTRUCTION OF BLACK TOP ROAD MARVI TOWARDS MADRESSA TOOK TEHSIL WAD DISTRICT
KHUZDAR
045702- A03    Operating Expenses                                 3,662,000             3,662,000            11,937,000
045702- A039   General                                              3,662,000             3,662,000            11,937,000
045702- A12     Civil works                                         56,338,000            56,338,000          183,649,000
045702- A124    Building and Structures                             56,338,000            56,338,000          183,649,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          60,000,000         60,000,000        195,586,000
           MARVI TOWARDS MADRESSA TOOK
            TEHSIL WAD DISTRICT KHUZDAR
IB9152 KHARAN DEVELOPMENT PACKAGE (SOLAR PUMPING-HOME SOLAR KITS-ROADS-ELECTRICITY-WATER
045702- A03    Operating Expenses                                 3,687,000             3,687,000             2,548,000
045702- A039   General                                              3,687,000             3,687,000             2,548,000
045702- A12     Civil works                                         56,721,000            56,721,000            39,199,000
045702- A124    Building and Structures                             56,721,000            56,721,000            39,199,000
        Total- KHARAN DEVELOPMENT PACKAGE             60,408,000         60,408,000          41,747,000
           (SOLAR PUMPING-HOME SOLAR
            KITS-ROADS-ELECTRICITY-WATER
IB9153 DEVELOPMENT PACKAGE SHANGLA ROADS-WATER SUPPLY ETC
045702- A03    Operating Expenses                               61,033,000            43,706,000
045702- A039   General                                             61,033,000            43,706,000
045702- A12     Civil works                                        938,967,000          672,411,000

Page 547

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                            938,967,000          672,411,000
        Total- DEVELOPMENT PACKAGE SHANGLA         1,000,000,000        716,117,000
          ROADS-WATER SUPPLY ETC
IB9154 DEVELOPMENT SCHEME FOR INSTALLATION OF SOLAR ENERGY SYSTEM OF EXISTING TUBE WELL FOR
WATER SUPPLY CUM
045702- A03    Operating Expenses                                 6,761,000
045702- A039   General                                              6,761,000
045702- A12     Civil works                                        104,009,000
045702- A124    Building and Structures                            104,009,000
        Total- DEVELOPMENT SCHEME FOR                 110,770,000
            INSTALLATION OF SOLAR ENERGY
          SYSTEM OF EXISTING TUBE WELL FOR
          WATER SUPPLY CUM
IB9155 CONSTRUCTION OF PCC ROAD/STREET-BLACK TOP ROAD-RETAINING WALL/BREAST WALL AT VARIOUS
PLACES TEHSIL
045702- A03    Operating Expenses                                 9,155,000             9,155,000             6,103,000
045702- A039   General                                              9,155,000             9,155,000             6,103,000
045702- A12     Civil works                                        140,845,000          140,845,000            93,897,000
045702- A124    Building and Structures                            140,845,000          140,845,000            93,897,000
        Total- CONSTRUCTION OF PCC                      150,000,000        150,000,000        100,000,000
           ROAD/STREET-BLACK TOP
           ROAD-RETAINING WALL/BREAST WALL
           AT VARIOUS PLACES TEHSIL
IB9156 COMMUNITY BASED DEVELOPMENT SCHEMES FOR INSTALLATION OF COMMUNITY HOMES SOLAR
SYSTEM IN VARIOUS KILLIS OF
045702- A03    Operating Expenses                                 7,629,000             7,629,000
045702- A039   General                                              7,629,000             7,629,000
045702- A12     Civil works                                        117,371,000          117,371,000
045702- A124    Building and Structures                            117,371,000          117,371,000
        Total- COMMUNITY BASED DEVELOPMENT           125,000,000        125,000,000
          SCHEMES FOR INSTALLATION OF
          COMMUNITY HOMES SOLAR SYSTEM
              IN VARIOUS KILLIS OF
IB9157 DEVELOPMENT SCHEME FOR WATER SUPPLY CUM AGRICULTURE IN VARIOUS KILLIS OF TEHSIL
SARANAN NANABAD AND PISHIN

Page 548

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A03    Operating Expenses                                 5,493,000             5,493,000
045702- A039   General                                              5,493,000             5,493,000
045702- A12     Civil works                                         84,507,000            84,507,000
045702- A124    Building and Structures                             84,507,000            84,507,000
        Total- DEVELOPMENT SCHEME FOR WATER           90,000,000         90,000,000
           SUPPLY CUM AGRICULTURE IN
           VARIOUS KILLIS OF TEHSIL SARANAN
          NANABAD AND PISHIN
IB9158 CONSTRUCTION OF 24 KM BLACK TOP ROAD IN NAWAN KILLI KOTWAL AND SURROUNDING AREAS OF
NAWAN KILLI KILLI KOTWAL
045702- A03    Operating Expenses                                 5,441,000             5,441,000             8,062,000
045702- A039   General                                              5,441,000             5,441,000             8,062,000
045702- A12     Civil works                                         83,709,000            83,709,000          124,029,000
045702- A124    Building and Structures                             83,709,000            83,709,000          124,029,000
        Total- CONSTRUCTION OF 24 KM BLACK TOP          89,150,000         89,150,000        132,091,000
          ROAD IN NAWAN KILLI KOTWAL AND
          SURROUNDING AREAS OF NAWAN
              KILLI KILLI KOTWAL
IB9159 VARIOUS DEVELOPMENT WORKS I.E BLACK TOP ROADS FLOOD PROTECTION WALL AND COMMUNITY
CENTER IN SUB DIVISION
045702- A03    Operating Expenses                                 6,103,000             6,103,000             1,831,000
045702- A039   General                                              6,103,000             6,103,000             1,831,000
045702- A12     Civil works                                         93,897,000            93,897,000            28,169,000
045702- A124    Building and Structures                             93,897,000            93,897,000            28,169,000
        Total- VARIOUS DEVELOPMENT WORKS I.E          100,000,000        100,000,000          30,000,000
          BLACK TOP ROADS FLOOD
           PROTECTION WALL AND COMMUNITY
          CENTER IN SUB DIVISION
IB9160 CONSTRUCTION OF BLACK TOP ROAD LALA LEHAD CROSS VIA HUMARI ROSH SHOB (30KM)
045702- A03    Operating Expenses                                 9,155,000             9,155,000             6,103,000
045702- A039   General                                              9,155,000             9,155,000             6,103,000
045702- A12     Civil works                                        140,845,000          140,845,000            93,897,000
045702- A124    Building and Structures                            140,845,000          140,845,000            93,897,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        150,000,000        150,000,000        100,000,000
           LALA LEHAD CROSS VIA HUMARI

Page 549

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          ROSH SHOB (30KM)
IB9475 DEC JAFFARABAD & MASTUNG
045702- A03    Operating Expenses                               12,207,000            12,207,000            20,683,000
045702- A039   General                                             12,207,000            12,207,000            20,683,000
045702- A12     Civil works                                        187,793,000          187,793,000          318,204,000
045702- A124    Building and Structures                            187,793,000          187,793,000          318,204,000
        Total- DEC JAFFARABAD & MASTUNG               200,000,000        200,000,000        338,887,000
IB9476 CONSTRUCTION OF DEC OFFICE SAHIWAL
045702- A03    Operating Expenses                               15,258,000            15,258,000            14,943,000
045702- A039   General                                             15,258,000            15,258,000            14,943,000
045702- A12     Civil works                                        234,742,000          234,742,000          229,893,000
045702- A124    Building and Structures                            234,742,000          234,742,000          229,893,000
        Total- CONSTRUCTION OF DEC OFFICE              250,000,000        250,000,000        244,836,000
           SAHIWAL
IB9477 CONSTRUCTION OF DEC OFFICE RAJANPUR
045702- A03    Operating Expenses                                 6,103,000             6,103,000             6,140,000
045702- A039   General                                              6,103,000             6,103,000             6,140,000
045702- A12     Civil works                                         93,897,000            93,897,000            94,460,000
045702- A124    Building and Structures                             93,897,000            93,897,000            94,460,000
        Total- CONSTRUCTION OF DEC OFFICE              100,000,000        100,000,000        100,600,000
          RAJANPUR
IB9478 CONSTRUCTION OF REC / DECS OFFICE FAISALABAD
045702- A03    Operating Expenses                               18,310,000            18,310,000            42,701,000
045702- A039   General                                             18,310,000            18,310,000            42,701,000
045702- A12     Civil works                                        281,690,000          281,690,000          656,940,000
045702- A124    Building and Structures                            281,690,000          281,690,000          656,940,000
        Total- CONSTRUCTION OF REC / DECS               300,000,000        300,000,000        699,641,000
            OFFICE FAISALABAD
IB9479 CONSTRUCTION OF ELECTION COMMISSION OFFICE AT NAROWAL
045702- A03    Operating Expenses                                 9,155,000             9,155,000             8,336,000
045702- A039   General                                              9,155,000             9,155,000             8,336,000
045702- A12     Civil works                                        140,845,000          140,845,000          128,238,000
045702- A124    Building and Structures                            140,845,000          140,845,000          128,238,000

Page 550

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- CONSTRUCTION OF ELECTION                150,000,000        150,000,000        136,574,000
           COMMISSION OFFICE AT NAROWAL
IB9480 DEC GAWADAR & LASBELLA
045702- A03    Operating Expenses                               12,207,000            12,207,000            20,328,000
045702- A039   General                                             12,207,000            12,207,000            20,328,000
045702- A12     Civil works                                        187,793,000          187,793,000          312,733,000
045702- A124    Building and Structures                            187,793,000          187,793,000          312,733,000
        Total- DEC GAWADAR & LASBELLA                  200,000,000        200,000,000        333,061,000
IB9481 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY IN VARIOUS KILLIS
OF TEHSIL BESIMA
045702- A03    Operating Expenses                               28,271,000            13,570,000             1,221,000
045702- A039   General                                             28,271,000            13,570,000             1,221,000
045702- A12     Civil works                                        434,946,000          208,774,000            18,779,000
045702- A124    Building and Structures                            434,946,000          208,774,000            18,779,000
        Total- PUBLIC SECTOR DEVELOPMENT              463,217,000        222,344,000          20,000,000
         PROGRAM FOR AGRICULTURE CUM
          WATER SUPPLY IN VARIOUS KILLIS OF
            TEHSIL BESIMA
IB9482 DEVELOPMENT SCHEMES IN PLANTAK BASIMA ASFANDABAD DISTRICT WASHUK (4 SCHEMES) (AT
REDUCED COST OF RS
045702- A03    Operating Expenses                               17,503,000            17,503,000             6,301,000
045702- A039   General                                             17,503,000            17,503,000             6,301,000
045702- A12     Civil works                                        269,280,000          269,280,000            96,941,000
045702- A124    Building and Structures                            269,280,000          269,280,000            96,941,000
        Total- DEVELOPMENT SCHEMES IN PLANTAK        286,783,000        286,783,000        103,242,000
           BASIMA ASFANDABAD DISTRICT
         WASHUK (4 SCHEMES) (AT REDUCED
          COST OF RS
IB9483 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY AND COMMUNITY
HOME SOLAR ENERGY SYSTEM
045702- A03    Operating Expenses                               30,516,000            29,906,000             1,221,000
045702- A039   General                                             30,516,000            29,906,000             1,221,000
045702- A12     Civil works                                        469,484,000          460,094,000            18,779,000
045702- A124    Building and Structures                            469,484,000          460,094,000            18,779,000

Page 551

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- PUBLIC SECTOR DEVELOPMENT              500,000,000        490,000,000          20,000,000
         PROGRAM FOR AGRICULTURE CUM
          WATER SUPPLY AND COMMUNITY
         HOME SOLAR ENERGY SYSTEM
IB9484 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY AND COMMUNITY
HOME SOLAR ENERGY SYSTEM
045702- A03    Operating Expenses                               15,258,000            15,258,000             5,493,000
045702- A039   General                                             15,258,000            15,258,000             5,493,000
045702- A12     Civil works                                        234,742,000          234,742,000            84,507,000
045702- A124    Building and Structures                            234,742,000          234,742,000            84,507,000
        Total- PUBLIC SECTOR DEVELOPMENT              250,000,000        250,000,000          90,000,000
         PROGRAM FOR AGRICULTURE CUM
          WATER SUPPLY AND COMMUNITY
         HOME SOLAR ENERGY SYSTEM
IB9485 RECONDITIONING WORK ON DUREJI ROAD AND PROTECTION WORK SORH ROAD AND IMPROVEMENT
2200 RFT RCC CAUSEWAY
045702- A03    Operating Expenses                               15,083,000            15,083,000
045702- A039   General                                             15,083,000            15,083,000
045702- A12     Civil works                                        232,050,000          232,050,000
045702- A124    Building and Structures                            232,050,000          232,050,000
        Total- RECONDITIONING WORK ON DUREJI           247,133,000        247,133,000
          ROAD AND PROTECTION WORK SORH
          ROAD AND IMPROVEMENT 2200 RFT
          RCC CAUSEWAY
IB9486 DEVELOPMENT SCHEMES IN PIRHYAN ARI PEER BARAK BEHLOOR DISTRICT HUB (04 SCHEMES)
045702- A03    Operating Expenses                               29,519,000            29,519,000             6,295,000
045702- A039   General                                             29,519,000            29,519,000             6,295,000
045702- A12     Civil works                                        454,141,000          454,141,000            96,842,000
045702- A124    Building and Structures                            454,141,000          454,141,000            96,842,000
        Total- DEVELOPMENT SCHEMES IN PIRHYAN         483,660,000        483,660,000        103,137,000
            ARI PEER BARAK BEHLOOR DISTRICT
          HUB (04 SCHEMES)
IB9487 DEVELOPMENT SCHEMES IN KALAT SURAB & MASTUNG DISTRICTS
045702- A03    Operating Expenses                               60,423,000            23,790,000             3,052,000
045702- A039   General                                             60,423,000            23,790,000             3,052,000

Page 552

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A12     Civil works                                        929,577,000          365,993,000            46,948,000
045702- A124    Building and Structures                            929,577,000          365,993,000            46,948,000
        Total- DEVELOPMENT SCHEMES IN KALAT           990,000,000        389,783,000          50,000,000
          SURAB & MASTUNG DISTRICTS
IB9488 COMMUNITY BASED DEVELOPMENT SCHEMES FOR INSTALLATION OF COMMUNITY HOME SOLAR
SYSTEM IN VARIOUS KILLIS OF
045702- A03    Operating Expenses                                 6,714,000             6,714,000             2,417,000
045702- A039   General                                              6,714,000             6,714,000             2,417,000
045702- A12     Civil works                                        103,286,000          103,286,000            37,183,000
045702- A124    Building and Structures                            103,286,000          103,286,000            37,183,000
        Total- COMMUNITY BASED DEVELOPMENT           110,000,000        110,000,000          39,600,000
          SCHEMES FOR INSTALLATION OF
          COMMUNITY HOME SOLAR SYSTEM IN
           VARIOUS KILLIS OF
IB9489 INSTAKKATION OF SOLAR ENERGY BASED IRRIGATION \TUBE WELL 03-NOS AT SUB DIVISION MIRAN
SHAH 02 NOS AT
045702- A03    Operating Expenses                               12,207,000            12,207,000
045702- A039   General                                             12,207,000            12,207,000
045702- A12     Civil works                                        187,793,000          187,793,000
045702- A124    Building and Structures                            187,793,000          187,793,000
        Total- INSTAKKATION OF SOLAR ENERGY            200,000,000        200,000,000
          BASED IRRIGATION \TUBE WELL
            03-NOS AT SUB DIVISION MIRAN SHAH
             02 NOS AT
IB9490 CONSTRUCTION OF BLACK TOP ROADS: I) MUHAMMAD KHEL CHOWK TO MAIN FACTORY NWTD II) DATA
KHEL BAZAR
045702- A03    Operating Expenses                                 9,155,000             9,155,000
045702- A039   General                                              9,155,000             9,155,000
045702- A12     Civil works                                        140,845,000          140,845,000
045702- A124    Building and Structures                            140,845,000          140,845,000
        Total- CONSTRUCTION OF BLACK TOP               150,000,000        150,000,000
           ROADS: I) MUHAMMAD KHEL CHOWK
          TO MAIN FACTORY NWTD II) DATA
          KHEL BAZAR
IB9491 CONSTRUCTION OF INTERNAL BLACK TOP ROADS AT TEHSIL & DISTRICT CHAMAN

Page 553

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A03    Operating Expenses                               29,296,000            24,466,000             4,883,000
045702- A039   General                                             29,296,000            24,466,000             4,883,000
045702- A12     Civil works                                        450,704,000          376,395,000            75,117,000
045702- A124    Building and Structures                            450,704,000          376,395,000            75,117,000
        Total- CONSTRUCTION OF INTERNAL BLACK         480,000,000        400,861,000          80,000,000
          TOP ROADS AT TEHSIL & DISTRICT
          CHAMAN
IB9492 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR BORING OF TUBE WELL AND INSTALLATION OF SOLAR
ENERGY
045702- A03    Operating Expenses                               16,479,000            16,479,000             5,932,000
045702- A039   General                                             16,479,000            16,479,000             5,932,000
045702- A12     Civil works                                        253,521,000          253,521,000            91,268,000
045702- A124    Building and Structures                            253,521,000          253,521,000            91,268,000
        Total- PUBLIC SECTOR DEVELOPMENT              270,000,000        270,000,000          97,200,000
         PROGRAM FOR BORING OF TUBE
          WELL AND INSTALLATION OF SOLAR
          ENERGY
IB9493 URABAN SEWERAGE/DRAINAGE PCC AND TUFF TILE STRET FOR ZONE-D GOJRA CITY TEHSIL GOJRA
DISTRCIT TOAB TEK
045702- A03    Operating Expenses                               15,258,000            15,258,000
045702- A039   General                                             15,258,000            15,258,000
045702- A12     Civil works                                        234,742,000          234,742,000
045702- A124    Building and Structures                            234,742,000          234,742,000
        Total- URABAN SEWERAGE/DRAINAGE PCC          250,000,000        250,000,000
          AND TUFF TILE STRET FOR ZONE-D
          GOJRA CITY TEHSIL GOJRA DISTRCIT
          TOAB TEK
IB9494 CONSTRUCTION OF INTERNAL ROADS IN KUCHLAAK AND SURROUNDING AREAS DISTRICT QUETTA.
045702- A03    Operating Expenses                               23,974,000            23,974,000             3,748,000
045702- A039   General                                             23,974,000            23,974,000             3,748,000
045702- A12     Civil works                                        368,836,000          368,836,000            57,664,000
045702- A124    Building and Structures                            368,836,000          368,836,000            57,664,000
        Total- CONSTRUCTION OF INTERNAL ROADS         392,810,000        392,810,000          61,412,000
              IN KUCHLAAK AND SURROUNDING
          AREAS DISTRICT QUETTA.

Page 554

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9495 CONSTRUCTION OF INTERNAL ROADS AT PANJPAI AGHBARG CHASHMA & SURROUNDING AREAS OF
DISTRICT
045702- A03    Operating Expenses                               21,800,000            21,800,000             4,186,000
045702- A039   General                                             21,800,000            21,800,000             4,186,000
045702- A12     Civil works                                        335,390,000          335,390,000            64,402,000
045702- A124    Building and Structures                            335,390,000          335,390,000            64,402,000
        Total- CONSTRUCTION OF INTERNAL ROADS         357,190,000        357,190,000          68,588,000
           AT PANJPAI AGHBARG CHASHMA &
          SURROUNDING AREAS OF DISTRICT
IB9496 CONSTRUCTION OF PARK AT CAR BAZAR UC-06 DISTRICT CENTRAL KARACHI (AT REDUCED COST OF
RS 265.843 MN ONLY
045702- A03    Operating Expenses                               16,225,000            16,225,000            15,468,000
045702- A039   General                                             16,225,000            16,225,000            15,468,000
045702- A12     Civil works                                        249,618,000          249,618,000          237,965,000
045702- A124    Building and Structures                            249,618,000          249,618,000          237,965,000
        Total- CONSTRUCTION OF PARK AT CAR             265,843,000        265,843,000        253,433,000
          BAZAR UC-06 DISTRICT CENTRAL
           KARACHI (AT REDUCED COST OF RS
              265.843 MN ONLY
IB9497 CONSTRUCTION OF PARK NEAR AL-KHAIR SCHOOL UC-09 DISTRICT CENTRAL KARACHI
045702- A03    Operating Expenses                                 3,920,000             3,920,000             3,920,000
045702- A039   General                                              3,920,000             3,920,000             3,920,000
045702- A12     Civil works                                         60,313,000            60,313,000            60,313,000
045702- A124    Building and Structures                             60,313,000            60,313,000            60,313,000
        Total- CONSTRUCTION OF PARK NEAR                64,233,000         64,233,000          64,233,000
            AL-KHAIR SCHOOL UC-09 DISTRICT
          CENTRAL KARACHI
IB9498 CONSTRUCTION OF DAUD GROUND BEHIND MAKHDOOMIN MASJID UC-10 DISTRICT CENTRAL KARACHI
045702- A03    Operating Expenses                                 8,164,000             8,164,000             8,164,000
045702- A039   General                                              8,164,000             8,164,000             8,164,000
045702- A12     Civil works                                        125,600,000          125,600,000          125,600,000
045702- A124    Building and Structures                            125,600,000          125,600,000          125,600,000
        Total- CONSTRUCTION OF DAUD GROUND           133,764,000        133,764,000        133,764,000
           BEHIND MAKHDOOMIN MASJID UC-10

Page 555

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

            DISTRICT CENTRAL KARACHI
IB9499 CONSTRUCTION OF PARK ASIAN FOOTBALL GROUND UC-07 DISTRICT CENTRAL KARACHI
045702- A03    Operating Expenses                                 6,073,000             6,073,000             6,070,000
045702- A039   General                                              6,073,000             6,073,000             6,070,000
045702- A12     Civil works                                         93,424,000            93,424,000            93,378,000
045702- A124    Building and Structures                             93,424,000            93,424,000            93,378,000
        Total- CONSTRUCTION OF PARK ASIAN               99,497,000         99,497,000          99,448,000
          FOOTBALL GROUND UC-07 DISTRICT
          CENTRAL KARACHI
IB9500 CONSTRUCTION OF COMPUTER INSTITUTE BEHIND UC-06 DISTRICT CENTRAL KARACHI
045702- A03    Operating Expenses                                 2,832,000             2,832,000             2,832,000
045702- A039   General                                              2,832,000             2,832,000             2,832,000
045702- A12     Civil works                                         43,566,000            43,566,000            43,566,000
045702- A124    Building and Structures                             43,566,000            43,566,000            43,566,000
        Total- CONSTRUCTION OF COMPUTER                46,398,000         46,398,000          46,398,000
            INSTITUTE BEHIND UC-06 DISTRICT
          CENTRAL KARACHI
IB9501 CONSTRUCTION OF CRICKET STADIUM AT ST-15 SECTOR 5A-4 DISTRICT CENTRAL KARACHI
045702- A03    Operating Expenses                                 3,524,000             3,524,000             3,524,000
045702- A039   General                                              3,524,000             3,524,000             3,524,000
045702- A12     Civil works                                         54,216,000            54,216,000            54,216,000
045702- A124    Building and Structures                             54,216,000            54,216,000            54,216,000
        Total- CONSTRUCTION OF CRICKET STADIUM         57,740,000         57,740,000          57,740,000
           AT ST-15 SECTOR 5A-4 DISTRICT
          CENTRAL KARACHI
IB9502 CONSTRUCTION OF IT & COMPUTER DIPLOMA CENTER AT ST-22 GULSHAN SAEED DISTRICT CENTRAL
KARACHI
045702- A03    Operating Expenses                                 5,037,000             5,037,000             5,037,000
045702- A039   General                                              5,037,000             5,037,000             5,037,000
045702- A12     Civil works                                         77,488,000            77,488,000            77,488,000
045702- A124    Building and Structures                             77,488,000            77,488,000            77,488,000
        Total- CONSTRUCTION OF IT & COMPUTER            82,525,000         82,525,000          82,525,000
           DIPLOMA CENTER AT ST-22 GULSHAN
          SAEED DISTRICT CENTRAL KARACHI

Page 556

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9503 REHABILITATION OF MIAN EXISTING NALA FROM SATTAR SHAH PARK TO ODIAN PLAZA VIA NISHAT
CHOWCK HYDERABAD
045702- A03    Operating Expenses                               16,479,000            16,479,000            16,479,000
045702- A039   General                                             16,479,000            16,479,000            16,479,000
045702- A12     Civil works                                        253,521,000          253,521,000          253,521,000
045702- A124    Building and Structures                            253,521,000          253,521,000          253,521,000
        Total- REHABILITATION OF MIAN EXISTING           270,000,000        270,000,000        270,000,000
          NALA FROM SATTAR SHAH PARK TO
           ODIAN PLAZA VIA NISHAT CHOWCK
          HYDERABAD
IB9504 CONSTRUCTION OF GOVERNMENT GIRLS DEGREE COLLEGE BUILDINGS & LIBRARY WITH FURNITURE#S
AT GOVERNMENT BOYS
045702- A03    Operating Expenses                               29,296,000            29,296,000            30,125,000
045702- A039   General                                             29,296,000            29,296,000            30,125,000
045702- A12     Civil works                                        450,704,000          450,704,000          463,460,000
045702- A124    Building and Structures                            450,704,000          450,704,000          463,460,000
        Total- CONSTRUCTION OF GOVERNMENT            480,000,000        480,000,000        493,585,000
            GIRLS DEGREE COLLEGE BUILDINGS &
           LIBRARY WITH FURNITURE#S AT
          GOVERNMENT BOYS
IB9505 CONSTRUCTION OF WATER SUPPLY LINE (24# DIA) FROM HUSSAINABAD FILTER PLANT TO KOHSAR
WATER PUMPING STATION
045702- A03    Operating Expenses                               45,775,000            45,775,000            45,775,000
045702- A039   General                                             45,775,000            45,775,000            45,775,000
045702- A12     Civil works                                        704,225,000          704,225,000          704,225,000
045702- A124    Building and Structures                            704,225,000          704,225,000          704,225,000
        Total- CONSTRUCTION OF WATER SUPPLY           750,000,000        750,000,000        750,000,000
            LINE (24# DIA) FROM HUSSAINABAD
            FILTER PLANT TO KOHSAR WATER
           PUMPING STATION
IB9506 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN
VARIOUS KILLIS OF DISTRICT
045702- A03    Operating Expenses                               30,508,000            30,508,000             1,831,000
045702- A039   General                                             30,508,000            30,508,000             1,831,000
045702- A12     Civil works                                        469,348,000          469,348,000            28,169,000

Page 557

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                            469,348,000          469,348,000            28,169,000
        Total- PUBLIC SECTOR DEVELOPMENT              499,856,000        499,856,000          30,000,000
         PROGRAM FOR COMMUNITY HOME
          SOLAR ENERGY SYSTEM IN VARIOUS
             KILLIS OF DISTRICT
IB9507 RESTORATION/ REHABILITATION OF FLOOD DAMAGED AGRICULTURE TUBE WELLS IN VARIOUS KILLIS
OF TEHSIL AND
045702- A03    Operating Expenses                               15,258,000            15,258,000             1,831,000
045702- A039   General                                             15,258,000            15,258,000             1,831,000
045702- A12     Civil works                                        234,742,000          234,742,000            28,169,000
045702- A124    Building and Structures                            234,742,000          234,742,000            28,169,000
        Total- RESTORATION/ REHABILITATION OF           250,000,000        250,000,000          30,000,000
          FLOOD DAMAGED AGRICULTURE TUBE
          WELLS IN VARIOUS KILLIS OF TEHSIL
          AND
IB9508 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN
VARIOUS KILLIS OF DISTRICT
045702- A03    Operating Expenses                               30,508,000            30,508,000             3,052,000
045702- A039   General                                             30,508,000            30,508,000             3,052,000
045702- A12     Civil works                                        469,348,000          469,348,000            46,948,000
045702- A124    Building and Structures                            469,348,000          469,348,000            46,948,000
        Total- PUBLIC SECTOR DEVELOPMENT              499,856,000        499,856,000          50,000,000
         PROGRAM FOR COMMUNITY HOME
          SOLAR ENERGY SYSTEM IN VARIOUS
             KILLIS OF DISTRICT
IB9509 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY IN VARIOUS KILLIS
OF DISTRICT PISHIN
045702- A03    Operating Expenses                               15,258,000            15,258,000             3,052,000
045702- A039   General                                             15,258,000            15,258,000             3,052,000
045702- A12     Civil works                                        234,742,000          234,742,000            46,948,000
045702- A124    Building and Structures                            234,742,000          234,742,000            46,948,000
        Total- PUBLIC SECTOR DEVELOPMENT              250,000,000        250,000,000          50,000,000
         PROGRAM FOR AGRICULTURE CUM
          WATER SUPPLY IN VARIOUS KILLIS OF
            DISTRICT PISHIN

Page 558

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9510 COMMUNITY HOME SOLAR ENERGY SYSTEM IN TEHSIL AMORI TAFTAN DALBANDIN CHILGHAZAI AND
CHAGHI DISTRICT
045702- A03    Operating Expenses                               12,207,000            12,207,000             3,052,000
045702- A039   General                                             12,207,000            12,207,000             3,052,000
045702- A12     Civil works                                        187,793,000          187,793,000            46,948,000
045702- A124    Building and Structures                            187,793,000          187,793,000            46,948,000
        Total- COMMUNITY HOME SOLAR ENERGY           200,000,000        200,000,000          50,000,000
          SYSTEM IN TEHSIL AMORI TAFTAN
           DALBANDIN CHILGHAZAI AND CHAGHI
            DISTRICT
IB9511 CONSTRUCTION OF PCC ROADS AND DRAIN AT DISTRICT TANK
045702- A03    Operating Expenses                               36,283,000            32,180,000             5,279,000
045702- A039   General                                             36,283,000            32,180,000             5,279,000
045702- A12     Civil works                                        558,207,000          495,065,000            81,211,000
045702- A124    Building and Structures                            558,207,000          495,065,000            81,211,000
        Total- CONSTRUCTION OF PCC ROADS AND          594,490,000        527,245,000          86,490,000
           DRAIN AT DISTRICT TANK
IB9512 INSTALLATION OF PRESSURE PUMPS AT VARIOUS PLACES OF DISTRICT TANK (AT REDUCED COST OF
RS 150 MN
045702- A03    Operating Expenses                                 9,155,000             9,155,000
045702- A039   General                                              9,155,000             9,155,000
045702- A12     Civil works                                        140,845,000          140,845,000
045702- A124    Building and Structures                            140,845,000          140,845,000
        Total- INSTALLATION OF PRESSURE PUMPS         150,000,000        150,000,000
           AT VARIOUS PLACES OF DISTRICT
          TANK (AT REDUCED COST OF RS 150
         MN
IB9513 CONSTRUCTION OF ROAD FROM ESSA MORR TO SIDDIQUEPURA
045702- A03    Operating Expenses                               24,413,000             5,371,000            29,184,000
045702- A039   General                                             24,413,000             5,371,000            29,184,000
045702- A12     Civil works                                        375,587,000            82,629,000          448,984,000
045702- A124    Building and Structures                            375,587,000            82,629,000          448,984,000
        Total- CONSTRUCTION OF ROAD FROM ESSA        400,000,000         88,000,000        478,168,000
         MORR TO SIDDIQUEPURA

Page 559

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9514 CONSTRUCTION OF CARPET ROAD FROM MARI BHINDRAN TO GHUMAN WALA DISTRICT GUJRANWALA
045702- A03    Operating Expenses                                 6,103,000             1,831,000            31,703,000
045702- A039   General                                              6,103,000             1,831,000            31,703,000
045702- A12     Civil works                                         93,897,000            28,169,000          487,737,000
045702- A124    Building and Structures                             93,897,000            28,169,000          487,737,000
        Total- CONSTRUCTION OF CARPET ROAD            100,000,000         30,000,000        519,440,000
          FROM MARI BHINDRAN TO GHUMAN
         WALA DISTRICT GUJRANWALA
IB9515 DEVELOPMENT SCHEMES IN DISTRICT KACHHI JHAL MAGSI AND NASEERABAD (10 NO.S SCHEMES)
045702- A03    Operating Expenses                               30,514,000            30,514,000             7,934,000
045702- A039   General                                             30,514,000            30,514,000             7,934,000
045702- A12     Civil works                                        469,441,000          469,441,000          122,053,000
045702- A124    Building and Structures                            469,441,000          469,441,000          122,053,000
        Total- DEVELOPMENT SCHEMES IN DISTRICT         499,955,000        499,955,000        129,987,000
           KACHHI JHAL MAGSI AND
          NASEERABAD (10 NO.S SCHEMES)
IB9516 CONSTRUCTION OF BLACK TOP ROAD FROM REHABILITATION BAND MAHMOOD TO BARIJA DISTRICT
JHAL MAGSI
045702- A03    Operating Expenses                               15,258,000            15,258,000             4,883,000
045702- A039   General                                             15,258,000            15,258,000             4,883,000
045702- A12     Civil works                                        234,742,000          234,742,000            75,117,000
045702- A124    Building and Structures                            234,742,000          234,742,000            75,117,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        250,000,000        250,000,000          80,000,000
          FROM REHABILITATION BAND
         MAHMOOD TO BARIJA DISTRICT JHAL
           MAGSI
IB9517 CONSTRUCTION OF BLACK TOP ROAD FROM GAWAK TO BULLO VIA GOBURD SHAH BAIG KALAT
DALSAR 23 KM
045702- A03    Operating Expenses                               21,362,000            21,362,000
045702- A039   General                                             21,362,000            21,362,000
045702- A12     Civil works                                        328,638,000          328,638,000
045702- A124    Building and Structures                            328,638,000          328,638,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        350,000,000        350,000,000
          FROM GAWAK TO BULLO VIA GOBURD

Page 560

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          SHAH BAIG KALAT DALSAR 23 KM
IB9518 CONSTRUCTION OF TUFF TILES PAVEMENT WITH SOLAR STREET LIGHTS SEWERAGE LINE OF SOORO
MARKET 5KM
045702- A03    Operating Expenses                                 4,272,000             4,272,000
045702- A039   General                                              4,272,000             4,272,000
045702- A12     Civil works                                         65,728,000            65,728,000
045702- A124    Building and Structures                             65,728,000            65,728,000
        Total- CONSTRUCTION OF TUFF TILES                70,000,000         70,000,000
          PAVEMENT WITH SOLAR STREET
            LIGHTS SEWERAGE LINE OF SOORO
          MARKET 5KM
IB9519 CONSTRUCTION OF TUFF TILES PAVEMENT WITH SOLAR STREET LIGHTS SEWERAGE LINE OF BULLO
MARKET 3KM
045702- A03    Operating Expenses                                 1,831,000             1,831,000
045702- A039   General                                              1,831,000             1,831,000
045702- A12     Civil works                                         28,169,000            28,169,000
045702- A124    Building and Structures                             28,169,000            28,169,000
        Total- CONSTRUCTION OF TUFF TILES                30,000,000         30,000,000
          PAVEMENT WITH SOLAR STREET
            LIGHTS SEWERAGE LINE OF BULLO
          MARKET 3KM
IB9520 CONSTRUCTION OF STADIUM COMPLEX WITH CRICKET / FOOTBALL GROUNDS CHANGING ROOMS
TOILETS BLOCK &
045702- A03    Operating Expenses                                 6,103,000             6,103,000
045702- A039   General                                              6,103,000             6,103,000
045702- A12     Civil works                                         93,897,000            93,897,000
045702- A124    Building and Structures                             93,897,000            93,897,000
        Total- CONSTRUCTION OF STADIUM                 100,000,000        100,000,000
          COMPLEX WITH CRICKET / FOOTBALL
          GROUNDS CHANGING ROOMS TOILETS
          BLOCK &
IB9521 MISSING FACILITIES TOILETS OF VARIOUS SCHOOLS OF MAND
045702- A03    Operating Expenses                                 4,883,000              977,000             3,906,000
045702- A039   General                                              4,883,000              977,000             3,906,000
045702- A12     Civil works                                         75,117,000            15,023,000            60,094,000

Page 561

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                             75,117,000            15,023,000            60,094,000
        Total- MISSING FACILITIES TOILETS OF                80,000,000         16,000,000          64,000,000
           VARIOUS SCHOOLS OF MAND
IB9522 CONSTRUCTION OF TEACHERS HOSTEL IN MAND
045702- A03    Operating Expenses                                 3,052,000             3,052,000             1,221,000
045702- A039   General                                              3,052,000             3,052,000             1,221,000
045702- A12     Civil works                                         46,948,000            46,948,000            18,779,000
045702- A124    Building and Structures                             46,948,000            46,948,000            18,779,000
        Total- CONSTRUCTION OF TEACHERS                 50,000,000         50,000,000          20,000,000
          HOSTEL IN MAND
IB9523 CONSTRUCTION OF BLACK TOP ROAD FROM DALSAR TO MANDIG
045702- A03    Operating Expenses                                 4,272,000             4,272,000
045702- A039   General                                              4,272,000             4,272,000
045702- A12     Civil works                                         65,728,000            65,728,000
045702- A124    Building and Structures                             65,728,000            65,728,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          70,000,000         70,000,000
          FROM DALSAR TO MANDIG
IB9524 REHABILITATION / IMPROVEMENT OF ROAD FROM GULBAHAR TO MARAKIWAL VIA DAIT AND KAROL
SIALKOT
045702- A03    Operating Expenses                               10,791,000             2,158,000            21,129,000
045702- A039   General                                             10,791,000             2,158,000            21,129,000
045702- A12     Civil works                                        166,014,000            33,203,000          325,061,000
045702- A124    Building and Structures                            166,014,000            33,203,000          325,061,000
        Total- REHABILITATION / IMPROVEMENT OF          176,805,000         35,361,000        346,190,000
          ROAD FROM GULBAHAR TO
          MARAKIWAL VIA DAIT AND KAROL
           SIALKOT
IB9525 SOLARIZATTION OF HOMES AT VARIOUS VILLAGES OF TRIBAL DISTRICT NORTH WAZIRISRAN
PACKAGE-III III IV V
045702- A03    Operating Expenses                               12,207,000            12,207,000             2,441,000
045702- A039   General                                             12,207,000            12,207,000             2,441,000
045702- A12     Civil works                                        187,793,000          187,793,000            37,559,000
045702- A124    Building and Structures                            187,793,000          187,793,000            37,559,000
        Total- SOLARIZATTION OF HOMES AT                200,000,000        200,000,000          40,000,000

Page 562

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

           VARIOUS VILLAGES OF TRIBAL
            DISTRICT NORTH WAZIRISRAN
             PACKAGE-III III IV V
IB9526 100 NOS WATER BORE FOR TUEB WELL AT DISTRICT SOUTH WAZIRSITAN
045702- A03    Operating Expenses                               24,968,000            24,968,000             6,020,000
045702- A039   General                                             24,968,000            24,968,000             6,020,000
045702- A12     Civil works                                        384,117,000          384,117,000            92,620,000
045702- A124    Building and Structures                            384,117,000          384,117,000            92,620,000
        Total- 100 NOS WATER BORE FOR TUEB             409,085,000        409,085,000          98,640,000
          WELL AT DISTRICT SOUTH
           WAZIRSITAN
IB9527 SOLARIZATION OF HOMES AT DISTRICT SOUTH WAZIRISRAN (AT REDUCED COST OF RS 340.915 MN
AGAINST APPROVED COST
045702- A03    Operating Expenses                               20,807,000            20,807,000             2,988,000
045702- A039   General                                             20,807,000            20,807,000             2,988,000
045702- A12     Civil works                                        320,108,000          320,108,000            45,972,000
045702- A124    Building and Structures                            320,108,000          320,108,000            45,972,000
        Total- SOLARIZATION OF HOMES AT                 340,915,000        340,915,000          48,960,000
            DISTRICT SOUTH WAZIRISRAN (AT
          REDUCED COST OF RS 340.915 MN
           AGAINST APPROVED COST
IB9528 CONSTRUCTION OF BLACK TOP ROAD PCC STREET AND JEEPABLE TRACKS AT TRIBAL DISTRICT
UPPER SOUTH
045702- A03    Operating Expenses                               45,775,000            30,517,000             3,052,000
045702- A039   General                                             45,775,000            30,517,000             3,052,000
045702- A12     Civil works                                        704,225,000          469,483,000            46,948,000
045702- A124    Building and Structures                            704,225,000          469,483,000            46,948,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        750,000,000        500,000,000          50,000,000
          PCC STREET AND JEEPABLE TRACKS
           AT TRIBAL DISTRICT UPPER SOUTH
IB9529 CONSTRUCTION OF DIFFERENT ROADS IN MARDAN
045702- A03    Operating Expenses                               45,775,000            45,775,000
045702- A039   General                                             45,775,000            45,775,000
045702- A12     Civil works                                        704,225,000          704,225,000

Page 563

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                            704,225,000          704,225,000
        Total- CONSTRUCTION OF DIFFERENT ROADS        750,000,000        750,000,000
              IN MARDAN
IB9530 CONSTRUCTION OF BLACK TOP ROAD FROM LARZAR TO BARZAR
045702- A03    Operating Expenses                                 4,272,000             4,272,000
045702- A039   General                                              4,272,000             4,272,000
045702- A12     Civil works                                         65,728,000            65,728,000
045702- A124    Building and Structures                             65,728,000            65,728,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          70,000,000         70,000,000
          FROM LARZAR TO BARZAR
IB9531 CONSTRUCTION OF 05 NUMBERS VETERINARY DISPENSARY AT VARIOUS PLACES OF UPPER AND
LOWER KURRUM
045702- A03    Operating Expenses                                 3,418,000             3,418,000
045702- A039   General                                              3,418,000             3,418,000
045702- A12     Civil works                                         52,582,000            52,582,000
045702- A124    Building and Structures                             52,582,000            52,582,000
        Total- CONSTRUCTION OF 05 NUMBERS               56,000,000         56,000,000
           VETERINARY DISPENSARY AT
           VARIOUS PLACES OF UPPER AND
          LOWER KURRUM
IB9532 CONSTRUCTION OF BRIDGES/CULVERT AT VARIOUS PLACES DISTRICT UPPER AND LOWER KURRUM
045702- A03    Operating Expenses                                 9,765,000             9,765,000             6,103,000
045702- A039   General                                              9,765,000             9,765,000             6,103,000
045702- A12     Civil works                                        150,235,000          150,235,000            93,897,000
045702- A124    Building and Structures                            150,235,000          150,235,000            93,897,000
        Total- CONSTRUCTION OF                           160,000,000        160,000,000        100,000,000
           BRIDGES/CULVERT AT VARIOUS
          PLACES DISTRICT UPPER AND LOWER
          KURRUM
IB9533 CONSTRUCTION OF 03 NO GOVT PRIMARY SCHOOLS AT VARIOUS PLACES DISTRICT KURRUM
045702- A03    Operating Expenses                                 3,052,000             3,052,000
045702- A039   General                                              3,052,000             3,052,000
045702- A12     Civil works                                         46,948,000            46,948,000
045702- A124    Building and Structures                             46,948,000            46,948,000

Page 564

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- CONSTRUCTION OF 03 NO GOVT                50,000,000         50,000,000
           PRIMARY SCHOOLS AT VARIOUS
          PLACES DISTRICT KURRUM
IB9534 CONSTRUCTION OF 03 NO DISPENSARY AT VARIOUS PLACES DISTRICT KURRUM
045702- A03    Operating Expenses                                 2,502,000             2,502,000
045702- A039   General                                              2,502,000             2,502,000
045702- A12     Civil works                                         38,498,000            38,498,000
045702- A124    Building and Structures                             38,498,000            38,498,000
        Total- CONSTRUCTION OF 03 NO                      41,000,000         41,000,000
           DISPENSARY AT VARIOUS PLACES
            DISTRICT KURRUM
IB9535 CONSTRUCTION OF BLACK TOP ROAD AT VARIOUS PLACES OF DISTRICT UPPER AND LOWER KURRUM
045702- A03    Operating Expenses                               22,765,000            22,765,000             2,930,000
045702- A039   General                                             22,765,000            22,765,000             2,930,000
045702- A12     Civil works                                        350,235,000          350,235,000            45,070,000
045702- A124    Building and Structures                            350,235,000          350,235,000            45,070,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        373,000,000        373,000,000          48,000,000
           AT VARIOUS PLACES OF DISTRICT
          UPPER AND LOWER KURRUM
IB9536 CONSTRUCTION OF WATER STORAGE DAMS KOH-E-CHILTAN AND ASSOCIATED AREA
045702- A03    Operating Expenses                                 6,103,000             6,103,000
045702- A039   General                                              6,103,000             6,103,000
045702- A12     Civil works                                         93,897,000            93,897,000
045702- A124    Building and Structures                             93,897,000            93,897,000
        Total- CONSTRUCTION OF WATER STORAGE         100,000,000        100,000,000
          DAMS KOH-E-CHILTAN AND
           ASSOCIATED AREA
IB9537 ESTABLISHMENT COMMUNITY HALL AT LOUD KAREZ
045702- A03    Operating Expenses                                 6,103,000             6,103,000             3,784,000
045702- A039   General                                              6,103,000             6,103,000             3,784,000
045702- A12     Civil works                                         93,897,000            93,897,000            58,216,000
045702- A124    Building and Structures                             93,897,000            93,897,000            58,216,000
        Total- ESTABLISHMENT COMMUNITY HALL AT        100,000,000        100,000,000          62,000,000
          LOUD KAREZ

Page 565

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9538 IMPROVEMENT OF SEWAGE SYSTEM TUFF TILES AND BLACK TOP IN DIFFERENT AREA QUETTA-3
045702- A03    Operating Expenses                                 9,155,000             9,155,000             3,296,000
045702- A039   General                                              9,155,000             9,155,000             3,296,000
045702- A12     Civil works                                        140,845,000          140,845,000            50,704,000
045702- A124    Building and Structures                            140,845,000          140,845,000            50,704,000
        Total- IMPROVEMENT OF SEWAGE SYSTEM          150,000,000        150,000,000          54,000,000
           TUFF TILES AND BLACK TOP IN
           DIFFERENT AREA QUETTA-3
IB9539 INSTALLATION OF SOLAR KITS FOR ELECTRIFICATION DIGARI MERGED ZEDCO SIMDIGI ZARGHOON
DASHT MIAN
045702- A03    Operating Expenses                               12,207,000            12,207,000             4,394,000
045702- A039   General                                             12,207,000            12,207,000             4,394,000
045702- A12     Civil works                                        187,793,000          187,793,000            67,606,000
045702- A124    Building and Structures                            187,793,000          187,793,000            67,606,000
        Total- INSTALLATION OF SOLAR KITS FOR           200,000,000        200,000,000          72,000,000
            ELECTRIFICATION DIGARI MERGED
          ZEDCO SIMDIGI ZARGHOON DASHT
           MIAN
IB9540 INSTALLATION OF SOLAR TUBE WELLS FOR PROVISION OF CLEAN AND SAFE DRINGKIN WATER
QUETTA-3
045702- A03    Operating Expenses                                 6,103,000             6,103,000
045702- A039   General                                              6,103,000             6,103,000
045702- A12     Civil works                                         93,897,000            93,897,000
045702- A124    Building and Structures                             93,897,000            93,897,000
        Total- INSTALLATION OF SOLAR TUBE               100,000,000        100,000,000
          WELLS FOR PROVISION OF CLEAN
          AND SAFE DRINGKIN WATER
           QUETTA-3
IB9541 CONSTRUCTION OF ADDITIONAL CLASS ROOMS & EXAMINATION CENTRE/MULTIPURPOSE HALL AT
DIFFERENT SCHOOLS DISTRCIT
045702- A03    Operating Expenses                                 6,103,000             2,136,000             3,967,000
045702- A039   General                                              6,103,000             2,136,000             3,967,000
045702- A12     Civil works                                         93,897,000            32,864,000            61,033,000
045702- A124    Building and Structures                             93,897,000            32,864,000            61,033,000

Page 566

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- CONSTRUCTION OF ADDITIONAL              100,000,000         35,000,000          65,000,000
          CLASS ROOMS & EXAMINATION
           CENTRE/MULTIPURPOSE HALL AT
           DIFFERENT SCHOOLS DISTRCIT
IB9542 BLACKTOP ROAD AT VARIOUS PLACES IN KHUZDAR CITY
045702- A03    Operating Expenses                               12,207,000            12,207,000             5,220,000
045702- A039   General                                             12,207,000            12,207,000             5,220,000
045702- A12     Civil works                                        187,793,000          187,793,000            80,301,000
045702- A124    Building and Structures                            187,793,000          187,793,000            80,301,000
        Total- BLACKTOP ROAD AT VARIOUS                200,000,000        200,000,000          85,521,000
          PLACES IN KHUZDAR CITY
IB9543 CUTTING AND IMPROVEMENT IF KACHA ROAD HIGHWAY TO ARANJI VIA AWAK INCLUDING STRUCTURE
WORKS DISTRCIT
045702- A03    Operating Expenses                               15,258,000            15,258,000             3,052,000
045702- A039   General                                             15,258,000            15,258,000             3,052,000
045702- A12     Civil works                                        234,742,000          234,742,000            46,948,000
045702- A124    Building and Structures                            234,742,000          234,742,000            46,948,000
        Total- CUTTING AND IMPROVEMENT IF               250,000,000        250,000,000          50,000,000
          KACHA ROAD HIGHWAY TO ARANJI
             VIA AWAK INCLUDING STRUCTURE
         WORKS DISTRCIT
IB9544 CONSTRUCTION/REHABILITATION OF BLACK TOP ROAD IN 07 KILLIS OF DISTRICT NUSHKI
045702- A03    Operating Expenses                                 6,103,000             6,103,000             2,197,000
045702- A039   General                                              6,103,000             6,103,000             2,197,000
045702- A12     Civil works                                         93,897,000            93,897,000            33,803,000
045702- A124    Building and Structures                             93,897,000            93,897,000            33,803,000
        Total- CONSTRUCTION/REHABILITATION OF          100,000,000        100,000,000          36,000,000
          BLACK TOP ROAD IN 07 KILLIS OF
            DISTRICT NUSHKI
IB9545 AGRICULTURE LAND LEVELINGTRACTOR HOURS DISTRICT NOSHKI
045702- A03    Operating Expenses                                 3,052,000             3,052,000
045702- A039   General                                              3,052,000             3,052,000
045702- A12     Civil works                                         46,948,000            46,948,000
045702- A124    Building and Structures                             46,948,000            46,948,000

Page 567

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- AGRICULTURE LAND                           50,000,000         50,000,000
           LEVELINGTRACTOR HOURS DISTRICT
           NOSHKI
IB9546 CONSTRUCTION OF BLACK TOP ROAD AND DRAINAGE SYSTEM KILLIS SAHIBZADA DISTRICT NOSHKI
045702- A03    Operating Expenses                                 3,052,000             3,052,000
045702- A039   General                                              3,052,000             3,052,000
045702- A12     Civil works                                         46,948,000            46,948,000
045702- A124    Building and Structures                             46,948,000            46,948,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          50,000,000         50,000,000
          AND DRAINAGE SYSTEM KILLIS
           SAHIBZADA DISTRICT NOSHKI
IB9547 CONSTRUCTION OF BLACK TOP ROAD FROM MEERAN KALAT TO MATTI AND KOTAN TO SYED AMEER
DISTRICT KHARAN
045702- A03    Operating Expenses                                 6,103,000             6,103,000
045702- A039   General                                              6,103,000             6,103,000
045702- A12     Civil works                                         93,897,000            93,897,000
045702- A124    Building and Structures                             93,897,000            93,897,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        100,000,000        100,000,000
          FROM MEERAN KALAT TO MATTI AND
          KOTAN TO SYED AMEER DISTRICT
          KHARAN
IB9548 SOLARIZATION OF EXISTING TUBEWELLS/BORES FOR AGRICULTURE PURPOSE IN VARIOUS KILLIS OF
045702- A03    Operating Expenses                                 6,103,000             6,103,000             2,197,000
045702- A039   General                                              6,103,000             6,103,000             2,197,000
045702- A12     Civil works                                         93,897,000            93,897,000            33,803,000
045702- A124    Building and Structures                             93,897,000            93,897,000            33,803,000
        Total- SOLARIZATION OF EXISTING                  100,000,000        100,000,000          36,000,000
           TUBEWELLS/BORES FOR
           AGRICULTURE PURPOSE IN VARIOUS
             KILLIS OF
IB9549 CONSTRUCTION OF BASIC HEALTH UNIT (BHU) BUILDING AT NOTAN CITY HURMANHGI
045702- A03    Operating Expenses                                 2,441,000             2,441,000
045702- A039   General                                              2,441,000             2,441,000
045702- A12     Civil works                                         37,559,000            37,559,000

Page 568

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                             37,559,000            37,559,000
        Total- CONSTRUCTION OF BASIC HEALTH             40,000,000         40,000,000
            UNIT (BHU) BUILDING AT NOTAN CITY
          HURMANHGI
IB9550 CONSTRUCTION/INSTALLATION OF FENCING FOR ANIMAL PARK AND REST HOUSE AT POSTI KAREZ
DISTRICT CHAGHI
045702- A03    Operating Expenses                                 3,662,000             3,662,000
045702- A039   General                                              3,662,000             3,662,000
045702- A12     Civil works                                         56,338,000            56,338,000
045702- A124    Building and Structures                             56,338,000            56,338,000
        Total- CONSTRUCTION/INSTALLATION OF             60,000,000         60,000,000
           FENCING FOR ANIMAL PARK AND
           REST HOUSE AT POSTI KAREZ
            DISTRICT CHAGHI
IB9551 COMMUNITY HOME SOLAR ENERGY SYSTEM & AGRICULTURE CUM WATER SUPPLY SCHEMES IN
VARIOUS KILLIS OF
045702- A03    Operating Expenses                                 9,155,000             9,155,000             3,296,000
045702- A039   General                                              9,155,000             9,155,000             3,296,000
045702- A12     Civil works                                        140,845,000          140,845,000            50,704,000
045702- A124    Building and Structures                            140,845,000          140,845,000            50,704,000
        Total- COMMUNITY HOME SOLAR ENERGY           150,000,000        150,000,000          54,000,000
          SYSTEM & AGRICULTURE CUM WATER
           SUPPLY SCHEMES IN VARIOUS KILLIS
          OF
IB9552 CONSTRUCTION OF 17 NO. WATER SUPPLY SCHEMES ALONG SOLAR SYSTEM OF VARIOUS LOCATIONS
AT DISTRICT
045702- A03    Operating Expenses                                 6,103,000             6,103,000
045702- A039   General                                              6,103,000             6,103,000
045702- A12     Civil works                                         93,897,000            93,897,000
045702- A124    Building and Structures                             93,897,000            93,897,000
        Total- CONSTRUCTION OF 17 NO. WATER            100,000,000        100,000,000
           SUPPLY SCHEMES ALONG SOLAR
          SYSTEM OF VARIOUS LOCATIONS AT
            DISTRICT
IB9553 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN

Page 569

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

VARIOUS KILLIS TEHSIL DUKI
045702- A03    Operating Expenses                               24,412,000            24,412,000             5,732,000
045702- A039   General                                             24,412,000            24,412,000             5,732,000
045702- A12     Civil works                                        375,567,000          375,567,000            88,190,000
045702- A124    Building and Structures                            375,567,000          375,567,000            88,190,000
        Total- PUBLIC SECTOR DEVELOPMENT              399,979,000        399,979,000          93,922,000
         PROGRAM FOR COMMUNITY HOME
          SOLAR ENERGY SYSTEM IN VARIOUS
             KILLIS TEHSIL DUKI
IB9554 CONSTRUCTION OF ROAD AND PCC STREET AT DISTRCIT LAKKI MARWAT
045702- A03    Operating Expenses                               21,362,000             3,631,000            17,883,000
045702- A039   General                                             21,362,000             3,631,000            17,883,000
045702- A12     Civil works                                        328,638,000            55,869,000          275,117,000
045702- A124    Building and Structures                            328,638,000            55,869,000          275,117,000
        Total- CONSTRUCTION OF ROAD AND PCC           350,000,000         59,500,000        293,000,000
           STREET AT DISTRCIT LAKKI MARWAT
IB9555 CONSTRUCTION OF FLOOD PROTECTION BAND AND FLOOD SAFETY WALL AT DISTRCIT LAKKI MARWAT
045702- A03    Operating Expenses                               12,207,000            12,207,000
045702- A039   General                                             12,207,000            12,207,000
045702- A12     Civil works                                        187,793,000          187,793,000
045702- A124    Building and Structures                            187,793,000          187,793,000
        Total- CONSTRUCTION OF FLOOD                    200,000,000        200,000,000
           PROTECTION BAND AND FLOOD
           SAFETY WALL AT DISTRCIT LAKKI
         MARWAT
IB9556 INSTALLATION OF PRESSURE PUMPS AND WATER SUPPLY SCHEMES AT DISTRICT LAKKI MARWAT
045702- A03    Operating Expenses                               12,207,000            12,207,000
045702- A039   General                                             12,207,000            12,207,000
045702- A12     Civil works                                        187,793,000          187,793,000
045702- A124    Building and Structures                            187,793,000          187,793,000
        Total- INSTALLATION OF PRESSURE PUMPS         200,000,000        200,000,000
          AND WATER SUPPLY SCHEMES AT
            DISTRICT LAKKI MARWAT
IB9557 REHABILITATION OF INFRASTRUCTURE WORKS (CONSTRUCTIN OF ROAD WATERLINE SEWERAGE

Page 570

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

SYSTEM PARKS &
045702- A03    Operating Expenses                               45,775,000            45,775,000            45,775,000
045702- A039   General                                             45,775,000            45,775,000            45,775,000
045702- A12     Civil works                                        704,225,000          704,225,000          704,225,000
045702- A124    Building and Structures                            704,225,000          704,225,000          704,225,000
        Total- REHABILITATION OF                          750,000,000        750,000,000        750,000,000
           INFRASTRUCTURE WORKS
           (CONSTRUCTIN OF ROAD WATERLINE
          SEWERAGE SYSTEM PARKS &
IB9558 REHABILITATION OF INFRASTRUCTURE WORKS (CONSTRUCTIN OF ROADS FOORPATH WATER SUPPY
SEWERAGE PUBLIC PARKS
045702- A03    Operating Expenses                               45,775,000            45,775,000            45,775,000
045702- A039   General                                             45,775,000            45,775,000            45,775,000
045702- A12     Civil works                                        704,225,000          704,225,000          704,225,000
045702- A124    Building and Structures                            704,225,000          704,225,000          704,225,000
        Total- REHABILITATION OF                          750,000,000        750,000,000        750,000,000
           INFRASTRUCTURE WORKS
           (CONSTRUCTIN OF ROADS FOORPATH
          WATER SUPPY SEWERAGE PUBLIC
          PARKS
IB9559 IMPROVEMENT / REHABILITATION OF DIFFERENT ROADS WATER SUPPLY SEWERAGE PARKS AND
PLAYGROUND IN
045702- A03    Operating Expenses                               45,775,000            45,775,000            45,775,000
045702- A039   General                                             45,775,000            45,775,000            45,775,000
045702- A12     Civil works                                        704,225,000          704,225,000          704,225,000
045702- A124    Building and Structures                            704,225,000          704,225,000          704,225,000
        Total- IMPROVEMENT / REHABILITATION OF          750,000,000        750,000,000        750,000,000
           DIFFERENT ROADS WATER SUPPLY
          SEWERAGE PARKS AND PLAYGROUND
              IN
IB9560 INFRASTRUCTURE DEVELOPMENT IN TEHSIL YAZMAN DISTRICT BAHAWALPUR
045702- A03    Operating Expenses                               45,775,000            45,775,000            16,479,000
045702- A039   General                                             45,775,000            45,775,000            16,479,000
045702- A12     Civil works                                        704,225,000          704,225,000          253,521,000
045702- A124    Building and Structures                            704,225,000          704,225,000          253,521,000

Page 571

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- INFRASTRUCTURE DEVELOPMENT IN          750,000,000        750,000,000        270,000,000
            TEHSIL YAZMAN DISTRICT
          BAHAWALPUR
IB9561 INFRASTRUCTURE DEVELOPMENT IN DISTRICT GUJRAT
045702- A03    Operating Expenses                               33,568,000             5,707,000            41,060,000
045702- A039   General                                             33,568,000             5,707,000            41,060,000
045702- A12     Civil works                                        516,432,000            87,793,000          631,690,000
045702- A124    Building and Structures                            516,432,000            87,793,000          631,690,000
        Total- INFRASTRUCTURE DEVELOPMENT IN          550,000,000         93,500,000        672,750,000
            DISTRICT GUJRAT
IB9562 INFRASTRUCTURE DEVELOPMENT IN DISTRICT GUJRAT
045702- A03    Operating Expenses                               12,207,000            12,207,000
045702- A039   General                                             12,207,000            12,207,000
045702- A12     Civil works                                        187,793,000          187,793,000
045702- A124    Building and Structures                            187,793,000          187,793,000
        Total- INFRASTRUCTURE DEVELOPMENT IN          200,000,000        200,000,000
            DISTRICT GUJRAT
IB9563 CONSTRUCTION OF CAT-D HOSPITAL AT AZAM WARSAK TEHSIL BIRMAL SWTD WANA
045702- A03    Operating Expenses                               21,362,000            21,362,000            24,413,000
045702- A039   General                                             21,362,000            21,362,000            24,413,000
045702- A12     Civil works                                        328,638,000          328,638,000          375,587,000
045702- A124    Building and Structures                            328,638,000          328,638,000          375,587,000
        Total- CONSTRUCTION OF CAT-D HOSPITAL          350,000,000        350,000,000        400,000,000
           AT AZAM WARSAK TEHSIL BIRMAL
          SWTD WANA
IB9564 MANSEHRA WATER SUPPLY SCHEME
045702- A03    Operating Expenses                                 6,103,000             6,103,000
045702- A039   General                                              6,103,000             6,103,000
045702- A12     Civil works                                         93,897,000            93,897,000
045702- A124    Building and Structures                             93,897,000            93,897,000
        Total- MANSEHRA WATER SUPPLY SCHEME         100,000,000        100,000,000
IB9565 CONSTRUCTION OF LINK ROAD FROM RAILWAY STATION TO SIALKOT PHATAK 2 KM
045702- A03    Operating Expenses                                 1,221,000
045702- A039   General                                              1,221,000

Page 572

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A12     Civil works                                         18,779,000
045702- A124    Building and Structures                             18,779,000
        Total- CONSTRUCTION OF LINK ROAD FROM          20,000,000
           RAILWAY STATION TO SIALKOT
          PHATAK 2 KM
IB9566 CONSTRUCTION OF ASPHALT ROAD FROM MIRPURKHAS MIRWAH ROAD TO JHULURI VIA VILLAGE SYED
GHULAM HAIRDER
045702- A03    Operating Expenses                                 6,103,000             6,103,000
045702- A039   General                                              6,103,000             6,103,000
045702- A12     Civil works                                         93,897,000            93,897,000
045702- A124    Building and Structures                             93,897,000            93,897,000
        Total- CONSTRUCTION OF ASPHALT ROAD           100,000,000        100,000,000
          FROM MIRPURKHAS MIRWAH ROAD TO
           JHULURI VIA VILLAGE SYED GHULAM
           HAIRDER
IB9567 CONSTRUCTION OF 50 NOS. SOLAR WATER SUPPLY SCHEMES IN DISTRICT KHUZDAR
045702- A03    Operating Expenses                                 6,103,000             1,038,000            23,680,000
045702- A039   General                                              6,103,000             1,038,000            23,680,000
045702- A12     Civil works                                         93,897,000            15,962,000          364,307,000
045702- A124    Building and Structures                             93,897,000            15,962,000          364,307,000
        Total- CONSTRUCTION OF 50 NOS. SOLAR           100,000,000         17,000,000        387,987,000
          WATER SUPPLY SCHEMES IN DISTRICT
          KHUZDAR
IB9568 CONSTRUCTION OF B/T ROAD IN MUNICIPLE CORPORATION KHUZDAR
045702- A03    Operating Expenses                                 6,103,000             6,103,000             4,512,000
045702- A039   General                                              6,103,000             6,103,000             4,512,000
045702- A12     Civil works                                         93,897,000            93,897,000            69,413,000
045702- A124    Building and Structures                             93,897,000            93,897,000            69,413,000
        Total- CONSTRUCTION OF B/T ROAD IN              100,000,000        100,000,000          73,925,000
            MUNICIPLE CORPORATION KHUZDAR
IB9569 REHABILITATION / IMPROVEMENT OF ROAD FROM DUGRI TO SATRA SINDHWAN TEHSIL DASKA
DISTRICT SIALKOT
045702- A03    Operating Expenses                                 6,103,000             6,103,000             4,725,000
045702- A039   General                                              6,103,000             6,103,000             4,725,000

Page 573

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A12     Civil works                                         93,897,000            93,897,000            72,695,000
045702- A124    Building and Structures                             93,897,000            93,897,000            72,695,000
        Total- REHABILITATION / IMPROVEMENT OF          100,000,000        100,000,000          77,420,000
          ROAD FROM DUGRI TO SATRA
          SINDHWAN TEHSIL DASKA DISTRICT
           SIALKOT
IB9570 GUJRANWALA RAJBAN BRIDGE TO JANDIALA DHABWALA (06 KM)
045702- A03    Operating Expenses                                 6,103,000             6,103,000
045702- A039   General                                              6,103,000             6,103,000
045702- A12     Civil works                                         93,897,000            93,897,000
045702- A124    Building and Structures                             93,897,000            93,897,000
        Total- GUJRANWALA RAJBAN BRIDGE TO            100,000,000        100,000,000
           JANDIALA DHABWALA (06 KM)
IB9571 CONSTRUCTION OF CARPET ROAD FROM MARI BHINDRAN TO GHUMMAN WALA DISTRICT GUJRANWALA
045702- A03    Operating Expenses                                 6,103,000             1,221,000            29,298,000
045702- A039   General                                              6,103,000             1,221,000            29,298,000
045702- A12     Civil works                                         93,897,000            18,779,000          450,732,000
045702- A124    Building and Structures                             93,897,000            18,779,000          450,732,000
        Total- CONSTRUCTION OF CARPET ROAD            100,000,000         20,000,000        480,030,000
          FROM MARI BHINDRAN TO GHUMMAN
         WALA DISTRICT GUJRANWALA
IB9572 REHABILITATION / CONSTRUCTION / RAISING OF ROAD FROM SHAHPUR CITY TO BANGLA HUSSAIN
SHAH ROAD TEHSIL
045702- A03    Operating Expenses                                 6,103,000             6,103,000
045702- A039   General                                              6,103,000             6,103,000
045702- A12     Civil works                                         93,897,000            93,897,000
045702- A124    Building and Structures                             93,897,000            93,897,000
        Total- REHABILITATION / CONSTRUCTION /           100,000,000        100,000,000
            RAISING OF ROAD FROM SHAHPUR
            CITY TO BANGLA HUSSAIN SHAH
          ROAD TEHSIL
IB9573 REPAIRING OF ROADS IN TANDLIANWALA FAISALABAD
045702- A03    Operating Expenses                                 6,103,000             6,103,000             9,155,000
045702- A039   General                                              6,103,000             6,103,000             9,155,000

Page 574

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A12     Civil works                                         93,897,000            93,897,000          140,845,000
045702- A124    Building and Structures                             93,897,000            93,897,000          140,845,000
        Total- REPAIRING OF ROADS IN                      100,000,000        100,000,000        150,000,000
          TANDLIANWALA FAISALABAD
IB9574 URBAN SEWERAGE / DRAINAGE PCC AND TUFF TILE STREET FOR ZONE-D GOJRA CITY TEHSIL GOJRA
DISTRICT TOBA TEK
045702- A03    Operating Expenses                                 6,103,000             6,103,000            18,578,000
045702- A039   General                                              6,103,000             6,103,000            18,578,000
045702- A12     Civil works                                         93,897,000            93,897,000          285,811,000
045702- A124    Building and Structures                             93,897,000            93,897,000          285,811,000
        Total- URBAN SEWERAGE / DRAINAGE PCC          100,000,000        100,000,000        304,389,000
          AND TUFF TILE STREET FOR ZONE-D
          GOJRA CITY TEHSIL GOJRA DISTRICT
          TOBA TEK
IB9575 URBAN SEWERAGE / DRAINAGE PCC AND TUFF TILE STREET FOR ZONE-D GOJRA CITY TEHSIL GOJRA
DISTRICT TOBA TEK
045702- A03    Operating Expenses                                 6,103,000             6,103,000
045702- A039   General                                              6,103,000             6,103,000
045702- A12     Civil works                                         93,897,000            93,897,000
045702- A124    Building and Structures                             93,897,000            93,897,000
        Total- URBAN SEWERAGE / DRAINAGE PCC          100,000,000        100,000,000
          AND TUFF TILE STREET FOR ZONE-D
          GOJRA CITY TEHSIL GOJRA DISTRICT
          TOBA TEK
IB9576 CONSTRUCTION OF OVERHEAD BRIDGE ON RAILWAY TRACK IN TEHSIL KOT RADHA KISHEN DISTRICT
KASUR
045702- A03    Operating Expenses                                 6,103,000             6,103,000
045702- A039   General                                              6,103,000             6,103,000
045702- A12     Civil works                                         93,897,000            93,897,000
045702- A124    Building and Structures                             93,897,000            93,897,000
        Total- CONSTRUCTION OF OVERHEAD               100,000,000        100,000,000
           BRIDGE ON RAILWAY TRACK IN TEHSIL
          KOT RADHA KISHEN DISTRICT KASUR
IB9577 CONSTRUCTION OF CARPET ROAD IN DIFFERENT UCS AND CONTONMENT BOARD AREAS DISTRICT
MULTAN

Page 575

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A03    Operating Expenses                                 6,103,000             6,103,000            12,023,000
045702- A039   General                                              6,103,000             6,103,000            12,023,000
045702- A12     Civil works                                         93,897,000            93,897,000          184,977,000
045702- A124    Building and Structures                             93,897,000            93,897,000          184,977,000
        Total- CONSTRUCTION OF CARPET ROAD IN         100,000,000        100,000,000        197,000,000
           DIFFERENT UCS AND CONTONMENT
          BOARD AREAS DISTRICT MULTAN
IB9578 CONSTRUCTION OF CARPET ROAD FROM BASTI GULBAHAR WALA - MATOTALI VIA BHADI WALA - BASTI
MAQEEM PUR DISTRICT
045702- A03    Operating Expenses                                 6,103,000             6,103,000
045702- A039   General                                              6,103,000             6,103,000
045702- A12     Civil works                                         93,897,000            93,897,000
045702- A124    Building and Structures                             93,897,000            93,897,000
        Total- CONSTRUCTION OF CARPET ROAD            100,000,000        100,000,000
          FROM BASTI GULBAHAR WALA -
           MATOTALI VIA BHADI WALA - BASTI
         MAQEEM PUR DISTRICT
IB9579 CONSTRUCTION OF ROAD FROM BHAGWAL AWAN TO DABOLA VIA KOTLI BHUTTA RORAS ROAD WITH
LINK INFRASTRUCTURE
045702- A03    Operating Expenses                                 6,103,000             6,103,000            16,446,000
045702- A039   General                                              6,103,000             6,103,000            16,446,000
045702- A12     Civil works                                         93,897,000            93,897,000          253,014,000
045702- A124    Building and Structures                             93,897,000            93,897,000          253,014,000
        Total- CONSTRUCTION OF ROAD FROM              100,000,000        100,000,000        269,460,000
         BHAGWAL AWAN TO DABOLA VIA
            KOTLI BHUTTA RORAS ROAD WITH
            LINK INFRASTRUCTURE
IB9580 CONSTRUCTION OF ROAD FROM JURIYAN KALAN TO MALKE KALAN VIA OLAKH AWAN & MALO CHAK
WITH LINK INFRASTRUCTURE
045702- A03    Operating Expenses                                 6,103,000             1,221,000            21,168,000
045702- A039   General                                              6,103,000             1,221,000            21,168,000
045702- A12     Civil works                                         93,897,000            18,779,000          325,655,000
045702- A124    Building and Structures                             93,897,000            18,779,000          325,655,000
        Total- CONSTRUCTION OF ROAD FROM              100,000,000         20,000,000        346,823,000
           JURIYAN KALAN TO MALKE KALAN VIA

Page 576

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          OLAKH AWAN & MALO CHAK WITH
            LINK INFRASTRUCTURE
IB9581 CONSTRUCTION OF SEWERAGE SOLING RE-SOLING DRAIN AND SLUDGE CARRIER IN DIFFERENCT UCS
AND CONTONMENT
045702- A03    Operating Expenses                                 6,103,000             1,221,000            29,692,000
045702- A039   General                                              6,103,000             1,221,000            29,692,000
045702- A12     Civil works                                         93,897,000            18,779,000          456,808,000
045702- A124    Building and Structures                             93,897,000            18,779,000          456,808,000
        Total- CONSTRUCTION OF SEWERAGE               100,000,000         20,000,000        486,500,000
           SOLING RE-SOLING DRAIN AND
          SLUDGE CARRIER IN DIFFERENCT UCS
          AND CONTONMENT
IB9582 CONSTRUCTION OF METTALED ROAD 20 FEET WIDE BHATTA CHOWK TO AHMADPUR DISTRICT
BAHAWALPUR (10 KM)
045702- A03    Operating Expenses                                 6,103,000             1,038,000            18,555,000
045702- A039   General                                              6,103,000             1,038,000            18,555,000
045702- A12     Civil works                                         93,897,000            15,962,000          285,482,000
045702- A124    Building and Structures                             93,897,000            15,962,000          285,482,000
        Total- CONSTRUCTION OF METTALED ROAD         100,000,000         17,000,000        304,037,000
             20 FEET WIDE BHATTA CHOWK TO
          AHMADPUR DISTRICT BAHAWALPUR
               (10 KM)
IB9583 CONSTRUCTION / WIDENING OF KACHA PAKKA NOOR SHAH ROAD DISTRICT SAHIWAL
045702- A03    Operating Expenses                                 6,103,000             6,103,000            34,776,000
045702- A039   General                                              6,103,000             6,103,000            34,776,000
045702- A12     Civil works                                         93,897,000            93,897,000          535,014,000
045702- A124    Building and Structures                             93,897,000            93,897,000          535,014,000
        Total- CONSTRUCTION / WIDENING OF               100,000,000        100,000,000        569,790,000
          KACHA PAKKA NOOR SHAH ROAD
            DISTRICT SAHIWAL
IB9584 CONST / REHB. OF METALLED ROAD OF KHAIRPUR TAMAY WALI ROAD MOUZA JINDO SHAH CHAK
LADHY WALA & BASTI
045702- A03    Operating Expenses                               12,207,000            48,827,000            25,270,000
045702- A039   General                                             12,207,000            48,827,000            25,270,000
045702- A12     Civil works                                        187,793,000          751,173,000          388,770,000

Page 577

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                            187,793,000          751,173,000          388,770,000
        Total- CONST / REHB. OF METALLED ROAD          200,000,000        800,000,000        414,040,000
          OF KHAIRPUR TAMAY WALI ROAD
          MOUZA JINDO SHAH CHAK LADHY
         WALA & BASTI
IB9585 CONSTRUCTION OF IB OFFICES (03) AT GHALLANAI TD MOHMAND KOHAT AND D.I KHAN
045702- A03    Operating Expenses                                 3,052,000             3,052,000             8,789,000
045702- A039   General                                              3,052,000             3,052,000             8,789,000
045702- A12     Civil works                                         46,948,000            46,948,000          135,211,000
045702- A124    Building and Structures                             46,948,000            46,948,000          135,211,000
        Total- CONSTRUCTION OF IB OFFICES (03) AT         50,000,000         50,000,000        144,000,000
           GHALLANAI TD MOHMAND KOHAT AND
                 D.I KHAN
IB9586 INSTALLATION OF PRESSURE PUMPS / TUBEWELLS IN DISTRICT BANNU
045702- A03    Operating Expenses                               45,775,000            45,775,000            38,451,000
045702- A039   General                                             45,775,000            45,775,000            38,451,000
045702- A12     Civil works                                        704,225,000          704,225,000          591,549,000
045702- A124    Building and Structures                            704,225,000          704,225,000          591,549,000
        Total- INSTALLATION OF PRESSURE PUMPS /        750,000,000        750,000,000        630,000,000
          TUBEWELLS IN DISTRICT BANNU
IB9587 CONSTRUCTION OF AUDITORIUM AT NIM PESHAWAR
045702- A03    Operating Expenses                                 7,324,000             7,324,000
045702- A039   General                                              7,324,000             7,324,000
045702- A12     Civil works                                        112,676,000          112,676,000
045702- A124    Building and Structures                            112,676,000          112,676,000
        Total- CONSTRUCTION OF AUDITORIUM AT           120,000,000        120,000,000
            NIM PESHAWAR
IB9588 UPGRADATION OF INFRASTRUCTURE (SOLARIZATION) OF ACADEMIC BLOCKS BOUNDARY WALL AND
STRENGTHENING OF
045702- A03    Operating Expenses                                 3,943,000             3,943,000
045702- A039   General                                              3,943,000             3,943,000
045702- A12     Civil works                                         60,665,000            60,665,000
045702- A124    Building and Structures                             60,665,000            60,665,000
        Total- UPGRADATION OF INFRASTRUCTURE           64,608,000         64,608,000

Page 578

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

            (SOLARIZATION) OF ACADEMIC
          BLOCKS BOUNDARY WALL AND
           STRENGTHENING OF
IB9589 UPGRADATION OF NCRD COMPLEX (PHASE-III) AT CHAK SHAHZAD ISLAMABAD
045702- A03    Operating Expenses                                 2,197,000             2,197,000
045702- A039   General                                              2,197,000             2,197,000
045702- A12     Civil works                                         33,800,000            33,800,000
045702- A124    Building and Structures                             33,800,000            33,800,000
        Total- UPGRADATION OF NCRD COMPLEX             35,997,000         35,997,000
               (PHASE-III) AT CHAK SHAHZAD
           ISLAMABAD
IB9700 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME (SAP) (H&W) PUNJAB
045702- A12     Civil works                                                            26,229,295,000
045702- A124    Building and Structures                                                26,229,295,000
        Total- SUSTAINABLE DEVELOPMENT GOALS                          26,229,295,000
           ACHIEVEMENT PROGRAMME (SAP)
            (H&W) PUNJAB
IB9701 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME (SAP) (H&W) SINDH
045702- A12     Civil works                                                             8,296,719,000
045702- A124    Building and Structures                                                 8,296,719,000
        Total- SUSTAINABLE DEVELOPMENT GOALS                           8,296,719,000
           ACHIEVEMENT PROGRAMME (SAP)
            (H&W) SINDH
IB9702 SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME (SAP) (H&W) BALOCHISTAN
045702- A12     Civil works                                                             2,495,782,000
045702- A124    Building and Structures                                                 2,495,782,000
        Total- SUSTAINABLE DEVELOPMENT GOALS                           2,495,782,000
           ACHIEVEMENT PROGRAMME (SAP)
            (H&W) BALOCHISTAN
     045702   Total-  Buildings and Structures               34,920,518,000      77,707,055,000      23,828,459,000
045720 Others  :
IB3526 REHABILITATION / CONSTRUCTION OF ROADS AT LATIFABAD HYDERABAD CITY 6 NOS SCHEMES
045720- A03    Operating Expenses                               12,207,000            12,207,000             3,052,000
045720- A039   General                                             12,207,000            12,207,000             3,052,000
045720- A12     Civil works                                        187,793,000          187,793,000            46,948,000

Page 579

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045720- A124    Building and Structures                            187,793,000          187,793,000            46,948,000
        Total- REHABILITATION / CONSTRUCTION OF         200,000,000        200,000,000          50,000,000
          ROADS AT LATIFABAD HYDERABAD
            CITY 6 NOS SCHEMES
IB3527 REFURBISHMENT AND REHABILITATION OF GOVERNMENT OWNED BUILDINGS AT ISLAMABAD
045720- A03    Operating Expenses                                 6,103,000            24,718,000            30,516,000
045720- A039   General                                              6,103,000            24,718,000            30,516,000
045720- A12     Civil works                                         93,897,000          380,282,000          469,484,000
045720- A124    Building and Structures                             93,897,000          380,282,000          469,484,000
        Total- REFURBISHMENT AND                        100,000,000        405,000,000        500,000,000
            REHABILITATION OF GOVERNMENT
         OWNED BUILDINGS AT ISLAMABAD
IB3528 REFURBISHMENT OF EXISTING FACILITIES & PROVISION OF ADDITIONAL FACILITIES AT PM STAFF
COLONY ISLAMABAD
045720- A03    Operating Expenses                                 6,103,000             6,103,000             8,239,000
045720- A039   General                                              6,103,000             6,103,000             8,239,000
045720- A12     Civil works                                         93,897,000            93,897,000          126,761,000
045720- A124    Building and Structures                             93,897,000            93,897,000          126,761,000
        Total- REFURBISHMENT OF EXISTING                100,000,000        100,000,000        135,000,000
             FACILITIES & PROVISION OF
           ADDITIONAL FACILITIES AT PM STAFF
          COLONY ISLAMABAD
IB3529 REFURBISHMENT OF PM OFFICE ISLAMABAD
045720- A03    Operating Expenses                                 6,103,000             6,103,000             9,956,000
045720- A039   General                                              6,103,000             6,103,000             9,956,000
045720- A12     Civil works                                         93,897,000            93,897,000          153,174,000
045720- A124    Building and Structures                             93,897,000            93,897,000          153,174,000
        Total- REFURBISHMENT OF PM OFFICE              100,000,000        100,000,000        163,130,000
           ISLAMABAD
IB3541 DEVELOPMENT SCHEMES IN DISTRICT KACHHI JHAL MAGSI AND NASEERABAD(17 NOS SCHEMES)
045720- A03    Operating Expenses                                 1,053,000             1,053,000
045720- A039   General                                              1,053,000             1,053,000
045720- A12     Civil works                                         16,197,000            16,197,000
045720- A124    Building and Structures                             16,197,000            16,197,000

Page 580

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- DEVELOPMENT SCHEMES IN DISTRICT          17,250,000         17,250,000
           KACHHI JHAL MAGSI AND
           NASEERABAD(17 NOS SCHEMES)
IB3542 PAVEMENT OF STREETS SOLING SYSTEM IN 15 DIFFERENT AREAS OF GUJRANWALA
045720- A03    Operating Expenses                               16,784,000            16,784,000             9,897,000
045720- A039   General                                             16,784,000            16,784,000             9,897,000
045720- A12     Civil works                                        258,216,000          258,216,000          152,270,000
045720- A124    Building and Structures                            258,216,000          258,216,000          152,270,000
        Total- PAVEMENT OF STREETS SOLING              275,000,000        275,000,000        162,167,000
          SYSTEM IN 15 DIFFERENT AREAS OF
          GUJRANWALA
IB3543 CONSTRUCTION OF CARPETED ROAD FROM DHILLAN WAL PHATTAK TO AIMANABAD TOWN DISTRICT
GUJRANWALA AND
045720- A03    Operating Expenses                                 6,725,000             6,725,000             6,494,000
045720- A039   General                                              6,725,000             6,725,000             6,494,000
045720- A12     Civil works                                        103,461,000          103,461,000            99,906,000
045720- A124    Building and Structures                            103,461,000          103,461,000            99,906,000
        Total- CONSTRUCTION OF CARPETED ROAD         110,186,000        110,186,000        106,400,000
          FROM DHILLAN WAL PHATTAK TO
          AIMANABAD TOWN DISTRICT
          GUJRANWALA AND
IB3545 PROVIDING WATER SUPPLY SEWERAGE LINES CC TOPPING SOLAR LIGHTS IN VARIOUS WARDS / UCS
OF NAWABSHAH
045720- A03    Operating Expenses                                 6,103,000             6,103,000             3,052,000
045720- A039   General                                              6,103,000             6,103,000             3,052,000
045720- A12     Civil works                                         93,897,000            93,897,000            46,948,000
045720- A124    Building and Structures                             93,897,000            93,897,000            46,948,000
        Total- PROVIDING WATER SUPPLY                   100,000,000        100,000,000          50,000,000
          SEWERAGE LINES CC TOPPING SOLAR
            LIGHTS IN VARIOUS WARDS / UCS OF
          NAWABSHAH
IB3548 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE
SYSTEM IN VARIOUS UNION
045720- A03    Operating Expenses                                 9,155,000             9,155,000             3,052,000
045720- A039   General                                              9,155,000             9,155,000             3,052,000

Page 581

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045720- A12     Civil works                                        140,845,000          140,845,000            46,948,000
045720- A124    Building and Structures                            140,845,000          140,845,000            46,948,000
        Total- IMPROVEMENT/REHABILITATION OF           150,000,000        150,000,000          50,000,000
           DIFFERENT ROADS/STREETS
           INCLUDING WATER & SEWERAGE
          SYSTEM IN VARIOUS UNION
IB3549 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE
SYSTEM IN VARIOUS UNION
045720- A03    Operating Expenses                                 9,155,000             9,155,000             3,052,000
045720- A039   General                                              9,155,000             9,155,000             3,052,000
045720- A12     Civil works                                        140,845,000          140,845,000            46,948,000
045720- A124    Building and Structures                            140,845,000          140,845,000            46,948,000
        Total- IMPROVEMENT/REHABILITATION OF           150,000,000        150,000,000          50,000,000
           DIFFERENT ROADS/STREETS
           INCLUDING WATER & SEWERAGE
          SYSTEM IN VARIOUS UNION
IB3550 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE
SYSTEM IN VARIOUS UNION
045720- A03    Operating Expenses                                 9,155,000             9,155,000             3,052,000
045720- A039   General                                              9,155,000             9,155,000             3,052,000
045720- A12     Civil works                                        140,845,000          140,845,000            46,948,000
045720- A124    Building and Structures                            140,845,000          140,845,000            46,948,000
        Total- IMPROVEMENT/REHABILITATION OF           150,000,000        150,000,000          50,000,000
           DIFFERENT ROADS/STREETS
           INCLUDING WATER & SEWERAGE
          SYSTEM IN VARIOUS UNION
IB3553 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE
SYSTEM AT DISTRICT
045720- A03    Operating Expenses                                 9,155,000             9,155,000             3,052,000
045720- A039   General                                              9,155,000             9,155,000             3,052,000
045720- A12     Civil works                                        140,845,000          140,845,000            46,948,000
045720- A124    Building and Structures                            140,845,000          140,845,000            46,948,000
        Total- IMPROVEMENT/REHABILITATION OF           150,000,000        150,000,000          50,000,000
           DIFFERENT ROADS/STREETS
           INCLUDING WATER & SEWERAGE

Page 582

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          SYSTEM AT DISTRICT
IB3555 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS /STREETS INCLUDING WATER & SEWERAGE
SYSTEM AT VARIOUS MAIN
045720- A03    Operating Expenses                               12,207,000            12,207,000             3,052,000
045720- A039   General                                             12,207,000            12,207,000             3,052,000
045720- A12     Civil works                                        187,793,000          187,793,000            46,948,000
045720- A124    Building and Structures                            187,793,000          187,793,000            46,948,000
        Total- IMPROVEMENT/REHABILITATION OF           200,000,000        200,000,000          50,000,000
           DIFFERENT ROADS /STREETS
           INCLUDING WATER & SEWERAGE
          SYSTEM AT VARIOUS MAIN
IB3556 DEVELOPMENT SCHEMES UNDER PRIME MINISTERS PROGRAMME IN SINDH- LARKANA SUKKUR AND
SHAHEED
045720- A03    Operating Expenses                               18,310,000            18,310,000             3,052,000
045720- A039   General                                             18,310,000            18,310,000             3,052,000
045720- A12     Civil works                                        281,690,000          281,690,000            46,948,000
045720- A124    Building and Structures                            281,690,000          281,690,000            46,948,000
        Total- DEVELOPMENT SCHEMES UNDER             300,000,000        300,000,000          50,000,000
           PRIME MINISTERS PROGRAMME IN
            SINDH- LARKANA SUKKUR AND
          SHAHEED
IB3557 DEVELOPMENT SCHEMES UNDER PRIME MINISTERS PROGRAMME IN SINDH- HYDERABAD AND
MIRPURKHAS DIVISIONS
045720- A03    Operating Expenses                               12,207,000            12,207,000             3,052,000
045720- A039   General                                             12,207,000            12,207,000             3,052,000
045720- A12     Civil works                                        187,793,000          187,793,000            46,948,000
045720- A124    Building and Structures                            187,793,000          187,793,000            46,948,000
        Total- DEVELOPMENT SCHEMES UNDER             200,000,000        200,000,000          50,000,000
           PRIME MINISTERS PROGRAMME IN
            SINDH- HYDERABAD AND
          MIRPURKHAS DIVISIONS
IB3563 CONSTRUCTION OF BLACK TOP ROAD CHINKINDIK TO MASKEECHAH DISTRICT CHAGHI
045720- A03    Operating Expenses                                 8,289,000             8,289,000             6,106,000
045720- A039   General                                              8,289,000             8,289,000             6,106,000
045720- A12     Civil works                                        127,518,000          127,518,000            93,933,000

Page 583

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045720- A124    Building and Structures                            127,518,000          127,518,000            93,933,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        135,807,000        135,807,000        100,039,000
            CHINKINDIK TO MASKEECHAH
            DISTRICT CHAGHI
IB3567 19 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN
045720- A03    Operating Expenses                                 1,831,000              610,000              610,000
045720- A039   General                                              1,831,000              610,000              610,000
045720- A12     Civil works                                         28,169,000             9,390,000             9,390,000
045720- A124    Building and Structures                             28,169,000             9,390,000             9,390,000
        Total- 19 NOS DEVELOPMENT SCHEMES IN            30,000,000         10,000,000          10,000,000
            DISTRICT BADIN
IB3568 11 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN
045720- A03    Operating Expenses                                 3,052,000              610,000              610,000
045720- A039   General                                              3,052,000              610,000              610,000
045720- A12     Civil works                                         46,948,000             9,390,000             9,390,000
045720- A124    Building and Structures                             46,948,000             9,390,000             9,390,000
        Total- 11 NOS DEVELOPMENT SCHEMES IN            50,000,000         10,000,000          10,000,000
            DISTRICT BADIN
IB3569 15 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN
045720- A03    Operating Expenses                                 2,441,000              610,000              610,000
045720- A039   General                                              2,441,000              610,000              610,000
045720- A12     Civil works                                         37,559,000             9,390,000             9,390,000
045720- A124    Building and Structures                             37,559,000             9,390,000             9,390,000
        Total- 15 NOS DEVELOPMENT SCHEMES IN            40,000,000         10,000,000          10,000,000
            DISTRICT BADIN
IB3570 CONSTRUCTION OF METALED ROADS IN TALUKA LAKHI DISTRICT SHIKARPUR SINDH (09 SCHEMES)
045720- A03    Operating Expenses                                 6,103,000              610,000              610,000
045720- A039   General                                              6,103,000              610,000              610,000
045720- A12     Civil works                                         93,897,000             9,390,000             9,390,000
045720- A124    Building and Structures                             93,897,000             9,390,000             9,390,000
        Total- CONSTRUCTION OF METALED ROADS         100,000,000         10,000,000          10,000,000
              IN TALUKA LAKHI DISTRICT
           SHIKARPUR SINDH (09 SCHEMES)
IB3571 CONSTRUCTION OF BLACK TOP ROADS PURANA DUKI AND RABBAT VILLAGES DISTRICT DUKI

Page 584

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045720- A03    Operating Expenses                                 1,831,000             1,831,000             7,385,000
045720- A039   General                                              1,831,000             1,831,000             7,385,000
045720- A12     Civil works                                         28,169,000            28,169,000          113,615,000
045720- A124    Building and Structures                             28,169,000            28,169,000          113,615,000
        Total- CONSTRUCTION OF BLACK TOP                30,000,000         30,000,000        121,000,000
          ROADS PURANA DUKI AND RABBAT
           VILLAGES DISTRICT DUKI
IB3576 DEVELOPMENT SCHEMES IN THAMBO & DMJAMALI DISTRICT NASEERABAD (2 NOS DEVELOPMENT
SCHEMES)
045720- A03    Operating Expenses                                 610,000              610,000
045720- A039   General                                              610,000              610,000
045720- A12     Civil works                                           9,390,000             9,390,000
045720- A124    Building and Structures                               9,390,000             9,390,000
        Total- DEVELOPMENT SCHEMES IN THAMBO          10,000,000         10,000,000
          & DMJAMALI DISTRICT NASEERABAD
                (2 NOS DEVELOPMENT SCHEMES)
IB3591 CONSTRUCTION OF SOLINGS/NALL AND TUFF TILE IN DIFFERENT UCS OF TEHSIL YAZMAN DISTRICT
BAHAWALPUR (02 NOS
045720- A03    Operating Expenses                                 4,577,000                                   335,000
045720- A039   General                                              4,577,000                                   335,000
045720- A12     Civil works                                         70,423,000                                   5,159,000
045720- A124    Building and Structures                             70,423,000                                   5,159,000
        Total- CONSTRUCTION OF SOLINGS/NALL             75,000,000                               5,494,000
          AND TUFF TILE IN DIFFERENT UCS OF
            TEHSIL YAZMAN DISTRICT
          BAHAWALPUR (02 NOS
IB3595 CONSTRUCTION OF METALED ROADS AND BRIDGES IN DIFFERENT AREAS OF DISTRICT BAHAWALPUR
(12 NOS
045720- A03    Operating Expenses                                 6,990,000
045720- A039   General                                              6,990,000
045720- A12     Civil works                                        107,536,000
045720- A124    Building and Structures                            107,536,000
        Total- CONSTRUCTION OF METALED ROADS         114,526,000
          AND BRIDGES IN DIFFERENT AREAS
          OF DISTRICT BAHAWALPUR (12 NOS

Page 585

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3596 CONSTRUCTION OF SOLING IN DIFFERENT AREAS OF TEHSIL YAZMAN DISTRICT BAHAWALPUR (20 NOS
SCHEMES)
045720- A03    Operating Expenses                                 8,979,000
045720- A039   General                                              8,979,000
045720- A12     Civil works                                        138,139,000
045720- A124    Building and Structures                            138,139,000
        Total- CONSTRUCTION OF SOLING IN                147,118,000
           DIFFERENT AREAS OF TEHSIL YAZMAN
            DISTRICT BAHAWALPUR (20 NOS
           SCHEMES)
IB3599 CONSTRUCTION OF PCC ROAD AND INFRASTRUCTURE DEVELOPMENT AT DIFFERENT UNION COUNCIL
DISTRICT
045720- A03    Operating Expenses                                 6,103,000             6,103,000             9,276,000
045720- A039   General                                              6,103,000             6,103,000             9,276,000
045720- A12     Civil works                                         93,897,000            93,897,000          142,702,000
045720- A124    Building and Structures                             93,897,000            93,897,000          142,702,000
        Total- CONSTRUCTION OF PCC ROAD AND           100,000,000        100,000,000        151,978,000
           INFRASTRUCTURE DEVELOPMENT AT
           DIFFERENT UNION COUNCIL DISTRICT
IB3602 REHABILITATION & IMPROVEMENT OF ROAD IN DISTRICT CHAKWAL (12 NOS SCHEMES)
045720- A03    Operating Expenses                                 6,422,000             6,422,000
045720- A039   General                                              6,422,000             6,422,000
045720- A12     Civil works                                         98,795,000            98,795,000
045720- A124    Building and Structures                             98,795,000            98,795,000
        Total- REHABILITATION & IMPROVEMENT OF         105,217,000        105,217,000
          ROAD IN DISTRICT CHAKWAL (12 NOS
           SCHEMES)
IB3603 DEVELOPMENT SCHEMES OF INFRASTRUCTURE AND PUBLIC WORKS IN DIFFERENT UCS OF DISTRICT
GUJRAT
045720- A03    Operating Expenses                                 6,103,000             2,746,000             3,052,000
045720- A039   General                                              6,103,000             2,746,000             3,052,000
045720- A12     Civil works                                         93,897,000            42,254,000            46,948,000
045720- A124    Building and Structures                             93,897,000            42,254,000            46,948,000
        Total- DEVELOPMENT SCHEMES OF                  100,000,000         45,000,000          50,000,000

Page 586

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

           INFRASTRUCTURE AND PUBLIC
         WORKS IN DIFFERENT UCS OF
            DISTRICT GUJRAT
IB3604 DEVELOPMENT SCHEMES IN DIFFERENT UCS OF DISTRICT GUJRAT-II (38 NOS DEVELOPMENT SCHEMES)
045720- A03    Operating Expenses                                 6,103,000             2,746,000            10,498,000
045720- A039   General                                              6,103,000             2,746,000            10,498,000
045720- A12     Civil works                                         93,897,000            42,254,000          161,504,000
045720- A124    Building and Structures                             93,897,000            42,254,000          161,504,000
        Total- DEVELOPMENT SCHEMES IN                  100,000,000         45,000,000        172,002,000
           DIFFERENT UCS OF DISTRICT
             GUJRAT-II (38 NOS DEVELOPMENT
           SCHEMES)
IB3606 MISCELLANEOUS DEVELOPMENT SCHEMES IN TEHSIL KOT MOMIN & TEHSIL SARGODHA DISTRICT
SARGODHA
045720- A03    Operating Expenses                               15,258,000            15,258,000             6,103,000
045720- A039   General                                             15,258,000            15,258,000             6,103,000
045720- A12     Civil works                                        234,742,000          234,742,000            93,897,000
045720- A124    Building and Structures                            234,742,000          234,742,000            93,897,000
        Total- MISCELLANEOUS DEVELOPMENT             250,000,000        250,000,000        100,000,000
          SCHEMES IN TEHSIL KOT MOMIN &
            TEHSIL SARGODHA DISTRICT
          SARGODHA
IB3607 CONSTRUCTION OF ROAD/PCC/TUFF PAVER/NALLAH/SOLING/DRAIN/CULVERTS IN CHAK 105 SB &
RUKHAN DISTRICT
045720- A03    Operating Expenses                               21,362,000            21,362,000             5,564,000
045720- A039   General                                             21,362,000            21,362,000             5,564,000
045720- A12     Civil works                                        328,638,000          328,638,000            85,602,000
045720- A124    Building and Structures                            328,638,000          328,638,000            85,602,000
        Total- CONSTRUCTION OF ROAD/PCC/TUFF          350,000,000        350,000,000          91,166,000
            PAVER/NALLAH/SOLING/DRAIN/CULVE
           RTS IN CHAK 105 SB & RUKHAN
            DISTRICT
IB3608 CONSTRUCTION OF ROAD/PCC/TUFF
045720- A03    Operating Expenses                               30,516,000            91,546,000            26,789,000
045720- A039   General                                             30,516,000            91,546,000            26,789,000

Page 587

NO. 130.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045720- A12     Civil works                                        469,484,000         1,408,454,000          412,137,000
045720- A124    Building and Structures                            469,484,000         1,408,454,000          412,137,000
        Total- CONSTRUCTION OF ROAD/PCC/TUFF          500,000,000       1,500,000,000        438,926,000
     045720   Total-  Others                                 4,540,104,000       5,218,460,000       2,787,302,000
     0457     Total-  Construction (Works)                  41,880,872,000      86,038,750,000      28,188,072,000
     045      Total-  Construction and Transport             41,880,872,000      86,038,750,000      28,188,072,000
     04        Total-  Economic Affairs                      41,880,872,000      86,038,750,000      28,188,072,000
               Total- ACCOUNTANT GENERAL                41,880,872,000        86,038,750,000        28,188,072,000
                PAKISTAN REVENUES
          TOTAL - DEMAND                           41,880,872,000      86,038,750,000      28,188,072,000

Page 588

No text layer on this page, see the official PDF.

Page 589

                                   SECTION V
                        MINISTRY OF INDUSTRIES AND PRODUCTION
                                                            **********

                                                                                  2024-2025
                                                                             Budget
                                                                                     Estimate

                                                                      (Rupees in Thousand)

Demands presented on behalf of the Ministry of
Industries and Production

Development Expendiutre on Capital Account.

             131.  Capital Outlay on Industrial Development                                  4,918,758

                                                                           Total :              4,918,758

Page 590

No text layer on this page, see the official PDF.

Page 591

NO. 131.- CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT                    DEMANDS FOR GRANTS
                                DEMAND NO. 131
                                                                            ( FC12C32 )
                         CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2025 to defray the Salaries and Other
Expenses of the CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT.

                                Voted           Rs. 4,918,758,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF INDUSTRIES AND PRODUCTION  .

                                                           2023-2024         2023-2024         2024-2025
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
044    Mining and Manufacturing                                 13,000,000,000         1,922,520,000         4,918,758,000
               Total                                              13,000,000,000         1,922,520,000         4,918,758,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                         231,971,000        134,120,000        222,456,000
A011  Pay                                                        231,971,000          134,120,000          222,456,000
A011-1 Pay of Officers                                               (179,256,000)         (115,980,000)         (148,605,000)
A011-2 Pay of Other Staff                                              (52,715,000)           (18,140,000)           (73,851,000)
A02    Project Pre-Investment Analysis                        50,000,000         91,000,000
A03   Operating Expenses                                  145,178,000        104,301,000        545,186,000
A05   Grants, Subsidies and Write off Loans               10,448,171,000        258,504,000        217,582,000
A09   Physical Assets                                      1,299,240,000        842,400,000       1,964,137,000
A12    Civil works                                           760,440,000        461,920,000       1,939,397,000
A13   Repairs and Maintenance                               65,000,000         30,275,000         30,000,000
               Total                                        13,000,000,000       1,922,520,000       4,918,758,000

Page 592

NO. 131.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2023-2024         2023-2024       2024-2025
                                       2023-24 2024-25       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
IB5262 SUPPORT FOR INDUSTRIAL DEVELOPMENT STRENGTHENING THE ENGINEERING INDUSTRY
044101- A01    Employees Related Expenses                      58,000,000            25,000,000            80,000,000
044101- A011   Pay                      15     19           58,000,000            25,000,000            80,000,000
044101- A011-1 Pay of Officers               (15)    (13)         (58,000,000)         (25,000,000)         (65,000,000)
044101- A011-2 Pay of Other Staff                       (6)                                                  (15,000,000)
044101- A03    Operating Expenses                                 8,000,000             8,000,000          102,000,000
044101- A032   Communications                                                                                 1,000,000
044101- A037   Consultancy and Contractual Work                   4,000,000             4,000,000            28,000,000
044101- A038    Travel & Transportation                                                                           5,000,000
044101- A039   General                                              4,000,000             4,000,000            68,000,000
044101- A09    Physical Assets                                      4,000,000             4,000,000            18,000,000
044101- A092   Computer Equipment                                 4,000,000             4,000,000            14,000,000
044101- A096   Purchase of Plant and Machinery                                                                 2,000,000
044101- A097   Purchase of Furniture and Fixture                                                                 2,000,000
        Total- SUPPORT FOR INDUSTRIAL                     70,000,000         37,000,000        200,000,000
          DEVELOPMENT STRENGTHENING THE
           ENGINEERING INDUSTRY
IB9598 PRIME MINISTER'S YOUTH PROGRAMME FOR SMALL LOANS
044101- A05    Grants, Subsidies and Write off Loans         10,000,000,000
044101- A052   Grants Domestic                                10,000,000,000
        Total- PRIME MINISTER'S YOUTH                  10,000,000,000
         PROGRAMME FOR SMALL LOANS
     044101   Total-  Support for Industrial Development      10,070,000,000         37,000,000        200,000,000

     0441     Total-  Manufacturing                        10,070,000,000         37,000,000        200,000,000
     044      Total-  Mining and Manufacturing              10,070,000,000         37,000,000        200,000,000
     04        Total-  Economic Affairs                      10,070,000,000         37,000,000        200,000,000
               Total- ACCOUNTANT GENERAL                10,070,000,000            37,000,000          200,000,000
                PAKISTAN REVENUES

Page 593

NO. 131.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
LO1175 NATIONAL BUSINESS DEVELOPMENT PROGRAM FOR SME'S
044101- A01    Employees Related Expenses                      47,024,000            36,605,000
044101- A011   Pay                      39                   47,024,000            36,605,000
044101- A011-1 Pay of Officers               (29)                (41,198,000)         (34,705,000)
044101- A011-2 Pay of Other Staff            (10)                  (5,826,000)          (1,900,000)
044101- A03    Operating Expenses                               30,000,000            25,525,000
044101- A037   Consultancy and Contractual Work                   3,250,000             2,695,000
044101- A039   General                                             26,750,000            22,830,000
044101- A05    Grants, Subsidies and Write off Loans            222,976,000            14,000,000
044101- A052   Grants Domestic                                  222,976,000            14,000,000
        Total- NATIONAL BUSINESS DEVELOPMENT          300,000,000         76,130,000
         PROGRAM FOR SME'S
LO1180 PRODUCT DEV. CENTRE FOR COMPOSITES BASED SPORTS GOOD SIALKOT
044101- A01    Employees Related Expenses                      18,170,000             5,720,000            27,111,000
044101- A011   Pay                      51     56           18,170,000             5,720,000            27,111,000
044101- A011-1 Pay of Officers                  (4)      (6)          (3,990,000)          (2,900,000)          (4,200,000)
044101- A011-2 Pay of Other Staff            (47)    (50)         (14,180,000)          (2,820,000)         (22,911,000)
044101- A03    Operating Expenses                               11,680,000             1,600,000            29,089,000
044101- A039   General                                             11,680,000             1,600,000            29,089,000
044101- A05    Grants, Subsidies and Write off Loans              4,000,000
044101- A052   Grants Domestic                                     4,000,000
044101- A09    Physical Assets                                    12,000,000             1,000,000            46,237,000
044101- A096   Purchase of Plant and Machinery                    10,000,000                                 15,680,000
044101- A098   Purchase of Other Assets                             2,000,000             1,000,000            30,557,000
        Total- PRODUCT DEV. CENTRE FOR                   45,850,000           8,320,000        102,437,000
           COMPOSITES BASED SPORTS GOOD
           SIALKOT
LO1182 BUSINESS SKILL DEV. CENTRE FOR WOMEN AT VARIOUS LOCATION
044101- A01    Employees Related Expenses                       9,151,000             8,868,000             6,955,000

Page 594

NO. 131.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A011   Pay                       8      8            9,151,000             8,868,000             6,955,000
044101- A011-1 Pay of Officers                  (4)      (8)          (6,946,000)          (6,663,000)          (6,955,000)
044101- A011-2 Pay of Other Staff               (4)                  (2,205,000)          (2,205,000)
044101- A03    Operating Expenses                                 2,859,000             2,728,000             4,241,000
044101- A032   Communications                                     100,000              100,000
044101- A033     Utilities                                               250,000              250,000
044101- A034   Occupancy Costs                                     888,000              881,000
044101- A038    Travel & Transportation                               400,000              400,000
044101- A039   General                                              1,221,000             1,097,000             4,241,000
044101- A05    Grants, Subsidies and Write off Loans              2,450,000             2,450,000
044101- A052   Grants Domestic                                     2,450,000             2,450,000
044101- A09    Physical Assets                                      100,000              100,000
044101- A098   Purchase of Other Assets                             100,000              100,000
044101- A12     Civil works                                           440,000               40,000
044101- A124    Building and Structures                               440,000               40,000
        Total- BUSINESS SKILL DEV. CENTRE FOR            15,000,000         14,186,000          11,196,000
         WOMEN AT VARIOUS LOCATION
LO1280 INDUSTRIAL DESIGN AND AUTOMATION CENTRE
044101- A01    Employees Related Expenses                      14,000,000             6,500,000            16,000,000
044101- A011   Pay                      18     18           14,000,000             6,500,000            16,000,000
044101- A011-1 Pay of Officers                  (5)      (5)          (5,000,000)          (5,000,000)          (7,000,000)
044101- A011-2 Pay of Other Staff            (13)    (13)          (9,000,000)          (1,500,000)          (9,000,000)
044101- A03    Operating Expenses                                 4,000,000             1,000,000             5,000,000
044101- A039   General                                              4,000,000             1,000,000             5,000,000
044101- A05    Grants, Subsidies and Write off Loans              3,000,000             1,500,000             4,000,000
044101- A052   Grants Domestic                                     3,000,000             1,500,000             4,000,000
044101- A09    Physical Assets                                    19,000,000            71,125,000          115,000,000
044101- A091   Purchase of Building                                  1,125,000             1,125,000             2,500,000
044101- A092   Computer Equipment                               13,675,000                                 13,700,000
044101- A096   Purchase of Plant and Machinery                                         70,000,000            94,600,000
044101- A097   Purchase of Furniture and Fixture                     4,200,000                                   4,200,000
044101- A12     Civil works                                        160,000,000                                160,000,000
044101- A124    Building and Structures                            160,000,000                                160,000,000
       Total- INDUSTRIAL DESIGN AND                     200,000,000         80,125,000        300,000,000
          AUTOMATION CENTRE

Page 595

NO. 131.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
LO1299 1000 INDUSTRIAL STITCHING UNITS ALL ACROSS PAKISTAN
044101- A01    Employees Related Expenses                      15,500,000            13,500,000            15,500,000
044101- A011   Pay                      14                   15,500,000            13,500,000            15,500,000
044101- A011-1 Pay of Officers                  (7)                (14,000,000)         (12,000,000)         (13,500,000)
044101- A011-2 Pay of Other Staff               (7)                  (1,500,000)          (1,500,000)          (2,000,000)
044101- A03    Operating Expenses                               13,000,000            13,000,000            23,196,000
044101- A038    Travel & Transportation                               3,500,000             3,500,000
044101- A039   General                                              9,500,000             9,500,000            23,196,000
044101- A05    Grants, Subsidies and Write off Loans              2,500,000             2,500,000            38,458,000
044101- A052   Grants Domestic                                     2,500,000             2,500,000            38,458,000
044101- A09    Physical Assets                                   135,140,000            69,535,000
044101- A096   Purchase of Plant and Machinery                  135,140,000            69,535,000
        Total- 1000 INDUSTRIAL STITCHING UNITS            166,140,000         98,535,000          77,154,000
           ALL ACROSS PAKISTAN
LO1303 ACQUISITION OF LAND FOR ESTABLISHMENT OF SME FACILITATION CENTRES AT VARIOUS LOCATIONS
044101- A01    Employees Related Expenses                                                                 10,215,000
044101- A011   Pay                                 6                                                      10,215,000
044101- A011-1 Pay of Officers                           (4)                                                    (8,715,000)
044101- A011-2 Pay of Other Staff                       (2)                                                    (1,500,000)
044101- A03    Operating Expenses                                 2,000,000             2,000,000            18,500,000
044101- A039   General                                              2,000,000             2,000,000            18,500,000
044101- A05    Grants, Subsidies and Write off Loans             98,000,000          166,456,000            43,859,000
044101- A052   Grants Domestic                                    98,000,000          166,456,000            43,859,000
044101- A09    Physical Assets                                                                               16,900,000
044101- A091   Purchase of Building                                                                             5,150,000
044101- A092   Computer Equipment                                                                             3,050,000
044101- A095   Purchase of Transport                                                                            4,500,000
044101- A097   Purchase of Furniture and Fixture                                                                 3,000,000
044101- A098   Purchase of Other Assets                                                                        1,200,000
044101- A12     Civil works                                                                                   572,873,000
044101- A124    Building and Structures                                                                       572,873,000
       Total- ACQUISITION OF LAND FOR                   100,000,000        168,456,000        662,347,000
           ESTABLISHMENT OF SME
            FACILITATION CENTRES AT VARIOUS
           LOCATIONS

Page 596

NO. 131.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
LO1644 SUPPORT CENTRE FOR DENTAL AND SURGICAL EQUIPMENT'S (SCDS) SIALKOT
044101- A01    Employees Related Expenses                       9,000,000             6,500,000             8,000,000
044101- A011   Pay                       3      3            9,000,000             6,500,000             8,000,000
044101- A011-1 Pay of Officers                  (3)      (2)          (9,000,000)          (6,500,000)          (5,000,000)
044101- A011-2 Pay of Other Staff                       (1)                                                    (3,000,000)
044101- A03    Operating Expenses                                 3,000,000             1,563,000             5,000,000
044101- A039   General                                              3,000,000             1,563,000             5,000,000
044101- A05    Grants, Subsidies and Write off Loans              5,000,000             1,000,000             5,000,000
044101- A052   Grants Domestic                                     5,000,000             1,000,000             5,000,000
044101- A09    Physical Assets                                    93,000,000            39,000,000          121,000,000
044101- A092   Computer Equipment                               14,000,000                                 14,000,000
044101- A096   Purchase of Plant and Machinery                    76,000,000            39,000,000          104,000,000
044101- A097   Purchase of Furniture and Fixture                     3,000,000                                   3,000,000
044101- A12     Civil works                                         90,000,000            11,500,000          111,000,000
044101- A124    Building and Structures                             90,000,000            11,500,000          111,000,000
        Total- SUPPORT CENTRE FOR DENTAL AND          200,000,000         59,563,000        250,000,000
           SURGICAL EQUIPMENT'S (SCDS)
           SIALKOT
LO1645 RESEARCH REGULATORY INSIGHTS & ADVOCACY ASSISTANCE FOR SMES
044101- A01    Employees Related Expenses                      15,255,000            11,039,000            16,275,000
044101- A011   Pay                      10     10           15,255,000            11,039,000            16,275,000
044101- A011-1 Pay of Officers                  (6)      (6)         (13,755,000)         (10,469,000)         (15,275,000)
044101- A011-2 Pay of Other Staff               (4)      (4)          (1,500,000)            (570,000)          (1,000,000)
044101- A03    Operating Expenses                                 8,500,000             8,500,000             7,460,000
044101- A034   Occupancy Costs                                     3,600,000             3,600,000             3,960,000
044101- A039   General                                              4,900,000             4,900,000             3,500,000
044101- A05    Grants, Subsidies and Write off Loans             56,245,000            25,398,000            56,265,000
044101- A052   Grants Domestic                                    56,245,000            25,398,000            56,265,000
        Total- RESEARCH REGULATORY INSIGHTS &          80,000,000         44,937,000          80,000,000
          ADVOCACY ASSISTANCE FOR SMES
LO3121 SME BUSINESS FACILITATION CENTRE (SMEBFC) MULTAN
044101- A01    Employees Related Expenses                       8,671,000             6,372,000
044101- A011   Pay                      13                    8,671,000             6,372,000
044101- A011-1 Pay of Officers                  (8)                  (6,367,000)          (5,954,000)
044101- A011-2 Pay of Other Staff               (5)                  (2,304,000)            (418,000)
044101- A03    Operating Expenses                               10,339,000             5,315,000

Page 597

NO. 131.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
044101- A039   General                                             10,339,000             5,315,000
044101- A05    Grants, Subsidies and Write off Loans              4,000,000              700,000
044101- A052   Grants Domestic                                     4,000,000              700,000
        Total- SME BUSINESS FACILITATION CENTRE         23,010,000         12,387,000
            (SMEBFC) MULTAN
LO9644 NATIONAL STRATEGIC PROGRAM FOR ACQUISITION OF IND TECH-NSPAIT INCLUDING FEASIBILITY-
KNOWLEDGE
044101- A01    Employees Related Expenses                      35,000,000            12,852,000            35,000,000
044101- A011   Pay                      17     28           35,000,000            12,852,000            35,000,000
044101- A011-1 Pay of Officers                  (8)    (13)         (20,000,000)          (5,957,000)         (20,000,000)
044101- A011-2 Pay of Other Staff               (9)    (15)         (15,000,000)          (6,895,000)         (15,000,000)
044101- A03    Operating Expenses                               28,000,000            10,234,000            30,000,000
044101- A039   General                                             28,000,000            10,234,000            30,000,000
044101- A05    Grants, Subsidies and Write off Loans             50,000,000            44,500,000            70,000,000
044101- A052   Grants Domestic                                    50,000,000            44,500,000            70,000,000
044101- A09    Physical Assets                                   122,000,000            32,140,000          335,000,000
044101- A092   Computer Equipment                               10,000,000             7,000,000            20,000,000
044101- A095   Purchase of Transport                              15,000,000                                   9,000,000
044101- A096   Purchase of Plant and Machinery                    82,000,000            13,140,000          290,000,000
044101- A097   Purchase of Furniture and Fixture                     5,000,000             5,000,000             8,000,000
044101- A098   Purchase of Other Assets                           10,000,000             7,000,000             8,000,000
044101- A13    Repairs and Maintenance                          65,000,000            30,275,000            30,000,000
044101- A133    Buildings and Structure                             65,000,000            30,275,000            30,000,000
        Total- NATIONAL STRATEGIC PROGRAM FOR        300,000,000        130,001,000        500,000,000
            ACQUISITION OF IND TECH-NSPAIT
           INCLUDING FEASIBILITY- KNOWLEDGE
     044101   Total-  Support for Industrial Development       1,430,000,000        692,640,000       1,983,134,000
     0441     Total-  Manufacturing                          1,430,000,000        692,640,000       1,983,134,000
     044      Total-  Mining and Manufacturing               1,430,000,000        692,640,000       1,983,134,000
     04        Total-  Economic Affairs                       1,430,000,000        692,640,000       1,983,134,000
               Total- ACCOUNTANT GENERAL                 1,430,000,000          692,640,000         1,983,134,000
                PAKISTAN REVENUES
                  SUB-OFFICE, LAHORE

Page 598

NO. 131.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
KA1373 DEVELOPMENT OF KARACHI INDUSTRIAL PARK (KIP) AT 1500 ACRES PSM LAND KARACHI
044101- A02     Project Pre-Investment Analysis                   50,000,000            91,000,000
044101- A021    Feasibility Studies                                   50,000,000            91,000,000
044101- A03    Operating Expenses                                                                         209,000,000
044101- A037   Consultancy and Contractual Work                                                            209,000,000
        Total- DEVELOPMENT OF KARACHI                   50,000,000         91,000,000        209,000,000
            INDUSTRIAL PARK (KIP) AT 1500
          ACRES PSM LAND KARACHI
KA1374 ESTABLISHMENT OF HIGH TENSILE SHEET METAL DIES MANUFACTURING AND TITANIUM COATING
SETUP AT KTDMC
044101- A09    Physical Assets                                    90,000,000             6,500,000          205,000,000
044101- A091   Purchase of Building                                                                             5,000,000
044101- A096   Purchase of Plant and Machinery                    90,000,000             6,500,000          200,000,000
044101- A12     Civil works                                         60,000,000              380,000            18,130,000
044101- A124    Building and Structures                             60,000,000              380,000            18,130,000
        Total- ESTABLISHMENT OF HIGH TENSILE            150,000,000           6,880,000        223,130,000
           SHEET METAL DIES MANUFACTURING
          AND TITANIUM COATING SETUP AT
          KTDMC
KA7198 ESTABLISHMENT OF 132 KV GRID STATION AT BIN QASIM INDUSTRIAL PARK KARACHI
044101- A03    Operating Expenses                               11,000,000            11,000,000            11,000,000
044101- A037   Consultancy and Contractual Work                  11,000,000            11,000,000            11,000,000
044101- A09    Physical Assets                                   824,000,000          619,000,000         1,105,000,000
044101- A096   Purchase of Plant and Machinery                  824,000,000          619,000,000         1,105,000,000
044101- A12     Civil works                                        165,000,000          165,000,000          187,494,000
044101- A125   Other Works                                      165,000,000          165,000,000          187,494,000
        Total- ESTABLISHMENT OF 132 KV GRID            1,000,000,000        795,000,000       1,303,494,000
           STATION AT BIN QASIM INDUSTRIAL
          PARK KARACHI
     044101   Total-  Support for Industrial Development       1,200,000,000        892,880,000       1,735,624,000
     0441     Total-  Manufacturing                          1,200,000,000        892,880,000       1,735,624,000
     044      Total-  Mining and Manufacturing               1,200,000,000        892,880,000       1,735,624,000
     04        Total-  Economic Affairs                       1,200,000,000        892,880,000       1,735,624,000
               Total- ACCOUNTANT GENERAL                 1,200,000,000          892,880,000         1,735,624,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI

Page 599

NO. 131.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
LS0109 ESTABLISHMENT OF HUB SPECIAL ECONOMIC ZONE LASBELA
044101- A01    Employees Related Expenses                       2,200,000             1,164,000             7,400,000
044101- A011   Pay                      29     29            2,200,000             1,164,000             7,400,000
044101- A011-1 Pay of Officers               (12)    (12)          (1,000,000)            (832,000)          (2,960,000)
044101- A011-2 Pay of Other Staff            (17)    (17)          (1,200,000)            (332,000)          (4,440,000)
044101- A03    Operating Expenses                               12,800,000            13,836,000          100,700,000
044101- A032   Communications                                     100,000              100,000              200,000
044101- A037   Consultancy and Contractual Work                   6,000,000             6,000,000            32,000,000
044101- A038    Travel & Transportation                               1,500,000             1,500,000             2,500,000
044101- A039   General                                              5,200,000             6,236,000            66,000,000
044101- A09    Physical Assets                                                                                 2,000,000
044101- A097   Purchase of Furniture and Fixture                                                                 2,000,000
044101- A12     Civil works                                        285,000,000          285,000,000          889,900,000
044101- A121   Roads Highways and Bridges                      180,000,000          180,000,000          150,000,000
044101- A123   Embankment and Drainage Works                 105,000,000          105,000,000            80,000,000
044101- A124    Building and Structures                                                                       259,900,000
044101- A125   Other Works                                                                                 400,000,000
        Total- ESTABLISHMENT OF HUB SPECIAL            300,000,000        300,000,000       1,000,000,000
          ECONOMIC ZONE LASBELA
     044101   Total-  Support for Industrial Development         300,000,000        300,000,000       1,000,000,000
     0441     Total-  Manufacturing                           300,000,000        300,000,000       1,000,000,000
     044      Total-  Mining and Manufacturing                 300,000,000        300,000,000       1,000,000,000
     04        Total-  Economic Affairs                        300,000,000        300,000,000       1,000,000,000
               Total- ACCOUNTANT GENERAL                  300,000,000          300,000,000         1,000,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
          TOTAL - DEMAND                           13,000,000,000       1,922,520,000       4,918,758,000

Page 600

No text layer on this page, see the official PDF.