Skip to content
Qanoon Digest

Details of Demands for Grants and Appropriations Vol-IV (Development), part 7

FY 2022-23Details of demandsPages 601 to 668 of 668

The Details of Demands for Grants and Appropriations Vol-IV (Development) is part of the federal budget for FY 2022-23. This page reproduces the text of its 668 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.

Go to a page or part

This text was extracted automatically from the PDF's text layer. Tables may lose their column alignment, and a page with no text layer is marked rather than guessed. Check the official PDF before relying on any figure.

Page 601

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- CONSTRUCTION OF OFFICES FOR              46,948,000         46,948,000          18,779,000
           INTELLEGENCE BUREAU ALONG-WITH
          CPEC
IB2240 DUALIZATION AND IMPROVEMENT OF MANDRA TO CHAKWAL ROAD (64 KM)
045702- A12     Civil works                                        200,000,000          200,000,000          100,000,000
045702- A124    Building and Structures                            200,000,000          200,000,000          100,000,000
        Total- DUALIZATION AND IMPROVEMENT OF         200,000,000        200,000,000        100,000,000
          MANDRA TO CHAKWAL ROAD (64 KM)
IB2241 DUALIZATION AND IMPROVEMENT OF SOHAWA TO CHAKWAL ROAD (70 KM)
045702- A12     Civil works                                        200,000,000          200,000,000          100,000,000
045702- A124    Building and Structures                            200,000,000          200,000,000          100,000,000
        Total- DUALIZATION AND IMPROVEMENT OF         200,000,000        200,000,000        100,000,000
         SOHAWA TO CHAKWAL ROAD (70 KM)
IB2247 PROVISION OF INSTALLATION OF PRESSURE SAND FILTER PLANT & BLOCK WIRING (VOICE/DATA) AT
PRIME MINISTER
045702- A12     Civil works                                           2,582,000
045702- A124    Building and Structures                               2,582,000
        Total- PROVISION OF INSTALLATION OF                2,582,000
          PRESSURE SAND FILTER PLANT &
          BLOCK WIRING (VOICE/DATA) AT
           PRIME MINISTER
IB2251 WIDENING / REHABILITATION / CONSTRUCTION OF 08 NOS ROADS IN UC MANDA KHEL UC QAMAR
MASHANI MC
045702- A12     Civil works                                         46,948,000            46,949,000            28,169,000
045702- A124    Building and Structures                             46,948,000            46,949,000            28,169,000
        Total- WIDENING / REHABILITATION /                  46,948,000         46,949,000          28,169,000
           CONSTRUCTION OF 08 NOS ROADS IN
          UC MANDA KHEL UC QAMAR MASHANI
         MC
IB2252 WIDENING / REHABILITATION / CONSTRUCTION OF 05 ROADS IN UC PAKI SHAH MARDIAN UC NAMAL UC
KOT
045702- A12     Civil works                                         46,948,000            46,949,000            28,169,000
045702- A124    Building and Structures                             46,948,000            46,949,000            28,169,000
        Total- WIDENING / REHABILITATION /                  46,948,000         46,949,000          28,169,000
           CONSTRUCTION OF 05 ROADS IN UC

Page 602

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

            PAKI SHAH MARDIAN UC NAMAL UC
          KOT
IB2253 WIDENING / REHABILITATION / CONSTRUCTION OF 07 NOS ROADS IN UC SHAHBAZ KHEL UC ROKHRI UC
PAI KHEL
045702- A12     Civil works                                         46,948,000            46,949,000            28,169,000
045702- A124    Building and Structures                             46,948,000            46,949,000            28,169,000
        Total- WIDENING / REHABILITATION /                  46,948,000         46,949,000          28,169,000
           CONSTRUCTION OF 07 NOS ROADS IN
          UC SHAHBAZ KHEL UC ROKHRI UC PAI
          KHEL
IB2259 CONSTRUCTION OF INDUSTRIAL AREA ROAD FROM GT ROAD TO GHAZI CHAK INCLUDING BRIDGES ON
BHIMER NALLAH
045702- A12     Civil works                                        234,742,000          234,742,000            93,897,000
045702- A124    Building and Structures                            234,742,000          234,742,000            93,897,000
        Total- CONSTRUCTION OF INDUSTRIAL AREA        234,742,000        234,742,000          93,897,000
          ROAD FROM GT ROAD TO GHAZI CHAK
           INCLUDING BRIDGES ON BHIMER
          NALLAH
IB2264 CONSTRUCTION OF SERVICE MORE FLYOVER AND INDUSTRIAL AREA LINK ROAD GUJRAT DISTRICT
GUJRAT-II
045702- A12     Civil works                                        281,691,000          154,928,000          126,763,000
045702- A124    Building and Structures                            281,691,000          154,928,000          126,763,000
        Total- CONSTRUCTION OF SERVICE MORE           281,691,000        154,928,000        126,763,000
          FLYOVER AND INDUSTRIAL AREA LINK
          ROAD GUJRAT DISTRICT GUJRAT-II
IB2265 REHABLITION OF ROAD FROM LAHORE ROAD (ADA 10 MILE) TO FAISLABAD ROAD (46 ADA) VIA 29
JHALL 36 PULL
045702- A12     Civil works                                           8,332,000
045702- A124    Building and Structures                               8,332,000
        Total- REHABLITION OF ROAD FROM LAHORE          8,332,000
          ROAD (ADA 10 MILE) TO FAISLABAD
          ROAD (46 ADA) VIA 29 JHALL 36 PULL
IB2266 DEVELPOMENT SCHEME 21 NOS IN DISTRICT CHAKWAL NA-65 (ROAD SCHEMES)
045702- A12     Civil works                                        187,793,000          187,793,000          187,793,000
045702- A124    Building and Structures                            187,793,000          187,793,000          187,793,000

Page 603

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- DEVELPOMENT SCHEME 21 NOS IN            187,793,000        187,793,000        187,793,000
            DISTRICT CHAKWAL NA-65 (ROAD
           SCHEMES)
IB2267 CONSTRUCTION OF 20 BEDDED HOSPITAL AT VILLAGE LATIFAL DISTRICT CHAKWAL
045702- A12     Civil works                                        676,204,000          338,103,000            75,117,000
045702- A124    Building and Structures                            676,204,000          338,103,000            75,117,000
        Total- CONSTRUCTION OF 20 BEDDED               676,204,000        338,103,000          75,117,000
           HOSPITAL AT VILLAGE LATIFAL
            DISTRICT CHAKWAL
IB2268 WIDENING/REHABILITATION OF ROAD FROM QUAIDABAD TO WARCHHA VIA FATEHPUR DISTRICT
KHUSHAB
045702- A12     Civil works                                        281,690,000          169,014,000            28,169,000
045702- A124    Building and Structures                            281,690,000          169,014,000            28,169,000
        Total- WIDENING/REHABILITATION OF ROAD         281,690,000        169,014,000          28,169,000
          FROM QUAIDABAD TO WARCHHA VIA
          FATEHPUR DISTRICT KHUSHAB
IB2271 CONSTRUCTION / REHABILITATION OF FLOOD AFFECTED ROAD DISTRICT MUZAFFARGARH-I
045702- A12     Civil works                                        189,689,000          189,689,000            56,338,000
045702- A124    Building and Structures                            189,689,000          189,689,000            56,338,000
        Total- CONSTRUCTION / REHABILITATION OF         189,689,000        189,689,000          56,338,000
          FLOOD AFFECTED ROAD DISTRICT
           MUZAFFARGARH-I
IB2273 CONSTRUCTION OF 2ND FLOOR OF BOLAN HOSTEL AT CIVIL SERVICES ACADEMY WALTON LAHORE
045702- A12     Civil works                                         25,000,000            46,234,000             9,390,000
045702- A124    Building and Structures                             25,000,000            46,234,000             9,390,000
        Total- CONSTRUCTION OF 2ND FLOOR OF             25,000,000         46,234,000           9,390,000
          BOLAN HOSTEL AT CIVIL SERVICES
          ACADEMY WALTON LAHORE
IB2278 CONSTRUCTION OF POLICE BARRACKS POLICE STATION CIVIL LINES INCLUDING PRISONER CELL AT
NAB KPK HAYATABAD
045702- A12     Civil works                                         34,237,000
045702- A124    Building and Structures                             34,237,000
        Total- CONSTRUCTION OF POLICE                    34,237,000
          BARRACKS POLICE STATION CIVIL
            LINES INCLUDING PRISONER CELL AT

Page 604

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          NAB KPK HAYATABAD
IB2285 CONSTRUCTION OF AUDITORIUM BACHELOR HOSTEL AND OFFICERS MESS FOR NAB (KP) AT
PESHAWAR
045702- A12     Civil works                                         93,897,000            93,897,000            56,338,000
045702- A124    Building and Structures                             93,897,000            93,897,000            56,338,000
        Total- CONSTRUCTION OF AUDITORIUM               93,897,000         93,897,000          56,338,000
          BACHELOR HOSTEL AND OFFICERS
          MESS FOR NAB (KP) AT PESHAWAR
IB2294 CONSTRUCTION OF BLACK TOP ROAD FROM NH-40 KHUCHAKI WADH TO KHARAN ROAD (30KM)
045702- A12     Civil works                                        144,221,000          115,377,000            28,843,000
045702- A124    Building and Structures                            144,221,000          115,377,000            28,843,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        144,221,000        115,377,000          28,843,000
          FROM NH-40 KHUCHAKI WADH TO
          KHARAN ROAD (30KM)
IB2296 CONSTRUCTION OF BUILDING FOR GIRLS COLLEGE AT KACHI BAIG SARYAB ROAD QUETTA
045702- A12     Civil works                                         46,948,000            46,949,000          309,859,000
045702- A124    Building and Structures                             46,948,000            46,949,000          309,859,000
        Total- CONSTRUCTION OF BUILDING FOR             46,948,000         46,949,000        309,859,000
            GIRLS COLLEGE AT KACHI BAIG
          SARYAB ROAD QUETTA
IB2297 CONSTRUCTION OF LIBRARY SARYAB ROAD QUETTA
045702- A12     Civil works                                         28,169,000            16,901,000            30,047,000
045702- A124    Building and Structures                             28,169,000            16,901,000            30,047,000
        Total- CONSTRUCTION OF LIBRARY SARYAB          28,169,000         16,901,000          30,047,000
          ROAD QUETTA
IB2299 CONSTRUCTION OF ROAD FROM HAZRAT JAFT TO ESSAH CHAH DISTRICT NUSHKI
045702- A12     Civil works                                        109,872,000            87,898,000            21,974,000
045702- A124    Building and Structures                            109,872,000            87,898,000            21,974,000
        Total- CONSTRUCTION OF ROAD FROM              109,872,000         87,898,000          21,974,000
          HAZRAT JAFT TO ESSAH CHAH
            DISTRICT NUSHKI
IB2301 CONSTRUCTION OF ROAD FROM UNION COUNCIL DAAK DISTRICT NUSHKI TO CHAGAI
045702- A12     Civil works                                        126,773,000          101,418,000            25,355,000
045702- A124    Building and Structures                            126,773,000          101,418,000            25,355,000

Page 605

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- CONSTRUCTION OF ROAD FROM              126,773,000        101,418,000          25,355,000
           UNION COUNCIL DAAK DISTRICT
           NUSHKI TO CHAGAI
IB2303 MUSA KHAIL TANNSA ROAD (35-KM) STRETCH ROAD TO CONSTRUCTED AND LINKS WITH ZHOB
045702- A12     Civil works                                        254,250,000          203,400,000            50,850,000
045702- A124    Building and Structures                            254,250,000          203,400,000            50,850,000
        Total- MUSA KHAIL TANNSA ROAD (35-KM)           254,250,000        203,400,000          50,850,000
          STRETCH ROAD TO CONSTRUCTED
          AND LINKS WITH ZHOB
IB2311 CONSTRUCTION OF BRIDGE OVER RIVER KOTIRA AND 17 KMS ROAD IN UC LOHI DISTRICT LASBELA
BALOCHISTAN
045702- A12     Civil works                                        233,854,000          116,927,000          116,927,000
045702- A124    Building and Structures                            233,854,000          116,927,000          116,927,000
        Total- CONSTRUCTION OF BRIDGE OVER             233,854,000        116,927,000        116,927,000
            RIVER KOTIRA AND 17 KMS ROAD IN
          UC LOHI DISTRICT LASBELA
           BALOCHISTAN
IB2360 CONSTRUCTION OF DHUDIAL BY PASS DISTRICT CHAKWAL
045702- A12     Civil works                                        191,742,000            95,871,000            93,897,000
045702- A124    Building and Structures                            191,742,000            95,871,000            93,897,000
        Total- CONSTRUCTION OF DHUDIAL BY PASS        191,742,000         95,871,000          93,897,000
            DISTRICT CHAKWAL
ID8076 ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD SINDH)
045702- A03    Operating Expenses                              445,409,000          191,000,000          159,137,000
045702- A039   General                                           445,409,000          191,000,000          159,137,000
045702- A12     Civil works                                         18,918,000
045702- A124    Building and Structures                             18,918,000
        Total- ESTABLISHMENT CHARGES CREDITED        464,327,000        191,000,000        159,137,000
          TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD SINDH)
ID8077 TOOLS AND PLANTS CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD SINDH)
045702- A03    Operating Expenses                              135,401,000            57,316,000            47,742,000
045702- A039   General                                           135,401,000            57,316,000            47,742,000
        Total- TOOLS AND PLANTS CHARGES                135,401,000         57,316,000          47,742,000
           CREDITED TO OTHER GOVERNMENT

Page 606

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          DEPARTMENTS (PAK. PWD SINDH)
ID8082 ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD PUNJAB)
045702- A03    Operating Expenses                              372,435,000          191,000,000          231,431,000
045702- A039   General                                           372,435,000          191,000,000          231,431,000
045702- A12     Civil works                                           4,223,000
045702- A124    Building and Structures                               4,223,000
        Total- ESTABLISHMENT CHARGES CREDITED        376,658,000        191,000,000        231,431,000
          TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD PUNJAB)
ID8083 TOOLS AND PLANTS CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD PUNJAB)
045702- A03    Operating Expenses                              131,306,000            57,316,000            69,431,000
045702- A039   General                                           131,306,000            57,316,000            69,431,000
        Total- TOOLS AND PLANTS CHARGES                131,306,000         57,316,000          69,431,000
           CREDITED TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD PUNJAB)
ID8085 ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD KHYBER
PAKHTUNKHWA).
045702- A03    Operating Expenses                                 6,407,000            32,612,000             3,756,000
045702- A039   General                                              6,407,000            32,612,000             3,756,000
        Total- ESTABLISHMENT CHARGES CREDITED           6,407,000         32,612,000           3,756,000
          TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD KHYBER
           PAKHTUNKHWA).
ID8086 TOOLS AND PLANTS CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. P.W.D.,
KHYBER PAKHTUNKHWA).
045702- A03    Operating Expenses                                 1,921,000             9,735,000             1,127,000
045702- A039   General                                              1,921,000             9,735,000             1,127,000
        Total- TOOLS AND PLANTS CHARGES                  1,921,000           9,735,000           1,127,000
           CREDITED TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. P.W.D., KHYBER
           PAKHTUNKHWA).
ID8088 ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD
BALOCHISTAN)
045702- A03    Operating Expenses                              247,504,000          191,000,000          208,839,000
045702- A039   General                                           247,504,000          191,000,000          208,839,000

Page 607

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- ESTABLISHMENT CHARGES CREDITED        247,504,000        191,000,000        208,839,000
          TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD
           BALOCHISTAN)
ID8089 TOOLS AND PLANTS CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD
BALOCHISTAN)
045702- A03    Operating Expenses                               74,245,000            57,316,000            62,651,000
045702- A039   General                                             74,245,000            57,316,000            62,651,000
        Total- TOOLS AND PLANTS CHARGES                 74,245,000         57,316,000          62,651,000
           CREDITED TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD
           BALOCHISTAN)
     045702   Total-  Buildings and Structures                 5,619,539,000       3,776,613,000       2,512,136,000
045720 Others  :
IB3525 REHABILITATION / CONSTRUCTION OF ROADS AT HYDERABAD CITY 20 NOS SCHEMES
045720- A12     Civil works                                        409,469,000          204,734,000          491,238,000
045720- A124    Building and Structures                            409,469,000          204,734,000          491,238,000
        Total- REHABILITATION / CONSTRUCTION OF         409,469,000        204,734,000        491,238,000
          ROADS AT HYDERABAD CITY 20 NOS
          SCHEMES
IB3526 REHABILITATION / CONSTRUCTION OF ROADS AT LATIFABAD HYDERABAD CITY 6 NOS SCHEMES
045720- A12     Civil works                                        599,469,000          299,734,000          281,690,000
045720- A124    Building and Structures                            599,469,000          299,734,000          281,690,000
        Total- REHABILITATION / CONSTRUCTION OF         599,469,000        299,734,000        281,690,000
          ROADS AT LATIFABAD HYDERABAD
            CITY 6 NOS SCHEMES
IB3527 REFURBISHMENT AND REHABILITATION OF GOVERNMENT OWNED BUILDINGS AT ISLAMABAD
045720- A12     Civil works                                         46,948,000            46,949,000            28,169,000
045720- A124    Building and Structures                             46,948,000            46,949,000            28,169,000
        Total- REFURBISHMENT AND                          46,948,000         46,949,000          28,169,000
            REHABILITATION OF GOVERNMENT
         OWNED BUILDINGS AT ISLAMABAD
IB3528 REFURBUSHMENT OF EXISTING FACILITIES & PROVISION OF ADDITIONAL FACILITIES AT PM STAFF
COLONY ISLAMABAD
045720- A12     Civil works                                         46,949,000            23,474,000            46,949,000

Page 608

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045720- A124    Building and Structures                             46,949,000            23,474,000            46,949,000
        Total- REFURBUSHMENT OF EXISTING                46,949,000         23,474,000          46,949,000
             FACILITIES & PROVISION OF
           ADDITIONAL FACILITIES AT PM STAFF
          COLONY ISLAMABAD
IB3529 REFURBISHMENT OF PM OFFICE ISLAMABAD
045720- A12     Civil works                                         46,949,000            28,169,000            46,949,000
045720- A124    Building and Structures                             46,949,000            28,169,000            46,949,000
        Total- REFURBISHMENT OF PM OFFICE                46,949,000         28,169,000          46,949,000
           ISLAMABAD
IB3530 REPLACEMENT OF EXISTING OUTLIVED AND ONSOLETE PASSENGER LIFTS AT PRIME MINISTERS
OFFICE G-5 ISLAMABAD
045720- A12     Civil works                                        161,521,000            80,760,000            80,762,000
045720- A124    Building and Structures                            161,521,000            80,760,000            80,762,000
        Total- REPLACEMENT OF EXISTING                  161,521,000         80,760,000          80,762,000
           OUTLIVED AND ONSOLETE
          PASSENGER LIFTS AT PRIME
            MINISTERS OFFICE G-5 ISLAMABAD
IB3531 UPGRADATION AND REFURBISHMENT OF 48 FAMILY SUITS
045720- A12     Civil works                                         28,169,000            28,169,000            37,465,000
045720- A124    Building and Structures                             28,169,000            28,169,000            37,465,000
        Total- UPGRADATION AND REFURBISHMENT          28,169,000         28,169,000          37,465,000
          OF 48 FAMILY SUITS
IB3532 REPLACEMENT OF UNSERVICEABLE ELEVATORS AT 48 FAMILY SUITS SECTOR G-5/1 ISLAMABAD (4 NOS
PASSENGER LIFTS)
045720- A12     Civil works                                         54,215,000            27,108,000            27,108,000
045720- A124    Building and Structures                             54,215,000            27,108,000            27,108,000
        Total- REPLACEMENT OF UNSERVICEABLE            54,215,000         27,108,000          27,108,000
          ELEVATORS AT 48 FAMILY SUITS
          SECTOR G-5/1 ISLAMABAD (4 NOS
          PASSENGER LIFTS)
IB3533 CONSTRUCTION OF ADDITIONAL BLOCK AT ELECTION HOUSE G-5/2 ISLAMABAD
045720- A12     Civil works                                         21,908,000
045720- A124    Building and Structures                             21,908,000
        Total- CONSTRUCTION OF ADDITIONAL               21,908,000

Page 609

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          BLOCK AT ELECTION HOUSE G-5/2
           ISLAMABAD
IB3534 20 NOS SCHEMES OF METALLED ROADS TUFF PAVERS CC ROADS & OPEN DRAINS IN TALUKA TALHAR
TANDO BAGO MATLI ETC
045720- A12     Civil works                                         94,834,000
045720- A124    Building and Structures                             94,834,000
        Total- 20 NOS SCHEMES OF METALLED               94,834,000
          ROADS TUFF PAVERS CC ROADS &
          OPEN DRAINS IN TALUKA TALHAR
          TANDO BAGO MATLI ETC
IB3535 8 NOS SCHEMES OF METALLED ROADS IN UC-AHMED RAJO UC-FATEHABAD UC-HALEPOTA UC HAJI
PARIAL BULEDI
045720- A12     Civil works                                        129,784,000
045720- A124    Building and Structures                            129,784,000
        Total- 8 NOS SCHEMES OF METALLED ROADS        129,784,000
              IN UC-AHMED RAJO UC-FATEHABAD
           UC-HALEPOTA UC HAJI PARIAL
           BULEDI
IB3536 4 NOS SCHEMES OF METALLED ROADS IN UC-NIDO UC-SAMAN SARKAR VILLAGE ABDUL HAMEED
JUNEJO AND VILLAGE
045720- A12     Civil works                                         88,492,000
045720- A124    Building and Structures                             88,492,000
        Total- 4 NOS SCHEMES OF METALLED ROADS         88,492,000
              IN UC-NIDO UC-SAMAN SARKAR
           VILLAGE ABDUL HAMEED JUNEJO AND
           VILLAGE
IB3537 COMMUNITY BASED DEVELOPMENT SCHEMES FOR INSTALLATION OF TUBE WELL AND COMMUNITY
SOLAR ENERGY SYSTEM FOR
045720- A12     Civil works                                         86,689,000
045720- A124    Building and Structures                             86,689,000
        Total- COMMUNITY BASED DEVELOPMENT            86,689,000
          SCHEMES FOR INSTALLATION OF
          TUBE WELL AND COMMUNITY SOLAR
          ENERGY SYSTEM FOR
IB3538 CONSTRUCTION OF BLACK TOP ROAD KILLI THAL KILLI KOCHI KILLI TADDARI AND KILLI SHAMBAY
DISTRICT DUKI

Page 610

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045720- A12     Civil works                                        140,845,000          112,676,000          148,122,000
045720- A124    Building and Structures                            140,845,000          112,676,000          148,122,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        140,845,000        112,676,000        148,122,000
              KILLI THAL KILLI KOCHI KILLI TADDARI
          AND KILLI SHAMBAY DISTRICT DUKI
IB3539 DEVELOPMENT WORKS IN VARIOUS KILLIS OF DISTRICT WASHUK AND AWARAN (3 NOS SCHEMES)
045720- A12     Civil works                                        145,540,000          116,432,000            29,108,000
045720- A124    Building and Structures                            145,540,000          116,432,000            29,108,000
        Total- DEVELOPMENT WORKS IN VARIOUS           145,540,000        116,432,000          29,108,000
             KILLIS OF DISTRICT WASHUK AND
         AWARAN (3 NOS SCHEMES)
IB3540 DEVELOPMENT WORKS IN VARIOUS KILLIS OF DISTRICT WASHUK
045720- A12     Civil works                                        225,352,000
045720- A124    Building and Structures                            225,352,000
        Total- DEVELOPMENT WORKS IN VARIOUS           225,352,000
             KILLIS OF DISTRICT WASHUK
IB3541 DEVELOPMENT SCHEMES IN DISTRICT KACHHI JHAL MAGSI AND NASEERABAD(17 NOS SCHEMES)
045720- A12     Civil works                                         93,897,000            93,897,000          288,732,000
045720- A124    Building and Structures                             93,897,000            93,897,000          288,732,000
        Total- DEVELOPMENT SCHEMES IN DISTRICT          93,897,000         93,897,000        288,732,000
           KACHHI JHAL MAGSI AND
           NASEERABAD(17 NOS SCHEMES)
IB3542 PAVEMENT OF STREETS SOLING SYSTEM IN 15 DIFFERENT AREAS OF GUJRANWALA
045720- A12     Civil works                                         93,897,000            93,897,000          281,690,000
045720- A124    Building and Structures                             93,897,000            93,897,000          281,690,000
        Total- PAVEMENT OF STREETS SOLING               93,897,000         93,897,000        281,690,000
          SYSTEM IN 15 DIFFERENT AREAS OF
          GUJRANWALA
IB3543 CONSTRUCTION OF CARPETED ROAD FROM DHILLAN WAL PHATTAK TO AIMANABAD TOWN DISTRICT
GUJRANWALA AND
045720- A12     Civil works                                         38,498,000            38,498,000            28,169,000
045720- A124    Building and Structures                             38,498,000            38,498,000            28,169,000
        Total- CONSTRUCTION OF CARPETED ROAD          38,498,000         38,498,000          28,169,000
          FROM DHILLAN WAL PHATTAK TO
          AIMANABAD TOWN DISTRICT

Page 611

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          GUJRANWALA AND
IB3544 WIDENING/RE-CARPETING OF ROAD FROM NOORANI CROSS TO SHRINE HAZRAT SHAH BILAWAL
NOORANI DISTRICT
045720- A12     Civil works                                        319,831,000
045720- A124    Building and Structures                            319,831,000
        Total- WIDENING/RE-CARPETING OF ROAD           319,831,000
          FROM NOORANI CROSS TO SHRINE
          HAZRAT SHAH BILAWAL NOORANI
            DISTRICT
IB3545 PROVIDING WATER SUPPLY SEWERAGE LINES CC TOPPING SOLAR LIGHTS IN VARIOUS WARDS / UCS
OF NAWABSHAH
045720- A12     Civil works                                         89,606,000          127,932,000            28,169,000
045720- A124    Building and Structures                             89,606,000          127,932,000            28,169,000
        Total- PROVIDING WATER SUPPLY                    89,606,000        127,932,000          28,169,000
          SEWERAGE LINES CC TOPPING SOLAR
            LIGHTS IN VARIOUS WARDS / UCS OF
          NAWABSHAH
IB3546 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS CC FLOORING & SEWERAGE IN
DISTRICT SOUTH KARACHI
045720- A12     Civil works                                        146,441,000            17,921,000            71,685,000
045720- A124    Building and Structures                            146,441,000            17,921,000            71,685,000
        Total- IMPROVEMENT/REHABILITATION OF           146,441,000         17,921,000          71,685,000
           DIFFERENT ROADS/STREETS CC
           FLOORING & SEWERAGE IN DISTRICT
          SOUTH KARACHI
IB3547 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE
SYSTEM IN VARIOUS UNION
045720- A12     Civil works                                        926,441,000            58,577,000            87,864,000
045720- A124    Building and Structures                            926,441,000            58,577,000            87,864,000
        Total- IMPROVEMENT/REHABILITATION OF           926,441,000         58,577,000          87,864,000
           DIFFERENT ROADS/STREETS
           INCLUDING WATER & SEWERAGE
          SYSTEM IN VARIOUS UNION
IB3548 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE
SYSTEM IN VARIOUS UNION

Page 612

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045720- A12     Civil works                                       1,362,770,000          522,054,000          281,690,000
045720- A124    Building and Structures                           1,362,770,000          522,054,000          281,690,000
        Total- IMPROVEMENT/REHABILITATION OF          1,362,770,000        522,054,000        281,690,000
           DIFFERENT ROADS/STREETS
           INCLUDING WATER & SEWERAGE
          SYSTEM IN VARIOUS UNION
IB3549 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE
SYSTEM IN VARIOUS UNION
045720- A12     Civil works                                        569,380,000          113,876,000          281,690,000
045720- A124    Building and Structures                            569,380,000          113,876,000          281,690,000
        Total- IMPROVEMENT/REHABILITATION OF           569,380,000        113,876,000        281,690,000
           DIFFERENT ROADS/STREETS
           INCLUDING WATER & SEWERAGE
          SYSTEM IN VARIOUS UNION
IB3550 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE
SYSTEM IN VARIOUS UNION
045720- A12     Civil works                                       1,238,770,000          474,930,000          281,690,000
045720- A124    Building and Structures                           1,238,770,000          474,930,000          281,690,000
        Total- IMPROVEMENT/REHABILITATION OF          1,238,770,000        474,930,000        281,690,000
           DIFFERENT ROADS/STREETS
           INCLUDING WATER & SEWERAGE
          SYSTEM IN VARIOUS UNION
IB3551 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE
SYSTEM IN VARIOUS UNION
045720- A12     Civil works                                        117,136,000            46,854,000            70,285,000
045720- A124    Building and Structures                            117,136,000            46,854,000            70,285,000
        Total- IMPROVEMENT/REHABILITATION OF           117,136,000         46,854,000          70,285,000
           DIFFERENT ROADS/STREETS
           INCLUDING WATER & SEWERAGE
          SYSTEM IN VARIOUS UNION
IB3552 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE
SYSTEM IN VARIOUS UNION
045720- A12     Civil works                                         58,516,000            43,407,000            35,111,000
045720- A124    Building and Structures                             58,516,000            43,407,000            35,111,000
        Total- IMPROVEMENT/REHABILITATION OF            58,516,000         43,407,000          35,111,000

Page 613

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

           DIFFERENT ROADS/STREETS
           INCLUDING WATER & SEWERAGE
          SYSTEM IN VARIOUS UNION
IB3553 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE
SYSTEM AT DISTRICT
045720- A12     Civil works                                        375,233,000          370,576,000          281,690,000
045720- A124    Building and Structures                            375,233,000          370,576,000          281,690,000
        Total- IMPROVEMENT/REHABILITATION OF           375,233,000        370,576,000        281,690,000
           DIFFERENT ROADS/STREETS
           INCLUDING WATER & SEWERAGE
          SYSTEM AT DISTRICT
IB3554 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER & SEWERAGE
SYSTEM AT DISTRICT EAST
045720- A12     Civil works                                        204,610,000            40,922,000          163,681,000
045720- A124    Building and Structures                            204,610,000            40,922,000          163,681,000
        Total- IMPROVEMENT/REHABILITATION OF           204,610,000         40,922,000        163,681,000
           DIFFERENT ROADS/STREETS
           INCLUDING WATER & SEWERAGE
          SYSTEM AT DISTRICT EAST
IB3555 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS /STREETS INCLUDING WATER & SEWERAGE
SYSTEM AT VARIOUS MAIN
045720- A12     Civil works                                        418,446,000          167,378,000          281,690,000
045720- A124    Building and Structures                            418,446,000          167,378,000          281,690,000
        Total- IMPROVEMENT/REHABILITATION OF           418,446,000        167,378,000        281,690,000
           DIFFERENT ROADS /STREETS
           INCLUDING WATER & SEWERAGE
          SYSTEM AT VARIOUS MAIN
IB3556 DEVELOPMENT SCHEMES UNDER PRIME MINISTERS PROGRAMME IN SINDH- LARKANA SUKKUR AND
SHAHEED
045720- A12     Civil works                                        781,842,000          312,736,000            28,169,000
045720- A124    Building and Structures                            781,842,000          312,736,000            28,169,000
        Total- DEVELOPMENT SCHEMES UNDER             781,842,000        312,736,000          28,169,000
           PRIME MINISTERS PROGRAMME IN
            SINDH- LARKANA SUKKUR AND
          SHAHEED
IB3557 DEVELOPMENT SCHEMES UNDER PRIME MINISTERS PROGRAMME IN SINDH- HYDERABAD AND

Page 614

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

MIRPURKHAS DIVISIONS
045720- A12     Civil works                                        569,292,000          227,717,000          328,638,000
045720- A124    Building and Structures                            569,292,000          227,717,000          328,638,000
        Total- DEVELOPMENT SCHEMES UNDER             569,292,000        227,717,000        328,638,000
           PRIME MINISTERS PROGRAMME IN
            SINDH- HYDERABAD AND
          MIRPURKHAS DIVISIONS
IB3558 PROVISION OF SOLAR SYSTEM FOR DOMESTIC USE OF PEOPLE OF DISTRICT CHAGHI(SOLAR KITS 2630
NOS)(SB)
045720- A12     Civil works                                         93,897,000
045720- A124    Building and Structures                             93,897,000
        Total- PROVISION OF SOLAR SYSTEM FOR            93,897,000
           DOMESTIC USE OF PEOPLE OF
            DISTRICT CHAGHI(SOLAR KITS 2630
            NOS)(SB)
IB3559 WATER SUPPLY SCHEME FOR NOKHUNDI DISTRICT CHAGHI FROM PATHAN GAZ (DRILLING AND
DEVELOPMENT OF BORE
045720- A12     Civil works                                         93,897,000            93,897,000            75,474,000
045720- A124    Building and Structures                             93,897,000            93,897,000            75,474,000
        Total- WATER SUPPLY SCHEME FOR                  93,897,000         93,897,000          75,474,000
           NOKHUNDI DISTRICT CHAGHI FROM
          PATHAN GAZ (DRILLING AND
          DEVELOPMENT OF BORE
IB3560 REHABILITATION / RECONSTRUCTION OF TAJ PUR BRIDGE DAMAGED IN FLOODS OF 2010 DISTRICT
JAFFARABAD
045720- A12     Civil works                                         22,406,000            11,202,000            11,204,000
045720- A124    Building and Structures                             22,406,000            11,202,000            11,204,000
        Total- REHABILITATION / RECONSTRUCTION          22,406,000         11,202,000          11,204,000
          OF TAJ PUR BRIDGE DAMAGED IN
          FLOODS OF 2010 DISTRICT
          JAFFARABAD
IB3561 CONSTRUCTION OF BLACK TOP ROAD FROM NEW ROJHAN JAMALI VIA OLD ROJHAN JAMALI TO
VILLAGE GHAIBI KHAN
045720- A12     Civil works                                        187,676,000          112,608,000            75,069,000
045720- A124    Building and Structures                            187,676,000          112,608,000            75,069,000

Page 615

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- CONSTRUCTION OF BLACK TOP ROAD        187,676,000        112,608,000          75,069,000
          FROM NEW ROJHAN JAMALI VIA OLD
          ROJHAN JAMALI TO VILLAGE GHAIBI
          KHAN
IB3562 REHABILITATION/RECONSTRUCTION OF LAL MANDIR BRIDGE DAMAGED IN FLOODS OF 2010 DISTRICT
JAFFARABAD
045720- A12     Civil works                                         24,901,000            12,450,000            12,451,000
045720- A124    Building and Structures                             24,901,000            12,450,000            12,451,000
        Total- REHABILITATION/RECONSTRUCTION           24,901,000         12,450,000          12,451,000
          OF LAL MANDIR BRIDGE DAMAGED IN
          FLOODS OF 2010 DISTRICT
          JAFFARABAD
IB3563 CONSTRUCTION OF BLACK TOP ROAD CHINKINDIK TO MASKEECHAH DISTRICT CHAGHI
045720- A12     Civil works                                        140,845,000            84,507,000            93,897,000
045720- A124    Building and Structures                            140,845,000            84,507,000            93,897,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        140,845,000         84,507,000          93,897,000
            CHINKINDIK TO MASKEECHAH
            DISTRICT CHAGHI
IB3564 CONSTRUCTION OF BLACK TOP ROAD CHAGHI TO LASHKARAP DISTRICT CHAGHI
045720- A12     Civil works                                        140,845,000            84,507,000          152,423,000
045720- A124    Building and Structures                            140,845,000            84,507,000          152,423,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        140,845,000         84,507,000        152,423,000
           CHAGHI TO LASHKARAP DISTRICT
           CHAGHI
IB3565 CONSTRUCTION OF BLACK TOP ROAD LASHKARAP TO NALOOP DISTRICT CHAGHI
045720- A12     Civil works                                        140,845,000            84,507,000          150,235,000
045720- A124    Building and Structures                            140,845,000            84,507,000          150,235,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        140,845,000         84,507,000        150,235,000
          LASHKARAP TO NALOOP DISTRICT
           CHAGHI
IB3566 CONSTRUCTION OF 38 KMS ROAD CONNECTING DUREJI TOWN OF LASBELA TO UC TAUNG WITH 8 KMS
LINK TO TALANGA DAM IN
045720- A12     Civil works                                        469,342,000          281,606,000          332,928,000
045720- A124    Building and Structures                            469,342,000          281,606,000          332,928,000
        Total- CONSTRUCTION OF 38 KMS ROAD             469,342,000        281,606,000        332,928,000

Page 616

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

           CONNECTING DUREJI TOWN OF
          LASBELA TO UC TAUNG WITH 8 KMS
            LINK TO TALANGA DAM IN
IB3567 19 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN
045720- A12     Civil works                                        140,845,000            70,423,000            28,169,000
045720- A124    Building and Structures                            140,845,000            70,423,000            28,169,000
        Total- 19 NOS DEVELOPMENT SCHEMES IN           140,845,000         70,423,000          28,169,000
            DISTRICT BADIN
IB3568 11 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN
045720- A12     Civil works                                        187,793,000            93,897,000            28,169,000
045720- A124    Building and Structures                            187,793,000            93,897,000            28,169,000
        Total- 11 NOS DEVELOPMENT SCHEMES IN           187,793,000         93,897,000          28,169,000
            DISTRICT BADIN
IB3569 15 NOS DEVELOPMENT SCHEMES IN DISTRICT BADIN
045720- A12     Civil works                                        140,845,000            70,423,000            28,169,000
045720- A124    Building and Structures                            140,845,000            70,423,000            28,169,000
        Total- 15 NOS DEVELOPMENT SCHEMES IN           140,845,000         70,423,000          28,169,000
            DISTRICT BADIN
IB3570 CONSTRUCTION OF METALLED ROADS IN TALULKA LAKHI DISTRICT SHIKARPUR SINDH (09 SCHEMES)
045720- A12     Civil works                                        444,131,000          222,066,000            28,169,000
045720- A124    Building and Structures                            444,131,000          222,066,000            28,169,000
        Total- CONSTRUCTION OF METALLED ROADS        444,131,000        222,066,000          28,169,000
              IN TALULKA LAKHI DISTRICT
           SHIKARPUR SINDH (09 SCHEMES)
IB3571 CONSTRUCTION OF BLACK TOP ROADS PURANA DUKI AND RABBAT VILLAGES DISTRICT DUKI
045720- A12     Civil works                                        194,366,000            97,183,000          381,419,000
045720- A124    Building and Structures                            194,366,000            97,183,000          381,419,000
        Total- CONSTRUCTION OF BLACK TOP               194,366,000         97,183,000        381,419,000
          ROADS PURANA DUKI AND RABBAT
           VILLAGES DISTRICT DUKI
IB3572 CONSTRUCTION OF BLACK TOP ROAD AT DISTRICT HARNAI ZIARAT AND LORALAI (30 KM)
045720- A12     Civil works                                        187,793,000            93,897,000          281,690,000
045720- A124    Building and Structures                            187,793,000            93,897,000          281,690,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        187,793,000         93,897,000        281,690,000

Page 617

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

           AT DISTRICT HARNAI ZIARAT AND
           LORALAI (30 KM)
IB3573 CONSTRUCTION OF BLACK TOP ROAD FROM KILLA SHAIR TO YARO SHAIR THAL DISTRICT DUKI
045720- A12     Civil works                                         87,324,000            43,662,000            43,662,000
045720- A124    Building and Structures                             87,324,000            43,662,000            43,662,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          87,324,000         43,662,000          43,662,000
          FROM KILLA SHAIR TO YARO SHAIR
           THAL DISTRICT DUKI
IB3574 DEVELOPMENT SCHEMES IN GHAS KARH HATHYARI JHAL MAGSI CITY DISTRICT JHAL MAGSI (3
SCHEMES)
045720- A12     Civil works                                        122,066,000            69,577,000          178,675,000
045720- A124    Building and Structures                            122,066,000            69,577,000          178,675,000
        Total- DEVELOPMENT SCHEMES IN GHAS            122,066,000         69,577,000        178,675,000
          KARH HATHYARI JHAL MAGSI CITY
            DISTRICT JHAL MAGSI (3 SCHEMES)
IB3575 COMMUNITY BASED DEVELOPMENT SCHEMES FOR WATER SUPPLY IN VARIOUS UCS TEHSIL AND
DISTRICT JHAL MAGSI (2 NOS
045720- A12     Civil works                                        131,455,000          131,455,000          135,753,000
045720- A124    Building and Structures                            131,455,000          131,455,000          135,753,000
        Total- COMMUNITY BASED DEVELOPMENT           131,455,000        131,455,000        135,753,000
          SCHEMES FOR WATER SUPPLY IN
           VARIOUS UCS TEHSIL AND DISTRICT
           JHAL MAGSI (2 NOS
IB3576 DEVELOPMENT SCHEMES IN THAMBO & DMJAMALI DISTRICT NASEERABAD (2 NOS DEVELOPMENT
SCHEMES)
045720- A12     Civil works                                        215,962,000          123,099,000          271,621,000
045720- A124    Building and Structures                            215,962,000          123,099,000          271,621,000
        Total- DEVELOPMENT SCHEMES IN THAMBO         215,962,000        123,099,000        271,621,000
          & DMJAMALI DISTRICT NASEERABAD
                (2 NOS DEVELOPMENT SCHEMES)
IB3577 COMMUNITY BASED DEVELOPMENT SCHEMES FOR INSTALLATION OF COMMUNITY HOME SOLAR
SYSTEM IN VARIOUS UCS OF
045720- A12     Civil works                                         46,948,000            46,949,000          187,793,000
045720- A124    Building and Structures                             46,948,000            46,949,000          187,793,000
        Total- COMMUNITY BASED DEVELOPMENT            46,948,000         46,949,000        187,793,000

Page 618

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          SCHEMES FOR INSTALLATION OF
          COMMUNITY HOME SOLAR SYSTEM IN
           VARIOUS UCS OF
IB3578 CONSTRUCTION OF BLACK TOP ROAD FROM PATK TO SHIREZA DISTRICT WASHUK
045720- A12     Civil works                                         46,948,000            28,169,000            18,779,000
045720- A124    Building and Structures                             46,948,000            28,169,000            18,779,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          46,948,000         28,169,000          18,779,000
          FROM PATK TO SHIREZA DISTRICT
         WASHUK
IB3579 CUTTING LEVELING DRESSING AND CONVERTING IT INTO JEEPABLE SURFACE FROM GARHARI TO
BARRONT
045720- A12     Civil works                                         46,946,000            23,473,000            23,472,000
045720- A124    Building and Structures                             46,946,000            23,473,000            23,472,000
        Total- CUTTING LEVELING DRESSING AND            46,946,000         23,473,000          23,472,000
           CONVERTING IT INTO JEEPABLE
          SURFACE FROM GARHARI TO
          BARRONT
IB3580 CONSTRUCTION OF BLACK TOP ROAD FROM LUNDO TOWARDS NAAG DISTRICT WASHUK
045720- A12     Civil works                                         46,946,000            18,168,000            18,777,000
045720- A124    Building and Structures                             46,946,000            18,168,000            18,777,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          46,946,000         18,168,000          18,777,000
          FROM LUNDO TOWARDS NAAG
            DISTRICT WASHUK
IB3581 CONSTRUCTION OF BLACL TOP ROAD FROM JORI TO SONERI DISTRICT AWARAN
045720- A12     Civil works                                         46,948,000            23,474,000            46,949,000
045720- A124    Building and Structures                             46,948,000            23,474,000            46,949,000
        Total- CONSTRUCTION OF BLACL TOP ROAD          46,948,000         23,474,000          46,949,000
          FROM JORI TO SONERI DISTRICT
         AWARAN
IB3582 COMMUNITY BASED DEVELOPMENT SCHEMES FOR INSTALLATION OF COMMUNITY HOME SOLAR
STREET LIGHTS IN VARIOUS
045720- A12     Civil works                                         46,948,000            23,474,000            70,423,000
045720- A124    Building and Structures                             46,948,000            23,474,000            70,423,000
        Total- COMMUNITY BASED DEVELOPMENT            46,948,000         23,474,000          70,423,000
          SCHEMES FOR INSTALLATION OF

Page 619

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          COMMUNITY HOME SOLAR STREET
            LIGHTS IN VARIOUS
IB3583 CONSTRUCTION OF BLACKTOP ROAD FROM DELI KALAAGAN TO PURPAT DISTRICT WASHUK
045720- A12     Civil works                                         46,945,000            28,167,000            18,777,000
045720- A124    Building and Structures                             46,945,000            28,167,000            18,777,000
        Total- CONSTRUCTION OF BLACKTOP ROAD          46,945,000         28,167,000          18,777,000
          FROM DELI KALAAGAN TO PURPAT
            DISTRICT WASHUK
IB3584 CONSTRUCTION OF BLACKTOP ROAD FROM CPEC KHARAN YAK MACH ROAD TO GUL KHARAMGAI
DISTRICT WASHUK
045720- A12     Civil works                                         46,948,000            28,169,000            18,779,000
045720- A124    Building and Structures                             46,948,000            28,169,000            18,779,000
        Total- CONSTRUCTION OF BLACKTOP ROAD          46,948,000         28,169,000          18,779,000
          FROM CPEC KHARAN YAK MACH ROAD
          TO GUL KHARAMGAI DISTRICT
         WASHUK
IB3585 COMMUNITY BASED DEVELOPMET SCHEMES FOR INSTALLATION OF COMMUNITY HOME SOLAR SYSTEM
IN U/C SOTHGAN AND
045720- A12     Civil works                                         46,948,000            46,949,000          187,793,000
045720- A124    Building and Structures                             46,948,000            46,949,000          187,793,000
        Total- COMMUNITY BASED DEVELOPMET              46,948,000         46,949,000        187,793,000
          SCHEMES FOR INSTALLATION OF
          COMMUNITY HOME SOLAR SYSTEM IN
            U/C SOTHGAN AND
IB3586 CONSTRUCTION BLACKTOP ROAD FROM CADET COLLEGE JAHOO TO SISTAGAN TEHSIL JAHOO
DISTRICT AWARAN
045720- A12     Civil works                                         46,948,000            23,474,000            46,945,000
045720- A124    Building and Structures                             46,948,000            23,474,000            46,945,000
        Total- CONSTRUCTION BLACKTOP ROAD              46,948,000         23,474,000          46,945,000
          FROM CADET COLLEGE JAHOO TO
           SISTAGAN TEHSIL JAHOO DISTRICT
         AWARAN
IB3587 CONSTRUCTION OF ADDITIONAL ROOMS FOR GOVT GIRLS/BOYS PRIMARY/MIDDLE/HIGH SCHOOL AT
045720- A12     Civil works                                        145,331,000            72,666,000            72,665,000
045720- A124    Building and Structures                            145,331,000            72,666,000            72,665,000

Page 620

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- CONSTRUCTION OF ADDITIONAL              145,331,000         72,666,000          72,665,000
         ROOMS FOR GOVT GIRLS/BOYS
            PRIMARY/MIDDLE/HIGH SCHOOL AT
IB3588 CONSTRUCTION OF ROAD FROM ROBDBUN TO GOMAZI 23 KM DISTRICT KECH
045720- A12     Civil works                                        257,182,000          128,591,000          142,767,000
045720- A124    Building and Structures                            257,182,000          128,591,000          142,767,000
        Total- CONSTRUCTION OF ROAD FROM              257,182,000        128,591,000        142,767,000
          ROBDBUN TO GOMAZI 23 KM DISTRICT
          KECH
IB3589 ESTABLISHMENT OF BIBI BAZAR AT MAND DISTRICT KECH
045720- A12     Civil works                                         66,971,000            33,485,000            33,487,000
045720- A124    Building and Structures                             66,971,000            33,485,000            33,487,000
        Total- ESTABLISHMENT OF BIBI BAZAR AT            66,971,000         33,485,000          33,487,000
         MAND DISTRICT KECH
IB3590 CONSTRUCTION OF SHED AND BWALL OF JANAZGAH/GRAVEYARD/SCHOOLS IN DIFFERENT UCS OF
TEHSIL YAZMAN
045720- A12     Civil works                                         51,408,000            33,416,000            17,992,000
045720- A124    Building and Structures                             51,408,000            33,416,000            17,992,000
        Total- CONSTRUCTION OF SHED AND BWALL          51,408,000         33,416,000          17,992,000
          OF JANAZGAH/GRAVEYARD/SCHOOLS
              IN DIFFERENT UCS OF TEHSIL YAZMAN
IB3591 CONSTRUCTION OF SOLINGS/NALL AND TUFF TILE IN DIFFERENT UCS OF TEHSIL YAZMAN DISTRICT
BAHAWALPUR (02 NOS
045720- A12     Civil works                                        138,122,000            89,779,000            95,291,000
045720- A124    Building and Structures                            138,122,000            89,779,000            95,291,000
        Total- CONSTRUCTION OF SOLINGS/NALL            138,122,000         89,779,000          95,291,000
          AND TUFF TILE IN DIFFERENT UCS OF
            TEHSIL YAZMAN DISTRICT
          BAHAWALPUR (02 NOS
IB3592 PROVISION OF SEWERAGE IN DIFFERENT UCS OF TEHSIL YAZMAN DISTICT BAHAWALPUR (8 NOS
DEVELOPMENT
045720- A12     Civil works                                         78,488,000            51,018,000            74,419,000
045720- A124    Building and Structures                             78,488,000            51,018,000            74,419,000
        Total- PROVISION OF SEWERAGE IN                   78,488,000         51,018,000          74,419,000
           DIFFERENT UCS OF TEHSIL YAZMAN

Page 621

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

             DISTICT BAHAWALPUR (8 NOS
          DEVELOPMENT
IB3593 INSTALLATION OF FILTERATION PLANT IN DIFFERENT AREAS OF DISTRICT BAHAWALPUR (3 NOS
DEVELOPMENT
045720- A12     Civil works                                         63,850,000
045720- A124    Building and Structures                             63,850,000
        Total- INSTALLATION OF FILTERATION PLANT         63,850,000
              IN DIFFERENT AREAS OF DISTRICT
          BAHAWALPUR (3 NOS DEVELOPMENT
IB3594 CONSTRUCTION OF METALLED ROAD IN DIFFERENT AREAS OF DISTRICT BAHAWALPUR (24 NOS
DEVELOPMENT
045720- A12     Civil works                                        235,168,000          188,134,000          456,487,000
045720- A124    Building and Structures                            235,168,000          188,134,000          456,487,000
        Total- CONSTRUCTION OF METALLED ROAD         235,168,000        188,134,000        456,487,000
              IN DIFFERENT AREAS OF DISTRICT
          BAHAWALPUR (24 NOS DEVELOPMENT
IB3595 CONSTRUCTION OF METTALED ROADS AND BRIDGES IN DIFFERENT AREAS OF DISTRICT BAHAWALPUR
(12 NOS
045720- A12     Civil works                                        148,321,000            96,409,000            51,912,000
045720- A124    Building and Structures                            148,321,000            96,409,000            51,912,000
        Total- CONSTRUCTION OF METTALED ROADS        148,321,000         96,409,000          51,912,000
          AND BRIDGES IN DIFFERENT AREAS
          OF DISTRICT BAHAWALPUR (12 NOS
IB3596 CONSTRUCTION OF SOLING IN DIFFERENT AREAS OF TEHSIL YAZMAN DISTRICT BAHAWALPUR (20 NOS
SCHEMES)
045720- A12     Civil works                                        281,690,000          183,099,000          238,444,000
045720- A124    Building and Structures                            281,690,000          183,099,000          238,444,000
        Total- CONSTRUCTION OF SOLING IN                281,690,000        183,099,000        238,444,000
           DIFFERENT AREAS OF TEHSIL YAZMAN
            DISTRICT BAHAWALPUR (20 NOS
           SCHEMES)
IB3597 CONSTRUCTION OF SOLING IN UC-KARAMPUR AND UC ANAITI TEHSIL KHAIRPUR TAMAYWALI DISTRICT
BAHAWALPUR
045720- A12     Civil works                                         54,596,000            35,488,000            19,109,000
045720- A124    Building and Structures                             54,596,000            35,488,000            19,109,000

Page 622

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- CONSTRUCTION OF SOLING IN                  54,596,000         35,488,000          19,109,000
          UC-KARAMPUR AND UC ANAITI TEHSIL
           KHAIRPUR TAMAYWALI DISTRICT
          BAHAWALPUR
IB3598 DEVELOPMENT SCHEMES IN DIFFERENT UCS OF DISTRICT GUJRAT-I (60 NOS DEVELOPMENT SCHEMES)
045720- A12     Civil works                                        938,967,000          938,967,000            28,169,000
045720- A124    Building and Structures                            938,967,000          938,967,000            28,169,000
        Total- DEVELOPMENT SCHEMES IN                  938,967,000        938,967,000          28,169,000
           DIFFERENT UCS OF DISTRICT
            GUJRAT-I (60 NOS DEVELOPMENT
           SCHEMES)
IB3599 CONSTRUCTION OF PCC ROAD AND INFRASTRUCTURE DEVELOPMENT AT DIFFERENT UNION COUNCIL
DISTRICT
045720- A12     Civil works                                        187,794,000            93,897,000            93,897,000
045720- A124    Building and Structures                            187,794,000            93,897,000            93,897,000
        Total- CONSTRUCTION OF PCC ROAD AND           187,794,000         93,897,000          93,897,000
           INFRASTRUCTURE DEVELOPMENT AT
           DIFFERENT UNION COUNCIL DISTRICT
IB3600 IMPROVEMENT OF ROAD INFRASTRUCTURE AT DISTRIDCT CHAKWAL (10 NOS SCHEMES)
045720- A12     Civil works                                        211,329,000          105,665,000          105,664,000
045720- A124    Building and Structures                            211,329,000          105,665,000          105,664,000
        Total- IMPROVEMENT OF ROAD                      211,329,000        105,665,000        105,664,000
           INFRASTRUCTURE AT DISTRIDCT
          CHAKWAL (10 NOS SCHEMES)
IB3601 CONSTRUCTION AND IMPROVEMENT OF ROAD INFRASTRUCTURE AT TEHSIL TALAGANG & LAWA
DISTRICT CHAKWAL (11 NOS
045720- A12     Civil works                                        249,296,000          124,648,000          124,648,000
045720- A124    Building and Structures                            249,296,000          124,648,000          124,648,000
        Total- CONSTRUCTION AND IMPROVEMENT          249,296,000        124,648,000        124,648,000
          OF ROAD INFRASTRUCTURE AT
            TEHSIL TALAGANG & LAWA DISTRICT
          CHAKWAL (11 NOS
IB3602 REHABILITATION & IMPROVEMENT OF ROAD IN DISTRICT CHAKWAL (12 NOS SCHEMES)
045720- A12     Civil works                                        290,549,000          159,360,000            93,897,000
045720- A124    Building and Structures                            290,549,000          159,360,000            93,897,000

Page 623

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- REHABILITATION & IMPROVEMENT OF         290,549,000        159,360,000          93,897,000
          ROAD IN DISTRICT CHAKWAL (12 NOS
           SCHEMES)
IB3603 DEVELOPMENT SCHEMES OF INFRASTRUCTURE AND PUBLIC WORKS IN DIFFERENT UCS OF DISTRICT
GUJRAT
045720- A12     Civil works                                        281,690,000          160,563,000            28,169,000
045720- A124    Building and Structures                            281,690,000          160,563,000            28,169,000
        Total- DEVELOPMENT SCHEMES OF                  281,690,000        160,563,000          28,169,000
           INFRASTRUCTURE AND PUBLIC
         WORKS IN DIFFERENT UCS OF
            DISTRICT GUJRAT
IB3604 DEVELOPMENT SCHEMES IN DIFFERENT UCS OF DISTRICT GUJRAT-II (38 NOS DEVELOPMENT SCHEMES)
045720- A12     Civil works                                        779,343,000          467,606,000            28,169,000
045720- A124    Building and Structures                            779,343,000          467,606,000            28,169,000
        Total- DEVELOPMENT SCHEMES IN                  779,343,000        467,606,000          28,169,000
           DIFFERENT UCS OF DISTRICT
             GUJRAT-II (38 NOS DEVELOPMENT
           SCHEMES)
IB3605 REHABILITATION & CONSTRUCTION OF ROADS IN TEHSIL DASKA & PASROR DISTRICT SIALKOT (13 NOS
DEVELOPMENT
045720- A12     Civil works                                        234,742,000          140,845,000            93,897,000
045720- A124    Building and Structures                            234,742,000          140,845,000            93,897,000
        Total- REHABILITATION & CONSTRUCTION OF        234,742,000        140,845,000          93,897,000
          ROADS IN TEHSIL DASKA & PASROR
            DISTRICT SIALKOT (13 NOS
          DEVELOPMENT
IB3606 MISCELLANEOUS DEVELOPMENT SCHEMES IN TEHSIL KOT MOMIN & TEHSIL SARGODHA DISTRICT
SARGODHA
045720- A12     Civil works                                           9,390,000             9,390,000            28,169,000
045720- A124    Building and Structures                               9,390,000             9,390,000            28,169,000
        Total- MISCELLANEOUS DEVELOPMENT                9,390,000           9,390,000          28,169,000
          SCHEMES IN TEHSIL KOT MOMIN &
            TEHSIL SARGODHA DISTRICT
          SARGODHA
IB3607 CONSTRUCTION OF ROAD/PCC/TUFF PAVER/NALLAH/SOLING/DRAIN/CULVERTS IN CHAK 105 SB &
RUKHAN DISTRICT

Page 624

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045720- A12     Civil works                                           9,390,000             9,390,000            28,169,000
045720- A124    Building and Structures                               9,390,000             9,390,000            28,169,000
        Total- CONSTRUCTION OF ROAD/PCC/TUFF             9,390,000           9,390,000          28,169,000
            PAVER/NALLAH/SOLING/DRAIN/CULVE
           RTS IN CHAK 105 SB & RUKHAN
            DISTRICT
IB3608 CONSTRUCTION OF ROAD/PCC/TUFF
045720- A12     Civil works                                        375,587,000          225,352,000          281,690,000
045720- A124    Building and Structures                            375,587,000          225,352,000          281,690,000
        Total- CONSTRUCTION OF ROAD/PCC/TUFF          375,587,000        225,352,000        281,690,000
IB3609 DEVELOPMENT SCHEMES IN DISTRICT RAWALPINDI
045720- A03    Operating Expenses                               18,779,000
045720- A039   General                                             18,779,000
        Total- DEVELOPMENT SCHEMES IN DISTRICT          18,779,000
           RAWALPINDI
IB3610 CONSTRUCTION OF ROADS/PCC/SOLING/INFRASTRUCTURE AT SHEIKHUPURA (10 NOS SCHEMES)
045720- A12     Civil works                                         56,338,000            33,803,000            22,535,000
045720- A124    Building and Structures                             56,338,000            33,803,000            22,535,000
        Total- CONSTRUCTION OF                            56,338,000         33,803,000          22,535,000
           ROADS/PCC/SOLING/INFRASTRUCTUR
           E AT SHEIKHUPURA (10 NOS
           SCHEMES)
IB3611 DUALIZATION AND IMPROVEMENT OF KALLAR KAHAR TO CHOA SAIDAN SHAH (28 KM) FEASIBILITY
STUDY
045720- A12     Civil works                                         37,258,000            18,629,000            18,629,000
045720- A124    Building and Structures                             37,258,000            18,629,000            18,629,000
        Total- DUALIZATION AND IMPROVEMENT OF           37,258,000         18,629,000          18,629,000
          KALLAR KAHAR TO CHOA SAIDAN
          SHAH (28 KM) FEASIBILITY STUDY
     045720   Total-  Others                               18,570,025,000       9,191,009,000       9,164,142,000
     0457     Total-  Construction (Works)                  25,115,568,000      13,625,473,000      15,060,204,000
     045      Total-  Construction and Transport             25,115,568,000      13,625,473,000      15,060,204,000
     04        Total-  Economic Affairs                      25,115,568,000      13,625,473,000      15,060,204,000
               Total- ACCOUNTANT GENERAL                25,115,568,000        13,625,473,000        15,060,204,000
                PAKISTAN REVENUES

Page 625

NO. 128.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                       (In Foreign Exchange)                                                                        (1,000,000,000)
               (Own Resources)
                   (Foreign Aid)                                                                                 (1,000,000,000)
                       (In Local Currency)                            (25,115,568,000)       (13,625,473,000)       (14,060,204,000)
04     Economic Affairs:
045    Construction and Transport:
0457   Construction (Works):
045701 Administration  :
IB3443 PC-II OF THE PROJECTED TITLED CONSTRUCTION OF HAJJ COMPLEX LAHORE
045701- A02     Project Pre-Investment Analysis                   15,365,000
045701- A021    Feasibility Studies                                   15,365,000

045701- A12     Civil works                                                                 7,682,000
045701- A124    Building and Structures                                                     7,682,000
        Total-  PC-II OF THE PROJECTED TITLED               15,365,000           7,682,000
           CONSTRUCTION OF HAJJ COMPLEX
          LAHORE

IB3444 CONSTRUCTION OF BOUNDARY WALL ALONG WITH RAISING OF EXISTING BOUNDARY WALL AT HAJJ
COMLEX QUETTA
045701- A12     Civil works                                         25,574,000            25,574,000
045701- A124    Building and Structures                             25,574,000            25,574,000
        Total- CONSTRUCTION OF BOUNDARY WALL          25,574,000         25,574,000
          ALONG WITH RAISING OF EXISTING
          BOUNDARY WALL AT HAJJ COMLEX
          QUETTA
     045701   Total-  Administration                            40,939,000         33,256,000
     0457     Total-  Construction (Works)                      40,939,000         33,256,000
     045      Total-  Construction and Transport                 40,939,000         33,256,000
     04        Total-  Economic Affairs                          40,939,000         33,256,000
               Total-                                                 40,939,000            33,256,000
          TOTAL - DEMAND                           25,156,507,000      13,658,729,000      15,060,204,000
                  (In Foreign Exchange)                                                                    (1,000,000,000)
            (Own Resources)
               (Foreign Aid)                                                                            (1,000,000,000)
                  (In Local Currency)                            (25,156,507,000)     (13,658,729,000)     (14,060,204,000)
                                                  __________________________________________________

Page 626

No text layer on this page, see the official PDF.

Page 627

                                   SECTION V

                       MINISTRY OF INDUSTRIES AND PRODUCTION

                                                            **********

                                                                                  2022-2023
                                                                             Budget
                                                                                    Estimate

                                                                      (Rupees in Thousand)

Demands presented on behalf of the Ministry of
Industries and Production

Development Expendiutre on Capital Account.
             129.  Capital Outlay on Industrial Development                                  2,850,000

                                                                          Total :              2,850,000

Page 628

No text layer on this page, see the official PDF.

Page 629

NO. 129.- CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT                    DEMANDS FOR GRANTS
                                DEMAND NO. 129
                                                                            ( FC12C32 )
                         CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2023 to defray the Salaries and Other
Expenses of the CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT.

                                Voted           Rs. 2,850,000,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF INDUSTRIES AND PRODUCTION  .

                                                           2021-2022         2021-2022         2022-2023
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
044    Mining and Manufacturing                                   2,916,082,000         1,700,838,000         2,850,000,000
               Total                                               2,916,082,000         1,700,838,000         2,850,000,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                         135,472,000         87,330,000        206,743,000
A011  Pay                                                        135,472,000            87,330,000          206,743,000
A011-1 Pay of Officers                                               (106,660,000)           (74,333,000)         (160,816,000)
A011-2 Pay of Other Staff                                              (28,812,000)           (12,997,000)           (45,927,000)
A02    Project Pre-Investment Analysis                       200,000,000        100,000,000        145,000,000
A03   Operating Expenses                                  233,227,000        155,987,000        239,033,000
A05   Grants, Subsidies and Write off Loans                  613,087,000        291,277,000        560,359,000
A09   Physical Assets                                      1,096,661,000        684,251,000        979,891,000
A12    Civil works                                           625,635,000        363,528,000        692,974,000
A13   Repairs and Maintenance                               12,000,000         18,465,000         26,000,000
               Total                                         2,916,082,000       1,700,838,000       2,850,000,000

Page 630

NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2021-2022         2021-2022       2022-2023
                                       2021-22 2022-23       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
IB3485 IMPROVING COMPETITIVENESS THROUGH SUSTAINABLE NATION PRODUCTIVITY (SNP)
044101- A01    Employees Related Expenses                       4,300,000             4,300,000             7,742,000
044101- A011   Pay                       3      3            4,300,000             4,300,000             7,742,000
044101- A011-1 Pay of Officers                  (3)      (3)          (4,300,000)          (4,300,000)          (7,742,000)
044101- A03    Operating Expenses                               16,340,000            13,033,000            48,318,000
044101- A039   General                                             16,340,000            13,033,000            48,318,000
044101- A09    Physical Assets                                      4,360,000             4,360,000
044101- A092   Computer Equipment                                 3,600,000             3,600,000
044101- A097   Purchase of Furniture and Fixture                     760,000              760,000
        Total- IMPROVING COMPETITIVENESS                 25,000,000         21,693,000          56,060,000
          THROUGH SUSTAINABLE NATION
           PRODUCTIVITY (SNP)
IB5262 SUPPORT FOR INDUSTRIAL DEVELOPMENT STRENTHENING THE ENGINEERING INDUSTRY
044101- A01    Employees Related Expenses                                                                 36,000,000
044101- A011   Pay                                 5                                                      36,000,000
044101- A011-1 Pay of Officers                           (5)                                                  (36,000,000)
044101- A03    Operating Expenses                                                                             9,000,000
044101- A037   Consultancy and Contractual Work                                                               2,000,000
044101- A039   General                                                                                          7,000,000
044101- A09    Physical Assets                                                                                 5,000,000
044101- A092   Computer Equipment                                                                             4,000,000
044101- A097   Purchase of Furniture and Fixture                                                                 1,000,000
        Total- SUPPORT FOR INDUSTRIAL                                                            50,000,000
          DEVELOPMENT STRENTHENING THE
           ENGINEERING INDUSTRY
     044101   Total-  Support for Industrial Development          25,000,000         21,693,000        106,060,000

     0441     Total-  Manufacturing                            25,000,000         21,693,000        106,060,000
     044      Total-  Mining and Manufacturing                  25,000,000         21,693,000        106,060,000
     04        Total-  Economic Affairs                          25,000,000         21,693,000        106,060,000
               Total- ACCOUNTANT GENERAL                    25,000,000            21,693,000          106,060,000
                PAKISTAN REVENUES

Page 631

NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
LO0774 PESHAWAR LIGHT ENGINEERING SUPPORT CENTRE (PESC) (ADB FUNDED) KHYBER PAKHTUNKHWA
044101- A09    Physical Assets                                                                               49,866,000
044101- A096   Purchase of Plant and Machinery                                                               49,866,000
        Total- PESHAWAR LIGHT ENGINEERING                                                      49,866,000
          SUPPORT CENTRE (PESC) (ADB
           FUNDED) KHYBER PAKHTUNKHWA
LO1175 NATIONAL BUSSINESS DEVELOPMENT PROGRAMM FOR SME'S
044101- A01    Employees Related Expenses                      46,639,000            39,034,000            52,080,000
044101- A011   Pay                      45     36           46,639,000            39,034,000            52,080,000
044101- A011-1 Pay of Officers               (32)      (8)         (44,066,000)         (37,558,000)         (50,380,000)
044101- A011-2 Pay of Other Staff            (13)    (28)          (2,573,000)          (1,476,000)          (1,700,000)
044101- A03    Operating Expenses                               12,414,000            10,958,000            13,700,000
044101- A037   Consultancy and Contractual Work                   3,408,000             3,408,000             3,700,000
044101- A039   General                                              9,006,000             7,550,000            10,000,000
044101- A05    Grants, Subsidies and Write off Loans            340,947,000          189,526,000          216,234,000
044101- A052   Grants Domestic                                  340,947,000          189,526,000          216,234,000
        Total- NATIONAL BUSSINESS DEVELOPMENT        400,000,000        239,518,000        282,014,000
         PROGRAMM FOR SME'S
LO1180 PRODUCT DEV.CENTRE FOR COMPOSITS BASED SPORTS GOOD SIALKOT
044101- A01    Employees Related Expenses                       4,800,000             4,800,000            17,992,000
044101- A011   Pay                      15     51            4,800,000             4,800,000            17,992,000
044101- A011-1 Pay of Officers                  (4)      (2)          (1,800,000)          (1,800,000)          (4,290,000)
044101- A011-2 Pay of Other Staff            (11)    (49)          (3,000,000)          (3,000,000)         (13,702,000)
044101- A03    Operating Expenses                                 810,000              810,000             5,508,000
044101- A037   Consultancy and Contractual Work                                         810,000
044101- A039   General                                              810,000                                   5,508,000
044101- A05    Grants, Subsidies and Write off Loans            111,121,000             1,800,000            37,000,000
044101- A052   Grants Domestic                                  111,121,000             1,800,000            37,000,000
044101- A09    Physical Assets                                    31,890,000            30,090,000             9,500,000

Page 632

NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A095   Purchase of Transport                                1,800,000
044101- A096   Purchase of Plant and Machinery                    16,300,000            16,300,000             5,500,000
044101- A097   Purchase of Furniture and Fixture                     3,720,000             3,720,000
044101- A098   Purchase of Other Assets                           10,070,000            10,070,000             4,000,000
044101- A12     Civil works                                         12,500,000            12,500,000
044101- A124    Building and Structures                             12,500,000            12,500,000
        Total- PRODUCT DEV.CENTRE FOR                  161,121,000         50,000,000          70,000,000
           COMPOSITS BASED SPORTS GOOD
           SIALKOT
LO1182 BUSSINESS SKILL DEV. CENTRE FOR WOMEN AT VARIOUS LOCATION
044101- A01    Employees Related Expenses                       4,230,000             2,818,000             8,444,000
044101- A011   Pay                       8      8            4,230,000             2,818,000             8,444,000
044101- A011-1 Pay of Officers                  (4)      (4)          (2,970,000)          (1,968,000)          (7,100,000)
044101- A011-2 Pay of Other Staff               (4)      (4)          (1,260,000)            (850,000)          (1,344,000)
044101- A03    Operating Expenses                                 2,445,000             2,370,000             3,758,000
044101- A032   Communications                                     125,000               50,000              150,000
044101- A033     Utilities                                               180,000              180,000              280,000
044101- A034   Occupancy Costs                                     990,000              990,000              808,000
044101- A037   Consultancy and Contractual Work                    100,000              100,000              100,000
044101- A038    Travel & Transportation                               150,000              150,000              500,000
044101- A039   General                                              900,000              900,000             1,920,000
044101- A09    Physical Assets                                      2,325,000             2,325,000             1,180,000
044101- A092   Computer Equipment                                 550,000              550,000              330,000
044101- A097   Purchase of Furniture and Fixture                     400,000              400,000              700,000
044101- A098   Purchase of Other Assets                             1,375,000             1,375,000              150,000
044101- A12     Civil works                                           9,000,000             7,687,000             3,618,000
044101- A124    Building and Structures                               9,000,000             7,687,000             3,618,000
        Total- BUSSINESS SKILL DEV. CENTRE FOR           18,000,000         15,200,000          17,000,000
         WOMEN AT VARIOUS LOCATION
LO1280 INDUSTRIAL DESIGN AND AUTOMATION CENRE
044101- A01    Employees Related Expenses                      13,380,000             6,250,000            15,563,000
044101- A011   Pay                       7     18           13,380,000             6,250,000            15,563,000
044101- A011-1 Pay of Officers                  (3)      (5)          (7,140,000)          (4,250,000)          (5,000,000)

Page 633

NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A011-2 Pay of Other Staff               (4)    (13)          (6,240,000)          (2,000,000)         (10,563,000)
044101- A03    Operating Expenses                                 3,500,000             2,000,000             5,500,000
044101- A039   General                                              3,500,000             2,000,000             5,500,000
044101- A05    Grants, Subsidies and Write off Loans              8,594,000             8,594,000             5,970,000
044101- A052   Grants Domestic                                     8,594,000             8,594,000             5,970,000
044101- A09    Physical Assets                                   155,014,000          127,956,000          132,967,000
044101- A091   Purchase of Building                                33,923,000          127,806,000             2,800,000
044101- A092   Computer Equipment                               11,415,000                                   9,415,000
044101- A096   Purchase of Plant and Machinery                  107,040,000                                115,840,000
044101- A097   Purchase of Furniture and Fixture                     2,636,000              150,000             4,912,000
044101- A12     Civil works                                        119,512,000            42,000,000          127,000,000
044101- A124    Building and Structures                            119,512,000            42,000,000          127,000,000
        Total- INDUSTRIAL DESIGN AND                     300,000,000        186,800,000        287,000,000
          AUTOMATION CENRE
LO1299 1000 INDUSTRIAL STITCHING UNITS ALL ACROSS PAKISTAN
044101- A01    Employees Related Expenses                      12,478,000             7,220,000            15,000,000
044101- A011   Pay                      14     14           12,478,000             7,220,000            15,000,000
044101- A011-1 Pay of Officers                  (9)      (9)         (11,178,000)          (5,920,000)         (12,500,000)
044101- A011-2 Pay of Other Staff               (5)      (5)          (1,300,000)          (1,300,000)          (2,500,000)
044101- A03    Operating Expenses                                 6,422,000             4,720,000             4,500,000
044101- A032   Communications                                     450,000              200,000              200,000
044101- A033     Utilities                                               300,000
044101- A038    Travel & Transportation                               3,000,000             2,800,000             2,500,000
044101- A039   General                                              2,672,000             1,720,000             1,800,000
044101- A05    Grants, Subsidies and Write off Loans              6,100,000             1,000,000              500,000
044101- A052   Grants Domestic                                     6,100,000             1,000,000              500,000
044101- A09    Physical Assets                                    75,000,000            54,690,000            60,000,000
044101- A096   Purchase of Plant and Machinery                    75,000,000            54,690,000            60,000,000
        Total- 1000 INDUSTRIAL STITCHING UNITS            100,000,000         67,630,000          80,000,000
           ALL ACROSS PAKISTAN
LO1644 SUPPORT CENTRE FOR DENTAL AND SURGICAL EQUIPMENTS (SCDS) SIALKOT
044101- A01    Employees Related Expenses                       6,600,000             3,362,000             5,600,000
044101- A011   Pay                       3      3            6,600,000             3,362,000             5,600,000

Page 634

NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A011-1 Pay of Officers                  (3)      (3)          (6,600,000)          (3,362,000)          (5,600,000)
044101- A03    Operating Expenses                                 2,100,000             1,100,000             3,500,000
044101- A039   General                                              2,100,000             1,100,000             3,500,000
044101- A05    Grants, Subsidies and Write off Loans             26,000,000            26,125,000             9,180,000
044101- A052   Grants Domestic                                    26,000,000            26,125,000             9,180,000
044101- A09    Physical Assets                                   113,800,000          135,000,000            30,520,000
044101- A091   Purchase of Building                               113,800,000          135,000,000
044101- A092   Computer Equipment                                                                           14,190,000
044101- A095   Purchase of Transport                                                                            5,600,000
044101- A096   Purchase of Plant and Machinery                                                                 7,550,000
044101- A097   Purchase of Furniture and Fixture                                                                 3,180,000
044101- A12     Civil works                                           1,500,000                                 51,200,000
044101- A124    Building and Structures                               1,500,000                                 51,200,000
        Total- SUPPORT CENTRE FOR DENTAL AND          150,000,000        165,587,000        100,000,000
           SURGICAL EQUIPMENTS (SCDS)
           SIALKOT
LO1645 RESEARCH REGULATORY INSIGHTS & ADVOCACY ASSISTANCE FOR SMES
044101- A01    Employees Related Expenses                       5,895,000             3,455,000             9,006,000
044101- A011   Pay                       7      7            5,895,000             3,455,000             9,006,000
044101- A011-1 Pay of Officers                  (6)      (4)          (5,670,000)          (3,280,000)          (8,646,000)
044101- A011-2 Pay of Other Staff               (1)      (3)            (225,000)            (175,000)            (360,000)
044101- A03    Operating Expenses                                 8,025,000             5,499,000            11,494,000
044101- A033     Utilities                                               900,000              300,000
044101- A034   Occupancy Costs                                     4,500,000             2,924,000             3,217,000
044101- A038    Travel & Transportation                               500,000
044101- A039   General                                              2,125,000             2,275,000             8,277,000
044101- A05    Grants, Subsidies and Write off Loans              4,424,000             5,145,000            50,000,000
044101- A052   Grants Domestic                                     4,424,000             5,145,000            50,000,000
044101- A09    Physical Assets                                      4,906,000             5,721,000
044101- A091   Purchase of Building                                                       1,810,000
044101- A092   Computer Equipment                                 1,810,000
044101- A097   Purchase of Furniture and Fixture                     2,200,000             2,610,000
044101- A098   Purchase of Other Assets                             896,000             1,301,000

Page 635

NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A12     Civil works                                           6,750,000             7,640,000
044101- A124    Building and Structures                               6,750,000             7,640,000
        Total- RESEARCH REGULATORY INSIGHTS &          30,000,000         27,460,000          70,500,000
          ADVOCACY ASSISTANCE FOR SMES
LO1646 AGRO FOOD PROCESSING FACILITIES MIRPURKHAS
044101- A01    Employees Related Expenses                       3,840,000             1,154,000             3,690,000
044101- A011   Pay                       6      4            3,840,000             1,154,000             3,690,000
044101- A011-1 Pay of Officers                  (5)      (3)          (3,540,000)          (1,154,000)          (3,540,000)
044101- A011-2 Pay of Other Staff               (1)      (1)            (300,000)                                (150,000)
044101- A03    Operating Expenses                                                                             4,110,000
044101- A039   General                                                                                          4,110,000
044101- A05    Grants, Subsidies and Write off Loans             10,003,000             1,368,000             3,074,000
044101- A052   Grants Domestic                                    10,003,000             1,368,000             3,074,000
044101- A09    Physical Assets                                    41,157,000              478,000             2,970,000
044101- A091   Purchase of Building                                40,000,000              478,000
044101- A092   Computer Equipment                                 1,157,000                                   120,000
044101- A095   Purchase of Transport                                                                            2,850,000
044101- A12     Civil works                                           5,000,000                                136,156,000
044101- A124    Building and Structures                               5,000,000                                136,156,000
        Total- AGRO FOOD PROCESSING FACILITIES          60,000,000           3,000,000        150,000,000
          MIRPURKHAS
LO3121 SME BUSSINESS FACILITATION CENTRE (SMEBFC) MULTAN
044101- A01    Employees Related Expenses                       6,204,000             6,112,000             6,162,000
044101- A011   Pay                       9      9            6,204,000             6,112,000             6,162,000
044101- A011-1 Pay of Officers                  (8)      (8)          (6,204,000)          (6,112,000)          (5,962,000)
044101- A011-2 Pay of Other Staff               (1)      (1)                                                     (200,000)
044101- A03    Operating Expenses                                 6,296,000             5,078,000             6,419,000
044101- A039   General                                              6,296,000             5,078,000             6,419,000
044101- A05    Grants, Subsidies and Write off Loans               500,000              310,000              400,000
044101- A052   Grants Domestic                                     500,000              310,000              400,000
044101- A09    Physical Assets                                                                                 2,019,000
044101- A095   Purchase of Transport                                                                            2,019,000
        Total- SME BUSSINESS FACILITATION                 13,000,000         11,500,000          15,000,000
          CENTRE (SMEBFC) MULTAN

Page 636

NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

LO6587 ESTABLISHMENT OF NAPTHA CRACKER COMPLEX (NCC) FEASIBILITY STUDY
044101- A01    Employees Related Expenses                                                                   5,000,000
044101- A011   Pay                                 6                                                        5,000,000
044101- A011-1 Pay of Officers                           (3)                                                    (2,000,000)
044101- A011-2 Pay of Other Staff                       (3)                                                    (3,000,000)
044101- A03    Operating Expenses                                                                           83,870,000
044101- A039   General                                                                                        83,870,000
044101- A05    Grants, Subsidies and Write off Loans                                                        10,000,000
044101- A052   Grants Domestic                                                                               10,000,000
044101- A09    Physical Assets                                                                                 1,130,000
044101- A092   Computer Equipment                                                                             1,130,000
        Total- ESTABLISHMENT OF NAPTHA                                                        100,000,000
          CRACKER COMPLEX (NCC)
             FEASIBILITY STUDY
LO6588 CENTRE FOR ACQUISITION OF SEMI CONDUCTOR TECHNOLOGY (CAST) FEASIBILITY STUDY
044101- A01    Employees Related Expenses                                                                   3,000,000
044101- A011   Pay                                 6                                                        3,000,000
044101- A011-1 Pay of Officers                           (3)                                                    (1,500,000)
044101- A011-2 Pay of Other Staff                       (3)                                                    (1,500,000)
044101- A03    Operating Expenses                                                                             2,870,000
044101- A039   General                                                                                          2,870,000
044101- A05    Grants, Subsidies and Write off Loans                                                          3,000,000
044101- A052   Grants Domestic                                                                                 3,000,000
044101- A09    Physical Assets                                                                                 1,130,000
044101- A092   Computer Equipment                                                                             1,130,000
        Total- CENTRE FOR ACQUISITION OF SEMI                                                   10,000,000
          CONDUCTOR TECHNOLOGY (CAST)
             FEASIBILITY STUDY
LO9644 NATIONAL STRATEGIC PROGRAM FOR ACQUISTION OF IND TECH-NSPAIT INCLUDING FEASIBILITY-
KNOWLEDGE
044101- A01    Employees Related Expenses                      13,000,000             4,829,000            11,000,000
044101- A011   Pay                      24     46           13,000,000             4,829,000            11,000,000
044101- A011-1 Pay of Officers               (10)    (20)          (7,000,000)          (3,129,000)          (5,500,000)

Page 637

NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A011-2 Pay of Other Staff            (14)    (26)          (6,000,000)          (1,700,000)          (5,500,000)
044101- A03    Operating Expenses                                 9,000,000             2,115,000            14,000,000
044101- A039   General                                              9,000,000             2,115,000            14,000,000
044101- A05    Grants, Subsidies and Write off Loans             50,000,000            27,000,000            75,000,000
044101- A052   Grants Domestic                                    50,000,000            27,000,000            75,000,000
044101- A09    Physical Assets                                   216,000,000            46,531,000          174,000,000
044101- A092   Computer Equipment                                 4,000,000             2,921,000             5,000,000
044101- A095   Purchase of Transport                                2,900,000
044101- A096   Purchase of Plant and Machinery                  203,600,000            38,251,000          164,200,000
044101- A097   Purchase of Furniture and Fixture                     2,500,000             3,385,000             3,800,000
044101- A098   Purchase of Other Assets                             3,000,000             1,974,000             1,000,000
044101- A13    Repairs and Maintenance                          12,000,000            18,465,000            26,000,000
044101- A133    Buildings and Structure                             12,000,000            18,465,000            26,000,000
        Total- NATIONAL STRATEGIC PROGRAM FOR        300,000,000         98,940,000        300,000,000
           ACQUISTION OF IND TECH-NSPAIT
           INCLUDING FEASIBILITY- KNOWLEDGE
LO9645 FOOTWEAR CLUSTER DEV THROUGH CAD CAM AND CNC MACHINING LAHORE
044101- A01    Employees Related Expenses                       4,434,000             3,480,000             5,628,000
044101- A011   Pay                       8      8            4,434,000             3,480,000             5,628,000
044101- A011-1 Pay of Officers                  (1)      (2)          (1,080,000)          (1,080,000)          (2,500,000)
044101- A011-2 Pay of Other Staff               (7)      (6)          (3,354,000)          (2,400,000)          (3,128,000)
044101- A03    Operating Expenses                               11,682,000             4,800,000             4,957,000
044101- A039   General                                             11,682,000             4,800,000             4,957,000
044101- A05    Grants, Subsidies and Write off Loans               420,000              420,000                 1,000
044101- A052   Grants Domestic                                     420,000              420,000                 1,000
044101- A09    Physical Assets                                    15,574,000            13,600,000             1,974,000
044101- A096   Purchase of Plant and Machinery                    15,574,000            13,600,000             1,974,000
        Total- FOOTWEAR CLUSTER DEV THROUGH           32,110,000         22,300,000          12,560,000
          CAD CAM AND CNC MACHINING
          LAHORE
     044101   Total-  Support for Industrial Development       1,564,231,000        887,935,000       1,543,940,000

     0441     Total-  Manufacturing                          1,564,231,000        887,935,000       1,543,940,000
     044      Total-  Mining and Manufacturing               1,564,231,000        887,935,000       1,543,940,000
     04        Total-  Economic Affairs                       1,564,231,000        887,935,000       1,543,940,000
               Total- ACCOUNTANT GENERAL                 1,564,231,000          887,935,000         1,543,940,000
                PAKISTAN REVENUES
                  SUB-OFFICE, LAHORE

Page 638

NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
KA1373 DEVELOPMENT OF KARACHI INDUSTRIAL PARK (KIP) AT 1500 ACRES PSM LAND KARACHI
044101- A02     Project Pre-Investment Analysis                  200,000,000          100,000,000          145,000,000
044101- A021    Feasibility Studies                                 200,000,000          100,000,000          145,000,000
044101- A12     Civil works                                                                                       5,000,000
044101- A125   Other Works                                                                                     4,000,000
044101- A126   Telecommunication Works                                                                        1,000,000
        Total- DEVELOPMENT OF KARACHI                  200,000,000        100,000,000        150,000,000
            INDUSTRIAL PARK (KIP) AT 1500
          ACRES PSM LAND KARACHI
KA1374 ESTABLISHMENT OF HIGH TENSILE SHEET METAL DIES MANUFACTURING AND TITANIUM COATING
SETUP AT KTDMC
044101- A05    Grants, Subsidies and Write off Loans              5,000,000             5,000,000
044101- A052   Grants Domestic                                     5,000,000             5,000,000
044101- A09    Physical Assets                                    95,000,000            95,000,000          300,000,000
044101- A096   Purchase of Plant and Machinery                    95,000,000            95,000,000          300,000,000
        Total- ESTABLISHMENT OF HIGH TENSILE            100,000,000        100,000,000        300,000,000
           SHEET METAL DIES MANUFACTURING
          AND TITANIUM COATING SETUP AT
          KTDMC
KA7198 ESTABLISHMENT OF 132 KV GRID STATION AT BIN QASIM INDUSTRIAL PARK KARACHI
044101- A03    Operating Expenses                               25,000,000            13,040,000
044101- A037   Consultancy and Contractual Work                  25,000,000            13,040,000
044101- A05    Grants, Subsidies and Write off Loans             49,978,000            24,989,000          150,000,000
044101- A052   Grants Domestic                                    49,978,000            24,989,000          150,000,000
044101- A09    Physical Assets                                   334,000,000          167,000,000          200,000,000
044101- A096   Purchase of Plant and Machinery                  334,000,000          167,000,000          200,000,000
044101- A12     Civil works                                        211,373,000          105,681,000            50,000,000
044101- A125   Other Works                                      211,373,000          105,681,000            50,000,000
        Total- ESTABLISHMENT OF 132 KV GRID             620,351,000        310,710,000        400,000,000
           STATION AT BIN QASIM INDUSTRIAL
          PARK KARACHI

Page 639

NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA9649 DEVELOPMENT OF DATES STORAGE PROCESSING AND PACKAGING PLANT IN TURBAT
044101- A12     Civil works                                                                                   100,000,000
044101- A124    Building and Structures                                                                       100,000,000
        Total- DEVELOPMENT OF DATES STORAGE                                                 100,000,000
           PROCESSING AND PACKAGING PLANT
              IN TURBAT
     044101   Total-  Support for Industrial Development         920,351,000        510,710,000        950,000,000

     0441     Total-  Manufacturing                           920,351,000        510,710,000        950,000,000
     044      Total-  Mining and Manufacturing                 920,351,000        510,710,000        950,000,000
     04        Total-  Economic Affairs                        920,351,000        510,710,000        950,000,000
               Total- ACCOUNTANT GENERAL                  920,351,000          510,710,000          950,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI

Page 640

NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
LS0109 ESTABLISHMENT OF HUB SPECIAL ECONOMIC ZONE LASBELA
044101- A01    Employees Related Expenses                       9,672,000              516,000             4,836,000
044101- A011   Pay                      29     29            9,672,000              516,000             4,836,000
044101- A011-1 Pay of Officers               (12)    (12)          (5,112,000)            (420,000)          (2,556,000)
044101- A011-2 Pay of Other Staff            (17)    (17)          (4,560,000)             (96,000)          (2,280,000)
044101- A03    Operating Expenses                               22,693,000             9,964,000            17,529,000
044101- A032   Communications                                     100,000                                   100,000
044101- A037   Consultancy and Contractual Work                  16,091,000             5,364,000            11,454,000
044101- A038    Travel & Transportation                               1,800,000             1,800,000             1,800,000
044101- A039   General                                              4,702,000             2,800,000             4,175,000
044101- A09    Physical Assets                                      7,635,000             1,500,000             7,635,000
044101- A095   Purchase of Transport                                5,135,000                                   5,135,000
044101- A097   Purchase of Furniture and Fixture                     2,500,000             1,500,000             2,500,000
044101- A12     Civil works                                        260,000,000          188,020,000          220,000,000
044101- A121   Roads Highways and Bridges                      150,000,000          124,495,000            90,000,000
044101- A123   Embankment and Drainage Works                  50,000,000            63,525,000            90,000,000
044101- A124    Building and Structures                             10,000,000                                 20,000,000
044101- A125   Other Works                                        50,000,000                                 20,000,000
        Total- ESTABLISHMENT OF HUB SPECIAL            300,000,000        200,000,000        250,000,000
          ECONOMIC ZONE LASBELA
QA9175 FEASIBILITY FOR ESTABLISHMENT OF METAL PARK IN CHAGAI
044101- A03    Operating Expenses                              106,500,000            80,500,000
044101- A037   Consultancy and Contractual Work                  77,000,000            69,500,000
044101- A038    Travel & Transportation                               9,000,000             2,000,000
044101- A039   General                                             20,500,000             9,000,000
        Total- FEASIBILITY FOR ESTABLISHMENT OF         106,500,000         80,500,000
          METAL PARK IN CHAGAI
     044101   Total-  Support for Industrial Development         406,500,000        280,500,000        250,000,000

Page 641

NO. 129.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

     0441     Total-  Manufacturing                           406,500,000        280,500,000        250,000,000
     044      Total-  Mining and Manufacturing                 406,500,000        280,500,000        250,000,000
     04        Total-  Economic Affairs                        406,500,000        280,500,000        250,000,000
               Total- ACCOUNTANT GENERAL                  406,500,000          280,500,000          250,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
          TOTAL - DEMAND                             2,916,082,000       1,700,838,000       2,850,000,000

Page 642

No text layer on this page, see the official PDF.

Page 643

                                   SECTION VI

                     CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION
                                                            **********

                                                                                   2022-2023
                                                                              Budget
                                                                                     Estimate

                                                                       (Rupees in Thousand)

 Demand presented on behalf of the
Capital Outlay on Maritime Affairs Division

 Development Expenditure on Capital Account.
              130.  Capital Outlay on Maritime Affairs Division                                3,465,378

                                                                          Total :              3,465,378

Page 644

No text layer on this page, see the official PDF.

Page 645

NO. 130.- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION                   DEMANDS FOR GRANTS
                                DEMAND NO. 130
                                                                            ( FC12C51 )
                         CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2023 to defray the Salaries and Other
Expenses of the CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION.

                                Voted           Rs. 3,465,378,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF MARITIME AFFAIRS  .

                                                           2021-2022         2021-2022         2022-2023
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
045    Construction and Transport                                 2,025,638,000          900,646,000          938,933,000
046    Communications                                            2,436,273,000         1,211,164,000         2,526,445,000
               Total                                               4,461,911,000         2,111,810,000         3,465,378,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                            2,000,000           2,000,000           3,032,000
A011  Pay                                                            2,000,000             2,000,000             3,032,000
A011-1 Pay of Officers                                                   (400,000)             (400,000)             (432,000)
A011-2 Pay of Other Staff                                                (1,600,000)            (1,600,000)            (2,600,000)
A02    Project Pre-Investment Analysis                       443,000,000        296,124,000        304,240,000
A03   Operating Expenses                                     7,000,000           4,586,000       1,507,000,000
A09   Physical Assets                                      447,271,000             81,000        571,290,000
A12    Civil works                                          3,509,476,000       1,808,420,000       1,079,316,000
A13   Repairs and Maintenance                               53,164,000            599,000            500,000
               Total                                         4,461,911,000       2,111,810,000       3,465,378,000
                  (In Foreign Exchange)                              (1,856,544,000)                                (293,532,000)
            (Own Resources)
               (Foreign Aid)                                        (1,856,544,000)                                (293,532,000)
                  (In Local Currency)                                  (2,605,367,000)        (2,111,810,000)        (3,171,846,000)
                                                  __________________________________________________

Page 646

NO. 130.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS
III.I.  - DETAILS are as follows:-
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
04     Economic Affairs:
045    Construction and Transport:
0453   Water Transport:
045301 PORT AND SHIPPPING  :
KA7083 MODIFICATION OF AUCTION HALL KORANGI FISHERIES HARBOUR KARACHI
045301- A12     Civil works                                         94,500,000                                   5,743,000
045301- A124    Building and Structures                             94,500,000                                   5,743,000
        Total- MODIFICATION OF AUCTION HALL              94,500,000                               5,743,000
           KORANGI FISHERIES HARBOUR
           KARACHI
                   (In Foreign Exchange)                                                                         (5,743,000)
               (Foreign Aid)                                                                                  (5,743,000)
                   (In Local Currency)                                (94,500,000)
                                                  __________________________________________________
KA7084 ESTABLISHMENT OF COLD STORAGE AND FREEZING TUNNELS AT KORANGI FISHERIES HARBOUR
KARACHI
045301- A12     Civil works                                        170,100,000                                 41,928,000
045301- A124    Building and Structures                            170,100,000                                 41,928,000
        Total- ESTABLISHMENT OF COLD STORAGE          170,100,000                             41,928,000
          AND FREEZING TUNNELS AT KORANGI
            FISHERIES HARBOUR KARACHI
                   (In Foreign Exchange)                                                                      (41,928,000)
               (Foreign Aid)                                                                               (41,928,000)
                   (In Local Currency)                              (170,100,000)
                                                  __________________________________________________
KA7085 ESTABLISHMENT OF BUSINESS PARK AT KORANGI FISHERIES HARBOUR KARACHI
045301- A12     Civil works                                        281,050,000                                245,861,000
045301- A124    Building and Structures                            281,050,000                                245,861,000
        Total- ESTABLISHMENT OF BUSINESS PARK         281,050,000                            245,861,000
           AT KORANGI FISHERIES HARBOUR
           KARACHI
                   (In Foreign Exchange)                                                                    (245,861,000)
               (Foreign Aid)                                                                             (245,861,000)
                   (In Local Currency)                              (281,050,000)
                                                  __________________________________________________
     045301   Total- PORT AND SHIPPPING                  545,650,000                            293,532,000

Page 647

NO. 130.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

     0453     Total-  Water Transport                         545,650,000                            293,532,000
     045      Total-  Construction and Transport               545,650,000                            293,532,000
     04        Total-  Economic Affairs                        545,650,000                            293,532,000
               Total- ACCOUNTANT GENERAL                  545,650,000                                293,532,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI
                       (In Foreign Exchange)                                                                        (293,532,000)
               (Own Resources)
                   (Foreign Aid)                                                                                  (293,532,000)
                       (In Local Currency)                               (545,650,000)

Page 648

NO. 130.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04     Economic Affairs:
045    Construction and Transport:
0453   Water Transport:
045301 PORT AND SHIPPPING  :
GR0118 ESTABLISHMENT OF PORT CONTROL TOWER GWADAR
045301- A02     Project Pre-Investment Analysis                                       148,000,000          157,240,000
045301- A021    Feasibility Studies                                                      148,000,000          157,240,000
045301- A12     Civil works                                        192,168,000          119,144,000            34,554,000
045301- A124    Building and Structures                            192,168,000          119,144,000            34,554,000
        Total- ESTABLISHMENT OF PORT CONTROL          192,168,000        267,144,000        191,794,000
          TOWER GWADAR
GR0119 REHABILITATION OF LEADING LIGHT TOWERS GWADAR
045301- A13    Repairs and Maintenance                          20,590,000
045301- A133    Buildings and Structure                             20,590,000
        Total- REHABILITATION OF LEADING LIGHT           20,590,000
          TOWERS GWADAR
GR0120 STUDIES ON MAKING THE GWADAR PORT MORE COMPETIVE GWADAR
045301- A02     Project Pre-Investment Analysis                  295,000,000          148,124,000          147,000,000
045301- A021    Feasibility Studies                                 295,000,000          148,124,000          147,000,000
        Total- STUDIES ON MAKING THE GWADAR           295,000,000        148,124,000        147,000,000
          PORT MORE COMPETIVE GWADAR
GR9010 FEASIBILITY STUDY OF CAPITAL DREDGING OF BERTHING AREAS & CHANNEL FOR ADDITIONAL
TERMINALS
045301- A02     Project Pre-Investment Analysis                  148,000,000
045301- A021    Feasibility Studies                                 148,000,000
        Total- FEASIBILITY STUDY OF CAPITAL              148,000,000
           DREDGING OF BERTHING AREAS &
          CHANNEL FOR ADDITIONAL
           TERMINALS
GR9014 UPGRADATION OF BERTHING FACILITIES FOR BOATS AT GWADAR MINI PORT
045301- A13    Repairs and Maintenance                          31,975,000
045301- A133    Buildings and Structure                             31,975,000
        Total- UPGRADATION OF BERTHING                   31,975,000
             FACILITIES FOR BOATS AT GWADAR
             MINI PORT

Page 649

NO. 130.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

GR9015 ACQUISITION OF MARINE SERVICES VESSEL FOR GWADAR PORT
045301- A09    Physical Assets                                   159,650,000
045301- A096   Purchase of Plant and Machinery                  159,650,000
        Total- ACQUISITION OF MARINE SERVICES           159,650,000
           VESSEL FOR GWADAR PORT
GR9018 CONSTRUCTION OF GROYNE WALL/BREAK WATER & ALLIED WORKS AT EAST BAY (DEMI ZER)
GWADAR
045301- A12     Civil works                                        632,605,000          485,378,000          306,607,000
045301- A125   Other Works                                      632,605,000          485,378,000          306,607,000
        Total- CONSTRUCTION OF GROYNE                  632,605,000        485,378,000        306,607,000
           WALL/BREAK WATER & ALLIED
         WORKS AT EAST BAY (DEMI ZER)
         GWADAR
     045301   Total- PORT AND SHIPPPING                 1,479,988,000        900,646,000        645,401,000
     0453     Total-  Water Transport                        1,479,988,000        900,646,000        645,401,000
     045      Total-  Construction and Transport              1,479,988,000        900,646,000        645,401,000
046    Communications:
0461   Communications:
046101 ADMINISTRATION  :
GR0117 ESTABLISHMENT OF OFF DOCK TERMINAL (GPA) GWADAR
046101- A09    Physical Assets                                   287,540,000
046101- A091   Purchase of Building                               287,540,000
        Total- ESTABLISHMENT OF OFF DOCK               287,540,000
           TERMINAL (GPA) GWADAR
GR0210 SEWERAGE TREATMENT PLANT FOR GPA HOUSING COMPLEX GWADAR
046101- A12     Civil works                                                                                     51,895,000
046101- A127   Drought Emergency Relief Assistance                                                          51,895,000
        Total- SEWERAGE TREATMENT PLANT FOR                                                  51,895,000
          GPA HOUSING COMPLEX GWADAR
GR0211 PERIMETRIC SECURITY SYSTEM FOR GWADAR PORT
046101- A09    Physical Assets                                                                             252,350,000
046101- A096   Purchase of Plant and Machinery                                                             252,350,000
        Total- PERIMETRIC SECURITY SYSTEM FOR                                                 252,350,000
         GWADAR PORT

Page 650

NO. 130.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

GR0212 MAINTENANCE DREDGING OF GWADAR PORT
046101- A03    Operating Expenses                                                                         1,000,000,000
046101- A039   General                                                                                       1,000,000,000
        Total- MAINTENANCE DREDGING OF                                                        1,000,000,000
         GWADAR PORT
GR0213 PROVISION OF 2000 ENGINES TO POOR FISHERMAN GWADAR
046101- A03    Operating Expenses                                                                         500,000,000
046101- A039   General                                                                                      500,000,000
        Total- PROVISION OF 2000 ENGINES TO POOR                                               500,000,000
           FISHERMAN GWADAR
GR0214 INSTALLATION OF FLOATING JETTY AT GWADAR FISH HARBOUR
046101- A09    Physical Assets                                                                             265,740,000
046101- A091   Purchase of Building                                                                         265,740,000
        Total- INSTALLATION OF FLOATING JETTY AT                                               265,740,000
         GWADAR FISH HARBOUR
GR2015 CONSTRUCTION OF EAST BAY EXPRESSWAY TO LINK GWADAR PORT WITH NATIONAL ROAD
NETWORK GWADAR.
046101- A12     Civil works                                       2,100,544,000         1,159,390,000          278,000,000
046101- A121   Roads Highways and Bridges                     2,100,544,000         1,159,390,000          278,000,000
        Total- CONSTRUCTION OF EAST BAY               2,100,544,000       1,159,390,000        278,000,000
          EXPRESSWAY TO LINK GWADAR PORT
           WITH NATIONAL ROAD NETWORK
          GWADAR.
                  (In Foreign Exchange)                          (1,856,544,000)
               (Foreign Aid)                                   (1,856,544,000)
                  (In Local Currency)                              (244,000,000)      (1,159,390,000)       (278,000,000)
                                                  __________________________________________________
GR2020 PAK-CHINA TECHNICAL & VOCATIONAL INSTITUTE AT GWADAR
046101- A09    Physical Assets                                                                               41,000,000
046101- A095   Purchase of Transport                                                                          41,000,000
046101- A12     Civil works                                         38,509,000            38,508,000            30,728,000
046101- A124    Building and Structures                             38,509,000            38,508,000            30,728,000
        Total- PAK-CHINA TECHNICAL &                      38,509,000         38,508,000          71,728,000
           VOCATIONAL INSTITUTE AT GWADAR

Page 651

NO. 130.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

GR2021 ESTABLISHMENT OF CPEC SUPPORT UNIT(CSU) FOR PROJECTS AND ACTIVITES IN GPA
046101- A01    Employees Related Expenses                       2,000,000             2,000,000             3,032,000
046101- A011   Pay                      10     10            2,000,000             2,000,000             3,032,000
046101- A011-1 Pay of Officers                           (3)            (400,000)            (400,000)            (432,000)
046101- A011-2 Pay of Other Staff            (10)      (7)          (1,600,000)          (1,600,000)          (2,600,000)
046101- A03    Operating Expenses                                 7,000,000             4,586,000             7,000,000
046101- A036   Motor Vehicles                                       2,200,000             2,200,000             2,500,000
046101- A038    Travel & Transportation                               1,800,000             1,086,000             2,500,000
046101- A039   General                                              3,000,000             1,300,000             2,000,000
046101- A09    Physical Assets                                       81,000               81,000            12,200,000
046101- A092   Computer Equipment                                   80,000               80,000              200,000
046101- A095   Purchase of Transport                                   1,000                 1,000            12,000,000
046101- A13    Repairs and Maintenance                            599,000              599,000              500,000
046101- A130    Transport                                            599,000              599,000              500,000
        Total- ESTABLISHMENT OF CPEC SUPPORT            9,680,000           7,266,000          22,732,000
            UNIT(CSU) FOR PROJECTS AND
            ACTIVITES IN GPA
GR3000 1.2 MGD REVERSE OSMOSIS DESALINATION PLANT GAWADAR
046101- A12     Civil works                                                                 6,000,000            84,000,000
046101- A127   Drought Emergency Relief Assistance                                      6,000,000            84,000,000
        Total-  1.2 MGD REVERSE OSMOSIS                                         6,000,000          84,000,000
           DESALINATION PLANT GAWADAR
     046101   Total-  ADMINISTRATION                     2,436,273,000       1,211,164,000       2,526,445,000
     0461     Total-  Communications                        2,436,273,000       1,211,164,000       2,526,445,000
     046      Total-  Communications                        2,436,273,000       1,211,164,000       2,526,445,000
     04        Total-  Economic Affairs                       3,916,261,000       2,111,810,000       3,171,846,000
               Total- ACCOUNTANT GENERAL                 3,916,261,000         2,111,810,000         3,171,846,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
                       (In Foreign Exchange)                          (1,856,544,000)
               (Own Resources)
                   (Foreign Aid)                                    (1,856,544,000)
                       (In Local Currency)                             (2,059,717,000)        (2,111,810,000)        (3,171,846,000)
          TOTAL - DEMAND                             4,461,911,000       2,111,810,000       3,465,378,000
                  (In Foreign Exchange)                          (1,856,544,000)                            (293,532,000)
            (Own Resources)
               (Foreign Aid)                                   (1,856,544,000)                            (293,532,000)
                  (In Local Currency)                             (2,605,367,000)      (2,111,810,000)      (3,171,846,000)
                                                  __________________________________________________

Page 652

No text layer on this page, see the official PDF.

Page 653

                                   SECTION VII

                                MINISTRY OF RAILWAYS

                                                            **********

                                                                                  2022-2023
                                                                             Budget
                                                                                    Estimate

                                                                      (Rupees in Thousand)

Demand presented on behalf of the
Ministry of Railways

Development Expenditure on Capital Account.
             131.  Capital Outlay on Pakistan Railways                                     32,648,036

                                                                          Total :             32,648,036

Page 654

No text layer on this page, see the official PDF.

Page 655

NO. 131.- CAPITAL OUTLAY ON RAILWAYS DIVISION                         DEMANDS FOR GRANTS
                                DEMAND NO. 131
                                                                            ( FC12C33 )
                            CAPITAL OUTLAY ON RAILWAYS DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2023 for CAPITAL OUTLAY ON
RAILWAYS DIVISION.

                                Voted           Rs. 32,648,036,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF RAILWAYS  .

                                                           2021-2022         2021-2022         2022-2023
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                 26,908,506,000        13,961,440,000        31,684,056,000
045    Construction and Transport                                 3,117,084,000          525,000,000          963,980,000
               Total                                              30,025,590,000        14,486,440,000        32,648,036,000
     OBJECT CLASSIFICATION
A03   Operating Expenses                                 3,117,084,000         30,000,000        507,500,000
A11   Investments                                        26,908,506,000      14,456,440,000      32,140,536,000
               Total                                        30,025,590,000      14,486,440,000      32,648,036,000
                  (In Foreign Exchange)                             (15,707,084,000)        (6,456,266,000)       (20,187,500,000)
            (Own Resources)                                  (12,590,000,000)        (6,426,266,000)       (19,980,000,000)
               (Foreign Aid)                                        (3,117,084,000)           (30,000,000)         (207,500,000)
                  (In Local Currency)                                (14,318,506,000)        (8,030,174,000)       (12,460,536,000)
                                                  __________________________________________________

Page 656

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2021-2022         2021-2022       2022-2023
                                       2021-22 2022-23       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
014    Transfers:
0143   Investments:
014302 Non-Financial Institutions  :
IB3615 RECONSTRUCTION/REHABILITATION OF ASSETS DAMAGED DURING THE FLOOD 2010
014302- A11    Investments                                       100,000,000
014302- A111   Investment Local                                  100,000,000
        Total- RECONSTRUCTION/REHABILITATION          100,000,000
          OF ASSETS DAMAGED DURING THE
          FLOOD 2010
IB3619 IMPROVEMENT OF TERMINAL FACILITIES AND ENHANCING SECURITY ARRANGEMENT IN MARSHILING
YAD PIPRI KARACHI
014302- A11    Investments                                       200,000,000
014302- A111   Investment Local                                  200,000,000
        Total- IMPROVEMENT OF TERMINAL                 200,000,000
             FACILITIES AND ENHANCING
           SECURITY ARRANGEMENT IN
           MARSHILING YAD PIPRI KARACHI
IB3620 EASTABLISHMENT OF COAL TERMINALS ON PAKISTAN RAILWAYS PHASE
014302- A11    Investments                                       200,000,000
014302- A111   Investment Local                                  200,000,000
        Total- EASTABLISHMENT OF COAL                  200,000,000
           TERMINALS ON PAKISTAN RAILWAYS
          PHASE
     014302   Total-  Non-Financial Institutions                 500,000,000
     0143     Total-  Investments                             500,000,000
     014      Total-  Transfers                               500,000,000
     01        Total-  General Public Service                   500,000,000
04     Economic Affairs:
045    Construction and Transport:
0454   Railway Trasport:
045401 Railway Trasport  :
IB3652 RENOVATION AND CONSTRUCTION OF OFFICES WOMENS BARRACKS AND MULTI PURPOSE TRAINING
ROOMS AT OFFICE OF THE

Page 657

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045401- A03    Operating Expenses                              127,610,000            30,000,000          107,500,000
045401- A039   General                                           127,610,000            30,000,000          107,500,000
        Total- RENOVATION AND CONSTRUCTION OF        127,610,000         30,000,000        107,500,000
           OFFICES WOMENS BARRACKS AND
            MULTI PURPOSE TRAINING ROOMS AT
            OFFICE OF THE
                  (In Foreign Exchange)                           (127,610,000)         (30,000,000)       (107,500,000)
               (Foreign Aid)                                    (127,610,000)         (30,000,000)       (107,500,000)
                                                  __________________________________________________
     045401   Total-  Railway Trasport                        127,610,000         30,000,000        107,500,000
     0454     Total-  Railway Trasport                        127,610,000         30,000,000        107,500,000
     045      Total-  Construction and Transport               127,610,000         30,000,000        107,500,000
     04        Total-  Economic Affairs                        127,610,000         30,000,000        107,500,000
               Total- ACCOUNTANT GENERAL                  627,610,000            30,000,000          107,500,000
                PAKISTAN REVENUES
                       (In Foreign Exchange)                           (127,610,000)           (30,000,000)         (107,500,000)
               (Own Resources)
                   (Foreign Aid)                                     (127,610,000)           (30,000,000)         (107,500,000)
                       (In Local Currency)                               (500,000,000)

Page 658

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01     General Public Service:
014    Transfers:
0143   Investments:
014302 Non-Financial Institutions  :
KA1363 INSTALLATION AND COMMISSIONING OF SOLAR SYSTEM AT 155 NOS RAILWAY STATIONS
014302- A11    Investments                                       210,296,000            10,000,000          300,000,000
014302- A111   Investment Local                                  210,296,000            10,000,000          300,000,000
        Total- INSTALLATION AND COMMISSIONING          210,296,000         10,000,000        300,000,000
          OF SOLAR SYSTEM AT 155 NOS
           RAILWAY STATIONS
KA1364 INDIGENOUS DEVELOPMENT OF WIRELESS BASED BLOCK INSTRUMENT INTERLOCKING SYSTEM AND
014302- A11    Investments                                       100,000,000            10,000,000          100,000,000
014302- A111   Investment Local                                  100,000,000            10,000,000          100,000,000
        Total- INDIGENOUS DEVELOPMENT OF               100,000,000         10,000,000        100,000,000
           WIRELESS BASED BLOCK
           INSTRUMENT INTERLOCKING SYSTEM
          AND
KA1365 PROCUREMENT OF 600 FLAT CONTAINER BOGIE WAGONS (ZBFC)
014302- A11    Investments                                       100,000,000
014302- A111   Investment Local                                  100,000,000
        Total- PROCUREMENT OF 600 FLAT                  100,000,000
           CONTAINER BOGIE WAGONS (ZBFC)
KA1366 REHABILITATION OF 300 KVA DG SETS
014302- A11    Investments                                       100,000,000            50,000,000          268,000,000
014302- A111   Investment Local                                  100,000,000            50,000,000          268,000,000
        Total- REHABILITATION OF 300 KVA DG SETS        100,000,000         50,000,000        268,000,000

KA1367 CONSTRUCTION OF NEW TRACK & UP-GRADATION / REHABILITATION OF TRACK FROM CHAMAN YARD
(INCLUDING)
014302- A11    Investments                                       367,610,000            10,000,000          200,000,000
014302- A111   Investment Local                                  367,610,000            10,000,000          200,000,000
        Total- CONSTRUCTION OF NEW TRACK &            367,610,000         10,000,000        200,000,000
           UP-GRADATION / REHABILITATION OF
          TRACK FROM CHAMAN YARD
             (INCLUDING)

Page 659

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA3500 IMPLEMENTATION OF PAKISTAN RAILAWAYS PLANNING PORTAL (PRPP) & HUMAN RESOURCE
MANAGENT INFORMATION
014302- A11    Investments                                        25,950,000            12,500,000            12,500,000
014302- A111   Investment Local                                    25,950,000            12,500,000            12,500,000
        Total- IMPLEMENTATION OF PAKISTAN                25,950,000         12,500,000          12,500,000
           RAILAWAYS PLANNING PORTAL
             (PRPP) & HUMAN RESOURCE
          MANAGENT INFORMATION
KA7109 CHINA-PAKISTAN ECONOMIC CORRIDOR SUPPORT PROJECT (CPECSP) AT MINISTRY OF RAILWAYS
014302- A11    Investments                                       200,000,000            40,000,000            50,000,000
014302- A111   Investment Local                                  200,000,000            40,000,000            50,000,000
        Total- CHINA-PAKISTAN ECONOMIC                  200,000,000         40,000,000          50,000,000
          CORRIDOR SUPPORT PROJECT
            (CPECSP) AT MINISTRY OF RAILWAYS
                  (In Foreign Exchange)                             (40,000,000)
            (Own Resources)                                 (40,000,000)
                  (In Local Currency)                              (160,000,000)         (40,000,000)         (50,000,000)
                                                  __________________________________________________
KA7110 CONSTRUCTION OF STAFF QUARTERS (REVISED)
014302- A11    Investments                                        80,000,000            18,000,000            50,000,000
014302- A111   Investment Local                                    80,000,000            18,000,000            50,000,000
        Total- CONSTRUCTION OF STAFF QUARTERS          80,000,000         18,000,000          50,000,000
             (REVISED)
KA7111 PRELIMINARY DESIGN / DRAWINGS FOR UPGRADATION/REHABILITATION OF MAIN LINE (ML-1) AND
ESTABLISHMENT OF
014302- A11    Investments                                       500,000,000          500,000,000          500,000,000
014302- A111   Investment Local                                  500,000,000          500,000,000          500,000,000
        Total- PRELIMINARY DESIGN / DRAWINGS            500,000,000        500,000,000        500,000,000
          FOR UPGRADATION/REHABILITATION
          OF MAIN LINE (ML-1) AND
           ESTABLISHMENT OF
KA7112 PROCUREMENT OF 75 NOS(55 NOS 4000-4500HP & 20 NOS 2000-2500 HP) DIESEL ELECTRIC
LOCOMOTIVES (DELS)
014302- A11    Investments                                       200,000,000

Page 660

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

014302- A111   Investment Local                                  200,000,000
        Total- PROCUREMENT OF 75 NOS(55 NOS            200,000,000
             4000-4500HP & 20 NOS 2000-2500 HP)
            DIESEL ELECTRIC LOCOMOTIVES
             (DELS)
                  (In Foreign Exchange)                           (100,000,000)
            (Own Resources)                                (100,000,000)
                  (In Local Currency)                              (100,000,000)
                                                  __________________________________________________
KA7113 PROCUREMENT OF EQUIPMENT FOR IMPROVED SECURITY AND ANTI-TERRORSIM MEASURES
014302- A11    Investments                                       141,168,000             1,000,000          139,168,000
014302- A111   Investment Local                                  141,168,000             1,000,000          139,168,000
        Total- PROCUREMENT OF EQUIPMENT FOR          141,168,000           1,000,000        139,168,000
           IMPROVED SECURITY AND
           ANTI-TERRORSIM MEASURES
KA7114 PROCURMENT/MANUFACTURE OF 820 HIGH CAPACITY BOGIE FREIGHT WAGONS AND 230 PASSENGER
COACHES
014302- A11    Investments                                      8,500,000,000         5,110,580,000        15,974,500,000
014302- A111   Investment Local                                 8,500,000,000         5,110,580,000        15,974,500,000
        Total- PROCURMENT/MANUFACTURE OF 820       8,500,000,000       5,110,580,000      15,974,500,000
           HIGH CAPACITY BOGIE FREIGHT
         WAGONS AND 230 PASSENGER
          COACHES
                  (In Foreign Exchange)                          (7,000,000,000)      (4,798,354,000)     (15,500,000,000)
            (Own Resources)                               (7,000,000,000)      (4,798,354,000)     (15,500,000,000)
                  (In Local Currency)                             (1,500,000,000)       (312,226,000)       (474,500,000)
                                                  __________________________________________________
KA7115 PROJECT MANAGEMENT UNIT (PMU) IN MINISTRY OF RAILWAYS (2ND REVISED)
014302- A11    Investments                                       281,814,000            15,000,000          250,000,000
014302- A111   Investment Local                                  281,814,000            15,000,000          250,000,000
        Total- PROJECT MANAGEMENT UNIT (PMU) IN        281,814,000         15,000,000        250,000,000
            MINISTRY OF RAILWAYS (2ND
            REVISED)
KA7118 REHABILITATION OF RAILWAY ASSETS DAMAGED AT SINDH DURING RIOTS OF 27-28 DECEMBER 2007
FOLLOWED BY
014302- A11    Investments                                       100,000,000

Page 661

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

014302- A111   Investment Local                                  100,000,000
        Total- REHABILITATION OF RAILWAY ASSETS        100,000,000
          DAMAGED AT SINDH DURING RIOTS OF
              27-28 DECEMBER 2007 FOLLOWED BY
                  (In Foreign Exchange)                             (90,000,000)
            (Own Resources)                                 (90,000,000)
                  (In Local Currency)                                (10,000,000)
                                                  __________________________________________________
KA7120 REPLACEMENT OF OLD AND OBSOLETE SIGNAL GEAR FROM LODHRAN -MULTAN-KHANEWAL
-SHAHDARA BAGH MAINLINE SECTION OF
014302- A11    Investments                                       900,000,000          771,360,000         1,000,000,000
014302- A111   Investment Local                                  900,000,000          771,360,000         1,000,000,000
        Total- REPLACEMENT OF OLD AND                  900,000,000        771,360,000       1,000,000,000
          OBSOLETE SIGNAL GEAR FROM
          LODHRAN -MULTAN-KHANEWAL
           -SHAHDARA BAGH MAINLINE SECTION
          OF
                  (In Foreign Exchange)                           (800,000,000)                            (800,000,000)
            (Own Resources)                                (800,000,000)                            (800,000,000)
                  (In Local Currency)                              (100,000,000)       (771,360,000)       (200,000,000)
                                                  __________________________________________________
KA7121 STRENGTHENING OF PLANNING DEVELOPMENT MONITORING AND EVALUATION (PD&ME)
DIRECTORATE MINISTRY OF MINISTRY
014302- A11    Investments                                       100,000,000
014302- A111   Investment Local                                  100,000,000
        Total- STRENGTHENING OF PLANNING               100,000,000
          DEVELOPMENT MONITORING AND
           EVALUATION (PD&ME) DIRECTORATE
            MINISTRY OF MINISTRY
KA7124 UP-GRADATION OF TERMINAL FACILITIES AND DRYPORTS (REVISED)
014302- A11    Investments                                          2,024,000
014302- A111   Investment Local                                     2,024,000
        Total- UP-GRADATION OF TERMINAL                   2,024,000
             FACILITIES AND DRYPORTS (REVISED)

Page 662

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA7129 SPECIAL REPAIR OF 100 NOS DE LOCOMOTIVES FOR IMPROVING THE REABILITY/AVAILABILITY OF
RUNNING
014302- A11    Investments                                      2,000,000,000         1,510,000,000         2,300,000,000
014302- A111   Investment Local                                 2,000,000,000         1,510,000,000         2,300,000,000
        Total- SPECIAL REPAIR OF 100 NOS DE             2,000,000,000       1,510,000,000       2,300,000,000
           LOCOMOTIVES FOR IMPROVING THE
             REABILITY/AVAILABILITY OF RUNNING
                   (In Foreign Exchange)                          (1,500,000,000)      (1,433,937,000)      (1,800,000,000)
            (Own Resources)                               (1,500,000,000)      (1,433,937,000)      (1,800,000,000)
                   (In Local Currency)                              (500,000,000)         (76,063,000)       (500,000,000)
                                                  __________________________________________________
KA7130 SPECIAL REPAIR OF 600 PASSENGER COACHES AND 1200 BOGIE WAGONS
014302- A11    Investments                                      1,000,000,000         1,245,000,000          980,000,000
014302- A111   Investment Local                                 1,000,000,000         1,245,000,000          980,000,000
        Total- SPECIAL REPAIR OF 600 PASSENGER        1,000,000,000       1,245,000,000        980,000,000
          COACHES AND 1200 BOGIE WAGONS
                   (In Foreign Exchange)                           (700,000,000)       (155,588,000)       (880,000,000)
            (Own Resources)                                (700,000,000)       (155,588,000)       (880,000,000)
                   (In Local Currency)                              (300,000,000)      (1,089,412,000)       (100,000,000)
                                                  __________________________________________________
KA7132 PC-II FOR COMMERCIAL AND FINANCIAL FEASIBILITY STUDY FOR THE SUB-PROJECT UNDER ML-I
PROJECT
014302- A11    Investments                                        16,000,000                                   5,000,000
014302- A111   Investment Local                                    16,000,000                                   5,000,000
        Total-  PC-II FOR COMMERCIAL AND                   16,000,000                               5,000,000
            FINANCIAL FEASIBILITY STUDY FOR
           THE SUB-PROJECT UNDER ML-I
           PROJECT
KA7133 UP-GRADATION OF PAKISTAN RAILWAYS EXISTING MAINLINE-1 (ML-I) AND ESTABLISHMENT OF
DRYPORT NEAR
014302- A11    Investments                                      3,010,526,000                               5,000,000,000
014302- A111   Investment Local                                 3,010,526,000                               5,000,000,000
        Total- UP-GRADATION OF PAKISTAN                3,010,526,000                           5,000,000,000
           RAILWAYS EXISTING MAINLINE-1 (ML-I)
          AND ESTABLISHMENT OF DRYPORT
          NEAR
                   (In Foreign Exchange)                          (1,500,000,000)                            (100,000,000)
            (Own Resources)                               (1,500,000,000)
               (Foreign Aid)                                                                             (100,000,000)
                  (In Local Currency)                             (1,510,526,000)                          (4,900,000,000)
                                                  __________________________________________________

Page 663

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA7134 OPERATIONALIZATION OF TRAIN ON EXISTING KCR ALLIGNMENT
014302- A11    Investments                                       350,000,000            57,000,000          350,000,000
014302- A111   Investment Local                                  350,000,000            57,000,000          350,000,000
        Total- OPERATIONALIZATION OF TRAIN ON          350,000,000         57,000,000        350,000,000
            EXISTING KCR ALLIGNMENT
                  (In Foreign Exchange)                                                                    (250,000,000)
            (Own Resources)                                                                         (250,000,000)
                  (In Local Currency)                              (350,000,000)         (57,000,000)       (100,000,000)
                                                  __________________________________________________
KA7135 PROVISION OF TRAIN APPROACHING WARNING SYSTEM FOR LEVEL CROSSING AND INHOUSE
DEVELOPMENT OF LED BASED
014302- A11    Investments                                        66,976,000            41,000,000            24,888,000
014302- A111   Investment Local                                    66,976,000            41,000,000            24,888,000
        Total- PROVISION OF TRAIN APPROACHING           66,976,000         41,000,000          24,888,000
          WARNING SYSTEM FOR LEVEL
           CROSSING AND INHOUSE
          DEVELOPMENT OF LED BASED
KA7136 UMBRELLA PCII FOR FEASIBITY STUDIES AND TRANSACTION ADVISORY SERVICES
014302- A11    Investments                                       500,000,000          128,000,000          100,000,000
014302- A111   Investment Local                                  500,000,000          128,000,000          100,000,000
        Total- UMBRELLA PCII FOR FEASIBITY               500,000,000        128,000,000        100,000,000
           STUDIES AND TRANSACTION
           ADVISORY SERVICES
KA7137 ESTABLISHMENT OF BUSINESS DEVELOPMENT AND HR SUPPORT UNIT AT PAKISTAN RAILWAYS
014302- A11    Investments                                       237,000,000            10,000,000            50,000,000
014302- A111   Investment Local                                  237,000,000            10,000,000            50,000,000
        Total- ESTABLISHMENT OF BUSINESS               237,000,000         10,000,000          50,000,000
          DEVELOPMENT AND HR SUPPORT UNIT
           AT PAKISTAN RAILWAYS
KA7138 COLLABORATION OF PAKISTAN RAILWAYS WITH DIFFERENT ACADEMIC INSTITUTES (TRIPLE HELIX
MODEL)
014302- A11    Investments                                       100,000,000            48,000,000            50,000,000
014302- A111   Investment Local                                  100,000,000            48,000,000            50,000,000

Page 664

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

        Total- COLLABORATION OF PAKISTAN               100,000,000         48,000,000          50,000,000
           RAILWAYS WITH DIFFERENT
           ACADEMIC INSTITUTES (TRIPLE HELIX
           MODEL)
KA7139 PROCUREMENT AND INSTALLATION OF MACHINERY AT SIGNAL WORKSHOP
014302- A11    Investments                                       308,142,000            29,000,000          280,000,000
014302- A111   Investment Local                                  308,142,000            29,000,000          280,000,000
        Total- PROCUREMENT AND INSTALLATION           308,142,000         29,000,000        280,000,000
          OF MACHINERY AT SIGNAL
         WORKSHOP
KA7141 REHABILITATION OF KPT AND RAIL CONNECTIVITY (PHASE-1)
014302- A11    Investments                                       500,000,000          378,000,000          500,000,000
014302- A111   Investment Local                                  500,000,000          378,000,000          500,000,000
        Total- REHABILITATION OF KPT AND RAIL            500,000,000        378,000,000        500,000,000
           CONNECTIVITY (PHASE-1)
KA7142 REHABILITATION OF TRACK BETWEEN REHMANI NAGAR - BAKRANI ROAD ON DADU-HABIB KOT
SECTION (SUKKUR DIVISION PH-4)
014302- A11    Investments                                      1,250,000,000            10,000,000          300,000,000
014302- A111   Investment Local                                 1,250,000,000            10,000,000          300,000,000
        Total- REHABILITATION OF TRACK BETWEEN       1,250,000,000         10,000,000        300,000,000
           REHMANI NAGAR - BAKRANI ROAD ON
           DADU-HABIB KOT SECTION (SUKKUR
             DIVISION PH-4)
KA7143 REHABILITATION OF TRACK BETWEEN BARULI-SOHAN BRIDGE ON KUNDIAN - ATTOCK CITY SECTION
(PESHAWAR
014302- A11    Investments                                      1,100,000,000            15,000,000          300,000,000
014302- A111   Investment Local                                 1,100,000,000            15,000,000          300,000,000
        Total- REHABILITATION OF TRACK BETWEEN       1,100,000,000         15,000,000        300,000,000
           BARULI-SOHAN BRIDGE ON KUNDIAN -
          ATTOCK CITY SECTION (PESHAWAR
KA7144 REVIVAL OF KARACHI CIRCULAR RAILWAYS (KCR) - PHASE2
014302- A11    Investments                                      1,000,000,000
014302- A111   Investment Local                                 1,000,000,000
        Total- REVIVAL OF KARACHI CIRCULAR            1,000,000,000
           RAILWAYS (KCR) - PHASE2

Page 665

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA7145 RECOMMISSIONING OF 5 ACCIDENTAL LOCOMOTIVES
014302- A11    Investments                                       961,000,000            42,000,000          250,000,000
014302- A111   Investment Local                                  961,000,000            42,000,000          250,000,000
        Total- RECOMMISSIONING OF 5 ACCIDENTAL         961,000,000         42,000,000        250,000,000
           LOCOMOTIVES
                  (In Foreign Exchange)                           (860,000,000)                            (200,000,000)
            (Own Resources)                                (860,000,000)                            (200,000,000)
                  (In Local Currency)                              (101,000,000)         (42,000,000)         (50,000,000)
                                                  __________________________________________________
KA7146 IMPROVEMENT OF TERMINAL FACILITIES (MUGHALPURA AND QILA SATTAR SHAH) ON PAKISTAN
RAILWAYS
014302- A11    Investments                                       100,000,000
014302- A111   Investment Local                                  100,000,000
        Total- IMPROVEMENT OF TERMINAL                 100,000,000
             FACILITIES (MUGHALPURA AND QILA
          SATTAR SHAH) ON PAKISTAN
           RAILWAYS
KA7148 REHABILITATION OF TRACK BETWEEN SAMA SATTA AND BAHAWALNAGAR ON SAMA SATTA AMRUKA
SECTION
014302- A11    Investments                                      2,000,000,000          130,000,000          500,000,000
014302- A111   Investment Local                                 2,000,000,000          130,000,000          500,000,000
        Total- REHABILITATION OF TRACK BETWEEN       2,000,000,000        130,000,000        500,000,000
          SAMA SATTA AND BAHAWALNAGAR
         ON SAMA SATTA AMRUKA SECTION
KA8500 CONSTRUCTION OF INFRASTRUCTURE (FLY OVER / UNDERPASS STRUCTURES)FOR ELIMATION OF
LEVEL CROSS ING FROM
014302- A11    Investments                                                            3,370,000,000            50,000,000
014302- A111   Investment Local                                                       3,370,000,000            50,000,000
        Total- CONSTRUCTION OF INFRASTRUCTURE                          3,370,000,000          50,000,000
             (FLY OVER / UNDERPASS
           STRUCTURES)FOR ELIMATION OF
           LEVEL CROSS ING FROM
KA9608 REHABILITATION AND IMPROVEMENT OF KOTRI JAMSHORO RAIL LINK / PC-I OF REHABILITATION OF
TRACK BETWEEN
014302- A03    Operating Expenses                                                                         200,000,000
014302- A039   General                                                                                      200,000,000

Page 666

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

        Total- REHABILITATION AND IMPROVEMENT                                                200,000,000
          OF KOTRI JAMSHORO RAIL LINK / PC-I
          OF REHABILITATION OF TRACK
          BETWEEN
KA9609 CONVERSION OF BREAKING SYSTEM OF 328 NOS OF MBFRS FROM VACCUM BRAKE TO AIR BRAKE
014302- A03    Operating Expenses                                                                         200,000,000
014302- A039   General                                                                                      200,000,000
        Total- CONVERSION OF BREAKING SYSTEM                                                200,000,000
          OF 328 NOS OF MBFRS FROM VACCUM
          BRAKE TO AIR BRAKE
KA9697 IMMEDIATE TRACK SAFETY WORK IN KARACHI AND SUKKUR
014302- A11    Investments                                                            400,000,000          800,000,000
014302- A111   Investment Local                                                        400,000,000          800,000,000
        Total- IMMEDIATE TRACK SAFETY WORK IN                             400,000,000        800,000,000
           KARACHI AND SUKKUR
KA9906 REPALCEMENT OF TRACK MACHINE
014302- A11    Investments                                                                                 600,000,000
014302- A111   Investment Local                                                                             600,000,000
        Total- REPALCEMENT OF TRACK MACHINE                                                 600,000,000
                  (In Foreign Exchange)                                                                    (550,000,000)
            (Own Resources)                                                                         (550,000,000)
                  (In Local Currency)                                                                         (50,000,000)
                                                  __________________________________________________
     014302   Total-  Non-Financial Institutions               26,408,506,000      13,961,440,000      31,684,056,000
     0143     Total-  Investments                          26,408,506,000      13,961,440,000      31,684,056,000
     014      Total-  Transfers                             26,408,506,000      13,961,440,000      31,684,056,000
     01        Total-  General Public Service                 26,408,506,000      13,961,440,000      31,684,056,000
04     Economic Affairs:
045    Construction and Transport:
0454   Railway Trasport:
045401 Railway Trasport  :
KA1376 RECONSTRUCTION/REHABILITATION OF ASSETS DAMAGED DURING THE FLOOD 2010
045401- A11    Investments                                                            465,000,000            56,480,000
045401- A111   Investment Local                                                        465,000,000            56,480,000
        Total- RECONSTRUCTION/REHABILITATION                              465,000,000          56,480,000

Page 667

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

          OF ASSETS DAMAGED DURING THE
          FLOOD 2010
                  (In Foreign Exchange)                                                  (38,387,000)
            (Own Resources)                                                      (38,387,000)
                  (In Local Currency)                                                   (426,613,000)         (56,480,000)
                                                  __________________________________________________
KA1377 IMPROVEMENT OF TERMINAL FACILITIES AND ENHANCING SECURITY ARRANGEMENT IN MARSHILING
YAD PIPRI KARACHI
045401- A11    Investments                                                              30,000,000          800,000,000
045401- A111   Investment Local                                                         30,000,000          800,000,000
        Total- IMPROVEMENT OF TERMINAL                                      30,000,000        800,000,000
             FACILITIES AND ENHANCING
           SECURITY ARRANGEMENT IN
           MARSHILING YAD PIPRI KARACHI
     045401   Total-  Railway Trasport                                            495,000,000        856,480,000
     0454     Total-  Railway Trasport                                            495,000,000        856,480,000
     045      Total-  Construction and Transport                                   495,000,000        856,480,000
     04        Total-  Economic Affairs                                            495,000,000        856,480,000
               Total- ACCOUNTANT GENERAL                26,408,506,000        14,456,440,000        32,540,536,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI
                       (In Foreign Exchange)                         (12,590,000,000)        (6,426,266,000)       (20,080,000,000)
               (Own Resources)                              (12,590,000,000)        (6,426,266,000)       (19,980,000,000)
                   (Foreign Aid)                                                                                  (100,000,000)
                       (In Local Currency)                            (13,818,506,000)        (8,030,174,000)       (12,460,536,000)
                              COMMERCIAL DEPARTMENTS

Page 668

NO. 131.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2021-2022         2021-2022        2022-2023
                                       2021-22 2022-23       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                              COMMERCIAL DEPARTMENTS

04     Economic Affairs:
045    Construction and Transport:
0454   Railway Trasport:
045401 Railway Trasport  :
HQ1763 PAKISTAN RAILWAYS -(FOREIGN AID PORTION)
045401- A03    Operating Expenses                             2,989,474,000
045401- A039   General                                          2,989,474,000
        Total- PAKISTAN RAILWAYS -(FOREIGN AID         2,989,474,000
            PORTION)
                  (In Foreign Exchange)                          (2,989,474,000)
               (Foreign Aid)                                   (2,989,474,000)
                                                  __________________________________________________
     045401   Total-  Railway Trasport                       2,989,474,000
     0454     Total-  Railway Trasport                       2,989,474,000
     045      Total-  Construction and Transport              2,989,474,000
     04        Total-  Economic Affairs                       2,989,474,000
               Total- COMMERCIAL DEPARTMENTS           2,989,474,000
                       (In Foreign Exchange)                          (2,989,474,000)
               (Own Resources)
                   (Foreign Aid)                                    (2,989,474,000)
          TOTAL - DEMAND                           30,025,590,000      14,486,440,000      32,648,036,000
                  (In Foreign Exchange)                         (15,707,084,000)      (6,456,266,000)     (20,187,500,000)
            (Own Resources)                             (12,590,000,000)      (6,426,266,000)     (19,980,000,000)
               (Foreign Aid)                                   (3,117,084,000)         (30,000,000)       (207,500,000)
                  (In Local Currency)                            (14,318,506,000)      (8,030,174,000)     (12,460,536,000)
                                                  __________________________________________________